Loading...
HomeMy WebLinkAbout20180152 Ver 2_2018.4.10 Savaan Subdivision stream wetland Impacts_20180420MAP A OVERALL MAP 1" = 300' VILLAGE VIEW LANE WETLAND AND STREAM IMPACT MAPS SAVAAN SUBDIVISION 4/10/18 APPLICANT ASHTON WOODS HOMES 5711 SIX FORKS RD SUITE #300 RALEIGH, NC 27609 VICINITY MAP S N W E SITE EXISTING ENVIRONMENTAL LEGEND BUFFER JURISDICTIONAL STREAM JURISDICTIONAL WETLAND MOR R I S V I L L E C A R P E N T E R R O A D VILLAGE VIEW LANE(EXISTING)AIRP O R T B L V D (EXIS T I N G ) AIRPORT BLVD (EXISTING) AIRPO R T B L V D V I L L A G E V I EW L A N E AIRPORT BOULEVARD PERMITTED BY TOWN OF CARY (UNDER DIFFERENT COVER) No.Checked ByRevisionDesignerDrawn ByDateByScaleDateJob No.Sheet No.Engineers | Planners | Surveyors115 MacKenan Drive | Cary, NC 27511t: 919.469.3340 | license #: C-0832 | www.withersravenel.comWithersRavenel0215031411.6.17AS NOTEDCARYNCWRJDBSSLSAVAAN SUBDIVISIONMAP A STREAM AND WETLANDIMPACTSI 4.1MAP A 1" =50' WETLAND PERMANENT STREAM IMPACT LEGEND TEMPORARY STREAM PROPERTY LINE TEMPORARY DIVERSION DITCH WITH SIDE SLOPES EXISTING PIPE THROUGH POND DAM PROPOSED SEWER EXISTING SEWER EXISTING ENVIRONMENTAL LEGEND BUFFER JURISDICTIONAL STREAM JURISDICTIONAL WETLAND ROADWAY CROSS DRAINAGE PIPING CONSTRUCTION SEQUENCE 1.CONTRACTOR TO INSTALL ALL CROSS DRAINAGE PIPING DURING A PERIOD OF TWO DRY DAYS. 2.INSTALL TEMPORARY SEDIMENT TRAPS AND TEMPORARY DIVERSIONS AS SHOWN ON THE PLANS. CLEAR ONLY AS REQUIRED TO CONSTRUCT THESE DEVICES. 3.INSTALL A TEMPORARY SILT FENCE. 4.CONSTRUCT PIPE FOLLOWING THE BEDDING DETAILS. 5.WHEN CONSTRUCTION OF CROSS DRAINAGE PIPING IS COMPLETE INSTALL SILT FENCE AS SHOWN. 6.BEGIN BACKFILLING AROUND CROSS DRAINAGE PIPING. 7.REMOVE TEMPORARY SILT FENCE THAT CROSS PROPOSED ROADWAY WHEN BACKFILL REACHES SILT FENCE. 8.BEGIN REMAINING ROADWAY CONSTRUCTION. 9.MAINTAIN ALL EROSION CONTROL DEVICES AS SHOWN TO PREVENT SEDIMENT ENTERING THE CROSS DRAIN PIPING. 10.CONTRACTOR WILL BE RESPONSIBLE FOR ALL SUPPLIES REQUIRED FOR ANY PUMPING OF WATER FLOW UNTIL BYPASS IS BUILT. LINE BOTTOM TARP PROTECTION 2 TEMPORARY STREAM BYPASS DITCH SECTION SCALE: NTS 1 inch = 50 ft. 50 GRAPHIC SCALE 0 25 50 100 PROPOSED CAST IN PLACE RETAINING WALL PRECAST REINFORCED CONCRETE BOX CULVERT 8' TYPICAL CAST IN PLACE RETAINING WALL DETAIL REBAR PER FINAL PLAN SAFETY FENCE PER DETAIL CIP CONCRETE SECTION VIEW 2'VILLAGE VIEW LANE No.Checked ByRevisionDesignerDrawn ByDateByScaleDateJob No.Sheet No.Engineers | Planners | Surveyors115 MacKenan Drive | Cary, NC 27511t: 919.469.3340 | license #: C-0832 | www.withersravenel.comWithersRavenel0215031411.6.17AS NOTEDCARYNCWRJDBSSLSAVAAN SUBDIVISIONVILLAGE VIEW LANE PROFILE VIEW 1" = 50'STREAM AND WETLANDCROSSING PROFILEI 4.21 inch = 50 ft. 50 GRAPHIC SCALE 0 25 50 100 SCALE: 1" = 50' HORIZ. 1" = 5' VERT. No.Checked ByRevisionDesignerDrawn ByDateByScaleDateJob No.Sheet No.Engineers | Planners | Surveyors115 MacKenan Drive | Cary, NC 27511t: 919.469.3340 | license #: C-0832 | www.withersravenel.comWithersRavenel021503144.10.18AS NOTEDCARYNCWRJDBSSLSAVAAN SUBDIVISIONSTREAM AND WETLANDCROSSING CROSS SECTIONI 4.3VILLAGE VIEW LANE CROSS SECTION 1" = 20'GRAPHIC SCALE 1 inch = 20 ft. 20 0 10 20 40 SCALE: 1" = 20' HORIZ. 1" = 20' VERT.