HomeMy WebLinkAboutNCG500139_Compliance Evaluation Inspection_20180420Water Resources
ENVIRONMENTAL QUALITY
April 20, 2018
Ms. Melanie Gardner, Water Management
Duke Energy Carolinas, LLC
4800 Concord Road, CN06MT
York, SC 29745
Dear Ms. Gardner:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Subject: Compliance Evaluation Inspection
Cowans Ford Hydroelectric Station
NPDES Permit No. NCG500139
Lincoln County
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted
at the subject facility on April 19, 2018, by Ori Tuvia. Your and Glenn Long's cooperation
during the site visit was much appreciated. Please advise the staff involved with this NPDES
Permit by forwarding a copy of the enclosed report.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at
ori. tuvia(a),ncdenr. gov.
Sincerely,
DocuSigned by:
A4.-dzew H Nu"
F161 FB69A2D84A3...
for W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
Cc: NPDES Unit, MRO Files (Laserfiche)
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCG500139 111 12 I 18/04/19 I17 18 I S J 19 LG] 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 1.0 70Iq I 71 72n, 73I i74 751 1 1 1 1 80
u Int
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
12:15PM 18/04/19
16/01/19
Cowans Ford Hydroelectric Station
257 Duke Ln
Exit Time/Date
Permit Expiration Date
Stanley NC 28164
02:15PM 18/04/19
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Glenn Long//980-722-0678 /
Melanie Gardner//803-701-5779 /
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Michael T Brissie,257 Duke Ln Stanley NC 28164/General Manager//
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenance 0 Records/Reports
Self-Monitoring Program 0 Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Ori A Tuvia -c MRO WQ//704-663-1699/ 4/20/2018
IBB057A2DE017498...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax NumbDocuSigned by: Date
Andrew Pitner MRO WQ//704-663-1699 Ext.21 Numb,
H Nuft 4/20/18
F161FB6gA2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCG500139 111 121 18/04/19 1 17 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCG500139 Owner - Facility: Cowans Ford Hydroelectric Station
Inspection Date: 04/19/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The subject permit expires on 7/31/2020.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
❑
❑
0
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CM
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
0
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
0
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
0
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
Page# 3
Permit: NCG500139
Inspection Date: 04/19/2018
Record Keeping
Owner - Facility: Cowans Ford Hydroelectric Station
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: Duke Enerav Carolinas. LLC has been certified by the Division to conduct the reauired oil &
grease analyses (Commercial Laboratory #248) as well the temperature and pH analyses
(Field Laboratory #5134). TRC and COD analyses are not required because no chemicals
are added in the electricity generating process. The records reviewed during the inspection
were organized and well maintained. Effluent, upstream, and downstream data were
reviewed for 2017. No effluent limit violations and/or instream temperature exceedances
were reported.
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
❑
0
❑
❑
Is flow meter calibrated annually?
❑
❑
0
❑
Is the flow meter operational?
❑
❑
0
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The discharge flow is estimated.
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
❑
❑
0
❑
Is sample collected below all treatment units?
❑
❑
0
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: The subject permit requires grab sampling.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment: The permittee was compliant with the temperature requirements on all monitoring occasions
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 4
Permit: NCG500139
Inspection Date: 04/19/2018
Operations & Maintenance
Owner - Facility: Cowans Ford Hydroelectric Station
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The Permittee notes 14 outfalls at the station for the four electric aeneratina units: four
outfalls are maintained for emergency bypass procedures. Discharges are released at the
tailrace of the dam. Oil/water separators are used on Outfalls 001, 004, 007, 010, and 013
to remove oil that might leak from the generators or associated equipment. Outfall 014
discharges groundwater seepage through the dam to ensure structural integrity
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0 ❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0 ❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑ ❑
0
❑
Comment: The facility was not discharging at the time of the inspection.
Page# 5