From: Homewood, Sue
Sent: Friday, April 20, 2018 8:34 AM
To: 'Adam Williams'; 'Fuemmeler, Amanda J CIV (US)'
Subject: RE: [External] RE: Boone Greenway Trail Extension NWP 42 PCN
Adam,
Would you please provide more of an avoidance and minimization/justification for these impacts. 40' of culvert is pretty
significant for a greenway. Please provide a justification for why a pedestrian bridge isn't feasible, and assuming that
justification is satisfactory, then please provide information on the greenway can't cross the stream at a more
perpendicular angle which would reduce impacts.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.
-----Original Message -----
From: Adam Williams [mailto:adam@bfec.org]
Sent: Monday, April 16, 2018 9:33 AM
To: 'Fuemmeler, Amanda J CIV (US)' <Amanda.Jones@usace.army.mil>
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: [External] RE: Boone Greenway Trail Extension NWP 42 PCN
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.<mailto:report.spam@nc.gov>
OK, I have forwarded your email to the project engineer for his feedback.
I'm assuming we are just talking Boone Greenway specifically, not any other connector greenways (Middle Fork, etc.)
correct?
Yes, I have you down for the 25th. Let me know what time works as we get closer.
1
Thanks,
Adam Williams, PWS
Brushy Fork Environmental Consulting, Inc.
10565 Highway 421 South
Trade, Tennessee 37691
ph: 423.727.4476
cell: 828.773.3820
www.bfec.org
"Whether you think you can, or you think you can't --you're right." - Henry Ford
-----Original Message -----
From: Fuemmeler, Amanda J CIV (US) [mailto:Amanda.Jones@usace.army.mil]
Sent: Monday, April 16, 2018 9:16 AM
To: Adam Williams
Cc: Homewood, Sue
Subject: Boone Greenway Trail Extension NWP 42 PCN
Adam,
I was looking through this one and need to get a better handle on what previous impacts have been issued for this trail
system. We've got several actions in our database for greenways in this area. Is there a master trail plan/map that you
can forward so I can correlate. Basically, we would consider impacts cumulatively so I need to figure out where we are at
with mitigation/permitting thresholds for any permanent impacts such as culverts (excluding stabilization/restoration
activities). Also, I may try and swing by next Wednesday (April 25th) if you wanted to meet/review.
Amanda Jones
Regulatory Specialist
U.S. Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
828-271-7980 ext. 4225