Loading...
HomeMy WebLinkAboutNCG090000_Reissuance Letters with COCs FILED_20121204A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Brian Neal The Sherwin-Williams Company 113 Stage Coach Trail Greensboro, NC 27409 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Sherwin Williams Co -Greensboro COC Number NCG090004 Guilford County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Brian Neal December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090004 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Sherwin-Williams Company is hereby authorized to discharge stormwater from a facility located at: Sherwin Williams Co -Greensboro 113 Stage Coach Tr Greensboro Guilford County to receiving waters designated as Horsepen Creek, a class WS-III;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Frank Samartino Mallard Creek Polymers Inc 14800 Mallard Creek Rd Charlotte, NC 28262 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Mallard Creek Polymers Incorporated COC Number NCG090006 Mecklenburg County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Frank Samartino December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090006 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Mallard Creek Polymers Inc is hereby authorized to discharge stormwater from a facility located at: Mallard Creek Polymers Incorporated 14800 Mallard Creek Rd Charlotte Mecklenburg County to receiving waters designated as Mallard Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Justin Sergent The Sherwin-Williams Company 1025 Howard St Greensboro, NC 27403 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Sherwin Williams Co - Greensboro COC Number NCG090007 Guilford County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Justin Sergent December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090007 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Sherwin-Williams Company is hereby authorized to discharge stormwater from a facility located at: Sherwin Williams Co - Greensboro 1025 Howard St Greensboro Guilford County to receiving waters designated as North Buffalo Creek, a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Willi Kramer Aldo Products Company Inc 1604 N Main St Kannapolis, NC 28081 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Aldo Products Company Incorporated COC Number NCG090009 Rowan County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Willi Kramer December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090009 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Aldo Products Company Inc is hereby authorized to discharge stormwater from a facility located at: Aldo Products Company Incorporated 1604 N Main St Kannapolis Rowan County to receiving waters designated as Cold Water Creek (Lake Fisher), a class WS-IV;CA waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Carolina Solvents Inc PO Box 9206 Hickory, NC 28603 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Carolina Solvents Incorporated COC Number NCG090011 Catawba County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090011 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Carolina Solvents Inc is hereby authorized to discharge stormwater from a facility located at: Carolina Solvents Incorporated 2274 1st St SE Hickory Catawba County to receiving waters designated as Henry Fork, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Gordon Hyde Rpm Wood Finishes Group Inc PO Box 22000 Hickory, NC 28603-0220 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal RPM Wood finishes Group, Inc. COC Number NCG090019 Caldwell County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Gordon Hyde December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090019 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rpm Wood Finishes Group Inc is hereby authorized to discharge stormwater from a facility located at: RPM Wood finishes Group, Inc. 3194 Hickory Blvd Hudson Caldwell County to receiving waters designated as Gunpowder Creek, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Ronald Cooper Akzo Nobel Coatings Inc PO Box 2124 High Point, NC 27261 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Akzo Nobel Coatings Incorporated COC Number NCG090021 Guilford County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Ronald Cooper December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090021 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Akzo Nobel Coatings Inc is hereby authorized to discharge stormwater from a facility located at: Akzo Nobel Coatings Incorporated 1431 Progress Ave High Point Guilford County to receiving waters designated as Uwharrie River, a class WS -III waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Sam Belding Engineered Polymer Solutions 188 Side Track Dr Statesville, NC 28625 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Engineered Polymer Solutions COC Number NCG090023 Iredell County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Sam Belding December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090023 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Engineered Polymer Solutions is hereby authorized to discharge stormwater from a facility located at: Engineered Polymer Solutions 188 Side Track Dr Statesville Iredell County to receiving waters designated as Fourth Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Gerald Thompson Bonakemi USA Inc 4275 Corporate Ctr Dr Monroe, NC 28110 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal BonaKemi USA, Inc. COC Number NCG090025 Union County In response to your renewal application for continued coverage under stormwater General Permit NCG090000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG090000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Gerald Thompson December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG090000 CERTIFICATE OF COVERAGE No. NCG090025 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Bonakemi USA Inc is hereby authorized to discharge stormwater from a facility located at: BonaKemi USA, Inc. 4275 Corporate Ctr Dr Monroe Union County to receiving waters designated as East Fork Twelvemile Creek, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission