HomeMy WebLinkAbout20081817 Ver 1_Triage Comments_20090427Use this form instead of writing inside the folder
Triage Comment Sheet
DWQ# <A'O?/f17
Triaged By:
Reviewer 1,.
Reviewer 2
Reviewer 3
Date: Z,-/b
Date:
Date:
? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2)
Issue with conditions (Reviewer 1)
Iss wwith conditions (Reviewer 2)
Y/ NAIN
? More Information (Reviewer 1)
? Return Application (Reviewer 1)
? Send to Regions (Reviewer 1)
? More Information (Reviewer 2)
? Return Application (Reviewer 2)
? Send to Regions (Reviewer 2)
SATriage FormsUriage Issue Sheet.doc
PLEASE PRINT CLEARLY
08-1817 NE Judd Parkway Extension - take 2
AML Comments
April 27, 2009
Per Item 2 of the Required Items Checklist for bioretention cells, please provide
plan details of the cells at a scale of 1" = 30' or larger. Please provide proposed
contour lines to show that the appropriate footprint for the bioretention cell can be
achieved.
2. Please provide an appropriate device (either a pipe or a reinforces swale) to non-
erosively convey the discharge from the bioretention cells to the stream during the
10-year storm.
3. Please provide the construction sequence on a plan sheet, where it will be more
prominent. In addition, provide watering specifications to establish the sod