Loading...
HomeMy WebLinkAbout20081817 Ver 1_Triage Comments_20090427Use this form instead of writing inside the folder Triage Comment Sheet DWQ# <A'O?/f17 Triaged By: Reviewer 1,. Reviewer 2 Reviewer 3 Date: Z,-/b Date: Date: ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue with conditions (Reviewer 1) Iss wwith conditions (Reviewer 2) Y/ NAIN ? More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 2) SATriage FormsUriage Issue Sheet.doc PLEASE PRINT CLEARLY 08-1817 NE Judd Parkway Extension - take 2 AML Comments April 27, 2009 Per Item 2 of the Required Items Checklist for bioretention cells, please provide plan details of the cells at a scale of 1" = 30' or larger. Please provide proposed contour lines to show that the appropriate footprint for the bioretention cell can be achieved. 2. Please provide an appropriate device (either a pipe or a reinforces swale) to non- erosively convey the discharge from the bioretention cells to the stream during the 10-year storm. 3. Please provide the construction sequence on a plan sheet, where it will be more prominent. In addition, provide watering specifications to establish the sod