Loading...
HomeMy WebLinkAboutNCGs_Misc Auto Reissuance COCs FILED_20121210A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Brad Cummock 11707 Steele Creek Rd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal CoaLogix SCR -Tech COC Number NCG030617 Mecklenburg County Your facility was granted coverage under stormwater General Permit NCG030000 on 3/9/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwatergualitv.org �atkra��� An Equal Opportunity \ Affirmative Action Employer Brad Cummock December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030617 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, CoaLogix SCR -Tech is hereby authorized to discharge stormwater from a facility located at: CoaLogix SCR -Tech 11707 Steele Creek Rd Charlotte Mecklenburg County to receiving waters designated as Neal Branch (Armour Creek), a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Karl Keller Reman Technologies 11421 Reames Rd Charlotte, NC 28269 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Reman Technologies COC Number NCG030619 Mecklenburg County Your facility was granted coverage under stormwater General Permit NCG030000 on 3/9/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Karl Keller December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030619 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Reman Technologies is hereby authorized to discharge stormwater from a facility located at: Reman Technologies 11421 Reames Rd Charlotte Mecklenburg County to receiving waters designated as Dixon Branch, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Thomas Grein Linamar North Carolina Inc 2169 Hendersonville Rd Arden, NC 28704 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Linamar North Carolina Inc COC Number NCG030620 Buncombe County Your facility was granted coverage under stormwater General Permit NCG030000 on 6/29/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Thomas Grein December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030620 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Linamar North Carolina Inc is hereby authorized to discharge stormwater from a facility located at: Linamar North Carolina Inc 2169 Hendersonville Rd Arden Buncombe County to receiving waters designated as Powell Creek (Lake Julian), a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 1I, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jerri Smith 2400 Shore St Archdale, NC 27263 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal IV -S Metal Stamping Inc COC Number NCG030622 Randolph County Your facility was granted coverage under stormwater General Permit NCG030000 on 3/29/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwatergualitv.org �atkra��� An Equal Opportunity \ Affirmative Action Employer Jerri Smith December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030622 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, IV -S Metal Stamping Inc is hereby authorized to discharge stormwater from a facility located at: IV -S Metal Stamping Inc 2400 Shore St High Point Randolph County to receiving waters designated as Uwharrie River, a class WS -III waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Bob Campbell Philips Optimum 880 Facet Rd Henderson, NC 27537 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Philips Optimum COC Number NCG030624 Vance County Your facility was granted coverage under stormwater General Permit NCG030000 on 7/13/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Bob Campbell December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030624 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Philips Optimum is hereby authorized to discharge stormwater from a facility located at: Philips Optimum 880 Facet Rd Henderson Vance County to receiving waters designated as Martin Creek, a class C;NSW:+ waterbody in the Tar -Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Amy Lucia Erico International Corporation 34600 Solon Rd Solon, OH 44139 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal ERICO International Corporation COC Number NCG030627 Moore County Your facility was granted coverage under stormwater General Permit NCG030000 on 8/27/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Amy Lucia December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030627 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Erico International Corporation is hereby authorized to discharge stormwater from a facility located at: ERICO International Corporation 188 Carolina Rd Aberdeen Moore County to receiving waters designated as Quewhiffle Creek, a class C waterbody in the Lumber River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Randy Earle Reser's Fine Foods Inc 11251 Hwy 903 Halifax, NC 27839 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Reser's Fine Foods Inc COC Number NCG060332 Halifax County Your facility was granted coverage under stormwater General Permit NCG060000 on 3/9/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG060000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Randy Earle December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG060000 CERTIFICATE OF COVERAGE No. NCG060332 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Reser's Fine Foods Inc is hereby authorized to discharge stormwater from a facility located at: Reser's Fine Foods Inc 11251 Hwy 903 Halifax Halifax County to receiving waters designated as Quankey Creek, a class C waterbody in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Chris Murray House of Raeford Farms Inc 520 E Central Ave Raeford, NC 28376 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal House of Raeford Farms Raeford Complex COC Number NCG060334 Hoke County Your facility was granted coverage under stormwater General Permit NCG060000 on 3/27/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG060000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Chris Murray December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG060000 CERTIFICATE OF COVERAGE No. NCG060334 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, House of Raeford Farms Inc is hereby authorized to discharge stormwater from a facility located at: House of Raeford Farms Raeford Complex 520 1000E Central Ave Raeford Hoke County to receiving waters designated as Pedler Branch, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director Jim Carr Prestage Farms Inc Moltonville Feed Mill PO Box 438 Clinton, NC 28329 Dear Permittee: December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Prestage Farms Inc (Moltonville Feed Mill) COC Number NCG060335 Sampson County Your facility was granted coverage under stormwater General Permit NCG060000 on 7/9/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG060000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Carr December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG060000 CERTIFICATE OF COVERAGE No. NCG060335 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Prestage Farms Inc Moltonville Feed Mill is hereby authorized to discharge stormwater from a facility located at: Prestage Farms Inc (Moltonville Feed Mill) PO Box 438 Clinton Sampson County to receiving waters designated as Six Runs Creek, a class C;Sw waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor G Clifton Prestage Farms Inc 421 Feed Mill PO Box 438 Clinton, NC 28329 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Prestage Farms Inc (421 Feed Mill) COC Number NCG060336 Sampson County Your facility was granted coverage under stormwater General Permit NCG060000 on 7/9/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG060000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf G Clifton December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG060000 CERTIFICATE OF COVERAGE No. NCG060336 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Prestage Farms Inc 421 Feed Mill is hereby authorized to discharge stormwater from a facility located at: Prestage Farms Inc (421 Feed Mill) PO Box 438 Clinton Sampson County to receiving waters designated as Crane Creek, a class C;Sw waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Frederick Battle Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 City of Raleigh Solid Waste Services Department 630 Beacon Lk Dr Raleigh, NC 27610 Dear Permittee: Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Wilders Grove Service Center Solid Waste Services Facility COC Number NCG080886 Wake County Your facility was granted coverage under stormwater General Permit NCG080000 on 6/22/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NOrthCarOlina Internet: www.ncwaterguality.org ��������� An Equal Opportunity \ Affirmative Action Employer Frederick Battle December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80886 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Raleigh Solid Waste Services Department is hereby authorized to discharge stormwater from a facility located at: Wilders Grove Service Center Solid Waste Services Facility 630 Beacon Lk Dr Raleigh Wake County to receiving waters designated as Crabtree Creek, a class C;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Schmitt Rolling Frito-Lay Sales LP 2700 Nevada Blvd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Ahoskie Bin COC Number NCG080887 Hertford County Your facility was granted coverage under stormwater General Permit NCG080000 on 7/13/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Schmitt December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80887 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rolling Frito-Lay Sales LP is hereby authorized to discharge stormwater from a facility located at: Ahoskie Bin 330 NC Hwy 42 W Ahoskie Hertford County to receiving waters designated as Ahoskie Creek (Ahoskie Swamp, Bear Swamp), a class C;NSW waterbody in the Chowan River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 101h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Schmitt Rolling Frito-Lay Sales LP 2700 Nevada Blvd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Selma Bin COC Number NCG080888 Johnston County Your facility was granted coverage under stormwater General Permit NCG080000 on 6/7/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Schmitt December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCG080888 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rolling Frito-Lay Sales LP is hereby authorized to discharge stormwater from a facility located at: Selma Bin 3888 Buffalo Rd Selma Johnston County to receiving waters designated as Mill Creek (at Selma), a class WS-IV;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 1I, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Schmitt Rolling Frito-Lay Sales LP 2700 Nevada Blvd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Elizabeth City Bin COC Number NCG080889 Pasquotank County Your facility was granted coverage under stormwater General Permit NCG080000 on 9/7/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Schmitt December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80889 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rolling Frito-Lay Sales LP is hereby authorized to discharge stormwater from a facility located at: Elizabeth City Bin 103 Barnhill Rd Elizabeth Cty Pasquotank County to receiving waters designated as Little River, a class C;Sw waterbody in the Pasquotank River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Schmitt Rolling Frito-Lay Sales LP 2700 Nevada Blvd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Powell's Point Bin COC Number NCG080890 Currituck County Your facility was granted coverage under stormwater General Permit NCG080000 on 9/7/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Schmitt December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80890 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rolling Frito-Lay Sales LP is hereby authorized to discharge stormwater from a facility located at: Powell's Point Bin 139 Fox Knoll Dr Powells Point Currituck County to receiving waters designated as North River, a class SC waterbody in the Pasquotank River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Schmitt Rolling Frito-Lay Sales LP 2700 Nevada Blvd Charlotte, NC 28273 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Shallotte Bin COC Number NCG080891 Brunswick County Your facility was granted coverage under stormwater General Permit NCG080000 on 9/7/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Jim Schmitt December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Wilmington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80891 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rolling Frito-Lay Sales LP is hereby authorized to discharge stormwater from a facility located at: Shallotte Bin 119 Forest Dr South Brunswick Brunswick County to receiving waters designated as Sharron Creek (Grissett Swamp), a class C;Sw,HQW waterbody in the Lumber River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 101h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Lance Scalsky Petroliance LLC 1009 Schieffelin Rd Apex, NC 27502 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Petroliance LLC COC Number NCG080894 Wake County Your facility was granted coverage under stormwater General Permit NCG080000 on 9/14/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Lance Scalsky December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80894 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Petroliance LLC is hereby authorized to discharge stormwater from a facility located at: Petroliance LLC 1009 Schieffelin Rd Apex Wake County to receiving waters designated as Middle Creek, a class C;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor William Long Long Hill LLC PO Box 11625 Winston Salem, NC 27105 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal 1275 Old Belt Way COC Number NCG080895 Forsyth County Your facility was granted coverage under stormwater General Permit NCG080000 on 7/13/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf William Long December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80895 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Long Hill LLC is hereby authorized to discharge stormwater from a facility located at: 1275 Old Belt Way 1275 Old Belt Way Rural Hall Forsyth County to receiving waters designated as Grassy Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mike Nix Saia Motor Freight Line Inc 1625 Corporate Dr La Vergne, TN 37086 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Saia Motor Freight Line COC Number NCG080897 Guilford County Your facility was granted coverage under stormwater General Permit NCG080000 on 8/2/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCGO80000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Mike Nix December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCGO80897 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Saia Motor Freight Line Inc is hereby authorized to discharge stormwater from a facility located at: Saia Motor Freight Line 2904 Torrence Dr Greensboro Guilford County to receiving waters designated as Ryan Creek, a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Joe Brady 436 W Greenhill Dr Siler City, NC 27344 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Joe L Brady COC Number NCG100223 Chatham County Your facility was granted coverage under stormwater General Permit NCG100000 on 7/16/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG100000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwatergualitv.org �atkra��� An Equal Opportunity \ Affirmative Action Employer Joe Brady December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG100000 CERTIFICATE OF COVERAGE No. NCG100223 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Joe L Brady is hereby authorized to discharge stormwater from a facility located at: Joe L Brady 437 Greenhill Rd W Siler City Chatham County to receiving waters designated as Blood Run Creek, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 10th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Ronald Church Church Auto Parts Inc 1839 Lowman Rd Shelby, NC 28150 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Church Auto Parts Inc COC Number NCG100224 Cleveland County Your facility was granted coverage under stormwater General Permit NCG100000 on 8/14/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG100000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Ronald Church December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG100000 CERTIFICATE OF COVERAGE No. NCG100224 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Church Auto Parts Inc is hereby authorized to discharge stormwater from a facility located at: Church Auto Parts Inc 1839 Lowman Rd Shelby Cleveland County to receiving waters designated as Buffalo Creek (Kings Mountain Reservoir), a class WS-III;CA waterbody in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 101h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Hubert Jones Mack's Used Cars & Truck Parts 1191 Sweeten Creek Rd Asheville, NC 28803-1870 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 10, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Mack's Used Cars & Truck Parts COC Number NCG100225 Buncombe County Your facility was granted coverage under stormwater General Permit NCG100000 on 8/24/2012. This letter serves as your notification that the Division of Water Quality (DWQ) has reissued the general permit and that your facility' coverage will continue under the conditions of the reissued general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG100000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarOlina Internet: www.ncwaterguality.orp An Equal Opportunity \ Affirmative Action Employer ;Vatura!!tf Hubert Jones December 10, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG100000 CERTIFICATE OF COVERAGE No. NCG100225 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Mack's Used Cars & Truck Parts is hereby authorized to discharge stormwater from a facility located at: Mack's Used Cars & Truck Parts 1191 Sweeten Creek Rd Asheville Buncombe County to receiving waters designated as Sweeten Creek (Busbee Reservoir), a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached. This certificate of coverage shall become effective December 10, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 101h day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission