Loading...
HomeMy WebLinkAboutNC0000752_Compliance Evaluation Inspection_20180411 ROY COOPER Gover nor MICHAEL S REGAN Secretary WaterResources LINDA CULPEPPER ENVIRONMENTAL QUALITY Interim Director April 11, 2018 Mr Benjamin White Vice President of Mill Operation Kapstone—Kraft Paper Corporation 100 Gaston Road Roanoke Rapids, NC 27870 Subject. Compliance Evaluation Inspection Kapstone—Kraft Paper Corporation - Roanoke Rapids Paper Mill Petnnt No. NC0000752 Northampton County Dear Mr. White. On November 16, 2016, Cheng Zhang of the Raleigh Regional Office (RRO) conducted a compliance evaluation inspection of the subject facility. The assistance provided by Mr. Neal Davis, the operator in responsible charge (ORC), Mr. Chris Williams, the backup ORC, and Mr Paul Kinnin, was appreciated as it facilitated the inspection process. The inspection report is attached. The following observations were made Kapstone—I -aft-Paper Corporation - Roanoke Rapid Paper Mill WWTP is permitted to discharge at a rate of 28 0 MGD and consist of mechanical bar screen, primary clarifier, emergency holding pond, sludge lagoon, aeration pond, and three stabilization ponds The plant discharges to Roanoke River, a Class C water in the Roanoke River basin 1 Current permit expired on March 31, 2017 The facility submitted penult renewal application On September 23, 2016 A draft pen-nit was sent to the facility for comments 2 All three influent pumps were in operation The primary clarifier was in good condition 3 Sludge from the primary clarifier was dewatered at the sludge handling facility, two trains of belt presses, screw presses, and chemical feed system were available One train was in use at the time of inspection, the other was off line for repair and maintenance. Dewatered sludge was disposed at the onsite land fill. Leachate from the land fill and the old sludge pond flows by gravity into the aeration pond and is treated along with the effluent from the primary clarifier. 4. Effluent from the clarifier was further treated at the aeration pond All 31 aerators were in operational condition Numbers of aerators on line was controlled by the DO level in the basin Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http/'portal ncdeni org/web/wqlaps 1628 Mail Service Center, Raleigh,NC 27699-1628 Phone (919)791-4200 Location 3800 Barlett Drive,Raleigh,NC 27609 Fax (919)788-7159 Kapstone—Kraft Paper Corpotation-Roanoke Rapids Paper Mill Permit No NC0000752 5 Effluent from the aeration pond was further treated in the three stabilization ponds before being discharged to the river. 6. The ORC maintains a daily logbook Lab results, chain-of-custody forms, and Discharge Monitoring Reports (DMRs) were complete and current, kept in good order and ready for review. November 2017 DMR data were compared to lab bench sheets; no data transcription errors were noted during the inspection. 7 The right of way to Outfall 001 was well maintained The effluent was observed to be clear and free of solids No visible impacts were noted immediately downstream the effluent pipe Outfall 002 was also maintained and accessible. 8. Field lab parameter (Certificate No 183) calibration and analysis records were reviewed during the inspection The overall condition of the facility is compliant with Division standards. If you have any questions regarding the attached reports or any of the findings, please contact Cheng Zhang at (919) 791-4200 (or email cheng.zhang@ncdenr gov). Since ely, Danny Si ith Water Quality Regional Supervisor Raleigh Regional Office Attachments Compliance Inspection Report Cc. Central Files w/attaclunent Raleigh Regional Office w/attaclunent Neal Davis— ORC w/attachment United States Environmental Protection Agency Form Approved EPA Washington,D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding(i e,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 H 2 [ I 3 I N00000752 111 12 1 18/03/12 117 18 LI, 191 s I 201 I 211 11111111111111 111111111111111111111111111 r6 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -------------Reserved — 67 1 1 70 1 1 71 1 I 72 12 1 73 I I 174 751 1 1 1 1 1 1 180 Section B Facility Data L_I Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10 00AM 18/03/12 12/06/01 Kapstone Kraft Paper Corporation WWTP 100 Gaston Rd Exit Time/Date Permit Expiration Date Roanoke Rapid NC 27870 12 30PM 18/03/12 17/03/31 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Neal R Davis/ORC/252-533-6295/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Benjamin P White,PO Box 458 Roanoke Rapids NC 2787004581/252-533-6335/2525336465 No Section C Areas Evaluated During Inspection(Check only those areas evaluated) • ® Permit ® Flow Measurement ® Operations&Maintenance ® Records/Reports ® Self-Monitoring Program ® Sludge Handling Disposal Bil Facility Site Review lig Effluent/Receiving Waters ® Laboratory Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Cheng Zhang RRO WQ//919-791-4200/ / C/L--4-110-A-C7 4>---- ignatur of Management A Revie -r Agency/Office/Phone and Fax Numbers Date atil 6,/ 7./P ,• P1/4g iefi7,,73)71.7 111117 /2 10,21 /57 ' V EPA Form 60-3(Rev 9-94)Previous editions are obsolete Page# 1 Permit NC0000752 Owner-Facility Kapstone Kraft Paper Corporation VVWTP Inspection Date 03/12/2018 Inspection Type Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping'? ® 000 Does the facility analyze process control parameters,for ex MLSS, MCRT, Settleable ® 000 Solids, pH, DO, Sludge Judge, and other that are applicable'? Comment DO, TSS, pH, and conductitivity Permit Yes No NA NE (If the present permit expires in 6 months or less) Has the permittee submitted a new 00110 application? Is the facility as described in the permit'? U ❑ ❑ ❑ #Are there any special conditions for the permit'? 01=11110 Is access to the plant site restricted to the general public'? ® ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment Draft permit in review Record Keeping, Yes No NA NE Are records kept and maintained as required by the permit'? ® ❑ ❑ ❑ Is all required information readily available, complete and current'? ® ❑ ❑ ❑ Are all records maintained for 3 years(lab reg required 5 years)? ® ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? IN 000 Is the chain-of-custody complete'? U ❑ ❑ ❑ Dates,times and location of sampling Ei Name of individual performing the sampling li Results of analysis and calibration IM Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete do they include all permit parameters'? !-, ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator 000 on each shift'? Is the ORC visitation log available and current'? 4 ❑ 1=1111 Is the ORC certified at grade equal to-or higher than the facility classification'? 000 Is the backup operator certified at one grade less or greater than the facility classification? N000 Is a copy of the current NPDES permit available on site'? MI ❑ ❑ ❑ Page# 3 Permit NC0000752 Owner-Facility Kapstone Kraft Paper Corporation WWTP Inspection Date 03/12/2018 Inspection Type Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? ❑ ❑ ! ❑ Comment Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? U ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 111000 If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ® ❑ Comment Right of way to both Outfall 001 and 002 was maintained properly Flow Measurement- Influent Yes No NA NE #Is flow meter used for reporting? 111000 Is flow meter calibrated annually? MOOD Is the flow meter operational? ® ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ODIND Comment Meter was calibrated on August 17, 2017 Solids Handling Equipment Yes No NA NE Is the equipment operational? MOOD Is the chemical feed equipment operational? MID00 Is storage adequate? MOOD Is the site free of high level of solids in filtrate from filter presses or vacuum filters? 10000 Is the site free of sludge buildup on belts and/or rollers of filter press? ® DOD Is the site free of excessive moisture in belt filter press sludge cake? n ❑ ❑ ❑ The facility has an approved sludge management plan? DOD Comment Two rotary screen thickeners and two screw presses One of each was off line for maintenance Chemical Feed Yes No NA NE Is containment adequate? MOOD Is storage adequate? 000 Are backup pumps available? IEI=100 Is the site free of excessive leaking? N1000 Comment Defoamer fed to effluent and aeration basin Surfarlc acid (pH), hydrogen peroxide (hydrogen sulfide control) and polymer fed to primary clarifier sludge Page# 4 Permit NC0000752 Owner-Facility Kapstone Kraft Paper Corporation VWVfP Inspection Date 03/12/2018 Inspection Type Compliance Evaluation Pump Station -Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 11000 Is the wet well free of excessive grease? 1111000 Are all pumps present? • 000 Are all pumps operable'? • 000 Are float controls operable'? • 000 Is SCADA telemetry available and operational? ® 000 Is audible and visual alarm available and operational? ® 000 Comment Three pumps controled by SCADA Overflow channel to emergency pond 20 4 acre emergency pond holds 28 million gallons of waste water under emergency situations, such as power failure, mechanical problems, or high strength waste Bar Screens Yes No NA NE Type of bar screen a Manual 0 b Mechanical PRI Are the bars adequately screening debris'? ® ❑ ❑ ❑ Is the screen free of excessive debris'? E1000 Is disposal of screening in compliance? r ❑ ❑ ❑ Is the unit in good condition'? ® ❑ ❑ ❑ Comment Screen runs on timer Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater'? 000 Is the site free of excessive buildup of solids in center well of circular clarifier? - 000 Are weirs level'? 000 Is the site free of weir blockage'? E000 Is the site free of evidence of short-circuiting? E000 Is scum removal adequate? 000 Is the site free of excessive floating sludge? J 000 Is the drive unit operational? ;; 000 Is the sludge blanket level acceptable'? • ) 000 Is the sludge blanket level acceptable'?(Approximately'/of the sidewall depth) 000 Comment Page# 5 Permit NC0000752 Owner-Facility Kapstone Kraft Paper Corporation VWTP Inspection Date 03/12/2018 Inspection Type Compliance Evaluation Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Surface Is the basin free of dead spots'? • 000 Are surface aerators and mixers operational? , ❑ ❑ ❑ Are the diffusers operational? ® 000 Is the foam the proper color for the treatment process? • 000 Does the foam cover less than 25% of the basin's surface? ® 000 Is the DO level acceptable? ® ❑ ❑ ❑ Is the DO level acceptable?(1 0 to 3 0 mg/I) ® ❑ ❑ ❑ Comment All 31 surface aerators were functional Number of aerators online is controlled by the DO sensor in the basin DO level at the channel to first stabilization pond ranges from 0 5 to 4 mq/I Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? ® 000 Are all other parameters(excluding field parameters)performed by a certified lab'? 11000 #Is the facility using a contract lab? 111000 #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees 11000 Celsius)? Incubator(Fecal Coliform)set to 44 5 degrees Celsius+/-0 2 degrees? ❑ ❑ ® ❑ Incubator(BOD)set to 20 0 degrees Celsius+/-1 0 degrees? 16100E1 Comment Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ • ❑ ❑ Is sample collected below all treatment units? 11000 Is proper volume collected? • 000 Is the tubing clean? 61000 #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees E1000 Celsius)? Is the facility sampling performed as required by the permit(frequency, sampling type E ❑ ❑ ❑ representative)? Comment Fixed time fixed volume composite sampling Influent Sampling Yes No NA NE Page# 6 Permit NC0000752 Owner-Facility Kapstone Kraft Paper Corporation VVV TP Inspection Date 03/12/2018 Inspection Type Compliance Evaluation Influent Sampling Yes No NA NE #Is composite sampling flow proportional? ❑ NI ❑ ❑ Is sample collected above side streams? • ❑ ❑ 0 Is proper volume collected? ■ ❑ ❑ ❑ Is the tubing clean'? • ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees ® ❑ 0 ❑ Celsius)? Is sampling performed according to the permit'? ® ❑ ❑ ❑ Comment Fixed time fixed volume composite sampling, no influent flow meter Lagoons Yes No NA NE Type of lagoons'? Facultative #Number of lagoons in operation at time of visit'? 3 Are lagoons operated in'? Series #Is a re-circulation line present'? ❑ ❑ ® ❑ Is lagoon free of excessive floating materials'? ® 0 ❑ ❑ #Are baffles between ponds or effluent baffles adjustable'? ❑ ❑ ® ❑ Are dike slopes clear of woody vegetation'? ® ❑ ❑ ❑ Are weeds controlled around the edge of the lagoon'? ® ❑ ❑ ❑ Are dikes free of seepage'? IN ❑ ❑ ❑ Are dikes free of erosion'? ® ❑ ❑ ❑ Are dikes free of burrowing animals'? El ❑ 0 0 #Has the sludge blanket in the lagoon(s)been measured periodically in multiple - 3 0 0 0 locations'? #If excessive algae is present, has barley straw been used to help control the growth'? ❑ ❑ 111 ❑ Is the lagoon surface free of weeds? EI ❑ ❑ ❑ Is the lagoon free of short circuiting'? El ❑ ❑ 0 Comment 1/5 of the first stabilization pond is dredged every year Page# 7 • Regional Inspectors' Checklist for Field Parameters Facility Name KGPs e' Pc p r' A ; ii Regional Plant Inspector C k a'r1 c 26 '" - NPDES # /Vc f)oO073'2 Regional Inspector Contact # S rs'-7 ri - 66-2.-3-5 Field Lab Certification # /83 Region ic-7f = r/, Lab Contact f k;r, ; - Date 3/ r z/ y0 (X I. Check the parameter(s) performed at this site for reporting purposes. ❑ Total Residual Chlorine (TRC) n Temperature (TEMP) n Specific Conductivity (SC) pH ,L Dissolved Oxygen (DO) ❑ Settleable Residue (SETT) II. General Laboratory (note any exceptions in section XI) Are instruments, meters, probes, photometric cells, etc maintained in good condition? IX. Yes ❑ No Are standards, reagents and consumables used within manufacturer expiration dates? 0 Yes ❑ No [TRC gel standard is exempt I Are the following items documented ( /where applicable): Item TRC pH TEMP DO SC SETT Date of sample collection* X 'x bC )4 Time of sample collection* X 1x X x Sample collector's initials or signature X .} x Date of sample analysis* ,' >- / Time of sample analysis* 76 )1 Analyst initials or signature >C . x s Sample location X ,}C. X *Date and time of sample collection and analysis may be the same for in situ or on-site measurements III. Total Residual Chlorine Total Residual Chlorine meter make and model Is a check standard analyzed each day of use? (Circle one gel or liquid standard) n Yes I I No What is the assigned/observed value of the daily check standard? Is a 5-point calibration verification performed? Note date of last verification ❑ Yes n No Alternatively, does the lab construct a linear regression, using 5 standards, to calculate ❑ Yes ❑ No results? Note date of last calibration curve constructed True values ❑ pg/L ❑ mg/L Obtained values ❑ pg/L ❑ mg/L What program are samples analyzed on? Are results reported in proper units? Check one n pg/L n mg/L n Yes No Are results reported between the facility's permit limit and the compliance limit of 50 pg/L? ❑ Yes n No If value is less than the low standard, report as "<x", where x=low standard conc Are samples analyzed within 15 minutes of collection? ❑ Yes No IV. pH pH meter make and model O'/oki s— S;Ai( p/-/ ( g 27/ -) Is the pH meter calibrated with at least 2 buffers per mfg's instructions each day of use? 14 Yes IIINo Note buffers used 4-, 7 , r O Is the pH meter calibration checked with an additional buffer each day of use? Note check X Yes ❑ No buffer used 7 Does the check buffer read within ±0 1 S U of the known value? Ig Yes n No Are the following items documented Meter calibration? E Yes ❑ No Check buffer reading? X Yes No Are samples analyzed within 15 minutes of collection? X Yes ❑ No Are sample results reported to 0 1 pH units? y Yes I I No r V. Temperature What instrument(s) is used to measure temperature'? Check all that apply n pH meter ❑ DO meter ❑ Conductivity meter Ill Digital thermometer ❑ Glass thermometer Is the instrument/thermometer calibration checked at least annually against a NIST LS.Yes ❑ No traceable or NIST certified thermometer? eui rJ,e_d& rlev✓ /h 2f-o—' cAn 0 ti.0-1l c--/— Are temperature corrections (even if zero) posted on the instrument/thermometer? I Yes ❑ No Are samples measured in situ or on-site? [REQUIRED - there is no holding time for IT Yes ❑ No temperature] Are sample results reported in degrees C? Iy(I Yes ❑ No VI. Dissolved Oxygen DO meter make and model y z - S'',To 4 -----Is-the-air calibration of-the DO meter performed-each day-of use'? - - -n Yes- --n No-- --- Are the following items documented Meter calibration'? ® Yes ❑ No Are samples analyzed within 15 minutes of collection'? Yes ❑ No Are results reported in mg/L' ❑X Yes ❑ No VII. Conductivity Conductivity meter make and model d fk l a N 3 S TA t. E 9 -E/3 Is the meter calibrated daily according to the manufacturer's instructions'? Note standard 74 Yes ❑ No used (this is generally a one-point calibration) S-0.o Air),9,Z.s.-`c m Is a daily check standard analyzed'? Note value ‘S--"o 0 ,Lt y".9/-s / c r*-i ® Yes ❑ No Are the following items documented Meter calibration? X Yes ❑ No Are samples analyzed within 28 days of collection'? ® Yes _ No Are results reported in pmhos/cm (some meters display equivalent pS/cm units)? 7 Yes ❑ No VIII. Settleable Residue Does the laboratory have an Imhoff Cone in good condition'? ❑ Yes ❑ No Is the sample settled for 1 hour? ❑ Yes ❑ No Is the sample agitated after 45 minutes'? I I Yes ❑ No Are the following items documented Volume of sample analyzed'? Note volume analyzed ❑ Yes No Date and time of sample analysis (settling start time)? n Yes ❑ No Time of agitation after 45 minutes of settling'? Ii Yes ❑ No Sample analysis completion (settling end time)? ❑ Yes ❑ No Are samples analyzed within 48 hours of collection'? ❑ Yes n No Are results reported in ml/L' f] Yes ❑ No IX. Was a paper trail (comparing contract lab and on-site data to DMR) [X Yes ❑ No performed? If so, list months reviewed: tI / 2-v 1 7 X. Is follow-up by the Laboratory Certification program recommended? n Yes 7 No Xl. Additional comments: /3, (c,,,Gr - re-cer6i f-,'.e_cP ® r-t �/ 23 i -:—v t r Please submit a copy of this completed form to the Laboratory Certification program at DWQ Lab Certification, Chemistry Lab, Courier# 52-01-01 Electronic copies may be emailed to linda chavis@ncdenr qov Revision 04/20/2012