Loading...
HomeMy WebLinkAbout20090473 Ver 1_Application_20090427SINAI- . I V 1'C?'? IrY? ®9_ 04 7 3 o?o qoc Nrtf l '/(ff ,t r >_ 7 ZaQ9 C/ ' ?' ° gF7rk- WATER 4VDsr. ?Q1/AL17Y Office Use only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notifica on CN Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: or GP number been verified by the Corps? ® Yes ? No roval sought from the DWQ (check all that apply): Quality Certification - Regular ? Non-404 Jurisdictional General Permit uality Certification - Express ® Riparian Buffer Authorization r thisnofification on solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the reco rd only for Corps Permit: ? Yes ®No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ®No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ® Yes ? No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No 2. Project Information 2a. Name of project: Replace Bridge No. 40 on NC304 over Bear Creek 21b. County: Pamlico 2c. Nearest municipality/ town: Bayboro 2d. Subdivision name: h/a 2e. NCDOT only, T.I.P. or state project no: B-51296 3. Owner Information 3a. Name(s) on Recorded Deed: State of North Carolina. Department of Transportation 3b. Deed Book and Page No. n/a 3c. Responsible Party (for LLC if applicable): , n/a 3d. Street address: 105 Pactolus Highway (NC33) 3e. City, state, zip: Greenville, NC 27835 3f. Telephone no.: (252) 830-3490 3g. Fax no.: (252) 830-3341 3h. Email address: Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Division 2 Environmental Officer 4b. Name: Jay B. Johnson 4c. Business name (if applicable): NC Department of Transportation 4d. Street address: 105 Pactolus Highway (NC33) 4e. City, state, zip: Greenville, NC 27835 4f. Telephone no.: (252) 830-3490 4g. Fax no.: (252) 830-3341 4h. Email address: jbjohnsdn@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Cindy Carr 5b. Business name (if applicable): Mulkey, Inc. 5c. Street address: 6750 Tryon Road 5d. City, state, zip: Cary, NC 27518 5e. Telephone no.: (919) 858-1871 5f. Fax no.: (919) 851-1918 5g. Email address: ccarr@mulkeyinc.com Page 2 of 11 PCN Form -Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): n/a Latitude: 35.2069385 'N 1b. Site coordinates (in decimal degrees): Longitude: - 76.6279622'W (DD. DDDDD D) (-0D. DDDDDD) 1c. Property size: n/a acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: gear Creek 2b. Water Quality Classification of nearest receiving water: SA HQW - NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: NC304 is a two-lane state highway. Land surrounding Bridge No. 40 is primarily rural residences and undeveloped land comprised of tidal freshwater marsh bordered by agricultural fields and pine flatwoods. The existing bridge is a 3 span, 52 foot 4 inch long reinforced concrete floor structure on timberjoists with bents that are timber caps on timber piles. Relic wood piles are located in the water at the bridge and have been cut to water surface level. Land use in the vicinity includes timber production, agriculture, and rural residential. 3b. List the total estimated acreage of all existing wetlands on the property: 0.27 acre. Site is part of a larger adjacent wetland system. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 10D linear feet. Site is part of a longer adjacent stream system. 3d. Explain the purpose of the proposed project: Replace a deficient bridge structure with a new safer facility that meets new design standards. 3e. Describe the overall project in detail, including the type of equipment to be used: The project will remove all components of Bridge No. 40 without dropping any pieces in the water and will remove relic wood piles in the water by pulling them straight out using cable tied to the limber. Sediment curtains will be used around piles to reduce sediment in the water. The new bridge will have 3 pre-cast concrete cored slabs, concrete and steel substructure on concrete piles, and will be approximately 90 feet long with a clear roadway width of 33 feet. Bridge replacement and roadway approach construction will use typical equipment such as track hoes, excavators, dump trucks, paving machines, and rollers. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ? No ? Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type f ® Preliminary ? Final o determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDOT Div. 2 Name (if known): Jay Johnson Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. February 2006, January 2009 Page 3 of 11 PCN Form -Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ? No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 66. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. . Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): N Wetlands ® Streams - tributaries ® Buffers N Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) -Temporary (T) W1 N P ? T Roadway fill, riprap Tidal Freshwater ? Yes N Corps 0.001 acre Marsh N No ? DWQ (63 sq.ft.) W2 N' P ? T Roadway fill, riprap Tidal Freshwater ? Yes N Corps 0.005 acre Marsh N No ? DWQ (204 sq.ft.) W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.006 acre (267 sq. ft.) 2h. Comments: W1 and W2 impacts include CAMA wetlands. Impacts are for fill placement at new bridge end bent locations and are necessary for guard rail installation. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 N P ? T Roadway fill, riprap Bear Creek ® PER ? INT N Corps ? DWQ 45 61 S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 61 3i. Comments: Fill placement is for new bridge end bent and.allows installation of guard rail. Fill represents 61 sq.feet. Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ®P ? T Bear Creek Fill (bridge interior piers) Perennial Stream 0.002 acre (99 sq. feet) 02 ®P ? T Bear Creek Fill (bridge interior piers) Perennial Stream 0.002 acre (999 9 sq sq. feet) 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.004 acre (198 sq. feet) 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feel) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 St. Total None 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for Stream name mitigation (square feet) (square feet) or Temporary T impact required? 61 ®P ? T Roadway Bear Creek ® s 533 391 nprap No B2 ® PEI T R oad w a y Bear Creek ® Nos 483 281 l p a p B3 ®P ? T Roadway Bear Creek ? Yes 0 0 Fill,riprap ® No 6h. Total buffer impacts - 1,387 *950 (0.032 acre) (0.022 acre) 6i. Comments: Add additional buffer impact B4 as follows: B4 X P Roadway Fill Vandemere Creek X No Zone 1: 371 sf Zone 2: 279 sf D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Avoidance Measures: Existing roadway and bridge alignment will be maintained during staged construction and an on-site detour will avoid need for a temporary detour bridge by using a portion of the existing bridge to maintain traffic flow. The new structure will be constructed using pre-cast concrete components which avoids potential impacts from live concrete. During demolition, components of the existing bridge will not be dropped in the water. Sediment curtains will be used around relic pylons to prevent sediment from entering the water column. Minimization Measures: Welland impacts have been minimized to the extent feasible, with impacts occurring only where new location of bridge bents and piers are required to support the structure and installation of safety guard rails. Existing roadway and bridge alignment have been maintained to minimize impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Use of the existing roadway to maintain traffic on-site during construction of the new bridge. Use of existing roadway to operate construction equipment; no equipment will enter wetlands or waters. Use of pre-cast concrete bridge components avoid use of live concrete. 2. Compensatory Mitigation for Impacts to Waters of the U:S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ®No _ impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a . Name of Mitigation Bank: 3b . Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a . Approval letter from in-lieu fee program is attached. ? Yes 4b . Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d . Buffer mitigation requested (DWQ only): square feet 4e . Riparian wetland mitigation requested: acres ' 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Buffer impacts for transportation facilities is within amount allowed without mitigation. Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ® Yes ? No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Bridge replacement project covered by NCDOT Statewide NPDES ? Yes ®No permit 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? n/a (roadway/bridge project) % 2b. Does this project require a Stormwater Management Plan? ? Yes ®No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Covered by NCDOT Statewide NPDES Permit 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Certified Local Governmen t 2e. Who will be responsible for the review of the Stormwater Management Plan? DWQ Stormwater Program FEJ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Pamlico ? Phase 11 3b. Which of the following locally-implemented stormwater management programs ® NSW apply (check all that apply): El USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply El HOW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ®No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: A Minimum Criteria Checklist (MCC) was completed for this project 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. n/a Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ®Yes El No impacts? Raleigh ® 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP GIS element occurrence maps (including NCNHP Virtual Workroom); on-site habitat investigation by qualified biologist; scoping letter comments 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? N Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS list of managed species occurring in the area; comparison of area measurements of existing and proposed structures in water (piers); scoping letter comments. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes N No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Scoping letter comments from NCSHPO. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? N Yes ? No 8b. If yes, explain how project meets FEMA requirements: Bridge designed to no-rise standards. A Firm maps. 8c. What source(s) did you use to make the floodplain determination? FEM / ? Jay B. Johnson A'r I \ March 2009 Applicant/Agent's Printed Name s Signature Ap fcan g Date J (Agent's signature is v onl if n thorization letter from the applicant i rovided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version PROJECT No. B-5129D WBS No. 42287.1.1 DATE: 1-19-2009 ROAD: NC 304 ROAD NAME: NC 304 OVER BEAR CREEK COUNTY: PAMUCO CROSS SECTION OF BRIDGE 1110. 40 EXISTING BRIDGE 1 @ 17'-8" I@ 16'-11" I@ M-9" 28W" .CLEAR ROADWAY NOT TO SCALE PROPOSED 21" CONCRETE CORED SLAB PROPOSED LENGTH.- 3 SPANS @ 30' 33'.CLEAR ROADWAY NO DECK DRAINS ALLOWED 304 NOT TO SCALE Sheet .4 of 7 r4 52_'-4° 3? _ 0 30' 30' .?. a< i - I y I ? y _. £I .511 B-5129D i y L= ( 1 ?. Kre ` 1 \ 1 " L :? ti` l 74t Pollee 1 v . ' .el n ' t JCL ? L a t> t>? L :,-r , ?i ? 'L.t 19:x, iii H f ( F? I r I I I t y ?kr Y r,x' S G 7 KN*tk?W t T?y"'? ?1 -a.i:n'?Zc?r ???Tb.?. ? _ - It ?:'. r ` a 1 n Legend Study Corridor PROJECT LOCATION Prepared For. B-5129D Figure Replace Bridge No. 40 on NC 304 over Bear Creek ° .• '41 Pamlico County, North Carolina 2 % 0 0.25 0.5 iMiles 1:24,000 USGS 7.S Mime Top mph V emem aM Jmms Say(oanmur INwal 5 Feel( LEGEND --WLB WETLAND BOUNDARY PROPOSED BRIDGE iL WETLAND PROPOSED BOX CULVERT DENOTES FILL IN WETLAND PROPOSED PIPE CULVERT 12'-48' DENOTES FILL IN (DASHED LINES DENOTE PIPES SURFACE WATER EXISTNG STRUCTURES) 54* PIPES A 48OVE p ? 7 DENOTES FILL Y?p /// CLLLLLLLd SURFACE PATER R (POND) SINGLE TREE DENOTES TEMPORARY FILL IN WETLAND 1r`tf^'tJr`Lr?`L WOODS LINE ® DENOTES EXCAVATION - ,IN WETLAND a DRAINAGE INLET ® DENOTES TEMPORARY FILL IN SURFACE ClATER R00T4?AD D OENDT ES MECHANIZED CLEARING -? > FLOW DIRECTION lam` RIP RAP TB ?- TOP OF BANK WE ADJACENT PROPERTY OWNER -° EDGE OF WATER 5 _ OR PARCEL NUMBER C IF AVAILABLE - PROP. LIMIT OF CUT - F PROP. LIMIT OF FILL ® PREFORMED SCOUR HOLE' PROP. RIGHT OF WAY LEVEL SPREADER LS) NO - NATURAL GROUND PL PROPERTY LINE ? DITCH / -TOE- TEMP.DRAINAGE GRASS S1.'ALE EASEMENT - PDE - PERMANENT DRAINAGE DENOTES IMPACTS TO EASEMENT BUFFER ZONE 1 - EAB - EXIST. ENDANGERED ANIMAL BOUNDARY DENOTES IMPACTS TO - EPB - EXIST.. ENDANGERED BUFFER ZONE 2 PLANT BOUNDARY ?7- - - WATER SURFACE x x x x x LIVE STAKES x x x NCDO?(`? ll BOULDER ' DIVISION OR HIGHWAYS --- CORE FIBER ROLLS PAMLICO COUNTY PROJECT: B-51291) 1VBS NUJIBER:42287.1.1 ``4`?. ' Is Ir {R1S DENOTES AREA TO DE XCAVATE REPLACE BRIDGE a40 ,?? E D ON NC 304 OVER BEAR CREEK SHEET 5 OF 7 1/19/09 <??l i i ?l o ^ a A T C n 5 K O C. m o /??l a p F n •°+ U uUK O ZJ zZ< o p Z' C ?_ am m6C?Wp °zW > 1 Z C 0 0 S o H w W q? nnQ LL G LL m ww <NmJ mr ?'a o¢a ax ¢?wm .. ?w¢ aa_ o,?wo o??zaN mF ??® mi- (JBry02U NUMI 1-Z S.OJmW GO Off` Xao o? ¢___°w G -UZ- GtV?J WN?i¢W1- _?Np 3pn??N iOnO m T-12y nZ ZOO Am0 NZ m i.' ntiAm®O w m O fin- n ?VI ?-1 OJ O ?A ? m r ?zm o wm A nno ? m c i ?otir+_r? •• AOCI Tm y np ?2m 31T A 00 mmAAc n Ow mA o- >= TAOao (0 rrytin . NmNK? T > M +GI tv i d A b 0 r? > Y 7 n C o r 4\ J ^oa n y °' In ? o ?., ? C n Y. ? M a" 2 2 A e? b -3? J u 3 z s BK?W° ° I I ?; I aSl e h .. ^`FI I II ? ? I I 0 w ?g0 yl f NI _n N °I I? +? 1 Ii l I / / H o n / _i c a L „ 00"I t m 0 D 6 00,i1 o\ m IF- D z n cz o n? o m `^ o? - 2 y 0 m 7P ?P v n m o 0 o C a m J O I ? t T r - y T m r p T A X C C n m ? 0 0 N D < r D 2? Z z O Z N O m 2 0 o v A 2 ZO O r Tm O 0 o v ? ? D T D m n D 0 o v D y r v Z N O a o j+ > Z> C Z o O N C D N ?? ?1 n m m ? 7 a 0 0 ° T m 9 F N N ? O u ? m = ? Z m 2 m m c n = N O z y z o o m (? N m O m m y a on N n v O J _ r m m m O N; r . a Om o a zZ m T a ° o N m o a x N N - N a m m m mo o0 Z O- z Z N D r O 00 m T N y P y r -0 N O ? o o = m Z C o ON ? o W.- 0 t ?t z l 1 ? i F _-f ?`ss c 4t? r is ?i A. 1EJ p Ul'IIIGIG C ?] i R- i %? +G { ?? .rie'-tt ; .. f 4 y'- t' ?. 1V `LIDO ll DIVISION OF HIGHWAYS PAMLICO COUNTY - ll ®P® MAP PROJECT: B-5129D WBS' NUMBER: 42287.1.1 SCALE: 1" _ 1500' REPLACE BRIDGE NO - _ ON NC 304 OVER BEAR CREEK SHEET 2 OF 7 1619/09 BRIDGE n40 ? 1 1 MESIC POP. 753 ` /.? V LLYVILLE (CASH CORNERI, POP. 100 , u/ 1210 VICINITY MAPS NC DDT DIVISION OF HIGHWAYS PADILICO COUNTY PROJECT: B-5129D WBS NUMBER:42287.1.1 REPLACE BRIDGE n40 ON NC 304 OVER BEAR CREEK SHEET 1 OF 7 1/19/ . l} NORTH. CAROLINA. Figure 1 Project Vicinity '--> rare Cow 5 , 1-1 r? /rj t > *aw 1,177_,, 7} !^f3? rrpesl N , ? cl ?°°y ?? y1 5 'rl P M e h '? V"" cw?x?ax ? eannan h y rL "? •?? -?-` (?k aeme?`` i?..?t canal w? ??c ?.cLSI ie?S '. Vim. ?- jr\ m,retil > l sr E.'nal N .wp . w N 'S t` 1 I I ai. NN ! t V?e9e .Av f' 1 T 1, I mw c,.m.ea. ! e Yeer „+f z- --`J ?_. ?I Protect Vanity -.?- 2'. ` . P A M L' 1 I G.? ? ' 1 e lre< Nnerrt p Nll ? g 1on \s r k. ?'r 'Z-V4, x N "??? a IIIN=O 4AS °'l{ {1 IIA ')' ` ' i I? LrIRFY gn\?N//-Y ? ? {{M Mme l C\? 1 JY Li NAL! t IM?U/i \ W? ) I.??t ?\? (V U 1/fly ! ^ii? ' ? Narelock 1 t ? ? Q- sl, ,. s 1 ? ?•. B-5129 B through E, B-4594 Bridge Replacement Projects on NC 304 Pamlico County, North Carolina B-51298 Bridge No. 31 over Vandemere Creek B-5129C Bridge No. 35 over Little Vandemere Creek B-5129D Bridge No. 40 over Bear Creek B-5129E Bridge No. 42 over Gale Creek B-4594 Bridge No. 44 over UT to Jones Bay a w? North Carolina x Department of Transportation R:??au w nxr? e 3{ 1 ??`p t ?.1 S t / 'RY ' Z T F'3. v 4t i Legend -' - - 'County Boundary . z'- Roads A ar. i ii.M1 ? v V #f kd (WI-, , „y PO @ Bridge Locations Sa` - Miles z b ) d, ; r USGS 1:24K Maps: Vandemere, Jones Bay South Creek and Lowland