Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0003425_CAMA Assessment Report PART 1.5_20180526
Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC TABLES SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx TABLE 4-1 PROVISIONAL BACKGROUND BEDROCK GROUNDWATER CONCENTRATIONS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Parameter Units NCAC 02L Standard Number of Wells Sample Size Number of Detections Detection Provisional Frequency Bedrock UTL pH S.U. 6.5-8.5 9 69 69 100 6.1 - 8.1 Aluminum pg/L NE 9 65 64 98 Antimony pg/L 1 9 69 0 0 ND Arsenic ug/L 10 9 69 10 14 1.71 Barium pg/L 700 9 69 69 100 402 Beryllium pg/L 4* 9 69 0 0 ND Bicarbonate mg/L NE 9 69 69 100 8 Boron pg/L 700 9 69 0 0 ND Cadmium pg/L 2 9 69 0 0 ND Calcium mg/L NE 9 69 69 100 Carbonate mg/L NE 9 69 0 0 ND Chloride mg/L 250 9 69 69 100 130 Chromium (VI) Ng/L 10 9 55 19 35 0.7 Chromium pg/L 10 9 69 27 39 12.1 Cobalt Ng/L 1* 9 69 33 48 .3 Copper pg/L 100 9 69 13 19 2.14 Iron Ng/L 300 9 69 69 100 5645 Lead pg/L 15 9 69 1 1 ND Magnesium mg/L NE 9 69 69 100 29.5 Manganese ug/L 50 9 69 69 100 1200 Mercury Ng/L 1 9 69 0 0 ND Methane ug/L NE 9 69 31 21 1180 Molybdenum pg/L NE 9 69 67 97 25.4 Nickel pg/L 100 9 69 44 64 6.25 Nitrate + Nitrite mg-N/L NE 9 69 37 54 0.4 Potassium mg/L NE 9 69 67 97 10 Selenium Ng/L 9 69 0 0 ND Sodium mg/L NE 9 69 69 100 40 Strontium pg/L NE 9 69 69 100 945 Sulfate mg/L 250 9 69 69 100 49 Sulfide Ng/L NE 9 69 4 6 0.241 TDS mg/L 500 9 69 69 100 540 Thallium Ng/L 0.2* 9 69 0 0 ND TOC mg/L NE 9 69 68 99 29 Radium pCi/L 5" 9 38 38 100 6.1 Uranium pg/L 30° 9 38 38 100 3.24 Vanadium pg/L 0.3* 9 69 52 75 7 Zinc pg/L 1000 9 69 29 42 43.4 Prepared by: JHG Checked by: ARL NOTES: _ - Comparative value TDS - Total Dissolved Solids mg-N/L - milligrams nitrogen per liter TOC - Total Organic Carbon NE - Not established pg/L - micrograms per liter UTL - Upper Tolerance Limit mg/L - milligrams per liter pCi/L - Picocuries per liter S.U. - Standard Unit * Interim Maximum Allowable Concentration (IMAC) of the 15A NCAC 02L Standard, Appendix 1, April 2013. 0 - US EPA MCL for Safe Drinking Water Background wells: BG -SBR, MW-10BR, MW-13BR, MW-14BR, MW-15BR, MW-16BR, MW-17BR, MW-18BR, MW-19BRL Background concentrations represent Upper Tolerance Limits. Samples size - Number of samples after outlier omission. ND - Nondetected concentration. Dataset contained <2 detected concentrations. Radium - Total concentration of Radium -226 + Radium -228 in groundwater. Uranium - Total concentration of Uranium -233 + Uranium -234 + Uranium -236 + Uranium -238 in groundwater. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 4-1 BG Concentrations in Bedrock Groundwater.xlsx Page 1 of 1 TABLE 5-1 CCR/SEDIMENT THICKNESS SUMMARY - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Sample Location Northing Easting Boring Interval (ft BWS) Ash Interval (ft BWS) Ash Thickness (feet) CF -01 987817.798 1979924.581 28.5-38 28.5-30.5 2 CF -03 987164.784 1980187.356 22.5-28.5 22.5-26.5 4 CF -05 986410.148 1980513.897 8.5-15.5 8.5-13.3 4.8 EF -01 987491.442 1980642.258 18.5-23.5 18.5-22.5 3 EF -03 987710.749 1981586.168 10.5-15.9 10.5-11 0.5 WF -01 987777.794 1979334.592 20.5-28.8 20.5-22.5 2 WF -03 987036.361 1979508.766 10.5-17 10.5-11.5 1 WDC -01 987735.372 1978891.15 5.3-6.4 5.3-5.95 0.65 WDC -02 987881.9846 1978243.127 2.35-3.25 2.35-3.2 0.85 WDC -03 988383.9162 1977735.209 NR GRAB <0.5 WDC -04 989224.7412 1977296.378 2.4-3.2 2.4-3.2 0.8 WDC -05 989967.9316 1976825.61 3.3-5.1 3.3-5.1 1.8 WDC -06 991130.5905 1976494.013 3.8-4.9 3.8-4.9 1.1 Prepared by: ARL cnecked by: LMB Notes ft BWS = Feet below water surface NR = Depth to sediment surface not recorded GRAB = Surficial sample collected using ponar dredge, profile not collected P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Dlscharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 5-1 Table 5-2 CCR Sediment Thickness Summary.xls Page 1 of 1 TABLE 5-2 CCR/SEDIMENT THICKNESS SUMMARY - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Sample Location Northing Easting Sample Depth (ft BWS) Ash Interval (ft BWS) Ash Thickness (feet) CL -02 992906.539 1983752.4 16-36 16-35.8 19.8 CL -04 992782.777 1984128.857 20-24 20-24 4 CL -06 992663.585 1984513.329 13-20 13-13.25 0.25 CL -07 992659.816 1984708.134 10-15 10-10.5 0.5 CV -01 992519.925 1984146.377 11.9-19.9 11.9-12.9 1 CV -02 992378.127 1984162.067 5.5 GRAB <1 NL -04 992883.221 1984124.924 9.9 GRAB <1 NL -08 992846.91 1984814.998 4.75 GRAB <1 SL -08 992679.167 1984920.233 8.1 GRAB <1 EDC -00 993302.952 1983504.207 NR 0-1 1 EDC -01 993517.9439 1983653.251 0-0.25 GRAB <0.5 EDC -02 994158.9067 1983797.548 NR GRAB <0.5 EDC -03 994936.1838 1983496.637 NR GRAB <0.5 EDC -05 995756.2859 1982533.301 NR GRAB <0.5 Prepared by: ARL Checked by: EMB Notes: ft BWS = Feet below water surface NR = Depth to sediment surface not recorded GRAB = Surficial sample collected using ponar dredge, profile not collected P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33. Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 5-1—Table 5-2 CCR—Sediment Thickness Summary.xls Page 1 of 1 TABLE 5-3 WELL CONSTRUCTION DATA ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC ID Date Installed Monitoring Zone Material Diameter (Inches) Northing (Fee) t Easting (Feet) Measuring Point TOC Elevation (Feet-NAVD 88) Ground Surface Elevation (Feet-NAVD 88) Z 3 Boring Depth ' (Feet -BGS) Surface Casing Depth3 (Feet -BGS) Total Well Depth 2,3 (Feet -BGS) Measured Well Depthl (Feet -TOC) Screened Interval3 (Feet -BGS) Top of Screen Elevation (Feet-NAVD 88) Bottom of Screen Elevation (Feet-NAVD 88) Impoundment and Discharge Canal Monitoring Wells MW-27BR 2/7/2017 Bedrock PVC 2 994890.412 1982526.565 484.0 481.1 79.1 NA 76.2 79.1 65.0 75.0 415.0 405.0 MW-28BR 2/21/2017 Bedrock PVC 2 995859.218 1983070.713 477.0 474.1 137.0 NA 134.0 137.0 124.0 134.0 350.1 340.1 MW-29BR 2/20/2017 Bedrock PVC 2 995175.743 1983887.260 499.1 496.1 87.4 NA 84.4 87.4 74.0 84.0 421.7 411.7 MW-30BR 2/10/2017 Bedrock PVC 2 994378.334 1984205.975 523.9 520.9 144.8 NA 141.7 144.8 130.0 140.0 389.2 379.2 MW-31BR 2/7/2017 Bedrock PVC 2 988213.189 1976895.635 505.4 502.7 81.4 NA 78.8 81.4 68.0 78.0 434.0 424.0 MW-32BR 2/14/2017 Bedrock PVC 2 989621.299 1976363.754 512.0 509.3 263.8 NA 261.0 263.8 250.0 260.0 258.3 248.3 MW-33BR 2/17/2017 Bedrock PVC 2 990698.733 1976056.916 520.1 516.9 301.4 NA 298.2 301.4 283.0 298.0 228.7 218.7 Ash Basin Monitoring Wells ABMW-1 4/28/2015 Ash PVC 2 991717.597 1977553.393 470.6 467.6 73.0 NA 70.0 73.0 65.0 70.0 402.6 397.6 ABMW-1BR 4/30/2015 Bedrock PVC 2 991717.874 1977548.287 470.6 467.7 118.0 82.0 118.7 121.6 108.0 118.0 359.7 349.7 ABMW-2 5/3/2015 Ash PVC 2 990476.644 1978113.168 471.7 469.0 78.5 NA 77.7 80.5 70.7 75.7 398.3 393.3 ABMW-2BR 5/5/2015 Bedrock PVC 2 990481.814 1978118.152 471.7 468.9 103.8 83.0 103.6 106.4 98.8 103.8 370.1 365.1 ABMW-3 4/27/2015 Ash PVC 2 992468.824 1977830.045 471.8 468.2 11.0 NA 7.4 11.0 3.0 8.0 465.2 460.2 ABMW-3BR 5/5/2015 Bedrock PVC 2 992469.711 1977834.637 471.9 468.2 77.0 19.0 53.3 57.0 47.0 57.0 421.2 411.2 ABMW-3BRL 3/18/2016 Bedrock PVC 2 992476.563 1977828.554 471.9 468.3 303* 60.0 244.4 248.00* 235.3 245.3 233.0 223.0 ABMW-4 4/18/2015 Ash PVC 2 993230.039 1980874.561 500.1 497.3 53.0 NA 48.4 51.2 43.0 48.0 454.3 449.3 ABMW-4BR 4/27/2015 Bedrock PVC 2 993231.942 1980879.202 500.1 497.2 99.0 50.0 96.2 99.1 90.2 95.2 407.0 402.0 ABMW-5 3/17/2015 Ash PVC 2 993818.437 1980356.451 480.0 477.4 60.0 NA 53.3 56.0 51.0 56.0 426.4 421.4 ABMW-51D 3/18/2015 Saprolite PVC 2 993819.314 1980358.913 480.0 477.3 94.0 60.0 88.3 91.0 86.0 91.0 391.3 386.3 ABMW-6 3/13/2015 Ash PVC 2 993007.814 1980056.173 481.1 478.3 63.0 NA 60.1 63.0 55.0 60.0 423.3 418.3 ABMW-6BR 3/14/2015 Bedrock PVC 2 993008.044 1980058.735 481.2 478.2 87.0 62.0 87.0 90.0 82.0 87.0 396.2 391.2 ABMW-7 3/15/2015 Ash PVC 2 993704.630 1980943.641 479.3 476.6 80.0 NA 77.4 80.1 72.0 77.0 404.6 399.6 ABMW-7BR 3/16/2015 Bedrock PVC 2 993704.414 1980941.236 479.3 476.4 137.0 80.0 132.3 135.1 127.6 132.6 348.8 343.8 ABMW-7BRL 3/31/2016 Bedrock PVC 2 993697.735 1980958.055 480.4 477.5 306* 88.0 295.1 298.00* 285.0 295.0 192.5 182.5 Gypsum Pad Monitoring Wells GPMW-1S 3/6/2017 Saprolite PVC 2 995026.095 1980829.552 437.3 434.5 30.0 NA 30.0 33.7 20.0 30.0 414.5 404.5 GPMW-1D 3/6/2017 Transition PVC 2 995023.517 1980822.572 437.5 434.8 60.0 40.0 60.0 63.3 50.0 60.0 384.8 374.8 GPMW-IBR 3/8/2017 Bedrock PVC 2 995031.923 1980828.053 437.4 434.7 109.0 66.0 109.0 112.3 99.0 109.0 335.7 325.7 GPMW-2D 3/7/2017 Transition PVC 2 995419.620 1981494.889 436.5 433.4 46.0 NA 46.0 50.0 36.0 46.0 397.4 387.4 GPMW-2BR 3/8/2017 Bedrock PVC 2 995419.325 1981501.066 436.3 433.3 99.5 54.5 99.5 102.0 89.5 99.5 343.8 333.8 GPMW-3D 3/6/2017 Transition PVC 2 995702.329 1982145.938 435.4 432.7 33.5 NA 33.5 35.5 23.5 33.5 409.2 399.2 GPMS-3BR 3/8/2017 Bedrock PVC 2 995706.237 1982154.080 435.7 432.6 108.0 46.0 108.0 111.2 98.0 108.0 334.6 324.6 Monitoring Wells BG-1BR 4/14/2015 Bedrock PVC 2 987880.960 1976137.660 534.7 531.2 93.0 53.0 92.1 95.6 82.0 92.0 449.2 439.2 BG -1D 4/10/2015 Transition PVC 2 987877.390 1976136.750 534.5 531.2 44.0 NA 44.7 48.0 39.0 44.0 492.2 487.2 BG-1BRL 3/2/2016 Bedrock PVC 2 988112.057 1976428.287 520.0 517.3 297.0* 47.0 275.3 278* 265.0 275.0 252.3 242.3 P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 5-3 Well Construction Data.xlsx Page 1 of 3 TABLE 5-3 WELL CONSTRUCTION DATA ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC ID Date Installed Monitoring Zone Material Diameter (Inches) Northing (Fee) t Easting (Feet) Measuring Point TOC Elevation (Feet-NAVD 88) Ground Surface Elevation (Feet-NAVD 88) Z 3 Boring Depth ' (Feet -BGS) Surface Casing Depth (Feet -BGS) Total Well Depth 2,3 (Feet -BGS) Measured Well Depth' (Feet -TOC) Screened Interval3 (Feet -BGS) Top of Screen Elevation (Feet-NAVD 88) Bottom of Screen Elevation (Feet-NAVD 88) Monitoring Wells (Continued) BG-1BRLR 2/22/2017 Bedrock PVC 2 988105.414 1976418.283 521.4 518.5 400.0 46.0 160.3 163.2 150.0 160.0 368.5 358.5 MW -IBR 3/26/2015 Bedrock PVC 2 994421.395 1982989.860 507.9 504.8 77.0 27.5 77.0 76.2 66.2 76.2 438.6 428.6 MW-2BR 3/12/2015 Bedrock PVC 2 992275.107 1979378.743 493.8 490.8 37.0 NA 36.0 39.0 30.1 35.4 460.7 455.4 MW-3BR 5/14/2015 Bedrock PVC 2 995567.440 1982389.530 452.8 449.6 68.0 7.0 63.9 67.1 57.1 67.1 392.5 382.5 MW-4BR 5/13/2015 Bedrock PVC 2 987870.413 1978604.316 502.5 499.1 111.0 NA 90.1 93.4 80.0 90.0 419.1 409.1 MW-4BRL 3/8/2016 Bedrock PVC 2 987877.358 1978601.478 502.6 499.7 307* 42.0 305.0 308* 285.0 305.0 214.7 194.7 MW-5BR 3/31/2015 Bedrock PVC 2 993047.040 1978346.602 459.0 455.9 74.0 28.0 70.0 73.0 62.8 73.0 393.1 382.9 MW -5D 3/27/2015 Transition PVC 2 993051.088 1978345.244 458.7 455.8 20.9 NA 20.9 23.8 15.4 20.4 440.4 435.4 MW-6BR 4/2/2015 Bedrock PVC 2 993847.694 1978041.647 417.7 415.0 75.0 27.0 74.0 76.8 62.9 73.0 352.1 342.0 MW -61D 4/1/2015 Transition PVC 2 993844.554 1978041.168 417.7 415.0 22.0 NA 21.1 23.8 16.0 21.0 399.0 394.0 MW-7BR 4/16/2015 Bedrock PVC 2 989954.039 1975502.889 478.1 475.2 67.0 NA 57.4 60.3 47.0 57.0 428.2 418.2 MW -BR 4/28/2015 Bedrock PVC 2 991669.296 1975524.608 482.7 479.9 88.0 NA 83.7 86.6 76.4 86.4 403.5 393.5 MW-9BR 5/4/2015 Bedrock PVC 2 992764.112 1976206.519 450.2 447.3 79.5 NA 52.2 55.1 42.0 52.0 405.3 395.3 MW-10BR 4/8/2015 Bedrock PVC 2 989997.663 1982067.903 536.2 533.4 42.0 NA 42.0 44.2 36.0 41.0 497.4 492.4 MW-11BR 3/4/2015 Bedrock PVC 2 993472.000 1979319.020 467.5 464.8 45.8 NA 43.1 45.8 40.5 45.5 424.3 419.3 MW -11D 2/6/2017 Transition PVC 2 993480.132 1979326.434 467.3 464.6 31.0 NA 31.0 33.6 20.5 30.5 444.1 434.1 MW-12BR 4/29/2015 Bedrock PVC 2 991274.913 1976269.544 456.5 453.5 57.0 NA 57.0 60.0 52.0 57.0 401.5 396.5 MW-13BR 3/4/2015 Bedrock PVC 2 990704.398 1982798.161 553.0 550.1 57.0 NA 55.9 58.8 43.0 48.0 507.1 502.1 MW-14BR 2/28/2015 Bedrock PVC 2 996095.637 1984648.021 513.3 510.6 83.0 42.0 82.4 85.2 77.0 82.0 433.6 428.6 MW -14S 3/2/2015 Saprolite PVC 2 996092.175 1984650.673 513.4 510.4 37.5 NA 37.5 38.7 31.0 36.0 479.4 474.4 MW -14D 3/2/2015 Transition PVC 2 996094.017 1984649.277 513.4 510.5 55.5 NA 54.7 57.6 50.0 55.0 460.5 455.5 MW-15BR 4/9/2015 Bedrock PVC 2 987071.733 1977796.644 508.3 504.8 85.0 NA 60.1 63.6 50.0 60.0 454.8 444.8 MW -15D 4/18/2015 Transition PVC 2 987068.841 1977798.333 508.4 505.2 31.0 NA 30.8 34.0 21.0 31.0 484.2 474.2 MW-16BR 4/7/2015 Bedrock PVC 2 990431.573 1981217.872 520.5 517.6 58.0 NA 55.7 58.6 50.5 55.5 467.1 462.1 MW-17BR 4/22/2015 Bedrock PVC 2 992038.661 1985264.186 534.5 532.1 82.0 NA 82.0 84.5 65.0 75.0 467.1 457.1 MW-18BR 5/18/2015 Bedrock PVC 2 986577.827 1982230.654 532.6 529.4 108.0 61.0 107.0 110.2 97.1 107.1 432.3 422.3 MW -18D 5/16/2015 Transition PVC 2 986575.379 1982232.696 532.7 529.7 58.4 NA 58.0 61.0 48.1 58.1 481.6 471.6 MW-19BRL 6/9/2016 Bedrock PVC 2 990230.279 1982876.094 564.3 561.2 77.0 NA 73.8 77.0 63.0 73.0 498.2 488.2 MW-20BRL 2/27/2016 Bedrock PVC 2 993029.101 1984933.114 487.1 483.5 207.0 26.0 201.0 205* 195.0 205.0 288.5 278.5 MW-21BRL 4/28/2016 Bedrock PVC 2 991832.780 1982130.128 529.6 526.6 297.0 37.0 157.8 160.8 143.0 158.0 383.6 368.6 MW-22BRL 4/13/2016 Bedrock PVC 2 994705.940 1981526.188 474.1 470.8 302.0 37.0 301.1 303.00* 290.0 300.0 180.8 170.8 MW-22BR 4/15/2016 Bedrock PVC 2 994705.938 1981529.128 474.0 470.9 72.0 37.0 71.2 74.3 60.0 70.0 410.9 400.9 MW -22D 4/14/2016 Bedrock PVC 2 994705.944 1981520.307 474.0 470.8 40.0 NA 35.7 38.9 26.0 36.0 444.8 434.8 MW-23BR 6/8/2016 Bedrock PVC 2 993204.212 1984286.303 518.9 515.7 129.0 NA 129.8 133.0 119.0 129.0 396.7 386.7 MW-23BRR 2/9/2017 Bedrock PVC 1 2 1 993220.300 1 1984306.440 1 523.8 1 521.1 203.0 1 NA 1 204.0 1 206.7 1 194.0 1 204.0 1 327.1 317.1 P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 5-3 Well Construction Data.xlsx Page 2 of 3 TABLE 5-3 WELL CONSTRUCTION DATA ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC ID Date Installed Monitoring Zone Material Diameter (Inches) Northing t (Fee) Easting (Feet) Measuring Point TOC Elevation (Feet-NAVD 88) Ground Surface Elevation (Feet-NAVD 88) Z 3 Boring Depth ' (Feet -BGS) Surface Casing Depth (Feet -BGS) Total Well Depth 2,3 (Feet -BGS) Measured Well Depth' (Feet -TOC) Screened Interval3 (Feet -BGS) Top of Screen Elevation (Feet-NAVD 88) Bottom of Screen Elevation (Feet-NAVD 88) Monitoring Wells (Continued) MW-24BR 6/8/2016 Bedrock PVC 2 992253.427 1985191.480 527.1 524.0 155.0 NA 155.8 158.9 145.0 155.0 379.0 369.0 MW-25BR 6/7/2016 Bedrock PVC 2 991842.165 1984850.165 543.4 540.4 110.0 NA 110.0 113.7 100.0 110.0 440.4 430.4 MW-26BR 6/8/2016 Bedrock PVC 2 988570.279 1982360.462 521.3 518.0 84.0 NA 80.9 84.2 74.0 84.0 444.0 434.0 Previously Installed Wells BG -1 11/2/2010 Transition - Bedrock PVC 2 987881.600 1976145.700 533.7 530.9 52.5 NA 51.9 54.8 32.5 52.0 498.4 478.9 CW -1 10/29/2010 Bedrock PVC 2 994400.840 1983011.710 508.2 505.8 40.3 NA 40.1 42.6 20.0 39.8 485.8 466.0 CW -2 10/29/2010 Transition PVC 2 993052.596 1977462.665 424.6 421.7 18.0 NA 17.3 20.1 7.7 17.5 414.0 404.2 CW -2D 10/28/2010 Bedrock PVC 2 993049.411 1977468.265 424.6 422.2 30.4 NA 30.4 32.6 25.1 29.9 397.1 392.3 CW -3 10/26/2010 Transition PVC 2 988904.538 1977321.007 451.8 448.5 11.4 NA 10.9 14.3 3.4 11.4 445.1 437.1 CW -3D 10/29/2010 Bedrock PVC 2 988904.348 1977313.050 451.6 448.1 47.0 NA 46.1 49.6 41.7 46.5 406.4 401.6 CW -4 11/1/2010 Transition - Bedrock PVC 2 987736.037 1978596.909 479.7 477.3 39.5 NA 39.8 42.2 24.2 39.0 453.1 438.3 CW -5 11/3/2010 Transition PVC 2 993025.771 1978359.730 459.7 457.4 21.9 NA 19.9 22.2 4.7 19.5 452.7 437.9 GMW-6 3/14/2002 Transition PVC 2 994176.004 1981014.166 480.1 477.7 45.0 NA 44.1 46.5 30.0 45.0 447.7 432.7 GMW-7 6/28/2010 Bedrock PVC 2 992406.857 1981055.189 499.6 497.0 54.0 NA 54.0 57.4 39.0 54.0 458.0 443.0 GMW-8 3/14/2002 Bedrock PVC 2 991818.762 1982129.865 528.6 525.6 65.0 NA 63.9 66.9 53.0 63.0 472.6 462.6 GMW-9 3/14/2002 Bedrock PVC 2 991723.256 1983059.403 536.2 533.8 45.0 NA 46.3 48.7 30.0 45.0 503.8 488.8 GMW-10 9/25/2002 Bedrock PVC 2 994405.330 1981428.524 494.1 491.0 45.0 NA 45.4 48.6 30.0 45.0 461.0 446.0 GMW-11 9/26/2002 Bedrock PVC 2 994284.698 1981768.827 496.6 493.4 45.0 NA 45.9 49.0 30.0 45.0 463.4 448.4 MW -1 12/22/1986 Saprolite PVC 2 992754.720 1977587.310 422.5 421.3 28.0 NA 26.8 28.0 23.0 28.0 398.3 393.3 MW -2 12/22/1986 Transition PVC 2 992334.638 1976849.035 422.9 421.3 25.6 NA 25.6 27.2 20.5 25.5 400.8 395.8 PZ -12 5/6/2003 Ash PVC 2 992994.766 1983152.753 514.4 511.6 50.0 NA 52.2 55.0 30.0 50.0 481.6 461.6 PZ -14 UNK UNK PVC 2 993893.201 1980352.801 471.7 468.9 UNK NA 43.7 46.6 UNK UNK UNK UNK Prepared by: ARL Checked by: ALA Notes: BGS = Below ground surface NA = Not applicable TOC = Top of casing NAVD 88 = North American Vertical Datum 1988 UNK = Data not known *= wells over 200 ft, total depth estimated = Well depths initially measured by SynTerra June 15, 2015 and updated as new wells are installed. Z = "Boring Depth" is the total depth of soil boring; "Total Well Depth" is the depth to the bottom of the filter pack. 3 = Values measured during well installation P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 5-3 Well Construction Data.xlsx Page 3 of 3 TABLE 6-1 WASTEWATER ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 1 of 3 Analytical Parameter pH Temp Spec Cond DO ORP Eh Turbidity Alkalinity Aluminum Antimony Arsenic Barium Beryllium Bi- carbonate Alkalinity Boron Cadmium DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT Reporting Units S.U. Deg C umcros mg/L my my NTUs mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE 1* NE 10 NE 700 NE 4* NE NE 700 NE 2 Sample ID Sample Collection Date Field Parameters Analytical Results CF -02 DW 7/19/2016 7.0 16 295 0.17 -51 154 56.30 77.8 40 1660 <1 <1 110.00 134.00 114 125 <1 <1 77.8 712 708 <1 <1 CF -02 SW 07/19/2016 8.0 31 268 7.91 129 334 5.66 37.2 23 126 <1 <1 6.99 7.97 57 58 <1 <1 37.2 813 800 <1 <1 CF -04 DW 07/19/2016 6.9 19 271 0.41 19 224 75.30 54.3 19 1490 <1 <1 46.90 60.20 95 109 <1 <1 54.3 709 740 <1 <1 CF -04 SW 07/19/2016 7.9 30 256 7.92 193 398 5.57 36.0 20 142 <1 <1 6.30 7.11 54 57 <1 <1 36.0 753 772 <1 <1 EF -02 DW 07/18/2016 6.9 19 279 0.30 -87 118 70.00 54.9 16 1420 <1 <1 40.10 54.30 94 107 <1 <1 54.9 724 731 <1 <1 EF -02 SW 07/18/2016 8.1 34 277 8.85 9 214 5.20 36.6 20 118 <1 <1 6.75 7.15 55 60 <1 <1 36.6 778 797 <1 <1 EF -04 DW 07/18/2016 7.5 31 237 7.01 50 255 9.31 35.4 8 333 <1 <1 5.44 7.10 50 64 <1 <1 35.4 680 696 <1 <1 EF -04 SW 07/18/2016 8.0 34 249 6.69 56 261 4.56 36.0 14 153 <1 <1 5.43 6.24 53 55 <1 <1 36.0 722 701 <1 <1 WF -02 DW 07/18/2016 7.0 22 340 0.21 -111 95 39.50 93.4 9 1780 <1 <1 32.30 138.00 114 147 <1 <1 93.4 780 798 <1 <1 WF -02 SW 07/18/2016 8.1 1 33 265 7.20 6 1 211 4.31 38.1 18 139 <1 <1 6.51 7.09 54 58 <1 <1 38.1 786 799 <1 <1 WF -04 DW 07/18/2016 7.8 31 262 6.50 106 311 12.20 37.4 13 221 <1 <1 5.60 7.07 52 56 <1 <1 37.4 774 770 <1 <1 WF -04 SW 07/18/2016 8.0 33 262 8.57 98 303 6.00 37.4 15 171 <1 <1 6.03 6.78 52 56 <1 <1 37.4 772 773 <1 <1 WDC -01 03/02/2017 8.2 15 338 7.80 -190 15 5.49 33.0 7 157 <1 <1 2.32 2.89 53 60 <1 <1 33.0 853 885 <1 <1 WDC -02 03/02/2017 7.6 15 274 6.70 -94 111 4.70 33.2 12 207 <1 <1 2.24 3.00 53 60 <1 <1 33.2 854 894 <1 <1 WDC -03 03/01/2017 7.5 17 269 7.97 350 555 10.90 33.0 6 398 <1 <1 2.10 4.00 53 59 <1 <1 33.0 880 877 <1 <1 WDC -04 03/01/2017 7.4 19 272 7.40 137 342 8.99 34.3 6 360 <1 <1 2.40 4.10 53 61 <1 <1 34.3 846 895 <1 <1 WDC -05 03/01/2017 7.4 19 280 7.30 137 342 6.45 34.4 7 335 <1 <1 2.24 4.02 54 61 <1 <1 34.4 911 1010 <1 <1 WDC -06 03/01/2017 7.2 21 325 7.40 143 348 11.30 36.9 8 333 <1 <1 2.82 4.39 54 60 <1 <1 36.9 1130 1210 <1 <1 WDC -06 DUP 03/01/2017 7.2 21 325 7.40 143 348 11.30 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 1 of 3 TABLE 6-1 WASTEWATER ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 2 of 3 Analytical Parameter Calcium TOT Carbonate Alkalinity Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Methane DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT TOT DIS TOT DIS TOT Reporting Units mg/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard NE NE 250 NE 30 NE 1* NE 1000 NE 300 NE 15 NE NE 50 NE 1 NE Sample ID Sample Collection Date Analytical Results CF -02 DW 7/19/2016 25.4 <5 21 B2 <1 2.36 2.24 3.56 <1 2.73 11700 13200 <1 1.71 8.13 2490 2510 NA 0.00775 D3 10300 CF -02 SW 07/19/2016 25.2 <5 25 B2 <1 <1 <1 <1 1.51 1.51 10 128 <1 <1 8.12 <5 45 NA 0.000857 11.9 CF -04 DW 07/19/2016 24.7 <5 21 B2 <1 1.72 2.58 3.67 <1 1.86 5300 6570 <1 1.42 7.49 2460 2610 NA 0.00665 D3 2900 CF -04 SW 07/19/2016 24.7 <5 23 B2 <1 <1 <1 <1 1.37 1.40 29 241 <1 <1 8.17 <5 53 NA 0.0011 27.5 EF -02 DW 07/18/2016 24.9 <5 21 B2 <1 1.78 2.78 3.68 <1 2.09 3140 6080 <1 1.21 7.57 2370 2440 NA 0.006070001 1360 EF -02 SW 07/18/2016 24.7 <5 24 B2 <1 <1 <1 <1 1.32 1.64 13 137 <1 <1 8.15 <5 45 NA 0.000933 1650 EF -04 DW 07/18/2016 22.1 <5 20 B2 <1 <1 <1 <1 <1 1.50 13 444 <1 <1 7.33 <5 105 NA 0.00151 27.6 EF -04 SW 07/18/2016 22.9 <5 21 B2 <1 <1 <1 <1 1.14 1.44 <10 181 <1 <1 7.58 <5 50 NA 0.00113 29.8 WF -02 DW 07/18/2016 30.0 <5 24 B2 <1 1.93 2.02 3.2 <1 2.71 2050 13400 <1 1.4 9.27 4160 4420 NA 0.00577 8850 WF -02 SW 07/18/2016 25.1 <5 24 B2 <1 <1 <1 <1 1.29 1.56 <10 163 <1 <1 8.33 <5 53 NA 0.000995 15.7 WF -04 DW 07/18/2016 24.7 <5 24 B2 <1 <1 <1 <1 1.44 1.63 17 288 <1 <1 8.19 <5 77 NA 0.0015 34.1 WF -04 SW 07/18/2016 24.6 <5 24 B2 <1 <1 <1 <1 1.18 1.58 18 243 <1 <1 8.20 <5 66 NA 0.00101 55.6 WDC -01 03/02/2017 24.4 <5 28 <1 <1 <1 <1 1.14 1.39 36 306 <1 <1 8.66 7 115 0.000578 H1 0.00122 <10 WDC -02 03/02/2017 24.7 <5 28 <1 <1 <1 <1 1.72 1.50 32 348 <1 <1 8.77 13 132 0.000541 H1 0.00162 <10 WDC -03 03/01/2017 24.8 <5 29 <1 <1 <1 <1 1.45 1.71 37 489 <1 <1 8.82 28 173 0.000654 H1 0.00147 <10 WDC -04 03/01/2017 24.7 <5 28 <1 <1 <1 <1 1.57 1.66 44 515 <1 <1 8.80 128 253 0.000573 H1 0.00155 30.6 WDC -05 03/01/2017 26.4 <5 31 <1 <1 <1 <1 1.55 1.68 53 499 <1 <1 9.80 181 306 0.000809 H1 0.00191 47.2 WDC -06 03/01/2017 30.5 <5 44 <1 <1 <1 <1 1.35 1.73 47 491 <1 <1 11.50 180 267 0.0012 H1 0.165 D3 32.6 WDC -06 DUP 03/01/2017 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 0.00116 H1 NA NA Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 2 of 3 TABLE 6-1 WASTEWATER ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 3 of 3 Analytical Parameter Molybdenum DIS TOT Nickel DIS TOT Nitrate + Nitrite Potassium Selenium Sodium Strontium Sulfate Sulfide Thallium Total Dissolved Solids Total Organic Carbon Total Suspended Solids Vanadium Zinc TOT DIS TOT TOT DIS TOT DIS TOT DIS TOT DIS TOT Reporting Units ug/L ug/L ug/L ug/L mg-N/L mg/L ug/L ug/L mg/L ug/L ug/L mg/L mg/L ug/L ug/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard NE NE NE 100 NE NE NE 20 NE NE NE 250 NE NE 0.2* 500 NE NE NE 0.3* NE 1000 Sample ID Sample Collection Date Analytical Results CF -02 DW 7/19/2016 21.70 44.20 1.02 3.98 <0.01 4.54 <1 1.77 8.09 270 271 17 <0.1 <0.2 <0.2 190 9.2 49 10.8 20.9 <5 9 CF -02 SW 07/19/2016 50.90 55.10 1.66 1.85 0.017 4.51 1.90 1.82 8.07 261 257 43 <0.1 <0.2 0.258 200 6.3 <5 6.8 8.1 <5 <5 CF -04 DW 07/19/2016 32.30 56.70 1.24 4.24 <0.01 4.57 <1 1.42 8.21 266 280 33 <0.1 <0.2 <0.2 200 7.1 45 5.59 12.2 <5 9 CF -04 SW 07/19/2016 48.30 52.00 1.38 1.64 0.073 4.82 1.91 1.7 8.64 241 249 40 <0.1 <0.2 0.2 190 6.4 <5 6.14 7.2 <5 <5 EF -02 DW 07/18/2016 44.20 52.40 2.71 3.97 <0.01 4.57 <1 1.5 8.29 269 277 31 <0.1 <0.2 <0.2 180 7.2 48 4.96 12.6 <5 8 EF -02 SW 07/18/2016 50.60 50.40 1.42 1.73 0.036 4.75 1.71 1.81 8.47 252 259 41 <0.1 0.224 <0.2 180 6.3 <5 6.14 6.8 <5 <5 EF -04 DW 07/18/2016 47.40 47.30 1.35 1.77 <0.01 4.46 1.51 1.8 7.89 231 236 36 <0.1 <0.2 <0.2 160 6.6 11 4.06 6.0 <5 <5 EF -04 SW 07/18/2016 47.20 48.70 1.23 1.59 0.012 4.55 1.63 1.76 8.12 239 234 38 <0.1 <0.2 <0.2 160 6.3 <5 4.72 5.8 <5 <5 WF -02 DW 07/18/2016 39.20 44.20 1.24 2.73 <0.01 5.19 <1 1.56 9.68 327 345 21 <0.1 <0.2 <0.2 210 8.2 53 2.29 14.8 <5 8 WF -02 SW 07/18/2016 50.50 51.00 1.37 1.62 <0.01 4.84 1.73 1.88 1 8.52 256 258 41 <0.1 M3 0.273 0.239 170 6.6 <5 5.99 7.2 <5 <5 WF -04 DW 07/18/2016 49.70 51.40 1.21 1.59 <0.01 4.81 1.77 1.97 8.47 251 251 41 <0.1 <0.2 0.203 180 6.4 20 5.43 7.3 <5 <5 WF -04 SW 07/18/2016 50.70 50.70 1.32 1.56 0.038 4.8 1.84 1.92 8.42 250 252 41 <0.1 0.206 <0.2 170 6.4 5.6 5.67 6.9 <5 <5 WDC -01 03/02/2017 46.50 44.90 2.07 2.34 0.213 5.30 1.52 1.69 8.65 254 256 45 <0.1 <0.2 <0.2 200 5.9 <5 2.09 B2 2.6 10 9 WDC -02 03/02/2017 45.90 44.00 2.26 2.28 0.256 5.34 1.51 1.52 8.70 254 257 45 <0.1 <0.2 <0.2 180 5.5 6 1.89 B2 2.8 <5 6 WDC -03 03/01/2017 43.00 45.70 1.79 2.56 0.21 5.39 1.46 1.52 8.73 1 261 253 46 <0.1 <0.2 <0.2 B3 180 6.0 9 1.58 3.6 5 7 WDC -04 03/01/2017 42.40 45.00 1.78 2.37 0.197 5.32 1.37 1.6 8.77 253 259 45 <0.1 <0.2 <0.2 B3 200 5.9 12 1.68 3.6 <5 11 WDC -05 03/01/2017 42.00 45.00 1.97 2.58 0.209 5.32 1.37 1.64 8.94 255 261 46 <0.1 <0.2 <0.2 B3 190 5.9 7 1.58 3.3 6 8 WDC -06 03/01/2017 43.60 45.80 2.52 3.23 0.171 5.52 2.02 2.55 9.36 277 282 50 <0.1 <0.2 <0.2 B3 230 6.0 8 2.47 4.4 7 11 WDC -06 DUP 03/01/2017 NA NA NA I NA NA NA NA NA NA NA NA NA NL_J NA NA NA NA NA NA NA NA NA Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Spec Cond - Specific Conductance Deg C - Degrees Celsius NTU - Nephelometric turbidity unit DO - Dissolved oxygen DUP - Duplicate umhos/cm - Micro mhos per centimeter NE - Not established ORP - Oxidation -Reduction Potential S.U. - Standard Unit mg/L - Milligrams per liter DIS - Dissolved Eh - Redox Potential NA - Not analyzed my - Millivolts Temp - Temperature NM - Not measured mg - N/L - Milligrams nitrogen per liter ug/L - Micrograms per liter TOT- Total < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H1 - Analysis conducted outside the EPA method holding time. M3 - Matrix spike recovery was outside laboratory control limits due to matrix interferences. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-1 Waste Water Analytical Resultss_SEI and WDC.XLSX Page 3 of 3 TABLE 6-2 SEDIMENT ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter y Cation Exchange 9 Capacity Fractional Organic Or 9 Carbon Fractional Organ g Matter Percent Moisture Percent Solids Percent Total Solids PH Oxidation Reduction Potential Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Reporting Units meq/100g 0/0 % 0/0 % % S.U. my mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg Soil RSL - Protection of Groundwater NE NE NE NE NE NE NE NE NE 0.27 0.29 82 3.2 NE NE NE NE 180000 NE Sample ID Sample Collection Date Analytical Results CF -01 07/20/2016 NA NA NA 31.9 NA NA NA NA 15000 <3 N2 26.5 140 1.6 10.3 0.25 1280 <365 D3 33.3 24.2 CF -03 07/21/2016 NA NA NA 75.3 NA NA NA NA 35300 <8.7 N2 77.9 261 1.5 12.1 1 2940 <1020 D3 55.8 25.6 CF -05 07/21/2016 NA NA NA 44.5 NA NA NA NA 13500 <3.3 N2 19.6 107 0.19 <4.1 0.22 1010 <452 D3 25.2 10 EF -01 07/21/2016 NA NA NA 69.9 NA NA NA NA 8730 <7.7 N2,M6 62.9 64 0.85 <9.1 0.92 841 <807 D3,M1 21.7 32.4 EF -03 07/21/2016 NA NA NA 38.3 NA NA NA NA 9800 <3.2 N2 15 65.9 0.42 <4 0.28 1190 <406 D3 25.1 13.9 WF -01 07/20/2016 NA NA NA 38.3 NA NA NA NA 20100 <2.9 N2 21.1 165 1.5 4.4 0.25 1620 <409 D3 32.6 19.8 WF -03 07/20/2016 NA NA NA 27.1 NA NA NA NA 10900 <2.3 N2,M6,R1 10.7 M6 88.9 0.42 <2.9 0.2 783 <337 D3 30.7 12.9 WDC -01 03/02/2017 8.8 4 6.92 NA 49.2 49.8 6.9 -41 H 21000 0.14 j 35 100 B 1.4 22j 0.6 2400 33 38 20 WDC -02 03/02/2017 6.7 1.2 2.02 NA 74.9 72.9 7.0 55 H 13000 0.22 j 28 94 B 1 11 j 0.42 4200 12j 36 21 WDC -03 03/01/2017 3.7 0.9 1.46 NA 74.4 72.8 7.3 16 H 12000 0.27 j 28 80 B 0.93 8.8 j 0.27 j 4900 13 51 20 WDC -04 03/01/2017 8.4 5.9 10.1 NA 33.1 34 7.0 -38 H 25000 0.37 j 43 140 B 1.7 22j 0.85 4500 59 37 28 WDC -05 03/01/2017 23 6 10.3 NA 30.7 93.5 H 6.6 257 H 39000 0.21 j 48 200 B 2.6 56j 1.4 5900 1100 65 33 WDC -06 03/01/2017 8.4 6.4 10.9 NA 24.9 29 6.9 -86 H 41000 0.12 j 33 150 B 2.8 58j 1.2 8200 910 73 31 Prepared by: BER Checked by: ARL Notes: 0 - Bold color highlighted concentrations indicate highest exceedance of the USEPA, 2016; Regional Screening Levels - May 2016 (USEPA, 2016) % - Percent NA - Not analyzed meq/1008 - millequivalents per 100 grams NE - Not established mg/kg - Milligrams per kilogram S.U. - Standard Unit my - Millivolts <- concentration not detected at or above the adjusted reporting limit. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 1OX the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H - Sample analyzed past the recommended holding time. H3 - Sample was received or analysis requested beyond the recognized method holding time. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. R1 - Relative Percent Difference (RPD) value was outside control limits. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-2 Sediment Analytical Results_SEI and WDC.XLSX Page 1 of 2 TABLE 6-2 SEDIMENT ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT AND WESTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel Nitrate (as N) Potassium Selenium Sodium Strontium Sulfate Thallium Total Organic Carbon Vanadium Zinc Reporting Units mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg Soil RSL - Protection of Groundwater 46 NE 14 NE NE 0.1 NE NE NE NE 0.26 NE NE NE 0.14 NE 8.6 NE Sample ID Sample Collection Date Analytical Results CF -01 07/20/2016 32.7 13700 24.5 1570 415 0.018 3.1 20.6 <36.5 H3,D3 1660 9.6 <372 64.8 <365 D3 <1.5 5780 100 39 CF -03 07/21/2016 53.8 35500 32.6 2570 394 0.073 22.4 47.5 <102 H3,D3 1870 29.9 274 70.9 <1020 D3 <4.4 35500 201 150 CF -05 07/21/2016 14.4 12500 14.5 1250 228 0.034 3.3 10.9 <45.2 H3,D3 855 13.4 86.9 19 <452 D3 <1.6 11600 65.8 30.6 EF -01 07/21/2016 20.2 8870 26.5 724 119 0.067 7.5 13.9 <80.7 H3,D3,M1 536 31.6 M6 <181 22.6 <807 D3 <3.9 9020 206 M6 36.3 EF -03 07/21/2016 15.3 14400 5.6 2010 355 0.014 2.4 15.5 <40.6 H3,D3 565 6 <79.3 14 <406 D3 <1.6 8920 55.4 39.8 WF -01 07/20/2016 42.9 19200 16.7 3770 413 0.018 3.3 20.2 <40.9 H3,D3 2320 7 324 49 <409 D3 <1.4 4060 93.7 55.2 WF -03 07/20/2016 15.9 9880 10.4 795 454 0.018 2 13.8 <33.7 H3,D3 498 7.2 102 22.4 <337 D3 <1.2 5070 51.7 M6 26.8 WDC -01 03/02/2017 46 22000 6.7 3500 570 0.0349 j 5.4 34 1.8 j 1200 9.4 110 28 130 NA NA 75 110 WDC -02 03/02/2017 34 25000 3.2 5100 800 <0.13 3.5 36 1 j 1500 1.4 210 20 60 NA NA 65 110 WDC -03 03/01/2017 42 25000 3.1 4400 700 <0.121 3.8 32 1 j 1200 0.81 310 27 46 NA NA 70 93 WDC -04 03/01/2017 54 27000 9.1 4500 900 <0.282 10 43 2.4 j 1600 9.1 190 48 280 NA NA 95 160 WDC -05 03/01/2017 96 37000 14 7500 360 0.215 j 10 74 2.9 j 2400 30 350 55 840 NA NA 120 220 WDC -06 03/01/2017 100 38000 13 9200 330 2.27 23 120 3.7j 2200 96 830 59 1200 NA NA 110 180 Prepared by: BER Checked by: ARL Notes: 0 - Bold color highlighted concentrations indicate highest exceedance of the USEPA, 2016; Regional Screening Levels - May 2016 (USEPA, 2016) % - Percent NA - Not analyzed meq/100g - millequivalents per 100 grams NE - Not established mg/kg - Milligrams per kilogram S.U. - Standard Unit my - Millivolts <- concentration not detected at or above the adjusted reporting limit. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 10X the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H - Sample analyzed past the recommended holding time. H3 - Sample was received or analysis requested beyond the recognized method holding time. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. R1 - Relative Percent Difference (RPD) value was outside control limits. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-2 Sediment Analytical Results_SEI and WDC.XLSX Page 2 of 2 TABLE 6-3 SPLP ANALYTICAL RESULTS - SOUTHERN EXTENSION IMPOUNDMENT ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) mg/L - Milligrams per liter NA - Not analyzed NE - Not established ug/L - Micrograms per liter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 10X the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. LS - Analyte recovery in the laboratory control sample (LCS) was above quality control (QC) limits. Results may be biased high. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-3 SPLP Analytical Results_SEI.XLSX Page 1 of 1 Analytical Parameter Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel �asN) Potassium Selenium Sodium Strontium Sulfate Thallium Vanadium Zinc Reporting Units ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L mg/L mg/L ug/L mg/L ug/L mg/L ug/L ug/L ug/L 15A NCAC 02L Standard NE 1* 10 700 4* 700 2 NE 250 10 1* 1000 300 15 NE 50 1 NE 100 10 NE 20 NE NE 250 0.2* 0.3* 1000 Sample ID Sample Collection Date Analytical Results CF -01 07/20/2016 11800 <2.5 D3 24.2 D3 91 1.2 D3 432 D3,L1,B <0.4 D3 2.4 11.3 22.5 D3,B 30.6 D3 27 D3 13200 24.8 D3 0.93 210 <0.2 NA 7.7 <0.29 <5 3.9 D3 28.3 L1,B 23 20.6 B <0.5 D3 125 D3 <50 CF -03 07/21/2016 7200 3.1 D3 23.5 D3 110 <0.5 D3 <250 D3,1_1 <0.4 D3 7.3 <20.3 5.5 D3,B 5.5 D3 16 D3 9200 6 D3 1.9 530 <0.2 NA 15 <0.81 <5 4 D3 7.1 L1,B 78 157 <0.5 D3 47.1 D3 <50 CF -05 07/21/2016 10400 4 D3 28.9 D3 60 0.67 D3 <250 D3,1_1 <0.4 D3 1.1 <9 8 D3,B 3.8 D3 9 D3 9500 11.6 D3 <0.5 82 <0.2 NA 6.3 <0.36 <5 4.7 D3 7.7 L1,B 13 29.9 B <0.5 D3 58.9 D3 <50 EF -01 07/21/2016 9300 3.9 D3 27.6 D3 120 0.76 D3 <250 D3,L1 <0.4 D3 6.9 <16.6 9 D3,B 9.2 D3 21.5 D3 11200 8.5 D3 2 540 <0.2 NA 21 <0.67 <5 4.5 D3 <5 L3 77 122 0.78 D3 71.8 D3 <50 EF -03 07/21/2016 6700 <2.5 D3 7.4 D3 60 <0.5 D3 <250 D3,1_1 <0.4 D3 3.2 <8.1 5 D3,B 5 D3 6.7 D3 9000 3.2 D3 1.4 240 <0.2 NA 7.7 <0.32 <5 <2.5 D3 <5 L3 36 29 B <0.5 D3 25.2 D3 <50 WF -01 07/20/2016 26400 97 D3 99.2 D3 150 101 D3 326 D3,L1,B 97.7 D3 2.6 <8.1 101 D3 99.1 D3 104 D3 24400 104 D3 2.2 630 <0.2 NA 13 <0.32 <5 97.6 D3 <5 L3 51 25.9 B 103 D3 99.8 D3 <50 WF -03 07/20/2016 21200 <2.5 D3 9.3 D3 120 0.68 D3 <250 D3,1_1 <0.4 D3 1.4 9.2 6.8 D3,B 1 12.2 D3 8.4 D3 20000 10.4 D3 1.1 280 <0.2 NA 14 <0.27 <5 3 D3 5.5 L1,B 19 11.2 B <0.5 D3 35.9 D3 <50 Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) mg/L - Milligrams per liter NA - Not analyzed NE - Not established ug/L - Micrograms per liter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 10X the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. LS - Analyte recovery in the laboratory control sample (LCS) was above quality control (QC) limits. Results may be biased high. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-3 SPLP Analytical Results_SEI.XLSX Page 1 of 1 TABLE 6-4 GROUNDWATER ANALYTICAL RESULTS - WAB, SEI AND WDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. RI - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 1 of 3 Analytical Parameter PH Water Level Temp Spec Cond DO ORP Eh Aluminum Aluminum Antimony Antimony Arsenic Arsenic Barium Barium Beryllium Beryllium BI- carbonate Alkalinity Boron Boron Cadmium Cadmium Calcium Carbonate Alkalinity Turbidity Alkalinity DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT TOT Reporting Units S. U. ft Deg C u/cm os mg/L mV mV NTUs mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L mg/L mg/L 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE NE 1* NE 10 NE 700 NE 4* NE NE 700 NE 2 NE NE Provisional Background 6.1-8.1 NE NE NE NE NE NE NE 308 NE 323 NE NE NE 1.71 NE 402 NE NE 308 NE NE NE NE 95.4 NE Sample ID Sample Collection Date Field Parameters Analytical Results ABMW-01 02/09/2017 9.5 7.31 13 537 0.40 -168 37 1.13 88.9 2860 2900 5.06 4.55 741 M4 641 156 171 <1 <1 <5 11800 12900 <1 <1 85.8 88.2 ABMW-01BR 02/09/2017 7.1 7.97 15 553 0.44 -131 74 0.84 261 <5 9 <1 <1 <1 <1 M4 31 34 <1 <1 261 515 547 <1 <1 68 <5 ABMW-02 02/09/2017 8.2 8.99 13 461 0.28 -214 -9 4.8 153 75 166 <1 <1 543 534 M4 399 506 <1 <1 153 5310 5650 <1 <1 41.2 <5 ABMW-02BR 02/09/2017 9.1 8.99 15 299 0.25 -229 -24 4.75 41.2 41 18 <1 <1 <1 <1 M4 140 92 <1 <1 41.2 <50 <50 <1 <1 16.6 <5 ABMW-03 02/08/2017 3.7 7.46 18 1790 1.60 112 317 0.87 <5 43200 47300 M4 <1 <1 7.2 7.12 17 17 18.4 21.9 <5 250 258 <1 <1 159 <5 ABMW-03BR 02/08/2017 5.5 23.59 20 3538 0.49 -76 129 2.94 126 413 429 <1 <1 <1 <1 20 20 3.9 4.25 126 4340 4150 <1 <1 491 M4 <5 ABMW-03BRL 02/09/2017 7.7 44.55 1 13 1125 1 0.40 -19 1 186 9.85 154 <5 181 <1 <1 <1 I <1 M4 34 1 37 <1 <1 154 1 <50 <50 1 <1 <1 192 1 <5 BG -01 01/26/2017 6.6 37.68 18 523 4.23 -22 183 4.49 244 <5 224 <1 <1 <1 <1 83 91 <1 <1 244 <50 <50 <1 <1 43.1 <5 BG-OIBR 01/25/2017 6.9 39.16 17 509 0.28 -36 169 4.77 250 <5 12 <1 <1 <1 <1 30 33 <1 <1 250 <50 <50 <1 <1 60.9 <5 BG-01BRLR 03/02/2017 7.2 37.73 16 1385 1.05 -10 195 4.56 276 <5 1320 1.71 1.76 7.06 8.68 80 92 <1 <1 276 72 97 <1 <1 73 <5 BG -01D 01/27/2017 6.8 38.40 11 496 4.75 -25 180 9.24 218 <5 208 <1 <1 <1 <1 87 90 <1 <1 218 <50 <50 <1 <1 50.1 M4 <5 CW -02 02/08/2017 6.9 13.27 18 712 3.79 -111 94 2.44 275 <5 45 <1 <1 <1 <1 77 81 <1 <1 275 <50 <50 <1 <1 38.1 <5 CW -02D 02/08/2017 6.7 13.27 17 678 1.76 -116 89 1.09 204 6 19 <1 <1 <1 <1 140 149 <1 <1 204 <50 <50 <1 <1 43.3 <5 CW -03 02/08/2017 6.4 5.49 1 14 629 2.27 166 371 5.13 194 <5 487 <1 <1 <1 <1 93 103 <1 <1 194 <50 <50 <1 <1 50.9 <5 CW -03 DUP 02/08/2017 6.4 5.49 14 629 2.27 166 371 5.13 191 <5 506 <1 <1 <1 <1 97 104 <1 <1 191 <50 <50 <1 <1 50.5 <5 CW -03D 02/08/2017 7.3 2.05 17 556 0.39 144 349 3.19 230 <5 36 <1 <1 <1 <1 47 48 <1 <1 230 <50 <50 <1 <1 69.9 <5 CW -04 02/08/2017 6.7 28.51 18 590 1.51 108 313 1.62 238 <5 18 <1 <1 <1 <1 126 126 <1 <1 238 <50 <50 <1 <1 41.4 <5 CW -05 02/08/2017 6.6 10.16 14 564 5.13 -69 136 0.86 148 <5 13 <1 <1 <1 <1 42 42 <1 <1 148 279 280 <1 <1 54.4 <5 MW-02BR 02/09/2017 6.1 15.98 12 961 0.54 77 282 7.8 263 21 31 <1 <1 1.18 1.29 M4 1180 1530 <1 <1 263 <50 <50 <1 <1 74.4 <5 MW-04BR 02/08/2017 7.8 45.78 21 465 0.33 -60 145 5.15 166 7 71 1.31 1 1.22 1.3 43 49 <1 <1 166 <50 <50 <1 <1 35.6 <5 MW-05BR 02/08/2017 7.3 27.64 13 779 0.78 1 -99 106 1.05 200 <5 12 <1 <1 <1 <1 17 18 <1 <1 200 <50 <50 <1 <1 99.6 <5 MW -05D 02/08/2017 6.6 9.31 14 927 2.77 -57 148 1.12 76.1 <5 10 <1 <1 <1 <1 26 27 <1 <1 76.1 758 786 <1 <1 70.8 <5 MW-06BR 02/07/2017 7.9 7.20 17 412 0.27 -169 37 2.64 1 203 10 37 <1 <1 <1 <1 8 9 <1 <1 203 <50 <50 <1 <1 37.8 <5 MW -06D 02/07/2017 6.7 5.91 17 368 0.43 -146 59 0.83 140 <5 10 <1 <1 <1 <1 5 6 <1 <1 140 <50 <50 <1 <1 30.8 <5 MW-07BR 01/25/2017 7.3 14.13 16 451 0.34 -50 155 3.89 178 <5 13 <1 <1 <1 <1 12 13 <1 <1 178 <50 <50 <1 <1 45.5 <5 MW-08BR 01/27/2017 7.6 40.31 14 607 0.24 -121 84 9.84 268 <5 58 <1 <1 <1 <1 31 34 <1 <1 268 <50 1 <50 <1 I <1 68.1 <5 MW-09BR 01/26/2017 6.8 34.15 17 345 0.22 -34 171 9.28 142 <5 92 <1 <1 <1 <1 20 23 <1 <1 142 <50 <50 <1 <1 24.4 <5 MW-10BR 01/26/2017 7.0 23.24 17 573 0.97 54 259 0.43 249 <5 7 <1 <1 <1 <1 134 145 <1 <1 249 <50 <50 <1 <1 51 <5 MW-15BR 01/25/2017 7.6 8.88 17 567 1 0.40S -119 86 4.16 217 <5 146 <1 <1 <1 <1 16 20 <1 <1 217 <50 <50 <1 <1 65.5 <5 MW -15D 01/25/2017 6.6 7.82 16 651 3.14S 137 342 1.27 1 233 <5 55 <1 <1 <1 <1 7 6 <1 <1 233 <50 <50 <1 <1 65.8 <5 MW -15D DUP 01/25/2017 6.6 7.82 16 651 3.14S 137 342 1.27 235 <5 66 <1 <1 <1 <1 6 6 <1 <1 235 <50 <50 <1 <1 65.9 <5 MW-18BR 01/25/2017 7.7 46.11 16 771 1.86S -160 45 0.88 183 <5 9 <1 <1 <1 <1 46 50 <1 <1 183 <50 <50 <1 <1 89.7 <5 MW -18D 01/25/2017 6.9 45.80 15 998 2.47S -46 159 0.63 198 18 60 <1 <1 <1 <1 25 29 <1 <1 198 <50 1 <50 <1 <1 108 M4 <5 MW- BR 01/26/2017 7.1 37.64 15 876 0.15 -89 116 2.73 370 <5 27 <1 <1 1.53 2.13 59 60 <1 <1 370 <50 <50 <1 <1 88.6 <5 MW-31BR 02/28/2017 6.9 81.44 18 659 0.68 2 207 9.33 312 <5 215 <1 <1 <1 <1 36 42 <1 <1 312 <50 <50 <1 <1 80.7 <5 MW-31BR DUP 02/28/2017 6.9 81.44 18 659 2 207 9.33 316 <5 253 <1 <1 <1 <1 36 43 <1 <1 316 <50 <50 <1 <1 78.7 <5 MW-32BR 02/28/2017 7.5 42.71 18 859 01621 -71 134 6.56 140 7 68 <1 <1 <1 <1 26 29 <1 <1 140 <50 <50 <1 <1 127 <5 MW-33BR 03/03/2017 9.8 64.70 15 1016 1.39 10 215 79.7 120 1 7 100 <1 I <1 1.02 1 1.3 24 29 <1 I <1 1 120 <50 <50 <1 <1 1 35.6 <5 Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. RI - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 1 of 3 TABLE 6-4 GROUNDWATER ANALYTICAL RESULTS - WAB, SEI AND WDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate my - Millivolts NTU - Nephelometric turbidity unit Spec Cord - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 2 of 3 Analytical Parameter Chloride Chromium (VI) Chromium Chromium Cobalt Cobalt Copper Copper Iron Iron Lead Lead Magnesium Manganese Manganese Mercury Mercury Methane Molybdenum Molybdenum Nickel Nickel Nitrate + Nitrite Potassium TOT Selenium DIS Selenium TOT TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT TOT DIS TOT DIS TOT DIS TOT DIS TOT Reporting Units mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg-N/L mg/L ug/L ug/L 15A NCAC 02L Standard 250 10 NE 10 NE 1* NE 1000 NE 300 NE 15 NE NE 50 NE 1 NE NE NE NE 100 NE NE NE 20 Provisional Background 130 0.7 NE 12.1 NE 10.3 NE 2.14 NE 5645 NE NE 29.5 NE 1200 NE NE 1180 NE 25.4 NE 6.25 0.4 10 NE NE Sample ID Sample Collection Date Analytical Results ABMW-01 02/09/2017 10 <0.12 D3 <1 <1 <1 <1 <1 <1 <10 22 <1 <1 0.462 <5 <5 <0.05 <0.05 5030 2350 M4 2140 2.89 2.79 <0.01 12.5 5.88 6.48 ABMW-01BR 02/09/2017 16 <0.12 D3 <1 <1 <1 <1 <1 <1 1520 1670 <1 <1 17.7 1010 1080 <0.05 <0.05 64.5 3.35 2.9 <1 <1 <0.01 6.68 <1 <1 ABMW-02 02/09/2017 8.2 1.7 <1 <1 <1 <1 <1 <1 5170 8060 <1 <1 10.9 709 1000 <0.05 <0.05 34800 412 339 RS <1 <1 <0.01 15.8 1.3 1.37 ABMW-02BR 02/09/2017 24 0.039 <1 <1 <1 <1 <1 <1 <10 12 <1 <1 4.22 102 5 <0.05 <0.05 1150 5.69 5.03 <1 <1 <0.01 8.3 <1 <1 ABMW-03 02/08/2017 4.1 3.6 3.74 4 105 112 9.7 10.8 14600 13600 <1 <1 48.6 6620 6860 <0.05 <0.05 190 N2 <1 <1 205 217 <0.01 14.6 <1 <1 ABMW-03BR 02/08/2017 18 <0.25 D3 <1 <1 140 158 <1 <1 5920 5900 <1 <1 275 M4 14300 14700 <0.05 <0.05 158 N2 <1 <1 308 321 <0.01 11.3 <1 <1 ABMW-03BRL 02/09/2017 9.4 <0.25 D3 <1 <1 <1 <1 I <1 <1 1 654 1030 1 <1 <1 1 23.2 178 204 <0.05 <0.05 1 <10 1.98 1.97 <1 1.22 1 <0.01 5,71 1 <1 <1 BG -01 01/26/2017 19 13.1 7.14 8.74 <1 <1 <1 1.8 <10 227 <1 <1 25.1 M4 <5 1 5 <0.05 <0.05 <10 N2 <1 <1 1.36 1.61 2.4 1.81 <1 <1 BG-01BR 01/25/2017 13 0.086 <1 <1 <1 <1 <1 <1 16 43 <1 <1 15.3 336 369 <0.05 <0.05 367 N2 7.02 7.57 1.14 1.1 0.43 5.29 <1 <1 BG-01BRLR 03/02/2017 320 0.83 <1 12.7 <1 <1 2.79 6.56 <10 518 <1 4.04 16.1 385 369 <0.05 <0.05 104 51.1 60.9 6.72 8.93 0.63 130 2.35 2.74 BG -01D 01/27/2017 21 0.82 <1 <1 <1 <1 3.68 10.2 <10 190 <1 <1 25 M4 16 21 <0.05 <0.05 <10 N2,1_3 1.04 1 1.4 1.39 2.6 2.11 <1 <1 CW -02 02/08/2017 16 0.73 P4 <1 <1 <1 <1 <1 <1 <10 29 <1 <1 31.5 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.315 1.09 <1 <1 CW -02D 02/08/2017 19 0.49 <1 <1 <1 <1 <1 <1 <10 34 <1 I <1 38.2 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.281 2.44 <1 <1 CW -03 02/08/2017 47 0.85 <1 <1 <1 <1 <1 <1 <10 296 <1 <1 26.2 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.366 2.47 <1 <1 CW -03 DUP 02/08/2017 48 <0.12 D3 <1 <1 <1 <1 <1 1.94 <10 319 <1 <1 25.9 <5 5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.363 2.47 <1 <1 CW -03D 02/08/2017 25 0.076 <1 <1 <1 <1 <1 <1 <10 36 <1 <1 17.5 27 72 <0.05 <0.05 <10 N2 3.29 3.3 <1 <1 <0.01 4.52 <1 <1 CW -04 02/08/2017 27 0.3 <1 <1 <1 <1 <1 <1 <10 236 <1 <1 25.6 <5 <5 <0.05 <0.05 <10 N2 6.2 6.14 <1 <1 0.372 4 <1 <1 CW -05 02/08/2017 4.3 0.24 <1 <1 <1 <1 <1 <1 <10 <10 <1 <1 36.8 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 1.1 0.877 <1 <1 MW-02BR 02/09/2017 110 <0.25 D3 <1 <1 4.79 4.11 <1 <1 17400 20600 <1 <1 39.3 1100 1540 <0.05 <0.05 64.7 2.47 1.64 <1 <1 <0.01 4.3 <1 <1 MW-04BR 02/08/2017 19 0.14 <1 1.4 <1 <1 <1 <1 1 21 138 <1 <1 14.3 27 38 <0.05 <0.05 10.3 N2 7.73 8.02 <1 <1 0.16 10.1 <1 <1 MW-05BR 02/08/2017 16 <0.12 D3 <1 <1 2.7 2.62 <1 1.06 462 684 <1 I <1 32 328 349 <0.05 <0.05 <10 N2 1.2 1.16 <1 <1 <0.01 4.72 <1 <1 MW -05D 02/08/2017 12 0.66 <1 <1 <1 <1 <1 <1 <10 12 <1 <1 41.7 <5 21 <0.05 <0.05 <10 N2 5.94 6.18 <1 <1 0.763 1.43 <1 <1 MW-06BR 02/07/2017 8.6 <0.12 D3 <1 <1 <1 <1 <1 <1 285 369 <1 <1 23.1 80 82 <0.05 <0.05 701 N2 3.47 4.9 <1 <1 <0.01 1.74 <1 <1 MW -06D 02/07/2017 9.8 0.11 <1 <1 <1 <1 <1 <1 <10 <10 <1 <1 20.5 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.194 1.26 <1 <1 MW-07BR 01/25/2017 7.1 0.13 <1 <1 <1 I <1 <1 <1 58 140 <1 <1 13.5 129 145 <0.05 <0.05 <10 N2 1.56 1.51 <1 <1 0.877 3.26 <1 <1 MW-08BR 01/27/2017 25 0.31 <1 <1 <1 <1 <1 1.21 1180 1800 <1 <1 22.8 553 697 <0.05 <0.05 550 N2 2.97 2.93 <1 <1 <0.01 5.16 <1 <1 MW-09BR 01/26/2017 11 0.036 <1 <1 <1 <1 <1 <1 105 223 <1 <1 15.2 114 114 <0.05 <0.05 59.4 N2 2 2.01 <1 <1 1 0.026 2.39 <1 <1 MW-10BR 01/26/2017 18 0.15 <1 <1 15.7 17.3 <1 <1 12 17 <1 <1 18.1 303 333 <0.05 <0.05 <10 N2 15.5 16.3 <1 <1 0.213 8.1 <1 <1 MW-15BR 01/25/2017 39 0.19 <1 1.07 <1 <1 <1 <1 599 838 <1 <1 15.2 40 49 <0.05 <0.05 <10 N2 10.9 11.4 <1 1.18 <0.01 5.03 <1 <1 MW -15D 01/25/2017 45 2.8 2.49 2.66 <1 <1 <1 <1 <10 72 <1 <1 27.7 6 8 <0.05 <0.05 <10 N2 1.31 1.78 9.67 9.12 3.4 1.11 <1 <1 MW -15D DUP 01/25/2017 44 2.7 2.49 2.75 1 <1 <1 <1 <1 <10 80 <1 <1 27.1 6 8 <0.05 <0.05 <10 N2 1.25 1.98 9.99 9.47 3.5 1.05 <1 <1 MW-18BR 01/25/2017 140 <0.12 D3,M1 <1 <1 <1 <1 <1 <1 1260 1250 <1 <1 22,9 876 902 <0.05 1 <0.05 173 N2 4.71 4.67 <1 <1 <0.01 8.74 <1 <1 MW -18D 01/25/2017 190 12.2 10.8 14.8 <1 I <1 <1 1.13 136 193 1 <1 <1 39.7 M4 405 305 <0.05 <0.05 <10 N2 12.2 14.9 <1 <1 0.209 4.13 <1 <1 MW-26BR 01/26/2017 40 <0.12 D3 <1 <1 <1 <1 <1 <1 1030 1160 1 <1 <1 1 39.3 573 562 <0.05 <0.05 <10 N2 7.39 8.66 <1 <1 I <0.01 8.12 <1 <1 MW-31BR 02/28/2017 21 <0.025 <1 2.12 <1 <1 <1 <1 <10 220 <1 <1 26.4 553 575 <0.05 <0.05 <10 1.37 1.43 1.65 2.22 0.129 5.7 <1 <1 MW-31BR DUP 02/28/2017 21 <0.025 <1 2.18 <1 <1 <1 <1 <10 260 <1 <1 26.4 556 583 <0.05 <0.05 <10 1.41 1.37 1.54 2.29 0.129 5.59 <1 <1 MW-32BR 02/28/2017 15 <0.025 <1 3.89 <1 <1 <1 <1 49 147 <1 <1 16.9 76 77 <0.05 <0.05 <10 3.55 4.19 1.06 3.06 <0.01 4.76 <1 <1 MW-33BR 03/03/2017 1 68 1 1.9 1 1.04 1 16.2 <1 <1 <1 2.08 28 182 <1 <1 11.9 137 100 1 <0.05 <0.05 <10 1 9.81 1 17.7 1 3.86 7.03 0.047 62.1 <1 <1 Prepared by: BER Checked by: ARL Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate my - Millivolts NTU - Nephelometric turbidity unit Spec Cord - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 2 of 3 TABLE 6-4 GROUNDWATER ANALYTICAL RESULTS - WAB, SEI AND WDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit DUP - Duplicate my - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. RI - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. Temp - Temperature TOT- Total ug/L - Micrograms per liter ug/mL - micrograms per milliliter Prepared by: BER Checked by: ARL umhos/cm - Micro mhos per centimeter P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 3 of 3 Analytical Parameter Sodium TOT Strontium DIS Strontium TOT Sulfate Sulfide Thallium Thallium Total Dissolved Solids Total Organic Carbon Total Suspended Solids Vanadium DIS Vanadium TOT Zinc DIS Zinc TOT Radium -226 Radium -228 Uranium -233 Uranium -234 Uranium -236 Uranium -238 DIS TOT Reporting Units mg/L ug/L ug/L mg/L mg/L ug/L ug/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L pCi/L pCi/L ug/mL ug/mL ug/mL ug/mL 15A NCAC 02L Standard NE NE NE 250 NE NE 0.2* 500 NE NE NE 0.3* NE 1000 NE NE NE NE NE NE Provisional Background 40 NE 945 49 0.241 NE NE 540 29 NE NE 3.67 NE 43.4 NE NE NE NE NE NE Sample ID Sample Collection Date Analytical Results ABMW-01 02/09/2017 11.7 1940 2070 170 4.4 M6 <0.2 <0.2 400 4 <5 1.62 2.28 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 <0.0002 ABMW-01BR 02/09/2017 20.2 181 189 20 <0.1 <0.2 <0.2 350 0.57 <5 <0.3 <0.3 <5 <5 0.694 1.03 <0.00005 <0.00005 <0.00005 0.0000706j ABMW-02 02/09/2017 6.9 1170 1290 54 <0.1 <0.2 <0.2 250 11 <5 1.34 3.24 <5 <5 <1 0.756 <0.00005 <0.00005 <0.00005 0.000977 ABMW-02BR 02/09/2017 29.1 548 426 54 6.4 <0.2 <0.2 190 1.4 <5 0.304 0.319 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000197j ABMW-03 02/08/2017 23.1 1130 1170 1900 <0.1 1.18 1.51 1400 0.291 <5 4.3 4.5 372 373 <1 1.5 <0.00005 <0.00005 <0.00005 0.000654 ABMW-03BR 02/08/2017 183 M4 1830 1850 3200 <0.1 <0.2 B3 <0.2 4300 1.2 <5 2.18 2.11 131 135 <1 2.05 <0.00005 <0.00005 <0.00005 0.00174 ABMW-03BRL 02/09/2017 35.8 1 814 809 470 M2 I <0.1 <0.2 1 <0.2 900 0.492 1 16 <0.3 0.318 <5 <5 1 0.434 1.04 <0.00005 <0.00005 <0.00005 0.00106 BG -01 01/26/2017 30.8 435 456 18 <0.1 <0.2 B2 <0.2 320 0.735 <5 17.1 18.7 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 <0.0002 BG-01BR 01/25/2017 24.2 178 183 19 <0.1 <0.2 B2 <0.2 330 0.849 <5 1.83 2.34 32 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00122 BG-01BRLR 03/02/2017 224 883 1010 330 <0.1 0.243 0.277 B2 1200 2.6 55 1.86 2.2 58 74 1.59 1.99 <0.00005 <0.00005 <0.00005 0.0297 BG -01D 01/27/2017 37.8 M4 423 438 14 <0.1 <0.2 B3 <0.2 310 1.5 5 12.5 14.4 B2 5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000604 CW -02 02/08/2017 69.8 325 342 81 <0.1 <0.2 B3 <0.2 450 0.998 <5 35.2 35.4 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.0027 CW -02D 02/08/2017 34.5 304 328 120 <0.1 <0.2 B3 <0.2 440 0.975 <5 1 13 13.3 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00154 CW -03 02/08/2017 36.2 1 291 335 1 54 <0.1 1 <0.2 B3 <0.2 360 3.2 <5 1.62 2.53 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00119 CW -03 DUP 02/08/2017 36.2 310 338 56 <0.1 <0.2 B3 <0.2 370 3.2 <5 1.66 2.46 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00125 CW -03D 02/08/2017 18.2 260 269 33 <0.1 <0.2 B3 <0.2 360 0.797 <5 2.33 2.8 <5 <5 0.346 <1 <0.00005 <0.00005 <0.00005 0.000785 CW -04 02/08/2017 42.7 183 191 37 <0.1 <0.2 B3 <0.2 360 0.778 <5 2.07 2.15 <5 <5 1.04 <1 <0.00005 <0.00005 <0.00005 0.00304 CW -05 02/08/2017 28 300 307 200 <0.1 <0.2 B3 <0.2 520 1.6 <5 26.4 26.8 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000242 MW-02BR 02/09/2017 36.4 532 606 44 <0.1 <0.2 <0.2 530 2.4 1 20 <0.3 <0.3 <5 6 <1 <1 <0.00005 1 <0.00005 <0.00005 0.000423 MW-04BR 02/08/2017 32.7 271 298 35 <0.1 <0.2 B3 1 <0.2 270 0.873 <5 1.47 1 <5 <5 1.22 <1 <0.00005 <0.00005 <0.00005 0.00115 MW-05BR 02/08/2017 17.3 276 294 1 200 <0.1 <0.2 B3 <0.2 540 1 5 <0.3 <0,3 <5 <5 0.796 <1 <0.00005 <0.00005 <0.00005 0.00383 MW -05D 02/08/2017 63.4 345 363 390 <0.1 <0.2 B3 <0.2 710 1.2 <5 12.5 12.9 <5 <5 1.58 <1 <0.00005 <0.00005 <0.00005 0.000246 MW-06BR 02/07/2017 14.1 148 154 12 0.12 <0.2 B3 <0.2 240 0.51 <5 <0.3 <0.3 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000201 MW -06D 02/07/2017 12 178 187 39 <0.1 <0.2 B3 <0.2 133 250 0.717 <5 6.16 6.42 <5 <5 1.71 0.779 <0.00005 <0.00005 <0.00005 0.000345 MW-07BR 01/25/2017 15.9 129 130 21 <0.1 <0.2 B3 <0.2 270 0.628 <5 3.83 4.36 B2 <5 5 <1 <1 <0.00005 <0.00005 <0.00005 0.000586 MW-08BR 01/27/2017 21 207 220 24 <0.1 <0.2 B3 <0.2 350 1 0.933 <5 0.59 0.86 B2 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000457 MW-09BR 01/26/2017 17.7 159 165 21 1 <0.1 <0.2 B2 <0.2 200 0.695 <5 1.6 2.06 <5 <5 1.01 <1 <0.00005 <0.00005 <0.00005 0.000597 MW-10BR 01/26/2017 37 172 176 40 <0.1 <0.2 B2 <0.2 330 0.966 <5 2.6 2.91 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00309 MW-15BR 01/25/2017 28.2 135 141 29 <0.1 <0.2 132 <0.2 350 0.776 7 <0.3 0.456 B2 <5 <5 0.611 <1 <0.00005 <0.00005 <0.00005 0.000535 MW -15D 01/25/2017 28.4 246 246 29 <0.1 <0.2 B3 <0.2 420 1.1 <5 9.89 9.4 B2 <5 <5 0.221 <1 <0.00005 <0.00005 <0.00005 0.000748 MW -15D DUP 01/25/2017 28.3 238 243 29 <0.1 <0.2 132 <0.2 420 1.1 <5 9.56 9.73 52 <5 <5 1.21 <1 <0.00005 <0.00005 <0.00005 0.000708 MW-18BR 01/25/2017 19.9 235 252 4.5 <0.1 <0.2 B3 <0.2 460 3.1 1 <5 <0.3 <0.3 B2 <5 <5 0.334 1.01 <0.00005 <0.00005 <0.00005 0.00017j MW -18D 01/25/2017 28.3 707 767 33 <0.1 <0.2 B3 <0.2 600 1.7 <5 1.11 1.35 B2 <5 <5 0.535 <1 <0.00005 <0.00005 <0.00005 0.00387 MW-26BR 01/26/2017 38.7 256 255 1 64 1 <0.1 <0.2 B2 <0.2 500 1.5 <5 <0.3 <0.3 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.0044 MW-31BR 02/28/2017 20.3 292 1 299 27 <0.1 <0.2 <0.2 390 1 8 1.75 2.28 <5 B3 7 1 <1 <1 <0.00005 <0.00005 <0.00005 1 0.00209 MW-31BR DUP 02/28/2017 19.7 293 298 27 <0.1 <0.2 <0.2 390 1 11 1.78 2.39 <5 B3 6 0.784 <1 <0.00005 <0.00005 <0.00005 0.00213 MW-32BR 02/28/2017 39.4 577 578 310 <0.1 <0.2 <0.2 B3 660 2.1 <5 0.548 0.876 8 B3 9 <1 1.62 <0.00005 <0.00005 <0.00005 0.00302 MW-33BR 03/03/2017 113 284 376 210 <0.1 <0.2 <0.2 B3 510 3.6 <5 0.866 1.3 <5 <5 0.48 0.661 <0.00005 <0.00005 <0.00005 0.00211 Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit DUP - Duplicate my - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution. N2 - The lab does not hold accreditation for this parameter. P4 - Sample field preservation does not meet EPA or method recommendations for this analysis. RI - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. Temp - Temperature TOT- Total ug/L - Micrograms per liter ug/mL - micrograms per milliliter Prepared by: BER Checked by: ARL umhos/cm - Micro mhos per centimeter P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-4 GW Analytical Results_WAB_SEI_and_WDC with BG.xlsx Page 3 of 3 TABLE 6-5 WASTEWATER ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter pH Temp Spec Cond DO ORP Eh Turbidity Alkalinity Aluminum Antimony Arsenic Barium Beryllium Bi- carbonate Alkalinity Boron Cadmium DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT Reporting Units S.U. Deg C umcros mg/L mV mV NTUs mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE 1* NE 10 NE 700 NE 4* NE NE 700 NE 2 Sample ID Sample Collection Date Field Parameters Analytical Results CL -02 04/26/2016 7.3 17 238 10.45 125 330 5.26 37.3 8 347 <1 <1 2.46 3.42 39 42 <1 <1 37.3 1150 1120 <1 <1 CL -02S 04/26/2016 7.4 22 240 8.03 101 306 3.43 39.4 5 179 <1 <1 2.76 3.67 38 40 <1 <1 39.4 1150 1110 <1 <1 CL -05 04/26/2016 7.1 15 270 4.92 100 305 6.46 41.1 7 332 <1 <1 2.09 4.6 55 59 <1 <1 41.1 1480 1430 <1 <1 CL -05S 04/26/2016 7.3 21 239 7.86 102 307 4.65 38 12 178 <1 <1 2.76 3.38 39 40 <1 <1 38 1150 1100 <1 <1 CL -07 04/26/2016 7.4 23 239 7.49 94 299 3.15 37.4 5 171 <1 <1 2.28 3.61 38 41 <1 <1 37.4 1130 1130 <1 <1 CV -02 04/26/2016 7.4 22 241 7.18 99 304 3.31 38.8 6 173 <1 <1 2.75 3.48 40 41 <1 <1 38.8 1180 1100 <1 <1 EDC -01 03/01/2017 7.0 18 385 7.03 351 556 4.28 63 <5 206 <1 <1 2.66 4.09 53 56 <1 <1 63 2130 2150 <1 <1 EDC -02 02/27/2017 6.9 14 403 2.43 331 536 2.58 72.7 <5 17 <1 <1 1.19 1.35 66 66 <1 <1 72.7 1820 1810 <1 <1 EDC -03 02/27/2017 7.4 14 488 9.68 271 476 2.31 91.2 <5 146 <1 <1 1.37 1.65 62 65 <1 <1 91.2 1960 2020 <1 <1 EDC -04 02/27/2017 7.4 14 478 8.03 182 387 2.2 96.4 <5 21 <1 <1 <1 <1 64 62 <1 <1 96.4 1590 1560 <1 <1 EDC -05 02/27/2017 7.1 15 597 7.94 211 416 8.61 1 103 <5 11 <1 <1 <1 <1 61 68 <1 <1 103 1460 1620 <1 <1 Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Deg C - Degrees Celsius mV - Millivolts S.U. - Standard Unit DIS - Dissolved NA- Not analyzed Spec Cond - Specific Conductance DO - Dissolved oxygen NE - Not established Temp - Temperature Eh - Redox Potential NM - Not measured TOT- Total mg - N/L - Milligrams nitrogen per liter NTU - Nephelometric turbidity unit ug/L - Micrograms per liter mg/L - Milligrams per liter ORP - Oxidation -Reduction Potential umhos/cm - Micro mhos per centimeter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. H1 - Analysis conducted outside the EPA method holding time. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-5 Waste Water Analytical Results_EEI and EDC.XLSX Page 1 of 3 TABLE 6-5 WASTEWATER ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Calcium Carbonate Alkalinity Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Methane Molybdenum TOT DIS TOT DIS TOT DIS TOT DIS TOT DIS TOT TOT DIS TOT DIS TOT DIS TOT Reporting Units mg/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard NE NE 250 NE 30 NE 1* NE 1000 NE 300 NE 15 NE NE 50 NE 1 NE NE NE Sample ID Sample Collection Date Analytical Results CL -02 04/26/2016 20.1 <5 6 <1 <1 <1 <1 9.62 <1 64 428 1.4 <1 7.65 328 390 NA 0.00202 <10 85.2 79.6 CL -02S 04/26/2016 20.7 <5 6 <1 <1 <1 <1 12.7 <1 41 247 1.71 <1 7.82 294 326 NA 0.00129 <10 89.6 95.2 CL -05 04/26/2016 24.7 <5 6.4 <1 <1 <1 <1 10.4 <1 34 480 1.55 <1 9.27 956 885 NA 0.00188 <10 94.9 94.4 CL -05S 04/26/2016 20.6 <5 6 <1 <1 <1 <1 11.9 <1 41 241 1.67 <1 7.78 292 323 NA 0.00141 <10 91.4 87.5 CL -07 04/26/2016 20.6 <5 5.9 <1 <1 <1 <1 11 <1 41 244 1.57 <1 7.78 290 336 NA 0.00133 <10 91.3 95.6 CV -02 04/26/2016 20.5 <5 6 <1 <1 <1 <1 10.9 <1 39 240 1.66 <1 7.76 302 322 NA 0.00136 <10 88.4 89.2 EDC -01 03/01/2017 32.7 <5 10 <1 <1 <1 <1 <1 <1 17 339 <1 <1 12.6 657 697 0.000631 H1 0.00223 73.4 84.3 89.9 EDC -02 02/27/2017 37 <5 11 <1 <1 <1 <1 3.77 4 <10 18 <1 <1 13.7 38 33 0.000583 0.00104 <10 48.8 51.7 EDC -03 02/27/2017 46.8 <5 13 <1 <1 <1 <1 1.88 2.47 <10 155 <1 <1 18.4 28 96 0.000522 0.00108 <10 36.1 38 EDC -04 02/27/2017 44.9 M4 <5 13 <1 <1 <1 <1 1.7 1.32 195 526 <1 <1 17.9 310 310 <0.0005 0.00092 <10 28.3 29.8 EDC -05 02/27/2017 59.3 <5 14 <1 <1 1.46 1.53 1.36 1.07 420 1290 <1 <1 27.8 922 1000 <0.0005 0.00098 <10 23.1 24.1 Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Deg C - Degrees Celsius mV - Millivolts S.U. - Standard Unit DIS - Dissolved NA- Not analyzed Spec Cond - Specific Conductance DO - Dissolved oxygen NE - Not established Eh - Redox Potential NM - Not measured mg - N/L - Milligrams nitrogen per liter NTU - Nephelometric turbidity unit mg/L - Milligrams per liter ORP - Oxidation -Reduction Potential < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit H1 - Analysis conducted outside the EPA method holding time. Temp - Temperature TOT- Total ug/L - Micrograms per liter umhos/cm - Micro mhos per centimeter Analyte concentration in sample is valid and may be used for compliance purposes. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-5 Waste Water Analytical Results_EEI and EDC.XLSX Page 2 of 3 TABLE 6-5 WASTEWATER ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Nickel Nitrate + Nitrite Potassium Selenium Sodium Strontium Sulfate Sulfide Thallium Total Dissolved Solids Total Organic Carbon Total Suspended Solids Vanadium Zinc DIS TOT TOT DIS TOT TOT DIS TOT DIS TOT DIS TOT DIS TOT Reporting Units ug/L ug/L mg-N/L mg/L ug/L ug/L mg/L ug/L ug/L mg/L mg/L ug/L ug/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L 15A NCAC 02L Standard NE 100 NE NE NE 20 NE NE NE 250 NE NE 0.2* 500 NE NE NE 0.3* NE 1000 Sample ID Sample Collection Date Analytical Results CL -02 04/26/2016 <1 <1 <0.01 4.32 <1 1.09 10.8 362 363 62 <0.1 <0.2 <0.2 160 6.2 <5 0.688 1.35 16 <5 CL -02S 04/26/2016 <1 <1 <0.01 4.42 <1 1.01 11.1 360 356 63 <0.1 <0.2 <0.2 160 5.9 <5 0.628 1.08 21 <5 CL -05 04/26/2016 <1 <1 0.025 4.95 1.08 1.27 12.2 457 463 75 <0.1 <0.2 <0.2 190 6 <5 0.433 1.36 20 <5 CL -05S 04/26/2016 <1 <1 0.054 4.39 1.01 1.06 11.1 361 355 63 <0.1 <0.2 <0.2 150 6.1 <5 0.77 1 19 <5 CL -07 04/26/2016 <1 <1 0.025 4.37 1.28 1.3 11.1 358 366 62 <0.1 <0.2 <0.2 160 6 <5 0.72 1.15 16 <5 CV -02 04/26/2016 <1 <1 <0.01 4.33 1.01 1.1 11 372 355 63 <0.1 <0.2 <0.2 150 6 <5 0.628 1.01 19 <5 EDC -01 03/01/2017 <1 <1 0.04 6.88 <1 <1 16 610 622 100 <0.1 <0.2 <0.2 B3 260 7.1 15 0.486 1.24 <5 6 EDC -02 02/27/2017 <1 <1 NA 6.41 1.81 1.86 17.3 514 511 99 <0.1 <0.2 <0.2 240 4.1 <5 1.62 1.83 <5 <5 EDC -03 02/27/2017 <1 <1 NA 5.6 2.51 2.69 19.6 537 551 1 130 <0.1 <0.2 <0.2 310 3.7 <5 1.37 2 <5 <5 EDC -04 02/27/2017 <1 <1 NA 4.92 2.28 2.48 18.7 484 469 160 <0.1 <0.2 <0.2 300 3.3 <5 <0.3 0.55 <5 <5 EDC -05 02/27/2017 <1 <1 NA 4.98 2.1 2.13 21.9 530 578 120 0.1 <0.2 <0.2 380 3.3 <5 <0.3 0.314 <5 6 Prepared by: BER Checked by: ARL Notes: - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) Deg C - Degrees Celsius mV - Millivolts S.U. - Standard Unit DIS - Dissolved NA- Not analyzed Spec Cond - Specific Conductance DO - Dissolved oxygen NE - Not established Temp - Temperature Eh - Redox Potential NM - Not measured TOT- Total mg - N/L - Milligrams nitrogen per liter NTU - Nephelometric turbidity unit ug/L - Micrograms per liter mg/L - Milligrams per liter ORP - Oxidation -Reduction Potential umhos/cm - Micro mhos per centimeter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. H1 - Analysis conducted outside the EPA method holding time. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-5 Waste Water Analytical Results_EEI and EDC.XLSX Page 3 of 3 TABLE 6-6 SEDIMENT ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM STATION DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Cation Exchange Capacity Fractional Organic Carbon Fractional Organic Matter Percent Moisture Percent Solids Percent Total Solids pH Oxidation Reduction Potential Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Reporting Units meq/100g oda oho oda % % S.U. my mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg Soil RSL - Protection of Groundwater NE NE NE NE NE NE NE NE NE 0.27 0.29 82 3.2 NE NE NE NE 180000 NE 46 Sample ID Sample Collection Date Analytical Results CL -02 04/26/2016 NA NA NA NA NA NA 7.7 H6 NA 305 <0.74 <0.99 3.8 <0.049 4.9 <0.12 104 <249 D3,M1 0.49 <0.99 0.69 CL -04 04/27/2016 NA NA NA 46.5 NA NA 7.9 H6 NA 6250 <3.8 N2 4.1 28.9 0.2 <4.5 <0.23 716 <467 D3 6 2.4 5.6 CL -06 04/27/2016 NA NA NA 32 NA NA 7.8 H6 NA 16900 M1 <2.8 N2 <1.4 92.7 M1 0.54 <3.5 M1 <0.17 5410 M1,R1 <365 D3 14.7 9.2 13.3 CL -07 04/27/2016 NA NA NA 26 NA NA 7.5 H6 NA 18700 <2.7 N2 5.7 120 0.43 <3.4 <0.16 3900 <342 D3 21.6 9.7 31.8 CV -01 04/27/2016 NA NA NA 25.8 NA NA 7.1 H6 NA 2860 <2.6 N2 <1.3 13.2 <0.067 <3.4 <0.15 205 <334 D3 3.6 2 2.9 CV -02 04/26/2016 NA NA NA NA NA NA 7.2 H6 NA 6800 <0.72 13.9 68.6 0.28 3.1 <0.11 886 <253 D3 6.6 5.3 9.5 NL -04 04/26/2016 NA NA NA NA NA NA 7.6 H6 NA 9110 <0.76 29.7 89 1 4 <0.12 5010 <253 D3 10.6 6.2 15.9 NL -08 04/26/2016 NA NA NA NA NA NA 7.6 H6 NA 947 <0.74 3.1 10 0.05 <2.5 <0.12 170 <247 D3 0.99 <0.99 2.8 SL -08 04/26/2016 NA NA NA NA NA NA 7.3 H6 NA 894 <0.73 3.4 6.4 <0.048 <2.4 <0.12 138 <243 D3 1.1 <0.97 1.5 EDC -01 03/01/2017 18 9.1 15.6 NA 27.5 27.2 7.0 180 H 66000 0.29 j 31 360 B 3.3 34j <0.89 4800 38 54 20 95 EDC -02 02/27/2017 17 5.2 8.99 NA 63.9 50.5 7.0 65 H 25000 0.21 j 40 150 1.9 17j 0.096 j 3300 12j 28 18 47 EDC -03 02/27/2017 18 4.5 7.7 NA 61.2 56.1 6.8 25 H 47000 0.51 6.8 180 1.3 19j <0.41 4800 15j 37 16 70 EDC -05 02/27/2017 16 2.4 4.17 NA 69.9 66.6 6.1 37 H 27000 0.12 j 7.5 85 1 11 j 0.057 j 3700 16 21 15 36 Prepared by: BER Checked by: ARL Notes: 0 - Bold color highlighted concentrations indicate highest exceedance of the USEPA, 2016; Regional Screening Levels - May 2016 (USEPA, 2016) % - Percent NA - Not analyzed meq/100g - millequivalents per 100 grams NE - Not established mg/kg - Milligrams per kilogram S.U. - Standard Unit mV - Millivolts < - concentration not detected at or above the adjusted reporting limit. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 10X the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H - Sample analyzed past the recommended holding time. H1 - Analysis conducted outside the EPA method holding time. H6 - Analysis initiated outside of the 15 minute EPA required holding time. H3 - Sample was received or analysis requested beyond the recognized method holding time. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. N2 - The lab does not hold accreditation for this parameter. R1 - Relative Percent Difference (RPD) value was outside control limits. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-6 Sediment Analytical Results_EEI and EDC.XLSX Page 1 of 2 TABLE 6-6 SEDIMENT ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT AND EASTERN DISCHARGE CANAL ROXBORO STEAM STATION DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Iron Lead Magnesium Manganese Mercury Molybdenum Nickel Nitrate (as N) Potassium Selenium Sodium Strontium Sulfate Thallium Total Organic Carbon Vanadium Zinc Reporting Units mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg Soil RSL - Protection of Groundwater NE 14 NE NE 0.1 NE NE NE NE 0.26 NE NE NE 0.14 NE 8.6 NE Sample ID Sample Collection Date Analytical Results CL -02 04/26/2016 93.1 <0.99 56.9 2.1 <0.008 <0.49 0.36 <24.9 H1,D3,M1 75.5 <0.99 <49.5 5 <249 D3,M1 <0.99 28400 1.1 1 CL -04 04/27/2016 5550 <1.9 1110 57.2 0.024 2.1 3.5 <46.7 H1,D3 139 2.2 120 9.1 <467 D3 <1.9 11900 18.4 10 CL -06 04/27/2016 17700 M1 3.8 4380 M1 124 M1 0.025 <0.71 M1 11.8 <36.5 D3 238 <1.4 253 32.5 <365 D3 <1.4 1720 51.6 27.5 CL -07 04/27/2016 26700 2.6 6880 387 <0.011 1.1 18.3 <34.2 D3 1840 2.8 119 31.2 <342 D3 <1.3 2740 69.8 45.9 CV -01 04/27/2016 2920 <1.3 409 101 0.012 <0.67 2.2 <33.4 H3,D3 110 <1.3 <67.4 2.4 <334 D3 <1.3 1770 8.5 4.8 CV -02 04/26/2016 9400 3.7 1180 721 0.031 8.1 3.9 <25.3 D3 421 3.3 <47.9 15.9 <253 D3 <0.96 13000 23.3 19 NL -04 04/26/2016 8580 9.4 676 1080 0.047 8.3 8.3 <25.3 D3 727 5.6 111 49.7 <253 D3 <1 12400 30.6 23.3 NL -08 04/26/2016 1140 <0.99 154 145 <0.008 4.4 0.59 <24.7 D3 87.5 1.3 <49.3 3.1 <247 D3 <0.99 9490 3.2 3.4 SL -08 04/26/2016 1100 <0.97 113 63.3 <0.0079 3.1 0.55 <24.3 D3 <48.5 1.7 <48.5 2.5 <243 D3 <0.97 12400 3 2.9 EDC -01 03/01/2017 55000 12 8100 1500 0.0801j 45 32 2.81 3500 4.6 340 93 290 NA NA 130 88 EDC -02 02/27/2017 22000 12 4300 1500 B 0.046 15 23 1.5j 1700 4.4 190 58 73 NA NA 67 110 EDC -03 02/27/2017 40000 6.2 8100 640 B 0.05 4.2 18 1.6j 2600 <0.81 230 53 140 NA NA 100 62 EDC -05 02/27/2017 29000 4.2 5100 380 B 0.033 1 3 9.7 1.5j 950 2.7 180 31 300 NA NA 92 35 Prepared by: BER Checked by: ARL Notes: 0 - Bold color highlighted concentrations indicate highest exceedance of the USEPA, 2016; Regional Screening Levels - May 2016 (USEPA, 2016) % - Percent NA - Not analyzed meq/1008 - millequivalents per 100 grams NE - Not established mg/kg - Milligrams per kilogram S.U. - Standard Unit mV - Millivolts < - concentration not detected at or above the adjusted reporting limit. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than IOX the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. H - Sample analyzed past the recommended holding time. H1 - Analysis conducted outside the EPA method holding time. H6 - Analysis initiated outside of the 15 minute EPA required holding time. H3 - Sample was received or analysis requested beyond the recognized method holding time. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. N2 - The lab does not hold accreditation for this parameter. R1 - Relative Percent Difference (RPD) value was outside control limits. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-6 Sediment Analytical Results_EEI and EDC.XLSX Page 2 of 2 TABLE 6-7 SPLP ANALYTICAL RESULTS - EASTERN EXTENSION IMPOUNDMENT ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) ug/L - Micrograms per liter mg/L - Milligrams per liter NE - Not established < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 1OX the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-7 SPLP Analytical Results_EEI.XLSX Page 1 of 1 Analytical Parameter Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel Nitrate (as N) Potassium Selenium Sodium Strontium Sulfate Thallium Vanadium Zinc Reporting Units ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L mg/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L mg/L mg/L ug/L mg/L ug/L mg/L ug/L ug/L ug/L 15A NCAC 02L Standard NE 1* 10 700 4* 700 2 NE 250 10 1* 1000 300 15 NE 50 1 NE 100 10 NE 20 NE NE 250 0.2* 0.3* 1000 Sample ID Sample Collection Date Analytical Results CL -02 04/26/2016 <100 22.7 70.4 130 <0.1 240 <0.08 5.2 <5 2 <0.5 <1 <50 <0.5 1.1 50 <0.2 55.5 <5 <0.2 B <5 41.4 <5 260 5.5 B <0.1 126 160 CL -04 04/27/2016 1900 2.9 22.2 79 0.7 310 <0.08 2.6 18.7 13.9 5.5 16.2 1400 5.9 1.1 300 <0.2 9.5 <5 <0.37 B <5 12.5 6.4 43 19.9 B 0.59 43.7 300 CL -06 04/27/2016 7900 2.9 24 72 0.7 <200 <0.08 2 13.1 12.7 5.1 14.6 5700 5.5 1 310 <0.2 11 <5 <0.29 B <5 14.3 <5 45 15.7 B 0.61 42 120 CL -07 04/27/2016 10200 2.5 38 100 1 230 0.26 3.5 22.2 21.2 13.3 30.7 9400 12.1 1.8 720 <0.2 13.4 9.1 <0.27 B <5 22.8 5.3 45 17.8 B 0.33 79.5 180 CV -01 04/27/2016 7600 <0.5 1.6 <50 0.79 <200 <0.08 2.2 44.5 35.3 15.3 21.8 7300 1 6.3 1.6 590 <0.2 1.3 5.4 0.27 B <5 2.1 <5 17 7.2 B <0.1 89.5 200 CV -02 04/26/2016 260 M1 0.51 1.8 170 M1 <0.1 220 M1 <0.08 24.5 M1 <5 0.68 1.4 1.6 140 M1 <0.5 3.5 M1 4400 M1 <0.2 6.7 <5 M1 <0.2 B <5 M1 1.3 <5 M1 270 M1 77.3 B <0.1 2.1 190 M1 NL -0404/26/2016 <100 0.88 227 140 <0.1 <200 <0.08 37 <5 <0.5 0.56 <1 260 <0.5 3.3 5600 <0.2 302 <5 <0.2 B <5 6.3 <5 360 12.4 B <0.1 1.7 93 NL -08 04/26/2016 220 0.69 6.1 210 <0.1 270 <0.08 11.6 <5 <0.5 5 <1 80 <0.5 3.1 7400 <0.2 19.2 <5 <0.2 B <5 1.8 5.3 200 65.7 B <0.1 0.67 180 SL -08 04/26/2016 440 0.71 1.6 220 0.13 1 250 1 0.12 1 15.1 1 <5 0.96 7.5 <1 290 <0.5 4.3 6400 <0.2 2.3 5.5 <0.2 B <5 1.9 F <5 270 76.1 B 0.11 0.91 210 Prepared by: BER Checked by: ARL Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) ug/L - Micrograms per liter mg/L - Milligrams per liter NE - Not established < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 1OX the concentration in the method blank. Analyte concentration in sample could be due to blank contamination. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-7 SPLP Analytical Results_EEI.XLSX Page 1 of 1 TABLE 6-8 GROUNDWATER ANALYTICAL RESULTS - EAB, EEI AND EDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. N2 - The lab does not hold accreditation for this parameter. P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. Prepared by: BER Checked by: ARL P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-8 GW Analytical Results_EAB_EEI_and_EDC_area_wells_2017-01 thru 2017 -03 -with BG.xlsx Page 1 of 3 Analytical Parameter pH Water Level Temp Spec Cond DO ORP Eh Turbidity Alkalinity Aluminum DIS Aluminum TOT Antimony DIS Antimony TOT Arsenic DIS Arsenic TOT Barium DIS Barium TOT Beryllium DIS Beryllium TOT Bi carbonate Alkalinity Boron DIS Boron TOT Cadmium DIS Cadmium TOT Calcium TOT Carbonate Alkalinity Reporting Units S.U. ft Deg C umcros mg/L mV mV NTUs mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L mg/L mg/L 15A NCAC 02L Standard 6.5-8.5 NE NE NE NE NE NE NE NE NE NE NE 1* NE 10 NE 700 NE 4* NE NE 700 NE 2 NE NE Provisional Background 6.1-8.1 NE NE NE NE NE NE NE 308 NE 323 NE NE NE 1.71 NE 402 NE NE 308 NE NE NE NE 95.4 NE Sample ID Sample Collection Date Field Parameters Analytical Results ABMW-04 02/06/2017 7.0 31.28 17 3952 0.19S -179 26 9.26 472 63 1290 <1 <1 903 M4 892 35 54 <1 <1 472 39300 40500 <1 <1 507 <5 ABMW-04BR 02/07/2017 6.9 31.21 20 462 0.64 -145 60 9.46 186 10 251 <1 <1 <1 <1 189 169 <1 <1 186 <50 <50 <1 <1 43.6 <5 ABMW-05 02/07/2017 7.3 12.70 16 2653 0.29 -54 151 1.15 321 14 23 <1 <1 262 251 47 48 <1 <1 321 24700 25000 <1 <1 360 <5 ABMW-05 03/02/2017 7.5 13.05 16 2580 0.26 -176 29 3.92 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ABMW-05D 02/07/2017 7.2 45.91 16 466 0.28 -129 76 9.98 186 31 241 <1 1.28 2.65 2.66 128 137 <1 <1 186 2350 2460 <1 <1 36.7 <5 ABMW-06 02/06/2017 7.2 12.46 18 1175 0.34S. -151 54 1.53 442 15 95 <1 <1 583 M4 589 698 708 <1 <1 442 2860 2820 <1 <1 164 <5 ABMW-06BR 02/06/2017 6.7 12.45 17 522 0.35S -112 93 0.22 216 <5 11 <1 <1 <1 <1 39 42 <1 <1 216 <50 <50 <1 <1 64.6 <5 ABMW-07 02/06/2017 9.4 12.25 18 935 0.27S 153 358 0.6 47.6 1980 2110 4.36 4.89 363 370 169 191 <1 <1 11.7 5910 5920 <1 <1 188 35.9 ABMW-07BR 02/06/2017 7.2 15.23 18 659 0.30S 107 312 0.53 229 <5 9 <1 <1 <1 <1 15 17 <1 <1 229 1340 1340 <1 <1 83.7 <5 ABMW-07BRL 02/06/2017 7.8 23.26 18 723 0.54S -15 190 2.32 104 <5 15 <1 <1 <1 1.52 14 18 <1 <1 104 70 115 <1 <1 96.4 <5 CW -01 02/07/2017 6.3 23.36 17 569 0.32 -150 55 3.32 147 <5 188 <1 <1 <1 <1 98 105 <1 <1 147 <50 <50 <1 <1 33.1 <5 GMW-06 02/10/2017 6.4 22.29 14 1589 1 0.44 207 1 412 3.34 1 305 <5 179 <1 <1 <1 <1 29 31 <1 <1 1 305 2450 2510 <1 <1 165 <5 GMW-07 02/07/2017 6.6 27.09 17 1288 2.10 205 410 2.61 392 M1,111 <5 116 <1 <1 <1 <1 139 200 <1 <1 392 1350 1610 <1 <1 86.4 <5 GMW-08 02/07/2017 6.5 46.88 18 217 0.29 159 364 9.82 378 <5 281 <1 <1 <1 <1 51 54 <1 <1 378 4610 4800 <1 <1 276 <5 GMW-09 02/09/2017 6.2 22.85 15 155 7.30 136 341 1.24 45.5 <5 54 <1 <1 <1 <1 M4 37 39 <1 <1 45.5 <50 <50 <1 <1 7.38 <5 GMW-09 DUP 02/09/2017 6.2 22.85 15 155 7.30 136 341 1.24 46 <5 54 <1 <1 <1 <1 M4 36 39 <1 <1 46 <50 <50 1 <1 <1 7.54 <5 GMW-10 01/24/2017 6.0 30.25 15 254 4.30 227 432 2.64 77.6 <5 54 <1 <1 <1 <1 82 82 <1 <1 77.6 97 95 <1 <1 14.2 <5 GMW-11 02/07/2017 6.6 17.02 17 1064 1.14 -138 67 9.94 203 5 73 <1 <1 <1 <1 51 52 1 <1 <1 203 3440 3380 <1 <1 117 <5 MW-01BR 02/07/2017 6.7 29.23 16 1015 0.49 1 -158 47 9.71 411 <5 59 <1 <1 <1 <1 377 395 <1 <1 411 1010 1050 <1 <1 78.2 <5 MW-03BR 02/08/2017 6.5 24.57 17 2581 0.67 250 455 4.07 277 <5 25 <1 <1 <1 <1 34 M2 36 <1 <1 277 2850 3000 <1 <1 371 <5 MW-11BR 02/10/2017 6.8 6.40 1 12 534 1.62 176 381 0.9 247 <5 13 <1 <1 <1 <1 200 201 <1 <1 247 <50 <50 <1 <1 46.5 <5 MW-13BR 01/26/2017 6.1 39.71 16 612 1.98 54 259 3.68 137 <5 154 <1 <1 <1 <1 369 402 <1 <1 137 <50 <50 <1 <1 49.2 <5 MW-14BR 01/26/2017 7.2 48.22 17 650 0.38 -83 122 3.75 282 5 16 <1 <1 <1 <1 30 33 <1 <1 282 <50 <50 <1 <1 66.7 <5 MW -14D 01/27/2017 6.8 47.80 12 45 3.14 187 392 1 12.7 179 <5 693 <1 <1 <1 <1 132 144 <1 <1 179 <50 <50 <1 <1 37.2 <5 MW-17BR 01/26/2017 7.3 37.33 16 652 1.79 -20 185 4.34 331 <5 10 <1 <1 <1 <1 96 100 <1 <1 331 <50 <50 <1 <1 92.5 <5 MW-19BRL 01/26/2017 7.2 38.42 16 767 0.09 -114 91 2.64 284 10 44 <1 <1 2.59 2.9 53 60 <1 <1 284 <50 <50 <1 <1 92.3 <5 MW-20BRL 01/26/2017 7.3 ARTESIAN 15 363 0.10 -52 153 1.06 177 <5 50 <1 <1 <1 <1 <5 <5 <1 <1 177 <50 1 <50 <1 <1 49 <5 MW-22BR 02/07/2017 6.9 17.90 1 19 1210 0.36 42 247 1.01 304 <5 47 <1 <1 1.09 1.26 77 81 <1 <1 304 498 541 <1 <1 150 1 <5 MW -22D 02/07/2017 6.3 17.81 18 2450 0.26 165 370 3.23 305 <5 290 <1 <1 <1 <1 41 46 <1 <1 305 388 398 <1 <1 478 M4 <5 MW-23BRR 03/02/2017 6.9 4.54 15 520 0.29 1 -32 173 9.85 144 <5 396 <1 <1 <1 <1 1 12 15 <1 <1 144 <50 <50 <1 <1 47.9 <5 MW-24BR 01/27/2017 7.9 39.80 13 463 0.36 -141 64 9.43 1 142 6 1 162 <1 <1 <1 1.28 64 67 1 <1 <1 142 <50 <50 <1 <1 54.9 <5 MW-25BR 02/09/2017 6.9 50.65 14 977 0.19 30235 9.23 333 <5 174 <1 <1 1.06 1.74 M4 57 68 <1 <1 333 <50 <50 <1 <1 129 <5 MW-27BR 02/28/2017 7.3 32.91 15 783 0.54 -16 189 2.1 221 6 22 <1 <1 <1 <1 14 16 <1 <1 221 <50 <50 <1 <1 104 M4 <5 MW-28BR 03/02/2017 7.5 87.36 14 509 5.79 13 218 3.74 204 13 67 <1 <1 <1 <1 55 61 <1 <1 204 <50 <50 <1 <1 39.2 <5 MW-29BR 02/28/20172 41.21 17 509 2.34 -13 192 2.64 240 6 37 <1 <1 <1 <1 22 28 <1 <1 240 <50 <50 <1 58.3 <5 MW-30BR 02/28/2017 6.9 64.40 16 818 0.61 -23 182 3.64 342 <5 52 <1 <1 <1 <1 17 18 <1 <1 342 <50 <50 <1 <1<1 112 <5 Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. N2 - The lab does not hold accreditation for this parameter. P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. Prepared by: BER Checked by: ARL P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-8 GW Analytical Results_EAB_EEI_and_EDC_area_wells_2017-01 thru 2017 -03 -with BG.xlsx Page 1 of 3 TABLE 6-8 GROUNDWATER ANALYTICAL RESULTS - EAB, EEI AND EDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Prepared by: BER Checked by: ARL Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. N2 - The lab does not hold accreditation for this parameter. P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-8 GW Analytical Results_EAB_EEI_and_EDC_area_wells_2017-01 thru 2017-03_with BG.xlsx Page 2 of 3 Analytical Parameter Chloride Chromium (VI) TOT Chromium DIS Chromium TOT Cobalt DIS Cobalt TOT Copper DIS Copper TOT Iron DIS Iron TOT Lead DIS Lead TOT Magnesium TOT Manganese DIS Manganese TOT Mercury DIS Mercury TOT Methane Molybdenum DIS Molybdenum TOT Nickel DIS Nickel TOT Nitrate + Nitrite Potassium TOT Reporting Units mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L mg-N/L mg/L 15A NCAC 02L Standard 250 10 NE 10 NE 1* NE 1000 NE 300 NE 15 NE NE s0 NE 1 NE NE NE NE 100 NE NE Provisional Background 130 0.7 NE 12.1 NE 10.3 NE 2.14 NE 5645 NE NE 29.5 NE 1200 NE NE 1180 NE 25.4 NE 6.25 0.4 10 Sample ID Sample Collection Date Analytical Results ABMW-04 02/06/2017 77 10.5 <1 2.56 6.25 6.22 <1 2.34 .533001 58400 <1 1.36 215 8720 9150 <0.05 <0.05 3350 N2 529 M4 532 4.02 5.16 <0.01 94.7 ABMW-04BR 02/07/2017 9.4 5.6 <1 <1 1.42 1.06 <1 <1 7200 8850 <1 <1 15.1 2770 2640 <0.05 <0.05 146 N2 3.88 3.97 <1 <1 <0.01 3.34 M2 ABMW-05 02/07/2017 86 0.87 <1 <1 1.77 1.73 <1 <1 2400 2560 <1 <1 85.3 1600 1620 <0.05 <0.05 657 N2 1250 1190 1.84 1.68 <0.01 M2 109 M2 ABMW-05 03/02/2017 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ABMW-05D 02/07/2017 15 4.7 <1 <1 <1 <1 <1 <1 24300 27900 <1 <1 11.2 5120 5490 <0.05 <0.05 13800 N2 21.9 22 5.55 6.34 <0.01 14.6 M2 ABMW-06 02/06/2017 8.1 4.3 <1 <1 <1 <1 <1 I <1 8050 8040 <1 I <1 49.8 1490 1460 <0.05 <0.05 <10 N2 110 109 <1 <1 <0.01 1 11.6 ABMW-06BR 02/06/2017 11 0.044 <1 <1 <1 <1 <1 <1 83 122 <1 <1 20.7 864 863 <0.05 <0.05 <10 N2 2.64 2.71 2.74 2.9 <0.01 5.61 ABMW-07 02/06/2017 25 <0.12 D3 <1 <1 <1 <1 <1 <1 <10 <10 <1 <1 5.34 10 11 <0.05 <0.05 1830 N2 1630 1610 1.39 1.63 <0.01 21 ABMW-07BR 02/06/2017 14 <0.12 D3 <1 <1 <1 <1 <1 <1 139 191 <1 <1 32 499 535 <0.05 <0.05 163 N2 2.08 1.65 <1 <1 <0.01 4.13 ABMW-07BRL 1 02/06/2017 9.7 <0.12 D3 <1 <1 <1 <1 <1 <1 194 292 <1 <1 16 62 72 <0.05 <0.05 <10 N2 6.66 7.24 <1 <1 <0.01 1.62 CW -01 02/07/2017 12 <0.12 D3 <1 <1 <1 <1 <1 2.17 262 537 <1 <1 14.6 36 56 <0.05 <0.05 5430 N2 <1 <1 <1 <1 0.075 2.51 M2 GMW-06 02/10/2017 62 0.75 <1 1.2 <1 <1 <1 <1 <10 152 <1 <1 68.2 <5 8 <0.05 <0.05 <10 <1 I <1 <1 <1 1 0.741 4.65 GMW-07 02/07/2017 170 1 0.19 <1 <1 <1 <1 <1 <1 <10 83 <1 <1 56.5 <5 <5 <0.05 <0.05 <10 N2 <1 <1 <1 <1 0.857 3.62 M2 GMW-08 02/07/2017 220 <0.12 D3 <1 1.61 <1 <1 2.04 3.21 <10 1 270 <1 <1 105 63 65 <0.05 <0.05 <10 N2 3.23 3.21 1.49 1.85 0.253 11.3 M2 GMW-09 02/09/2017 3.9 0.19 <1 <1 <1 <1 <1 <1 <10 52 <1 <1 2.15 <5 <5 <0.05 <0.05 <10 <1 <1 <1 <1 0.369 0.963 GMW-09 DUP 02/09/2017 3.9 0.18 <1 <1 <1 <1 <1 <1 <10 47 <1 <1 2.22 <5 <5 <0.05 <0.05 <10 <1 <1 <1 <1 0.368 0.976 GMW-10 01/24/2017 20 0.18 <1 <1 <1 <1 1.31 1.58 <10 37 <1 <1 7.18 <5 <5 <0.05 <0.05 <10 N2 1.8 2.04 1.24 1.37 0.44 2.88 GMW-11 02/07/2017 29 0.27 <1 <1 <1 I <1 <1 <1 <10 95 <1 <1 73.1 <5 <5 <0.05 <0.05 <10 N2 1.37 1.29 5.02 5 0.447 6.49 M2 MW-01BR 02/07/2017 40 <0.12 D3 <1 <1 1.18 1.32 <1 <1 42 174 <1 <1 44.9 459 568 <0.05 <0.05 20.1 N2 1.05 <1 3.19 3.71 0.068 8.08 MW-03BR 02/08/2017 72 0.054 <1 <1 1.13 <1 4.37 15.4 12 45 <1 <1 166 23 19 <0.05 0.08 316 N2 <1 <1 <1 <1 0.044 2.94 MW-11BR 02/10/2017 14 <0.12 D3 <1 I <1 <1 <1 1.24 1.26 11 24 <1 <1 30.3 53 52 <0.05 <0.05 <10 1.34 1.43 3.2 3.19 0.525 6.28 MW-13BR 01/26/2017 94 0.28 <1 <1 2.56 3.05 <1 <1 389 695 <1 <1 22 198 226 <0.05 <0.05 <10 N2 2.09 2.84 2.05 2.42 0.238 4.35 MW-14BR 01/26/2017 41 0.22 <1 <1 2.33 2.02 <1 <1 1010 1220 <1 <1 29.7 292 304 <0.05 <0.05 71.3 N2 1.69 1.53 1.49 1.57 <0.01 6.52 MW -14D 01/27/2017 29 0.7 <1 1.04 <1 <1 2.04 4.68 <10 730 <1 <1 20.6 71 66 <0.05 <0.05 <10 N2,L3 3.58 2.22 <1 1.7 <0.01 4.66 MW-17BR 01/26/2017 11 <0.025 <1 <1 <1 <1 <1 I <1 264 453 <1 <1 21 336 392 <0.05 <0.05 <10 N2 9.14 9.28 <1 <1 <0.01 4.29 MW-19BRL 01/26/2017 74 0.56 <1 <1 <1 <1 <1 <1 5260 5570 <1 <1 17 1090 1110 <0.05 <0.05 25800 N2,CH,P2 8.35 7.39 <1 <1 <0.01 6.28 MW-20BRL 01/26/2017 11 <0.025 1 <1 <1 <1 <1 <1 <1 65 99 <1 <1 6.64 355 356 <0.05 <0.05 12.3 N2 1.32 1.3 <1 <1 <0.01 3.32 MW-22BR 02/07/2017 25 <0.12 D3 <1 <1 9.59 9.27 <1 <1 1090 1 1490 <1 <1 58 2430 2550 <0.05 <0.05 <10 N2 9.09 9.25 1.12 <1 <0.01 9.72 M2 MW -22D 02/07/2017 20 <0.075 D3 <1 <1 7.68 7 <1 2.34 16 241 <1 <1 102 M4 2130 2150 <0.05 <0.05 <10 N2 <1 <1 1.95 1.84 0.774 6.11 M2 MW-23BRR 03/02/2017 44 <0.025 <1 <1 <1 <1 <1 <1 46 351 <1 <1 6.33 58 84 <0.05 <0.05 <10 3.1 3.38 <1 <1 0.131 2.98 MW-24BR 01/27/2017 23 0.28 <1 2.22 <1 <1 <1 <1 180 363 <1 <1 9.18 84 96 <0.05 <0.05 <10 N2 1.89 2.17 <1 1.13 <0.01 3.24 MW-25BR 02/09/2017 65 <0.25 D3 <1 44.6 <1 <1 <1 1.67 1140 1900 <1 <1 25.5 586 670 <0.05 <0.05 <10 1.45 2.72 <1 22.8 <0.01 6.77 MW-27BR 02/28/2017 18 1 <0.025 <1 <1 <1 <1 <1 <1 23 41 <1 <1 33.4 M4 265 269 <0.05 <0.05 <10 1.3 1.42 <1 <1 <0.01 6.68 MW-28BR 03/02/2017 25 0.055 <1 1 2.38 <1 <1 <1 <1 <10 68 <1 <1 21.3 96 124 <0.05 <0.05 <10 5.49 7.1 <1 2.09 0.012 2.94 MW-29BR 02/28/2017 17 0.076 <1 1.36 <1 <1 <1 <1 <10 46 <1 <1 20.5 48 53 <0.05 <0.05 <10 <1 1.09 <1 1.2 0.102 5.07 MW-30BR 02/28/2017 37 0.032 <1 2.16 <1 <1 I <1 I <1 1 843 828 <1 <1 27.7 1 1220 1 1170 <0.05 <0.05 1 116 6.38 6.26 <1 2.01 <0.01 4.91 Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Prepared by: BER Checked by: ARL Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature umhos/cm - Micro mhos per centimeter DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate mV - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. N2 - The lab does not hold accreditation for this parameter. P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-8 GW Analytical Results_EAB_EEI_and_EDC_area_wells_2017-01 thru 2017-03_with BG.xlsx Page 2 of 3 TABLE 6-8 GROUNDWATER ANALYTICAL RESULTS - EAB, EEI AND EDC AREA WELLS ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Analytical Parameter Selenium DIS Selenium TOT Sodium TOT Strontium DIS Strontium TOT Sulfate Sulfide Thallium DIS Thallium TOT Total Dissolved Solids Total Organic Carbon Tota Suspended Solids Vanadium DIS Vanadium TOT Zinc DIS Zinc TOT Radium -226 Radium -228 Uranium -233 Uranium -234 Uranium -236 Uranium -238 Reporting Units ug/L ug/L mg/L ug/L ug/L mg/L mg/L ug/L ug/L mg/L mg/L mg/L ug/L ug/L ug/L ug/L pCi/L pCi/L ug/mL ug/mL ug/mL ug/mL 15A NCAC 02L Standard NE 20 NE NE NE 250 NE NE 0.2* 500 NE NE NE 0.3* NE 1000 NE NE NE NE NE NE Provisional Background NE NE 40 NE 945 49 0.241 NE NE 540 29 NE NE 3.67 NE 43.4 NE NE NE NE NE NE Sample ID Sample Collection Date Analytical Results ABMW-04 02/06/2017 <1 <1 201 8830 9250 2200 <0.1 <0.2 B3, M2 <0.2 3600 1.1 110 1.25 4.24 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.0305 ABMW-04BR 02/07/2017 <1 <1 16.1 B3 171 179 17 <0.1 <0.2 B3 <0.2 B3 270 0.558 15 <0.3 <0.3 <5 <5 0.319 <1 <0.00005 <0.00005 <0.00005 0.000144 j ABMW-05 02/07/2017 <1 <1 110 B3 4330 4460 1200 <0.1 <0.2 B3 <0.2 B3 2100 0.845 NA 0.356 0.388 <5 <5 1.13 <1 <0.00005 <0.00005 <0.00005 0.0036 ABMW-05 03/02/2017 NA NA NA NA NA NA NA NA NA NA NA 12 NA NA NA NA NA NA NA NA NA NA ABMW-05D 02/07/2017 <1 <1 16.1 B3 392 413 1.3 <0.1 <0.2 B3 <0.2 B3 230 6.6 61 <0.3 0.504 <5 <5 0.703 <1 <0.00005 <0.00005 <0.00005 <0.0002 ABMW-06 02/06/2017 <1 <1 11.4 8190 8400 200 <0.1 <0.2 B3 <0.2 B3 780 11 14 1.07 1.37 B2 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00221 ABMW-06BR 02/06/2017 <1 <1 19.9 197 199 72 <0.1 <0.2 B3 <0.2 B3 350 0.604 <5 <0.3 0.324 B2 <5 <5 0.337 <1 <0.00005 <0.00005 <0.00005 0.000709 ABMW-07 02/06/2017 <1 1.24 16.3 5300 5500 630 0.11 <0.2 B3 <0.2 B3 830 3 <5 13.6 13.1 B2 <5 <5 1.01 <1 <0.00005 <0.00005 <0.00005 0.000932 ABMW-07BR 02/06/2017 <1 <1 17.2 236 248 120 <0.1 <0.2 B3 <0.2 B3 460 0.98 <5 <0.3 0.345 B2 <5 8 0.612 <1 <0.00005 <0.00005 <0.00005 0.000648 ABMW-07BRL 02/06/2017 <1 <1 47.3 730 754 410 0.13 <0.2 B3 <0.2 B3 590 0.74 <5 <0.3 0.307 B2 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.000129 j CW_01 02/07/2017 1.68 1.06 62.8 B3 347 351 120 <0.1 <0.2 B3 <0.2 B3 420 1.9 8 19.8 17.6 <5 <5 0.747 <1 <0.00005 <0.00005 <0.00005 0.000135 j GMW-06 02/10/2017 76.8 77.2 106 1020 1050 530 <0.1 <0.2 <0.2 B3 1200 3.1 1 <5 4.19 4.49 <5 <5 0.582 0.624 <0.00005 <0.00005 <0.00005 0.00277 GMW-07 02/07/2017 8.15 9.87 98.8 B3 588 633 230 <0.1 <0.2 B3 <0.2 B3 880 2.1 <5 6.48 6.81 7 <5 1.27 <1 <0.00005 <0.00005 <0.00005 0.00618 GMW-08 02/07/2017 <1 <1 82.9 B3 992 1020 600 <0.1 <0.2 B3 <0.2 B3 1 1700 3.3 6 1.61 2.16 <5 5 <1 <1 <0.00005 <0.00005 <0.00005 0.0248 GMW-09 02/09/2017 <1 <1 21.3 86 88 22 M2 <0.1 <0.2 <0.2 150 0.852 <5 3.66 3.62 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 <0.0002 GMW-09 DUP 02/09/2017 <1 <1 21.9 86 87 22 M2 <0.1 <0.2 <0.2 150 0.855 <5 3.81 3.58 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 <0.0002 GMW-10 01/24/2017 1.1 <1 29.7 116 118 26 <0.1 <0.2 B3 <0.2 200 0.987 <5 2.74 2.98 B2 <5 <5 0.378 1.21 <0.00005 <0.00005 <0.00005 <0.0002 GMW-11 02/07/2017 109 104 51.1 B3 477 483 470 <0.1 <0.2 B3 <0.2 B3 1000 1.6 <5 5.42 5.77 <5 <5 0.807 <1 <0.00005 <0.00005 <0.00005 0.00101 MW-01BR 02/07/2017 4.1 1 4 62.5 473 485 76 <0.1 <0.2 B3 <0.2 B3 620 2 <5 14.8 14.8 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00617 MW-03BR 02/08/2017 3.58 3.74 56.5 1340 1390 1400 <0.1 <0.2 B3 <0.2 2200 1.4 <5 14.6 15.3 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.0436 MW-11BR 02/10/2017 <1 <1 18.4 180 189 41 <0.1 <0.2 <0.2 340 0.828 <5 5.22 5.04 <5 <5 <1 1.76 <0.00005 <0.00005 <0.00005 0.000772 MW-13BR 01/26/2017 <1 <1 36.6 415 423 33 <0.1 <0.2 B2 <0.2 390 4.2 <5 4.56 4.32 <5 8 <1 0.478 <0.00005 <0.00005 <0.00005 0.0000902 j MW-14BR 01/26/2017 <1 <1 22.2 162 165 13 <0.1 <0.2 B2 <0.2 350 1.1 <5 <0.3 0.43 6 <5 1.17 0.906 <0.00005 <0.00005 <0.00005 0.000182 j MW -14D 01/27/2017 <1 <1 1 21.5 189 198 9.8 <0.1 M1 <0.2 B3 <0.2 280 2.8 120 3.64 5.64 B2 6 12 1 <1 <1 <0.00005 <0.00005 <0.00005 0.000325 MW-17BR 01/26/2017 <1 <1 18.1 863 896 36 <0.1 <0.2 B2 <0.2 390 0.728 <5 <0.3 <0.3 <5 <5 0.983 <1 <0.00005 <0.00005 <0.00005 0.000298 MW-19BRL 01/26/2017 <1 <1 31.1 224 230 5 <0.1 <0.2 B2 <0.2 440 1.9 14 <0.3 <0.3 <5 <5 1.84 <1 <0.00005 <0.00005 <0.00005 <0.0002 MW-20BRL 01/26/2017 <1 <1 14.3 177 183 9.8 <0.1 <0.2 B2 <0.2 240 0.424 <5 <0.3 <0.3 <5 <5 0.527 <1 <0.00005 <0.00005 <0.00005 0.000387 MW-22BR 02/07/2017 <1 <1 45.5 B3 533 560 370 <0.1 <0.2 <0.2 B3 930 2.5 <5 0.311 0.405 <5 <5 1.21 1.25 <0.00005 <0.00005 <0.00005 0.00258 MW -22D 02/07/2017 410 405 52.9 M4, B3 1760 1780 1300 <0.1 <0.2 <0.2 2200 2.5 6 3.51 3.98 <5 <5 <1 <1 <0.00005 <0.00005 <0.00005 0.00394 MW-23BRR 03/02/2017 <1 <1 35.2 147 152 1 34 <0.1 <0.2 B3 <0.2 B2,B3 300 2.9 13 0.978 1.31 <5 8 0.721 <1 <0.00005 <0.00005 <0.00005 0.00239 MW-24BR 01/27/2017 <1 <1 29.5 1850 1910 70 0.34 <0.2 B3 <0.2 300 1 1 10 <0.3 0.473 B2 <5 1 <5 1.2 1.3 <0.00005 <0.00005 <0.00005 0.000561 MW-25BR 02/09/2017 <1 <1 36.3 1800 1870 95 <0.1 <0.2 <0.2 600 2.7 7 <0.3 0.478 <5 <5 0.652 0.688 <0.00005 <0.00005 <0.00005 0.00178 MW-27BR 02/28/2017 <1 <1 17.7 235 237 200 <0.1 <0.2 <0.2 530 1.3 <5 0.465 0.589 <5 B3 <5 0.514 0.731 <0.00005 <0.00005 <0.00005 0.00242 MW -2 BR 03/02/2017 <1 <1 36.3 264 277 32 <0.1 <0.2 B3 <0.2 B2,B3 300 3.6 <5 1.81 2.14 <5 5 0.398 <1 <0.00005 <0.00005 <0.00005 0.00237 MW-29BR 02/28/2017 <1 <1 18 132 137 22 <0.1 <0.2 <0.2 280 1 <5 0.952 1.15 <5 B3 <5 0.664 <1 <0.00005 <0.00005 <0.00005 0.00112 MW-30BR 02/28/2017 1.43 1.19 32.1 294 287 77 <0.1 <0.2 <0.2 510 2.3 <5 0.556 0.767 <5 B3 <5 0.638 <1 <0.00005 1 <0.00005 I <0.00005 0.00605 Notes: 0 - Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202 Standard and IMAC is April 1, 2013) 0 - Bold highlighted concentration indicates exceedance of provisional background concentrations. Deg C - Degrees Celsius Eh - Redox Potential NA - Not analyzed ORP - Oxidation -Reduction Potential Temp - Temperature DIS - Dissolved mg - N/L - Milligrams nitrogen per liter NE - Not established pCi/L - picocuries per liter TOT- Total DO - Dissolved oxygen mg/L - Milligrams per liter NM - Not measured S.U. - Standard Unit ug/L - Micrograms per liter DUP - Duplicate my - Millivolts NTU - Nephelometric turbidity unit Spec Cond - Specific Conductance ug/mL - micrograms per milliliter < - concentration not detected at or above the adjusted reporting limit. * - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013. B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. B3 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high. D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference. j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in associated samples. Results unaffected by high bias. M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable. M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable. M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level. The associated Laboratory Control Spike recovery was acceptable. N2 - The lab does not hold accreditation for this parameter. P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount. R1 - Relative Percent Difference (RPD) value was outside control limits. S - Associated calibration check did not meet specified criteria. Prepared by: BER Checked by: ARL umhos/cm - Micro mhos per centimeter P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 6-8 GW Analytical Results_EAB_EEI_and_EDC_area_wells_2017-01 thru 2017 -03 -with BG.xlsx Page 3 of 3 TABLE 8-1 WATER ELEVATION DATA - APRIL 10, 2017 ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Well ID Northing (Feet) Eas et (Feet) ) Top of Casing Elevation (Feet-NAVD 88) Ground Surface Elevation (Feet-NAVD 88) Depth to Water (Feet, Below TOC) Groundwater Elevation (Feet) ABMW-01 991717.597 1977553.393 470.58 467.57 7.60 462.98 ABMW-01BR 991717.874 1977548.287 470.60 467.66 8.45 462.15 ABMW-02 990476.644 1978113.168 471.73 469.00 10.71 461.02 ABMW-02BR 990481.814 1978118.152 471.68 468.94 9.83 461.85 ABM W-03 992468.824 1977830.045 471.75 468.18 7.72 464.03 ABMW-03BR 992469.711 1977834.637 471.87 468.22 24.45 447.42 ABMW-03BRL 992476.553 1977828.554 471.90 468.27 44.96 426.94 ABMW-04 993230.039 1980874.561 500.14 497.30 31.58 468.56 ABMW-04BR 993231.942 1980879.202 500.14 497.23 31.68 468.46 ABMW-05 993818.437 1980356.451 480.03 477.37 12.90 467.13 ABMW-05D 993819.314 1980358.913 479.98 477.27 46.09 433.89 ABMW-06 993007.814 1980056.173 481.13 478.25 12.55 468.58 ABMW-06BR 993008.044 1980058.735 481.19 478.19 12.60 468.59 ABMW-07 993704.630 1980943.641 479.33 476.64 12.50 466.83 ABM W-07BR 993704.414 1980941.236 479.29 476.44 15.57 463.72 ABMW-07BRL 993697.735 1980958.055 480.43 477.53 23.76 456.67 BG -01 987881.600 1976145.700 533.74 530.89 38.24 495.50 13G-01BR 987880.955 1976137.663 534.68 531.20 39.70 494.98 BG-01BRL 988112.057 1976428.287 519.99 517.28 40.05 479.94 BG-01BRLR 988105.414 1976418.283 521.36 518.48 37.80 483.56 BG -01D 987877.386 1976136.745 534.50 531.18 38.97 495.53 CW -01 994400.840 1983011.710 508.24 505.77 23.28 484.96 CW -02 993052.600 1977462.670 424.60 421.74 13.24 411.36 CW -02D 993049.410 1977468.270 424.60 422.15 13.26 411.34 CW -03 988904.540 1977321.010 451.79 448.46 5.12 446.67 CW -03D 988904.350 1977313.050 451.61 448.12 1.57 450.04 CW -04 987736.040 1978596.910 479.65 477.26 29.07 450.58 CW -05 993025.770 1978359.730 459.74 457.43 9.65 450.09 GMW-01A 993978.625 1979939.237 436.51 433.62 25.34 411.17 G MW -02 994328.254 1980568.543 Unknown Unknow 5.03 Unknown G MW -06 994176.000 1981014.480 478.36 477.76 22.20 456.16 G MW -07 992406.860 1981055.190 499.60 496.96 27.08 472.52 G MW -08 991818.760 1982129.870 528.55 525.58 46.20 482.35 G MW -09 991723.260 1983059.400 536.52 533.80 23.54 512.98 G MW -10 994405.330 1981428.520 494.41 490.97 29.85 464.56 G MW -11 994284.700 1981768.830 496.55 493.41 17.23 479.32 GPMW-01BR 995031.923 1980828.053 437.41 434.67 22.61 414.80 GPMW-01D 995023.517 1980822.572 437.49 437.49 19.53 417.96 GPMW-01S 995026.095 1980829.552 437.30 434.49 18.45 418.85 GPMW-02BR 995419.325 1981501.066 436.31 433.28 24.65 411.66 GPMW-02D 995419.620 1981494.889 436.48 433.38 23.45 413.03 GPMW-03BR 995706.237 1982154.080 435.66 432.65 21.75 413.91 GPMW-03D 995702.329 1982145.938 435.42 432.66 14.26 421.16 MW -01 992754.716 1977587.309 422.45 421.28 11.15 411.30 MW-01BR 994421.395 1982989.860 507.86 504.82 28.57 479.29 MW -02 992334.638 1976849.035 423.20 421.34 12.54 410.66 M W-02BR 992275.107 1979378.743 493.79 490.79 16.95 476.84 M W-03BR 995567.440 1982389.530 452.77 449.59 25.13 427.64 M W-04BR 987870.413 1978604.316 502.46 499.10 47.24 455.22 MW-04BRL 987877.358 1978601.478 502.62 499.66 42.31 460.31 M W-05BR 993047.040 1978346.602 458.97 455.94 27.40 431.57 MW -05D 993051.088 1978345.244 458.71 455.76 8.37 450.34 MW-06BR 993847.694 1978041.647 417.73 415.02 7.17 410.56 MW -06D 993844.554 1978041.168 417.71 415.01 5.80 411.91 P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33. Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 8-1 Roxboro Water Elevation Data 2017-04-10.xlsx Page 1 of 2 TABLE 8-1 WATER ELEVATION DATA - APRIL 10, 2017 ROXBORO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, SEMORA, NC Well ID Northing (Feet) Eas et (Feet) ) Top of Casing Elevation (Feet-NAVD 88) Ground Surface Elevation (Feet-NAVD 88) Depth to Water (Feet, Below TOC) Groundwater Elevation (Feet) M W-07BR 989954.039 1975502.889 478.10 475.15 14.94 463.16 M W-08BR 991669.296 1975524.608 482.75 479.85 40.78 441.97 M W-09BR 992764.112 1976206.519 450.17 447.25 34.05 416.12 M W-10BR 989997.660 1982067.900 553.88 533.42 23.41 530.47 M W-11BR 993472.000 1979319.020 467.84 464.80 5.22 462.62 MW -11D 993480.428 1979325.989 467.28 464.60 5.57 461.71 MW-12BR 991274.913 1976269.544 456.45 453.48 4.30 452.15 MW-13BR 990704.398 1982798.161 553.28 550.12 40.01 513.27 MW-14BR 996095.637 1984648.021 513.34 510.56 48.39 464.95 MW -14D 996092.175 1984650.673 513.36 510.39 48.03 465.33 MW -14S 996094.017 1984649.277 513.39 510.48 Dry Dry MW-15BR 987071.733 1977796.644 508.58 504.83 9.68 498.90 MW -15D 987068.841 1977798.333 508.72 505.24 8.74 499.98 MW-16BR 990431.573 1981217.872 520.81 517.62 31.33 489.48 MW-17BR 992038.661 1985264.186 534.84 532.05 37.33 497.51 MW-18BR 986577.827 1982230.654 532.94 529.44 46.48 486.46 MW -18D 986575.379 1982232.696 532.96 529.66 46.17 486.79 M W-19BRL 990230.279 1982876.094 564.32 561.16 38.64 525.68 MW-20BRL 993029.101 1984933.114 487.11 483.47 Artisian 487.11 M W-21BRL 991832.780 1982130.128 529.59 526.57 47.65 481.94 MW-22BR 994705.938 1981529.128 474.00 470.93 19.05 454.95 MW-22BRL 994705.940 1981526.188 474.08 470.79 35.79 438.29 MW -22D 994705.944 1981520.307 474.05 470.79 18.98 455.07 M W-23BR 993204.212 1984286.308 518.94 515.74 46.72 472.22 MW-23BRR 993220.288 1984306.912 523.82 521.11 3.99 519.83 M W-24BR 992253.427 1985191.480 527.07 524.02 40.03 487.04 M W-25BR 991842.165 1984850.165 543.38 540.36 50.40 492.98 MW-26BR 988570.279 1982360.462 521.29 518.04 37.97 483.32 M W-27BR 994890.412 1982526.565 484.04 481.13 31.77 452.27 M W-28BR 995859.218 1983070.713 477.03 474.07 60.13 416.90 M W-29BR 995175.743 1983887.260 499.09 496.10 40.68 458.41 M W-30BR 994378.334 1984205.975 523.95 520.87 63.68 460.27 M W-31BR 988213.189 1976894.635 505.40 502.71 38.53 466.87 M W-32BR 989621.299 1976363.754 512.04 509.27 40.81 471.23 M W-33BR 990698.733 1976055.916 520.12 516.89 63.11 457.01 PZ -12 992994.770 1983152.750 514.41 511.64 44.14 470.27 PZ -14 993893.200 1 1980352.800 471.74 468.85 16.87454.87 Prepared by: BER Checked by: EMB Notes: Water levels collected within a 24 hr. period on April 10, 2017. TOC = Top of casing NAVD 88 = North American Vertical Datum 1988 P:\Duke Energy Progress. 1026\107. Roxboro Ash Basin GW Assessment Plan\33. Discharge Canal Assessment (EHS)\DC Assessment Report\Tables\Format\Table 8-1 Roxboro_Water Elevation Data 2017-04-10.xlsx Page 2 of 2 Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX A NCDEQ CORRESPONDENCE SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx Water Resources ENVIRONMLNTAL QUttOTY PA'T MCCRORY (i(11'1:moe DONALD R. VAN DER VAAR'T S. JAY ZIMMERMAN Do—ect"r July 8, 2016 Mr. Harry Sideris Senior Vice President Environment, Health, and Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, NC 28202 Subject: Additional Site Assessment Required James E. Rogers Energy Complex (Formerly Cliffside Steam Station) NPDES Permit NC0005088 — Rutherford and Cleveland Counties Roxboro Steam Electric Plant NPDES Permit NC0003425 — Person County W. H. Weatherspoon Power Plant NPDES Permit NC0005363 — Robeson County Dear Mr. Sideris: The .North Carolina Department of Environmental Quality's Division of Water Resources (DWR). requests Duke Energy (Duke) provide data and conduct additional site assessment as needed to characterize the distribution of coal ash residuals (CCR) at confirmed and potential coal ash disposal areas at the James E. Rogers Energy Complex, Roxboro Steam Electric Plant, and the W.H. Weatherspoon Plant. Descriptions and approximate locations of these areas are provided below. The additional assessments shall be included as part of the on-going Comprehensive Site Assessments (CSAs) for each of the subject facilities. Please be advised that these areas are to be included in an updated Groundwater Assessment Plan (GAP) that conforms with the North Carolina Department of Environment and Natural Resources Notice of Regulatory Requirements letter dated August 13, 2014 and Comprehensive Coal Ash Management Act (LAMA). Site activities shall follow the requirements under 15A NCAC 02L .0106(g). An assessment of surface water quality for those areas that have impounded or flowing water shall also be conducted. Area(s) of Wetness (AOW) related to these disposal areas should be assessed pursuant to CAMA §130A-309.212. State of North Carolina i Environmental Quality 1 Water Resources 1611 Mail service Center I Raleigh, North Carolina 27699-1611 - 919 707 9000 Additional Site Assessment Required July 8, 2016 The results of the characterization conducted to date in addition to pertinent historical records and detailed plans for additional site assessments must provide adequate detail to allow technical review of the proposed actions shall be provided to the DWR..GAPs are due to the DWR Central Office and the appropriate DWR Regional Office no later than August 19, 2016. Results of related investigations may be submitted as a CSA Addendum Report at.a.later.date, In addition to performing site assessment activities facility site maps :must be updated with.the revised waste boundaries and proposed compliance boundaries, established according to 15A NCAC 021 Section .0107. A letter requesting the approval of the new compliance boundaries shall be submitted to the appropriate DWR Central Office later than August 19, 2016. The following are background information and approximate locations of the identified areas at each of the subject sites requiring additional assessment: James E. Rogers Energy Complex On November 16, 2015, Duke communicated orally to .DWR that a historical coal ash disposal area located was identified just north of the Broad River and west of the switchyard at the James E. Rogers Energy Complex. Duke staff estimated the area to be approximately 3 acres in size, but stated that the full extent of the area is unknown. The approximate location of 'the area is shown below encircled. This area was not addressed .in the Groundwater Assessment Plan (GAP), Comprehensive Site Assessment (CSA) report, or Corrective Action Plans (CAPs) submitted to DWR. Characterization of CCR within the footprint of this disposal area was confirmed by Duke; however, no data related to this disposal area has been provided to DWR at this time. '.'1"I?�i�71?',y(dfJ{�n'! ,;, ::'7. ;: �i • - ,Pt�w'wiS.J'}f•�•1...`,::'£ .:. •, 2 1 P a g e Additional Site Assessment Required July 8, 2016 Roxboro Steam Electric Plant Area 1 - This area was discovered by Duke an& resented orally to DWR during a joint meeting ., . on January 14, 2016. This area is located directly:east:of. the East Ash Basin and was subsequently .: named by DWR the "Unnamed Eastern Extension Basin" for purposes of prioritization ranking- : = according to the Coal Ash Management Act. This area shalLalso include the discharge canal that runs north along the eastern side of the East Ash.Basin:: This area was not addressed in the GAP,, CSA report, or CAPS submitted to DWR. The approximate location of the area is shown below encircled. �;7.� tri. r•. / �' - `� �•3 � sx� tR',FiriA r r � - L� Area 2 — This area is located directly south of the West Ash Basin and encompasses the three "fingers" of the dammed watershed and the drainage canal that runs north along the west side of the West Ash Basin. The drainage canal should be assessed for the presence of coal ash and surface water standards. Based on site visits and information presented in the CSA and CAP reports, DWR suspects that coal ash may be present in this area. This area was not addressed in the GAP, CSA report, or CAPs submitted to DWR. The approximate location of the areas is shown below encircled. 31 Page Additional Site Assessment Required July 8, 2016 W. H. Weatherspoon Power Plant Duke informed DWR orally at a joint meeting on October 21, 2015, that the cooling pond may contain coal ash. Also, according to the CSA Report for the facility, the cooling pond is part of the treatment process before the effluent is discharged through the NPDES outfall. This area was not addressed in the GAP, CSA report, or CAN submitted to DWR; however, Duke has stated that an investigation is currently underway. The approximate location of the area is shown below encircled. 41 Page Additional Site Assessment Required July 8, 2016 If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444. Sincerely, S.q?74-Mmerman, P.G., Director Division of Water Resources cc: Landon Davidson — Asheville Regional Office Supervisor Danny Smith — Raleigh Regional Office Supervisor Belinda Henson -- Fayetteville Regional Office Supervisor Jeff Poupart, DWR Water Quality Permitting Section Chief WQROS Central File Copy 5 1 P a g e EaUNCR1lY t "INN Aflr m - eee S If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444. Sincerely, S.q?74-Mmerman, P.G., Director Division of Water Resources cc: Landon Davidson — Asheville Regional Office Supervisor Danny Smith — Raleigh Regional Office Supervisor Belinda Henson -- Fayetteville Regional Office Supervisor Jeff Poupart, DWR Water Quality Permitting Section Chief WQROS Central File Copy 5 1 P a g e . r fe ' DUKE ENERGY F� Harry K. Sideris S' Senior Vice -President Environmental, Health & Safety 526 South Church Street: Mail Code ECUP Charlotte, North Carolina 28202 704-382-4303 August 19, 2016 Mr, S. Jay Zimmerman, Director Division of Water Resources North Carolina Department of Environmental Quality 1611 Mail Service Center Raleigh, North Carolina 27699-1611 Subject- Additional Site Assessment Required James E. Rogers Energy Complex (formerly Cliffside Steam Station) Roxboro Steam Electric Plant W.H. Weatherspoon Power Plant Dear Mr, Zimmerman: Duke Energy received NCDEQ's July 8, 2016 request to "provide data and conduct additional site assessment as needed to characterize the distribution of coal ash residuals (CCR) at confirmed and potential coal ash disposal areas" at the following Duke Energy facilities: ■ James E. Rogers Energy Complex • Roxboro Steam Electric Plant • W.H. Weatherspoon Power Plant Attached you will find proposed Groundwater Assessment Work Plans (GAWPS) for each facility. The GAW Ps include additional activities that will be included as part of the ongoing comprehensive site assessment for each subject facility. This information is being provided to the respective regional offices. If you have comments and/or questions, please direct them to me at 704-382-4303. Sincerely, c Harry K. Sideris Senior Vice -President Environmental, Health & Safety Enclosure: Groundwater Assessment Work Plans- James E. Rogers Energy Complex, Roxboro Steam Electric Plant, and W.H. Weatherspoon Power Plant Cc: Landon Davidson — Asheville Regional Office Supervisor (Rogers) Danny Smith — Raleigh Regional Office Supervisor (Roxboro) Belinda Henson — Fayetteville Regional Office Supervisor (Weatherspoon) Water Resources ENVIRONMENTAL OUAL0 Y Mr. Harry Sideris Senior Vice President Environment, Health, and Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, NC 28202 PAT MCCRORY [�r:.emr3P DONALD R. VAN DER VAART <<cnr;,y S. JAY ZIMMERMAN 1)IrcYn• November 23, 2016 Subject: Conditional Additional Site Assessment Approvals James E. Rogers ,Energy Complex (Formerly Cli£fside Steam Station) NPDES Permit NC0005088 —Rutherford and Cleveland Counties Roxboro Steam Electric Plant NPDES Permit NC0003425 — Person County W. H. Weatherspoon Power Plant NPDES Permit NCO005363 — Robeson County Dear Mr. Sideris: On August 18, 2016, the North Carolina Department of Environmental Quality (DEQ) received the proposed plans to conduct additional assessment activities for the subject facilities per our request letter dated July 8, 2016. Based on a review of the plans and other information received by DEQ Regional Office staff, conditional approval of the plans is granted. DEQ's approval is contingent upon the following site specific conditions: James E. Rogers Energy Complex In the groundwater assessment report that will be provided following this investigation, please include the AMSC Foster Wheeler ash sampling results (map and tabular data). ■ if monitoring well data indicate exceedances of the 15A NCAC 02L groundwater standards, notify DEQ's Asheville Regional Office immediately so that deeper wells may be located and installed expeditiously. The deeper well(s) would be needed to determine the vertical extent of groundwater contamination_ ■ DEQ concurs with the proposed boring/well locationsT of which six are,ash-related and one is background. State of North Carolina I Environmental Quality I Water Resources 1611 Mail service Center I Raleigh, North Carolina 27699-1611 919 707 9000 • DEQ concurs with the sample depth intervals for purposes of Unified Soil Classification System descriptions. + Please revise the soil/ash sampling requirements as follows. For each of the six ash -related boring locations, a lab analysis (constituents are listed in Table 2) should be conducted for - all sampled depth intervals that contain visual evidence of ash. If 4 or more intervals contain ash, conduct a lab analysis only on the shallowest ash -interval, the deepest ash interval, and a composite ofthe remaining ash intervals, for a total of three ash lab analyses. DEQ concurs with the 5 -foot minimum thickness criterion to determine when to analyze variations in ash type (fly or bottom). ■ For soil sampling and lab analysis at each of the six ash -.related boring locations, DEQ concurs with the two proposed sample intervals: 2 feet below the ash/soil interface and 8 to 10 feet below the ash/soil interface. ■ For SPLP analysis at each of the six ash -related boring locations, please conduct an analysis on o a) the sampled ash interval with the highest concentration of arsenic, selenium, and strontium among all sampled ash intervals at that location, and o b) a sample composited from the two sampled soil intervals at that location. For soil sampling and analysis at the background boring location, please collect: o a) one shallow soil sample at a depth that approximates the general depth of most of the shallow soil samples from the other six borings, o b) one deeper soil sample at a depth that approximates the general depth of most of the deeper soil samples from the other six borings, and o c) one SPLP sample that is a composite of the shallow and deeper intervals in a) and b) above. ■ Please revise Section 2.2.3 to read that if inaccessible from the bank, a boat should be used to collect three surface water samples upstream, adjacent to, and downstream of the AO.ls. These samples should be collected immediately adjacent to the bank during conditions that approximate low or baseflow to the maximum extent possible and at least 5 days after a previous rain event of any magnitude. Contact DEQ's Asheville Regional Office if this request becomes difficult to meet based on weather conditions. Antecedent rainfall (prior 5 days and prior 48 hours) should be provided, along with its measurement location, as a footnote in surface water results table. Roxboro Steam Electric Plant • In the groundwater assessment report that will be provided following this investigation, please identify on a map all private supply well's within a :'% mile radius of an assumed compliance boundary around the study area, monitor- yell locations, any areas of wetness, and surface water features. • DEQ recommends additional monitoring we11s-�.td- be. installed in each water=bearing hydrostratigraphic unit at a nested well location'south.:east o:f existing well MW-12BR. ' • DEQ recommends relocating any proposed sampling point locations where insufficient sediment recovery is an issue. W. H. Weathers oon Power Plant • In the groundwater assessment report that will bei provided following, this investigation, please identify on a map all private supply wells -within a'/2 mile radius ofan assumed compliance boundary around the study area, monitor well locations,._any areas of wetness, and surface water features. DEQ recommends moving the proposed sample location JC -1 to the drainage feature before it enters the creek (coordinates N 34.5902, W 78.9660) In response to your "Proposed Waste and Compliance Boundaries" letter dated August 19, 2016, DEQ cannot approve the proposed revised compliance boundary locations for the subject facilities at this time. DEQ will provide correspondence and direction regarding this issue in the near future. Submit the findings of the site assessments for each subject facility as a groundwater site assessment report. The respective site assessment reports shall include figures, tables, cross- sections, and maps in a manner that provides an interpretation of site conditions. In each report, include a map that shows all private supply wells, monitoring well locations, any areas of wetness, and surface water features within a'/2 mile radius of a previously established compliance boundary around the study area. Reports submitted in a data summary format will not be approved as an acceptable documentation of findings. Submit site assessment reports for each facility by March 31, 2017. Please begin implementing these plans immediately to include the conditional .items listed. For general questions, contact Steve Lanter at (91.9) 807-6444. For more specific questions, please contact our Regional staff listed below: ■ James E. Rogers Energy Complex: Ted Campbell at (828) 296-4500 ■ Roxboro Steam Electric Plant: Eric Rice at (919) 791-4200 • W. H. Weatherspoon Power Plant: Kent White at (910) 433-3300 Sincerely, 4Jayimmeerman. P.G., Director Division of Water Resources cc: ARO, FRO, & RRO WQROS Regional Supervisors and Assistant Supervisors WQROS Central File Copy �' � r Energy, Mineral and LandResources ENVIRONMENTAL QUALITY January 27, 2017 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Duke Energy. Progress, LLC Attn: Issa Zarzar 410 South Wilmington St Raleigh, NC 27601 ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director RE: Project Name: ROXBORO STEAM ELECTRIC PLANT ASH BASIN GROUNDWATER ASSESSMENT PLAN Acres Approved: 3.33 Project ID: PERSO-2017-007 County: Person, City: Senora Address: 1700 Dunnaway Rd. River Basin: Roanoke Stream Classification: Other Submitted by: Mr. Culas Hutchinson Date Received -by LQS: November 22, 2016 Plan Type: Utilities Dear Sir or Madam: The subject erosion and sedimentation control plan was approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30 -day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A -61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. ifJollowing the commencement of this project, the State of North Carolina I Environmental Quality I Energy; Mineral, and Land Resources Raleigh Regional Office 1 1628 Mail Service Center I Raleigh, NC 27609 919 791 4200 Letter of Approval Duke Energy Progress, LLC January 27, 2017 Page 2 of 3 erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include agencies such as the DEMLR stormwater regulations, their enforcement requirements within Section 401 of the Clean Water Act, the Environmental Protection Agency and/or the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Solid Waste Management's landfill regulations, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All upland areas would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Resources, the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. DEMLR must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWR, the Corps, or the EPA, it is the responsibility of the developer to inform the DEMLR regional office so that an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval. Please be aware that your project will be covered by the enclosed NPDES General Stormwater Permit NCGO10000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed general permit. You are requested to file an amended Financial Responsibility/Ownership Form, if there is any change in the information provided to our office at the time of the initial plan submittal. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Si - reIII 2Evamn/Zol Sedimer. DEMLR Reviwd 081?'30]? Letter of Approval Duke Energy Progress, LLC January 27, 2017 Page 3 of 3 Enclosures: Certificate of Approval NPDES Permit cc: Culas W Hutchinson Jr, Syntera Diane Adams, DEMLR — electronic copy DEMLR — Raleigh Regional Office File MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: ROXBORO STEAM ELECTRIC PLANT ASH BASIN GROUNDWATER ASSESSMENT PLAN Project ID: PERSO-2017-007 County: Person 1. Please provide a copy of the USACE 404 and DWR 401 certifications for the office file. Submit documentation with maps showing location and extent of impacts to streams and wetlands with any special conditions pertaining to erosion and sediment control and restoration of affected areas. (GS 113A -54.1(a)) 2. Provide a plan detail, construction specifications, and maintenance requirements for the proposed temporary mats for wetland crossings. Show locations on the plan intended for use. (GS 113A-57((4)) 3. Indicate on the plan any areas that may require soil stabilization within 7 days. (GS. 113A-57(2)) 4. Additional measures may be required. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. (GS 113A- 57(3), 15A NCAC 04B.0105) 5. Provide 1 copy of revised plan sheets showing the modifications required for approval, and highlight or bubble the revisions for reference. Revixcxi D8 1720 12 DUKE %C ' ENERGY. January 27, 2017 Mr. S. Jay Zimmerman, Director Division of Water Resources North Carolina Department of Environmental Quality 1611 Mail Service Center Raleigh, North Carolina 27699-1611 Environmental, Health & Saleiy 526 South Church Street, Mali Code EC13K Charlotta, North Carolina 28202 Subject: Extension Request - Additional Site Assessments James E. Rogers Energy Complex (formerly Cliffside Steam Station) NPDES Permit NC0005088 - Rutherford and Cleveland Counties Roxboro Steam Electric Plant NPDES Permit NC0003425 - Person County W.H. Weatherspoon Power Plant NPDES Permit NC0005363 - Robeson County Dear Mr. Zimmerman: On August 18, 2016, Duke Energy (Duke) submitted Work Plans for additional assessment activities at the James E. Rogers Energy Complex (Rogers), Roxboro Steam Electric Plant (Roxboro), and W.H. Weatherspoon (Weatherspoon) Power Plant. On November 23, (revised December 2, 2016) Duke received North Carolina Division of Environmental Quality Division of Water Resources (DWR) approval to the Additional Site Assessment Approvals for these three facilities noting a reporting due date of March 31, 2017. On November 30, 2016 in a meeting with DWR Regional office personnel, Duke made DWR aware that permitting and constructability of monitoring wells would likely extend the schedules for assessment beyond the March 31, 2017 date specified in the November 23 letter. With this letter, Duke requests a 60 -day extension for the Additional Site Assessment Plans at Roxboro and Weatherspoon, and an extension until after ash removal is complete at Rogers. The extension request for these sites is outlined in more detail below: James E. Rogers Energy Complex • The area requested for additional assessment at Rogers is an ash area across the Broad River near the Unit 5 switchyard. This area has tentatively been scheduled to begin excavation in the second quarter of 2017 pending receipt of necessary permits. Wells installed in the area of excavation would need to be abandoned prior to beginning excavation resulting in reinstallation of most of the wells. Duke requests that installation of the additional site assessment wells be postponed until completion of ash removal from the area across the Broad River. Duke intends to propose an alternate schedule once there is more c)arily on the completion dale of ash removal, Preliminary discussions have occurred with Asheville Regional Office ori this topic: Mr. S. Jay Zimmerman, Director January 27, 2017 Page 2 Roxboro Steam Electric Plant ■ Work Plan Schedule Section 8.0 Proposed Schedule of the work plan noted that field work would begin approximately 45 days following final NCDEQ approval with the CSA Report submitted 60 days after receipt and validation of analytical data. The proposed schedule accounted for permitting and assessment of data obtained during the site assessment. The schedule submitted in the Work Plan was aggressive with any alterations leading to the potential submittal of an incomplete report. • Additional monitoring well location The Correction to the Additional Site Assessment Approvals requested one additional monitoring well cluster at a location southeast of MW-12BR. Duke noted that the requested location was likely an error with the actual location southwest of MW-12BR. Clarification for well cluster location was directed to NCDEQ on November 27, 2016. Confirmation of final cluster location was received from NCDEQ on December 1, 2016. • Permit Requirement The area of disturbance for the 7 well cluster locations is greater than 1 acre and therefore requires an Erosion and Sediment Control (E&SC) Permit from NCDEQ Division of Land Quality. The initial E&SC permit application was submitted on November 30, 2016 with a revision for the additional well cluster submitted on December 6, 2016. Clearing and creation of roadways/pads cannot begin until the E&SC permit is received. ■ Feasibility of compressed schedule Installation of access roads/pads and utility clearance will begin upon receipt of E&SC permit. However, the work is weather -dependent with driller mobilization not anticipated until approximately two weeks after start of work with clearing and road/pad installation continuing as well installation begins. o Well installation and development - approximately 2 to 3 weeks o Collection of groundwater and other media samples - approximately 1 week o Analytical analysis - approximately 3 to 4 weeks o Data validation of analytical results - approximately 1 week o Report development and review - approximately 4 weeks W.H. Weatherspoon Power Plant ■ Work Plan Schedule Section 8.0 Proposed Schedule of the work plan noted that field work would begin approximately 45 days following final NCDEQ approval with the CSA Report submitted 60 days after receipt and validation of analytical data. The proposed schedule accounted for permitting and assessment of data obtained during the site assessment. The schedule submitted in the work• plan was aggressive with any alterations leading to the potential submittal of an incomplete Comprehensive report. Mr. S. Jay Zimmerman, Director, January 27, 2017 Page 3 Permit Requirement The installation of six wells on the cooling pond dam required Dam Safety work plan approval by the NC Division of Energy, Mineral, and Land Resources. Approval was received on January 12, 2017. Aligning drilling resources could not begin until this approval was received. Feasibility of Compressed Schedule The following estimated durations beginning on the receipt date of the Dam Safety approval will move completion beyond the March 31, 2017 report date specified in the "Correction to the Additional Site Assessment Approvals" letter: o Well installation and development - approximately 2 to 3 weeks o Collection of groundwater and other media samples - approximately 1 week o Analytical analysis - approximately 3 to 4 weeks o Data validation of analytical results - approximately 1 week o Report development and review - approximately 4 weeks If you have comments and/or questions, please direct them to me at 980-373-3719. Sincerely, 4 m, D. Edwin M. Sullivan Director, Waste and Groundwater Programs Environmental, Health, & Safety Cc NCDEQ (electronic): Eric Bice - NCDEQ Raleigh Regional Office Ted Campbell - NCDEQ Asheville Regional Office !Cent White - NCDEQ Fayetteville Regional Office Steve Lanter - NCDEQ Ralelgh Eric Smith - NCDEQ Raleigh Cc Duke (electronic): Ryan Czop Kimberlee Witt Water Resources Environmental Quality February 27, 2017 D. Edwin Sullivan Director, Waste and Groundwater Programs Environmental, Health & Safety Duke Energy - 526 South Church Street Mail Code EC 13K Charlotte, North Carolina 28202 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Extension Request — Additional Areas Assessment James E. Rogers Energy Complex (Formerly — NPDES No. NC00005088 — Rutherford and Cleveland Counties Roxboro Steam Electric Plant — NPDES No. NCO003425 — Person County W.H. Weatherspoon Power Plant — NPDES No. NCO005363 — Gaston County Dear Mr. Sullivan: On August 18, 2016, the North Carolina Department of Environmental Quality (DEQ) received proposed plans from Duke Energy to conduct additional assessment activities for the James E. Rogers Energy Complex (Rogers), Roxboro Steam Electric Plant (Roxboro), and W.H. Weatherspoon Power Plant (Weatherspoon) as requested by the Department. Based on a review of the plans and other information received by DEQ Regional Office staff, conditional approval of the plans was granted based on site-specific provisions in our November 23, 2016 letter, which was revised on December 2, 2016. In granting conditional approval, the DEQ stipulated a deadline of March 31, 2017 for submittal of site assessment reports for each facility. In a January 27, 2017 letter to DEQ, Duke Energy requested a 60 -day extension for the Additional Areas Site Assessment Plan at Roxboro and Weatherspoon, and an extension at Rogers until all ash is removed from the ash basin. DEQ grants an extension as requested to complete activities related to the site assessments for the subject facilities contingent on updated status reports provided to the Regional Offices at the first of each month. These updated status reports will consist of documentation of permit issues, schedules for sample collection and analysis, and time estimates for reporting. Any problems that may impact meeting the revised timeframe for report completion must be communicated to the respective Regional Offices. If you have any questions regarding this letter, please feel free to'contact Steve Lanter (Central Office) - at 919-807-6444. For more specific questions, please.contact our Regional staff listed below: « :James E. Rogers Energy Complex: Ted Campbell at. (828).296-4500 e Roxboro Steam Electric Plant: Eric Rice ate{919) 7-91z4200.:;:;: • ' W. H. Weatherspoon `Power Plant: Kent White `at.(9-40) 433''3300 State or North Carolina j Environmental Quality I Division of Water Resources Rater Quality Regional Operations Section 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 919-707-9129 Sincerely, S. Z m nuan, P.G.,Director Division of Water Resources cc: WQROS Asheville, Raleigh, and _Fayetteville Regional Office Supervisors WQROS Central Pile Copy Page 2 of 2 Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX B SynTerra NPDES PERMIT DEVELOPMENT FACT SHEET P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx DEPARTEMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES FACT SHEET FOR NPDES PERMIT DEVELOPMENT NPDES No. NC0003425 Summary The Roxboro Steam Electric Plant is an electric generating facility that uses steam turbine generation (via four coal-fired units with a total net capacity of 2558 MW). Units No. 1 and 2 (385 MWe and 670 MWe, respectively) use condensers as cooling devices. Units No. 3 and 4 (707MWe and 700 MWe, respectively) use cooling towers as cooling devices. The facility has three existing cooling water intake structures (CWISs). The source water for CWISs No. 1 and 2 is the Hyco Reservoir. The source water for CWIS no. 4 is the site's cooling canal. The facility total intake is approximately 1,114 MGD. The facility discharges to subbasin 030205 in the Roanoke River Basin. Discharges are mostly industrial, with a very small domestic flow (internal Outfall 008) piped to the on-site ash pond. Discharges from the ash pond (internal Outfall 002), once -through cooling water and FGD treatmet sytem (internal outfall 010) are discharged to the Discharge Canal (outfall 003). The Discharge Canal and Coal Pile Runoff (outfall 006) both discharge to Hyco Reservoir. The Hyco Reservoir is a 17.6 km2 waterbody constructed in 1963 by CP&L to serve as a cooling water source. The receiving waterbody is class WS -V; B. The facility is located in the Lower Piedmont area of the state, the applicable state water quality temperature standard is 32'C (89.6'F). This facility is subject to EPA effluent guideline limits per 40 CFR 423 - Steam Electric Power Generating Point Source Category which were amended November 3, 2015. The facility is also subject to the Cooling Water Intake Structures Rules (40 CFR 125) effective October 14, 2014. The intake flow is > 125 MGD. Facility Information Applicant/ Facility Name: Duke Energy Progress/ Roxboro Steam Electric Generating Plant Applicant Address: 1700 Dunnaway Rd., Semora, NC 27343 Facility Address: 1700 Dunnaway Rd., Semora, NC 27343 Permitted Flow Not limited Type of Waste: 99.8 % Industrial, 0.2% - domestic Facility/Permit Status: Existing/ Renewal County: Person Miscellaneous Receiving Stream: Hyco Reservoir Stream Classification: WS -V, B Subbasin: 03-02-05 303(d) Listed?: No Drainage Area (mi2): Lake Primary SIC Code: 4911 Summer 7Q10 (cfs) 0 Regional Office: RRO 30Q2 (cfs): 0 Quad Olive Hill Average Flow (cfs): 0 Permit Writer: Teresa Rodriguez IWC (%): 100% 1 Date: 8/23/2016 Summary The Roxboro Steam Electric Plant is an electric generating facility that uses steam turbine generation (via four coal-fired units with a total net capacity of 2558 MW). Units No. 1 and 2 (385 MWe and 670 MWe, respectively) use condensers as cooling devices. Units No. 3 and 4 (707MWe and 700 MWe, respectively) use cooling towers as cooling devices. The facility has three existing cooling water intake structures (CWISs). The source water for CWISs No. 1 and 2 is the Hyco Reservoir. The source water for CWIS no. 4 is the site's cooling canal. The facility total intake is approximately 1,114 MGD. The facility discharges to subbasin 030205 in the Roanoke River Basin. Discharges are mostly industrial, with a very small domestic flow (internal Outfall 008) piped to the on-site ash pond. Discharges from the ash pond (internal Outfall 002), once -through cooling water and FGD treatmet sytem (internal outfall 010) are discharged to the Discharge Canal (outfall 003). The Discharge Canal and Coal Pile Runoff (outfall 006) both discharge to Hyco Reservoir. The Hyco Reservoir is a 17.6 km2 waterbody constructed in 1963 by CP&L to serve as a cooling water source. The receiving waterbody is class WS -V; B. The facility is located in the Lower Piedmont area of the state, the applicable state water quality temperature standard is 32'C (89.6'F). This facility is subject to EPA effluent guideline limits per 40 CFR 423 - Steam Electric Power Generating Point Source Category which were amended November 3, 2015. The facility is also subject to the Cooling Water Intake Structures Rules (40 CFR 125) effective October 14, 2014. The intake flow is > 125 MGD. NPDES PERMIT FACT SHEET Page 2 Roxboro Steam Electric Plant NPDES No. NC00003425 The facility operates five internal outfalls and two outfalls to Hyco Reservoir. Duke requested the addition of two new outfalls on the permit; one to reflect the future treatment system for the low volume wastes as the ash basin will be closed and one for seeps and stormwater. Description of existing outfalls: • Outfall 003 - Heated Discharge Canal to Hyco Reservoir. The discharge canal combines all internal outfalls (002, 005, 008, 009, 010) before discharging to Hyco Reservoir. In addition, once -through cooling water from condensers for units 1,2, and 3, once -through cooling water from heat exchangers, seepage from ash pond, and stormwater runoff from plant drainage areas are discharged to the discharge canal. Outfall 006 - Coal Pile Runoff discharges directly to Hyco Reservoir. Coal pile runoff wastewaters include runoff from the coal pile, limestone pile and gypsum pile, truck wheel wash area and coal handling areas. Treatment is accomplished by neutralization, sedimentation and equalization. Internal Outfall 002 - Ash Pond discharging to the discharge canal. The ash pond receives wastewater from the following source: • Bottom ash transport waters • Silo wash water • Ash landfill leachate and runoff (this landfill receives CCR from Mayo and Roxboro plants) • Dry -ash handling system wash water • Blowdown from Unit 4 cooling tower • Coal mill rejects and pyrites • Sewage treatment plant effluent • Low volume waste consisting of boiler blowdown, equipment maintenance cleaning wastewaters, RO reject wastewater and floor drains. Low volume wastes are treated by neutralization. • Emergency overflow from FGD system blowdown. The ash pond uses precipitation, adsorption, and settling for treatment, which has been determined by NC to be BAT for this facility. • Internal Outfall 005 - Cooling tower blowdown from Unit 4. • Internal Outfall 008 - Treated domestic wastewater. The treatment system consists of a screen, communitor, surge tank, aeration tank, clarifier, chlorine contact chamber and sludge holding tank. A new package plant will be installed to replace the existing plant. • Internal Outfall 009 - Chemical metal cleaning waste. Wastewaters from cleaning of the boilers is generated every five to eight years. Every three to five years wastewaters are generated from cleaning the heat exchangers. The wastewaters generated can be treated by evaporation or by neutralization and precipitation. • Internal Outfall 010 - Flue Gas Desulfurization (FGD) treatment system discharging to the discharge canal. The scrubber system removes SOx by mixing flue gas with a NPDES PERMIT FACT SHEET Page 3 Roxboro Steam Electric Plant NPDES No. NC00003425 limestone slurry. The blowdown from the scrubber is discharged to a gypsum settling pond system then to a bioreactor which utilizes microorganisms to reduce soluble contaminants to insoluble forms (under anaerobic conditions) that then precipitate from solution. Wastewater is discharged to the ash pond effluent channel. An emergency overflow from the FGD system blowdown discharges to the ash pond. Proposed Outfalls: Outfall 001 (Seeps) - The facility identified 16 unpermitted seeps. Seven seeps are engineered drains from the ash basin flowing to the discharge canal. Four non - engineered seeps also flow to the discharge canal. Four seeps from the ash landfill and one from the gypsum pile flow to the intake canal through a common outfall. This outfall was previously designated as outfall 001 in the permit and will be reinstated to monitor the seeps. Internal Outfall 012 - Low volume waste and other wastewaters. Duke will build a new dual basin treatment system to treat wastewaters than now go to the ash basin. CWA 316 (b) The permittee shall comply with the Cooling Water Intake Structure Rule per 40 CFR 125.95. The Division approved the facility request for an alternative schedule in accordance with 40 CFR 125.95(a)(2). The permittee shall submit all the materials required by the Rule with the next renewal application. Temperature Mixing Zone - Outfall 003 The facility is located in the Lower Piedmont area of the state, the applicable state water quality temperature standard is 32°C (89.6'F). The authorized temperature mixing zone for outfall 003 includes the North Hyco Arm downstream of NC Hwy 57, the main body of Hyco Reservoir downstream of the confluence of the Cobbs Creek Arm and the North Hyco Arm and the entire afterbay lake. USGS data at the afterbay monitoring station (USGS Station 02077303) was reviewed for the period of January 2011 to April 2016. Data shows that the temperature water quality standard was not exceeded for this period. Maximum temperature recorded was 30.5°C. Instream Monitoring The permit requires monitoring of Hyco Reservoir in accordance to the Biological Monitoring Program as approved by the Division. Based on the Division's review of the reports the fish community is comparable to other piedmont reservoirs and no problems were noted. DATA REVIEW/PERMIT REQUIREMENTS Internal Outfall 002 - Ash Pond This outfall is subject to the Effluent Limitations Guidelines (ELG) in Table 1. Table 1. ELG Outfall 002 (Prior to November 1, 2018) Pollutant Daily Maximum Monthly ELG Average TSS 100 mg/1 I 30 mg/1 40 CFR 423.12 (b) (4) Oil & Grease 20 mg/1 15 mg/1 40 CFR 423.12 (b) (4) NPDES PERMIT FACT SHEET Page 4 Roxboro Steam Electric Plant NPDES No. NC00003425 After November 1, 2018 no discharge of bottom ash transport water is allowed as per 40 CFR 423.13 (k) (1) (i). Compliance with this section shall be as soon as possible but no later than December 31, 2023. Duke has submitted a schedule of compliance for meeting the rule by April 30, 2021. Fly ash transport water is not discharge so they will meet the compliance date of November 1, 2018. The current permit requires monitoring for flow and total selenium, limits for Oil & Grease and TSS. A summary of DMR data for the period of January 2011 to January 2016 is included in Table 2. There have been no violations of permit limits or conditions. Table 2. DMR Summary Outfall 002 Parameter Average Maximum Minimum Flow 10.8 MGD 48.3 MGD 3.1 MGD TSS 5m /l 21m /l <2.5m /l Total Selenium 14.6 µ /l 68.8 µ /l < 10 µ /l O&G <5m /l 13.5m /l <5m /l Table 3. Monitoring Requirements/Proposed Changes Outfall 002 Parameter Monitoring Changes Basis requirements Flow Monitor No changes 15A NCAC 2B.0505 TSS 30 mg/1 monthly aver No changes 40 CFR 423.12(b) (4) 100 m /l daily max Oil & Grease 15 mg/l monthly aver No Changes 40 CFR 423.12(b)(4) 20 m / 1 daily max Total Monthly monitoring No changes Pollutant of concern. Selenium Turbidity, pH No requirement Monitor Pollutant of concern for dewatering/ decanting Internal Outfall 002 - Dewatering To meet the requirements of the Coal Ash Management Act of 2014, the facility needs to dewater two ash ponds by removing the interstitial water and excavate the ash to deposit it in landfills. The facility's highest discharge rate from the dewatering process will be 1 MGD. The facility submitted data for the standing surface water in the ash ponds, interstitial water in the ash, and interstitial ash water that was treated by filters of various sizes. The following pollutants were detected at concentrations higher than the water quality standards: selenium, arsenic and molybdenum. A new effluent and monitoring sheet is included in the permit for the ash pond dewatering phase. As this is an internal outfall the water quality standards are not applied. Monitoring will be required for selenium, arsenic, molybdenum, antimony and copper. Ash Pond Dams: Seepage through earthen dams is common and is an expected consequence of impounding water with an earthen embankment. Even the tightest, best -compacted clays cannot prevent some water from seeping through them. Seepage is not necessarily an indication that a dam has structural problems, but should be kept in check through various engineering controls and NPDES PERMIT FACT SHEET Roxboro Steam Electric Plant Page 5 NPDES No. NC00003425 regularly monitored for changes in quantity or quality which, over time, may result in dam failure. Outfall 003 - Discharge Canal (Combined outfalls) DMR/ Compliance Review Data were reviewed for the period of January 2011 to March 2016. There have been no violations of permit limits or conditions. Table 4. DMR Summary Outfall 003 Parameter i Average Maximum Minimum Flow MGD 840 1130 6.9 TRC Not discharged TP (mg/1) < 0.036 < 0.05 < 0.05 TN (mg/1) 0.68 1.08 0.44 Temperature °C 29 41 13°C Total Arsenic (gg/1) 6.2 17.1 < 2.8 H SU 7.34 8 6.38 Toxicity Testing (003): Current Requirement: Acute P/F at 90%, February, May, August, November. Proposed Requirement: Acute P/F at 90%, February, May, August, November. The facility passed 21 tests out of 21 tests performed for the period of January 2011 to January 2016. Reasonable Potential Analysis Outfall 003: The Division conducted EPA -recommended analyses to determine the reasonable potential for toxicants to be discharged at levels exceeding water quality standards/ EPA criteria by this facility from outfall 003. For the purposes of the RPA, the background concentrations for all parameters were assumed to be below detection level. The RPA uses 95% probability level and 95% confidence basis in accordance with the EPA Guidance entitled "Technical Support Document for Water Quality -based Toxics Control." With the approval of the Triennial Review (2007-2014) of the NC Water Quality Standards by the Environmental Management Commission (EMC) in 2014 and US -EPA (with some exceptions) on April 6, 2016, the NPDES Permitting Unit is required to implement the new dissolved metal standards in all permits public noticed after April 6, 2016. The RPA included evaluation of dissolved metals' standards, utilizing measured hardness value of 100 mg/L CaCO3 for hardness -dependent metals. A reasonable potential analysis was conducted for arsenic, copper, nickel, selenium, strontium, thallium, chlorides and zinc. Arsenic data used for the RPA was collected between 2011 and 2016. Data for the remaining parameters was from a special study for the period of March 2010 to August 2011. Based on this analysis, the following permitting actions are proposed for this permit: • Monitoring Only. The following parameters will receive a monitor -only requirement since they did not demonstrate reasonable potential to exceed applicable water quality standards/ criteria, but the maximum predicted concentration was >50% of the allowable concentration: Arsenic, selenium, chloride and thallium. • No Limit or Monitoring: The following parameters will not receive a limit or monitoring, since they did not demonstrate reasonable potential to exceed applicable water quality NPDES PERMIT FACT SHEET Page 6 Roxboro Steam Electric Plant NPDES No. NC00003425 standards/ criteria and the maximum predicted concentration was <50% of the allowable concentration: copper, nickel, strontium, and zinc. Mercury Evaluation Outfall 003: A mercury evaluation was conducted in accordance with the permitting guidance developed for the implementation of the statewide Mercury TMDL to determine the need for a limit and Mercury Minimization Plan (MMP). Monitoring for mercury is not required for outfall 003 but mercury data was collected during a special study during the period of March 2010 to August 2011. The water quality based effluent limitation (WQBEL) for mercury is 12 ng/1. The technology based effluent limit (TBEL) is 47 ng/1. None of the annual averages exceeds the WQBEL or TBEL, no limit is required. See the attached mercury evaluation spreadsheet. Table 5. Mercury Evaluation Table 6. Monitoring Requirements/ Proposed Changes Outfall 003 Parameter 2010 2011 # of Samples 20 16 Annual Average, n /L 3.6 4.4 Maximum Value, n /L 7.63 6.92 TBEL, n / L 47 WQBEL, n /L 12.0 Table 6. Monitoring Requirements/ Proposed Changes Outfall 003 Parameter Monitoring Changes Basis reguirements/Limits Flow Monitor No changes 15A NCAC 2B.0505 TRC 200 4g/l Modified limit to State WQ standards, 15A instantaneous max 28 µg /1 daily max NCAC 2B.0200. The water quality standard is more stringent than the effluent uidelines limit. TP Monitor No changes 15A NCAC 2B.0500 TN Monitor No changes 15A NCAC 2B.0500 Temperature Monitor No changes Approved Mixing zone Total Arsenic Monitor No changes Based on results from RPA, Predicted concentration greater than 50% of allowable. Total Selenium No requirement Quarterly Based on results from monitoring RPA, Predicted concentration greater than 50% of allowable. Total Thallium No requirement Quarterly Based on results from monitoring RPA, Predicted concentration greater than 50% of allowable. Chloride No requirement Quarterly Based on results from monitoring RPA, Predicted NPDES PERMIT FACT SHEET Page 7 Roxboro Steam Electric Plant NPDES No. NC00003425 Internal Outfall 005 - Cooling Tower Blowdown from Unit 4 This outfall is subject to the ELGs in Table 7. Table 7. ELG Outfall 005 pH Free Available Chlorine 126 Pollutants Total Chromium Total Zinc Daily Maximum Monthly Average 6to9SU 0.5 mg/1 0.2 mg/l No detectable amounts 0.2 mg/l 0.2 mg/l 1.0 mi/1 1.0 MSA 40 CFR 423.12 (b) (1) 40 CFR 423.12 (d) (1) 40 CFR 423.13 (d) (1) 40 CFR 423.13 (d) (1) 40 CFR 423.13 (d) (1) The permit includes monitoring for flow and Total Residual Chlorine (TRC), limits for Free Available Chlorine, Total Chromium, Total Zinc and 126 priority pollutants. Special condition A. (14) in the permit doesn't allow the discharge of the cooling tower blowdown to the discharge canal, it has to be discharged to the ash pond. With the modifications planned to the site and the future closure of the existing ash pond Duke will like to have the option to discharge the blowdown to the discharge canal. This will continue to be an internal outfall subject to the same limits under 40 CFR 423. The limits apply before it comingles with any other waste stream so there is no change in limits or other permit conditions by allowing the cooling tower blowdown to discharge into the discharge canal. DMR/ Compliance Review: Data were reviewed for the period of January 2011 to January 2016. There have been no violations of permit limits or conditions. Flow was the only parameter monitored at this outfall since the facility did not chlorinate or added chromium or zinc for maintenance activities. Flow is reported as 7.2 MGD on a daily basis. Table 8. Monitoring Requirements/ Proposed Changes Outfall 005 Parameter oloRequirements/Limits concentration greater than 50% of allowable. pH 6 to 9 SU No changes State WQ standards, 15A 115A NCAC 2B.0505 Free available 500 4g/l daily max NCAC 213.0200 Acute toxicity P/F 90% No changes State WQ standards, 15A Total Residual Chlorine Monitoring NCAC 213.0200 Internal Outfall 005 - Cooling Tower Blowdown from Unit 4 This outfall is subject to the ELGs in Table 7. Table 7. ELG Outfall 005 pH Free Available Chlorine 126 Pollutants Total Chromium Total Zinc Daily Maximum Monthly Average 6to9SU 0.5 mg/1 0.2 mg/l No detectable amounts 0.2 mg/l 0.2 mg/l 1.0 mi/1 1.0 MSA 40 CFR 423.12 (b) (1) 40 CFR 423.12 (d) (1) 40 CFR 423.13 (d) (1) 40 CFR 423.13 (d) (1) 40 CFR 423.13 (d) (1) The permit includes monitoring for flow and Total Residual Chlorine (TRC), limits for Free Available Chlorine, Total Chromium, Total Zinc and 126 priority pollutants. Special condition A. (14) in the permit doesn't allow the discharge of the cooling tower blowdown to the discharge canal, it has to be discharged to the ash pond. With the modifications planned to the site and the future closure of the existing ash pond Duke will like to have the option to discharge the blowdown to the discharge canal. This will continue to be an internal outfall subject to the same limits under 40 CFR 423. The limits apply before it comingles with any other waste stream so there is no change in limits or other permit conditions by allowing the cooling tower blowdown to discharge into the discharge canal. DMR/ Compliance Review: Data were reviewed for the period of January 2011 to January 2016. There have been no violations of permit limits or conditions. Flow was the only parameter monitored at this outfall since the facility did not chlorinate or added chromium or zinc for maintenance activities. Flow is reported as 7.2 MGD on a daily basis. Table 8. Monitoring Requirements/ Proposed Changes Outfall 005 Parameter oloRequirements/Limits onitoring Changes Flow Monitor I No changes 115A NCAC 2B.0505 Free available 500 4g/l daily max No changes 40 CFR 423.13 (d)(1) chlorine 200 4g/l monthly average Total Residual Chlorine Monitoring No changes 40 CFR 423.13 (d)(2) Total chromium 200 4g/l daily max No changes 40 CFR 423.13 (d)(1) NPDES PERMIT FACT SHEET Page 8 Roxboro Steam Electric Plant NPDES No. NC00003425 200 µg/l monthly average Total Zinc 1.0 mg/ 1 daily max 1.0 mg/1 monthly average No changes 40 CFR 423.13 (d)(1) The 126 priority No detectable amount No changes 40 CFR 423.13 (d)(1) pollutants Outfall 006 - Coal Pile Runoff This outfall is subject to the ELG in Table 9. Table 9. ELG Outfall 006 Daily Maximum Monthly Average TSS 50 mg/l I 140 CFR 423.12 (b) (9) PH 6 to 9 SU 140 CFR 423.12 (b) (1) DMR/ Compliance Review: Data were reviewed for the period of January 2008 to March 2013. There have been no violations of permit limits or conditions. Table 10. DMR Summary Outfall 006 Parameter 1 9 Average Maximum Minimum Flow (MGD) 0.23 0.05 0.002 TSS (mg/ 1) 2.6 76.6 < 2.5 pH (SU) 7.39 8.9 6.04 Priority Pollutant Scan: The application included the results of one scan. Selenium was detected above the water quality standard. Monitoring for selenium was added to the permit. Table 11. Monitoring Requirements/ Proposed Chances Outfall 006 Parameter Monitoring Changes Basis requirements/Limits Flow Monitor No changes 15A NCAC 2B.05 TSS 50 mg/1 instantaneous Added Monthly 40 CFR 423.12(b)(9), max � 1 ge limit of 30 40 CFR 122.45 pH 6 to 9 SU No changes 40 CFR 423.12 (b) (1) Total selenium No requirement Quarterly Monitoring Detected in the PPA Acute toxicity P F 90% / No changes State WQ standards, 15A NCAC 2B.0200 NPDES PERMIT FACT SHEET Page 9 Internal Outfall 008 - Domestic WWTP Table 12. DMR Review Outfall 008 Roxboro Steam Electric Plant NPDES No. NC00003425 ,Parameter Average Maximum Minimum Flow MGD 0.007 0.01 0.002 TSS (mg/ 1 14.7 30 5 H SU 6.8 7.3 6.5 BOD (mg/1) 10.4 28 2.1 NH3N (mg/1) 0.8 1.6 < 0.1 Table 13. Monitoring Requirements/ Proposed Changes Outfall 008 P Parameter Monitoring Changes Basis re uirements/Limits Flow 0.015 MGD Add effluent page WWTP will be upgraded Total Copper 1.0 mg/1 monthly aver for 0.025 MGD during this permit cycle TSS 30 mg/1 monthly aver No changes NPDES rules for Total Iron 45 mg/1 daily max No changes secondary treatment of 1.0 mg/1 dail max domestic wastewater, TSS 30 mg/1 monthly aver No changes 15A 2B .0400 pH 6 to 9 SU No changes State WQ standards, 15A Oil & Grease 15 mg/1 monthly aver No changes 213 .0200 BOD 30 mg/1 monthly aver No changes NPDES rules for 45 mg/1 daily max secondary treatment of domestic wastewater, 15A 2B .0400 Total Monitor No changes DWQ Policy ammonia Internal Outfall 009 - Chemical cleaning waste Table 14. Monitoring Requirements/ Proposed Changes Outfall 009 Parameter Monitoring Changes Basis requirements/Limits Flow Monitor No changes 15A NCAC 213.0505 Total Copper 1.0 mg/1 monthly aver No changes 40 CFR 423.13 (e) 1.0 mg/1 dail max Total Iron 1.0 mg/1 monthly aver No changes 40 CFR 423.13 (e) 1.0 mg/1 dail max TSS 30 mg/1 monthly aver No changes 40 CFR 423.13 (e) 100 mg/1 dail max Oil & Grease 15 mg/1 monthly aver No changes 40 CFR 423.13 (e) 20 mg/1 dailymax Internal Outfall 010 - FGD This outfall is subject to the Effluent Limitations Guidelines (ELG) in Table 15. These are new limitations promulgated November 3, 2015. NPDES PERMIT FACT SHEET Page 10 Roxboro Steam Electric Plant NPDES No. NC00003425 Table 15. ELG Outfall Pollutant ��Daily pH 010 Maximum + 6 to 9 Monthly Average SU Minimum 40 CFR 423.12 (b) (1) TSS 100 mg/1 I 30 mg/1 40 CFR 423.12 (b) (11) Oil and grease 20 mg/l I 15 mg/l 40 CFR 423.12 (b) (11) Total Arsenic 11 4g/l I 8 µg/l 40 CFR 423.13 (g) (1) (i) Total Mercury 788 ng/1 I 356 ng/l 40 CFR 423.13 (g) (1) (i) Total Selenium 23 µg/1 I 12 µg/l 40 CFR 423.13 (g) (1) (i) Nitrate/nitrite 17 me/l 4.4 me/l 40 CFR 423.13 (2) (1) (i) The rule establishes compliance dates for the new limitations. Permittee must meet limits as soon as possible beginning on November 1, 2018 but no later than December 31, 2023. Duke will construct a new treatment system and requested a compliance date of December 31, 2023. As the new treatment system will be placed in operation and the old pond may still discharge until it is decommissioned. A new outfall is included in the permit for the new system. The current permit includes monitoring for flow, total beryllium, total mercury, total antimony, total selenium, total silver and total vanadium. Table 16 includes a summary of DMR data for the period of January 2011 to January 2016. There have been no violations of permit limits or conditions. Table 16. DMR Summary Outfall 010 ffarame AveragdqWff I Maximum Minimum Flow (MGD) I 0.84 I 1.77 0.01 Total Beryllium (µg/l) 3.9 I 10 < 1 Total Mercury (4g/1) 1.08 I 9.6 < 1 Total Selenium (µg/1) 102 712 < 50 Total Silver (µg/1) 6 I 8.4 < 5 Total Antimony (4g/1) 31 I 70 < 25 Total Vanadium (µg/1) < 25 I < 25 < 5 Table 17. Monitoring Requirements/Proposed Chanes Outfall 010 Parameter Monitoring Changes Basis JL requirements/Limits Flow Monitor No changes 15A NCAC 2B.0505 Total Beryllium Monitor Remove monitoring Internal outfall, not a parameter of concern. Total Vanadium Monitor Remove monitoring Internal outfall, not a parameter of concern. Total Antimony Monitor Remove monitoring Internal outfall, not a parameter of concern. Total Silver Monitor Remove monitoring Internal outfall, not a parameter of concern. NPDES PERMIT FACT SHEET Page 11 Roxboro Steam Electric Plant NPDES No. NC00003425 Total Arsenic No monitoring Add limits of 11 µg/l Flow Monitor 15A NCAC 2B.0505 daily maximum and 40 CFR 423.13 1 i (g) () ( ) State WQ standards, 15A 2B .0200 Total copper, total antimony, total lead 8 µg/l monthly Detected below the wqs Fluoride Limit -1.8 m /l average Total Arsenic Total Selenium Monitor Add limits of 23 µg/l Limits 5 µg/l Monthly Average 56 µg/l Daily Max Detected above the wqs Sulfites daily maximum and 40 CFR 423.13 (g) (1) (i) TDS, Hardness, Conductivity Monitor 12 µg/l monthly Acute toxicity Quarterly Limit State WQ standards, 15A NCAC 2B.0200 average Nitrate/Nitrite No monitoring Add limits of 17 mg/1 daily maximum and 4.4 40 CFR 423.13 (g) (1) (i) mg/l monthly average Total Mercury Monitoring Add limits of 788 ng/l daily maximum 40 CFR 423.13 1 i (g) () ( ) and 356 ng/l monthly average. Proposed Outfalls: Outfall 001 The facility identified 16 unpermitted seeps. Data collected on the seeps was reviewed to determine the need for limits. Five seeps discharge to the intake canal at Hyco Reservoir. The point of discharge is where former Outfall 001 used to discharge. The Division will reinstate outfall 001 to monitor the discharge from the seeps. Table 18. Outfall 001 Proposed Limits/ Monitoring: Parameter Monitoring requirements/Limits Basis Flow Monitor 15A NCAC 2B.0505 pH 11 State WQ standards, 15A 2B .0200 Total copper, total antimony, total lead Monitor Detected below the wqs Fluoride Limit -1.8 m /l Detected above the wqs Total Arsenic Limit -10 µ /l Detected above the wqs Total Selenium Limits 5 µg/l Monthly Average 56 µg/l Daily Max Detected above the wqs Sulfites Limit - 250 mg/l (Monthly average & daily max Detected above the wqs TDS, Hardness, Conductivity Monitor Parameters of concern Acute toxicity Quarterly Limit State WQ standards, 15A NCAC 2B.0200 The remaining 11 seeps all drain to the discharge canal near the ash basin, 7 of those are chimney drains from the ash basin dam. The flow from the combined seeps account for less than 0.0005 % and will be included in the authorized wastewaters discharging through outfall 003. NPDES PERMIT FACT SHEET Page 12 Roxboro Steam Electric Plant NPDES No. NC00003425 Internal Outfall 012 A new treatment system will be installed to divert wastewaters from the ash basin. The proposed system consists of two lined basins discharging to the effluent discharge canal. Low volume wastes, metal cleaning wastes, stormwater, and other miscellaneous wastes that are routed to the ash basin will be routed to this new treatment system. Table 19. Outfall 012 Proposed Limits/ Monitoring: Parameter Monitoring requirements/Limits Flow Monitor 15A NCAC 2B.0505 Total Suspended Solids 30 mg/l Monthly Average 40 CFR 423.12 (b)(3) 100 m /l Daily Max Oil & Grease 15 mg/l Monthly Average 40 CFR 423.12 (b)(3) 100 m /l Daily max ADDITIONAL CHANGES TO PERMIT • A separate effluent page for the dewatering of the ash ponds (Outfall 002) was added to the permit. • Outfall 001 was reinstated to monitor discharge of seeps and stormwater. • A new internal outfall (Outfall 011) was added to the permit to monitor the discharge from the proposed FGD treatment system. • A new internal outfall (Outfall 012) was added to the permit for the proposed retention basin for wastewaters previously treated in the ash pond. • Special Condition A.(14) that prohibited the discharge of cooling tower blowdown from outfall 005 to the discharge canal was eliminated from the permit. • A special condition was added to describe Section 316(b) requirements for submittal of applicable information. • A special condition was added to the permit to require an Ash Pond Closure Plan • A Special Condition was added to the permit to require compliance with Senate Bill 729 (Coal Ash Management Act). • Attachment 1 entitled "Groundwater Monitoring Plan" was added to the permit. PROPOSED SCHEDULE FOR PERMIT ISSUANCE Draft Permit to Public Notice: August 24, 2016 Permit Scheduled to Issue: October 17, 2016 STATE CONTACT If you have any questions on any of the above information or on the attached permit, please contact Teresa Rodriguez at (919) 807-6387. NAME: DATE: 8/24/2016 v, Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra APPENDIX C WELL CONSTRUCTION APPENDIX C.1 WELL CONSTRUCTION LOGS APPENDIX C.2 DRILLERS LOGS APPENDIX C.3 WELL DEVELOPMENT LOGS P:\ Duke Energy Progress.1026 \ 107. Roxboro Ash Basin GW Assessment Plan\ 33.Discharge Canal Assessment (EHS)\DC Assessment Report \Final Roxboro Discharge Canal Assess Rpt.docx Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX C.1 WELL CONSTRUCTION LOGS SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx PROJECT: Roxboro Station WELL / BORING NO: MW-23BR PROJECT NO: 1026.107 STARTED: 6/8/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 993204.212 EASTING: 1984286.308 DRILLING METHOD: Air Hammer G.S. ELEV: 515.74 ft M.P. ELEV: 518.93 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 47.34 ft TOC TOTAL DEPTH: 129.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w [L O to �z _ 0 E WELL Lu Q O J 0 0 DESCRIPTION g Q U v= Lu` 0 a CONSTRUCppoteative p C7 m U Gag! AqTION V., tl� �o o locking cap �o o ML SILT, orange-brown, some clay lenses, moist to dry. rV5 PT SILT, light grey, sandy, dry. 10 K K PULVURIZED ROCK, gray with fine crystals, contains plagioclase feldspar and biotite, hard, moderately weathered to fresh, dry. 15 20 PULVURIZED ROCK, white and black, some pyrite, hard 2" Sch. 40 threaded PVC to very hard, moderately weathered to fresh. riser 25 PULVURIZED ROCK, light gray with fine palgioclase 30 feldspar and biotite crystals, hard and moderately weathered, some foliation with abundant iron and manganese oxide staining. 35 PULVURIZED ROCK, gneissic, white and black, fine crystals, hard, fresh, some water 36'-37' bgs. CLIENT: Duke Energy Progress, LLC. SynTerra L 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-23BR PROJECT NO: 1026.107 STARTED: 6/8/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 993204.212 EASTING: 1984286.308 DRILLING METHOD: Air Hammer G.S. ELEV: 515.74 ft M.P. ELEV: 518.93 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 47.34 ft TOC TOTAL DEPTH: 129.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O _j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L C7 U) m U 45- 50 PULVURIZED ROCK, gneissic, white and black, fine crystals, hard, fresh, some water 36'-37' bgs. (continued) —Grout (0'-107.5') 55 60 65 70 PULVURIZED ROCK, white and gray, contains plagioclase feldspar, biotite and quart, very fine to fine crystals, very hard to hard, fresh with water -126' bgs. 75 CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-23BR PROJECT NO: 1026.107 STARTED: 6/8/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 993204.212 EASTING: 1984286.308 DRILLING METHOD: Air Hammer G.S. ELEV: 515.74 ft M.P. ELEV: 518.93 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 47.34 ft TOC TOTAL DEPTH: 129.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O -j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L C7 U) m U 85 < Grout (0'-107.5') 90 95 PULVURIZED ROCK, white and gray, contains 100 plagioclase feldspar, biotite and quart, very fine to fine crystals, very hard to hard, fresh with water -126' bgs. (continued) 105 110 Bentonite (107.6-116.8') 115 CLIENT: Duke Energy Progress, LLC. SynTerra L 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 TL S Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-23BR PROJECT NO: 1026.107 STARTED: 6/8/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 993204.212 EASTING: 1984286.308 DRILLING METHOD: Air Hammer G.S. ELEV: 515.74 ft M.P. ELEV: 518.93 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 47.34 ft TOC TOTAL DEPTH: 129.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer (> =c� W d O^ V1 �z OJ _ p E WELL Lu Q O p DESCRIPTION 0 p a s CONSTRUCTION p C7 < �v m0 —Sand Pack (116.8'-129') PULVURIZED ROCK, white and gray, contains 2" pre -packed well screen plagioclase feldspar, biotite and quart, very fine to fine (119'-129') 125 crystals, very hard to hard, fresh with water -126' bgs. (continued) 130 135 140 145 150 155 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 swTerm Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-24BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 992253.427 EASTING: 1985191.48 DRILLING METHOD: Air Hammer G.S. ELEV: 524.02 ft M.P. ELEV: 527.06 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 39.91 ft TOC TOTAL DEPTH: 155.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w [L O to �z _ 0 E WELL Lu Q O J 0 0 DESCRIPTION g Q U v= Lu` 0 a CONSTRUCppoteative p C7 � m U Gag! AqTION V., tl� locking cap 5 SM SAND, orange brown, silty with some rock clasts mixed within, moist to dry. 10 15 SM SAND, light brown and gray, silty with rock mixed within, moist to dry. 20 2" Sch. 40 threaded PVC riser 25 PULVURIZED ROCK, composed of biotite and feldspar, silty with some iron and manganese oxide staining. 30 PULVURIZED ROCK, dary gray with abundant biotite. Top of bedrock —34'. 35 PULVURIZED ROCK, white and black, composed of hornblende, biotite and feldspar, fine to medium crystals, hard to very hard, some pyrite with iron and manganese oxide staining 60'-65' and 75-80' bgs, dry. CLIENT: Duke Energy Progress, LLC. SynTerra L 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-24BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 992253.427 EASTING: 1985191.48 DRILLING METHOD: Air Hammer G.S. ELEV: 524.02 ft M.P. ELEV: 527.06 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 39.91 ft TOC TOTAL DEPTH: 155.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O -j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L C7 U) m U 45 50 55 PULVURIZED ROCK, white and black, composed of 60 hornblende, biotite and feldspar, fine to medium crystals, hard to very hard, some pyrite with iron and manganese oxide staining 60'-65' and 75-80' bgs, dry. (continued) 65 <--Grout (0'-133') 70 75 CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-24BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 992253.427 EASTING: 1985191.48 DRILLING METHOD: Air Hammer G.S. ELEV: 524.02 ft M.P. ELEV: 527.06 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 39.91 ft TOC TOTAL DEPTH: 155.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O -j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L C7 U) m U 85 PULVURIZED ROCK, white and black, composed of hornblende, biotite and feldspar, fine to medium crystals, hard to very hard, some pyrite with iron and manganese oxide staining 60'-65' and 75'-80' bgs, dry. (continued) 90 95 100 < Grout (0'-133') 105 PULVURIZED ROCK, black-green, very fine to fine crystals, very hard, epidote crystal observed. 110 115 CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-24BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 992253.427 EASTING: 1985191.48 DRILLING METHOD: Air Hammer G.S. ELEV: 524.02 ft M.P. ELEV: 527.06 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 39.91 ft TOC TOTAL DEPTH: 155.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O _j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L O U) m U 125 130 135 PULVURIZED ROCK, granitic, fine crystals, hard to very hard, water —152' bgs (yield = 0.98 gpm) < Bentonite (133'-143') 140- 40145—Sand 145— —SandPack (143'-155') 150 2" pre-packed well screen (145'-156) 155 CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-25BR PROJECT NO: 1026.107 STARTED: 6/6/16 COMPLETED: 6/7/16 DRILLING COMPANY: Geologic Exploration NORTHING: 991842.165 EASTING: 1984850.165 DRILLING METHOD: Air Hammer G.S. ELEV: 540.36 ft M.P. ELEV: 543.38 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 49.99 ft TOC TOTAL DEPTH: 110.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w [L O to 3: 1-- _ 0 E WELL Lu Q O J 0 0 DESCRIPTION g Q U v= W` 0 a CONSTRUCppoteative p C7 � � m U Gag! AqTION V., W locking cap SM SILT, light brown orange, silty, dense, moist to dry. 5 SM SAND, brown orange, silty. PULVURIZED ROCK, white and gray, moderately hard. 10 15 ML SILT, gray, sandy, dry. 20 2" Sch. 40 threaded PVC o ° riser 0 25 0 ML SILT, very light gray, some rock clasts. 0 0 30 a 0 0 � ML SILT, gray brown, contains pulvurized rock. 35 0 0 PULVURIZED ROCK, composed of plagioclase feldspar and hornblende, medium crystals, very hard, top of competent bedrock —40' bgs. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 1 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-25BR PROJECT NO: 1026.107 STARTED: 6/6/16 COMPLETED: 6/7/16 DRILLING COMPANY: Geologic Exploration NORTHING: 991842.165 EASTING: 1984850.165 DRILLING METHOD: Air Hammer G.S. ELEV: 540.36 ft M.P. ELEV: 543.38 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 49.99 ft TOC TOTAL DEPTH: 110.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O _j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L C7 U) m U —Grout (0'-86') 45 PULVURIZED ROCK, gray, water –45' bgs. 50 55 60 65 PULVURIZED ROCK, composed of biotite, feldspar and pyrite, crystals medium, some iron and manganese oxide staining –80' bgs. 70 75 CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 2 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-25BR PROJECT NO: 1026.107 STARTED: 6/6/16 COMPLETED: 6/7/16 DRILLING COMPANY: Geologic Exploration NORTHING: 991842.165 EASTING: 1984850.165 DRILLING METHOD: Air Hammer G.S. ELEV: 540.36 ft M.P. ELEV: 543.38 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 49.99 ft TOC TOTAL DEPTH: 110.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O -j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L O U) m U 85- 90- - PULVURIZED ROCK, composed of biotite, feldspar and < Bentonite (86'-98') pyrite, crystals medium, some iron and manganese oxide staining —80' bgs. (continued) 95- 5100—Sand 100— —SandPack (98'-110') 105 2" pre-packed well screen (100'-110') PULVURIZED ROCK, comopsed of feldspar, biotite and hornblende, hard, water —109' bgs (yield = 1.1 gpm). 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra L 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 3 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-26BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 988570.279 EASTING: 1982360.462 DRILLING METHOD: Air Hammer G.S. ELEV: 518.04 ft M.P. ELEV: 521.29 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 36.89 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w [L O to �z _ 0 E WELL Lu Q O J 0 DESCRIPTION g Q U v= Lu` 0 a CONSTRUCppoteative p C7 � � m U Gag! AqTION V., tl� locking cap NOT RECORDED 5 PWR 10 15 PULVURIZED ROCK 20 2" Sch. 40 threaded PVC riser ML SILT, dark brown, sandy. PULVURIZED ROCK, orange-brown crystaline matrix, 25 weathered. 30 PULVURIZED ROCK, composed of hornblende, plagioclase feldspar and biotite, crystals fine, iron and manganese oxide staining present, water –32' bgs (yield = 0.2 gpm).K K<—Grout (0'-63') 35 PULVURIZED ROCK, composed of hornblende, plagioclase feldspar, biotite, and some K-feldspar, crystals fine, dry. CLIENT: Duke Energy Progress, LLC. SynTerra L 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 1 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-26BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 988570.279 EASTING: 1982360.462 DRILLING METHOD: Air Hammer G.S. ELEV: 518.04 ft M.P. ELEV: 521.29 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 36.89 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer ~^ U a0 U w O to �z _ D E WELL Lu Q O _j U) DESCRIPTION g Q U v Lu` JO 0 a CONSTRUCTION L O U) m U 45 —Grout (0'-63') 50 55 PULVURIZED ROCK, composed of hornblende, 60 plagioclase feldspar, biotite, and some K-feldspar, crystals fine, dry. (continued) 65 -+Bentonite (63'-72') 70- 75— Sand Pack (72'-84') 2" pre-packed well screen (74'-84') CLIENT: Duke Energy Progress, LLC. LSynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerm Phone: 864-421-9999 PAGE 2 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-26BR PROJECT NO: 1026.107 STARTED: 6/7/16 COMPLETED: 6/8/16 DRILLING COMPANY: Geologic Exploration NORTHING: 988570.279 EASTING: 1982360.462 DRILLING METHOD: Air Hammer G.S. ELEV: 518.04 ft M.P. ELEV: 521.29 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 36.89 ft TOC TOTAL DEPTH: 84.0 ft BGS NOTES: PWR: Partially Weathered Rock LOGGED BY: A. Lefitz CHECKED BY: J. Gilmer (> =c� W d O^ �z OJ _ p E WELL Lu Q O p DESCRIPTION 0 p a s CONSTRUCTION p C7 < �v m0 PULVURIZED ROCK, mafic mineralogy with some pyrite, crystals very fine to fine, fresh, water -82' bgs. 85 90 95 100 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 swTerm Phone: 864-421-9999 PAGE 3 OF 3 u PROJECT: Roxboro Station WELL / BORING NO: MW-27BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/7/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994891.1 EASTING: 1982526.34 DRILLING METHOD: Air Hammer G.S. ELEV: 481.13 ft M.P. ELEV: 484.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:32.91 ft TOC TOTAL DEPTH: 79.1 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 Cl) w a O o U) �z O❑ ❑_ E WELL W �'' O < U ❑ DESCRIPTION g ¢ U o W `� m 0 a a �- CONSTRUCTION F7]--*- ❑ C7 U a U locking cap Orange-brown, SILTY SAND with PARTIALY WEATHERED ROCK, dry. 5 PARTIALLY WEATHERED ROCK, schistose character, dry. 10 PARTIALLY WEATHERED ROCK, schistose character, abundant pyrite, dry. 15 2" Sch. 40 threaded PVC riser 20 - - 25 - ' PARTIALY WEATHERED ROCK to ROCK, soft, medium to fine grained, moderately weathered to fresh. - —Grout (0'-58') 30 - - 1 35 " = ' ROCK, gray and white, medium to fine grained, moderately weahtered to fresh, dry. Abundant - - orthoclase and epidote. Some iron-manganese staining ' i' present. Little water observed. CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 s�11e1rra Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station WELL / BORING NO: MW-27BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/7/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994891.1 EASTING: 1982526.34 DRILLING METHOD: Air Hammer G.S. ELEV: 481.13 ft M.P. ELEV: 484.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:32.91 ft TOC TOTAL DEPTH: 79.1 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O❑ ❑ E WELL W O of U ❑ DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION ❑ C7 � a U i' 45 - —Grout (0'-58') 50— N _ - ROCK, gray and white, medium to fine grained, moderately weahtered to fresh, dry. Abundant 55 = ; ' orthoclase and epidote. Some iron -manganese staining ;1 present. Little water observed. (continued) 60—'- ' —Bentonite (58'-63') 65 ' —Sand Pack (63'-75') 70 2" pre -packed well screen _ (65'-75') ROCK, gray and white, medium to fine grained, ' moderately weahtered to fresh, dry. Abundant orthoclase and epidote. Some iron -manganese staining - - present. Fracture observed at 70 ft-bgs, > 1gpm. 75 Boring terminal at 75.0 ft-bgs. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTerm Greenville, South Carolina 29601 s �11 11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station WELL / BORING NO: MW-28BR PROJECT NO: 1026.107 STARTED: 2/21/17 COMPLETED: 2/21/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995859.216 EASTING: 1983070.26 DRILLING METHOD: Air Hammer G.S. ELEV: 474.07 ft M.P. ELEV: 477.03 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:61.57 ft TOC TOTAL DEPTH: 137.0 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O❑ ❑_ E WELL W �'' O < U ❑ DESCRIPTION g ¢ U o W `� m 0 a a �- CONSTRUCTION F7]--*- ❑ C7 U a U locking cap ML Orange brown, clayey SANDY SILT, damp to dry moderately cohesive. 5- 10- 1015 15– —2" Sch. 40 threaded PVC riser 20 ML Gray SILT, dry with PARTIALY WEATHERED ROCK. 25 30 35 CLIENT: Duke Energy Progress, LLC. lop ra Syn148 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC River Greenville, South Carolina 29601 s)mTerm Phone: 864-421-9999 PAGE 1 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-28BR PROJECT NO: 1026.107 STARTED: 2/21/17 COMPLETED: 2/21/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995859.216 EASTING: 1983070.26 DRILLING METHOD: Air Hammer G.S. ELEV: 474.07 ft M.P. ELEV: 477.03 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:61.57 ft TOC TOTAL DEPTH: 137.0 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 Cl) w a O o U �z O❑ _ ❑ E WELL W O of U ❑ DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION ❑ C7 � a U 45 —Grout (0'-90') 50 ML Gray SILT, dry with PARTIALY WEATHERED ROCK. (continued) 55 60 - 1 65 - Mafic ROCK, hard, moderately weathered to fresh. " Pytrite, quartz, potassium feldspar and chlorite present. 70— —Grout (0'-90') 75 - ' ROCK, hard to very hard, black, fresh. Some feldspar epidote and pyrite present. Fracture at 77 ft-bgs, little - " Drecharge. CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 sy 11e1rra Phone: 864-421-9999 PAGE 2 OF 4 u PROJECT: Roxboro Station WELL / BORING NO: MW-28BR PROJECT NO: 1026.107 STARTED: 2/21/17 COMPLETED: 2/21/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995859.216 EASTING: 1983070.26 DRILLING METHOD: Air Hammer G.S. ELEV: 474.07 ft M.P. ELEV: 477.03 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:61.57 ft TOC TOTAL DEPTH: 137.0 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O❑ _ ❑ E WELL W O U ❑ DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION ❑ C7 U)a U ROCK, hard to very hard, black, fresh. Some feldspar - epidote and pyrite present. Fracture at 77 ft-bgs, little recharge. (continued) 85 90 `= 95 - 100 " _ —Aquaguard (90'-111') ROCK, hard to very hard, black with white and pink, ' medium to fine grained, some folliation present. Plagioclase, quartz, biotite, orthoclase and chlorite - - present. Fracture 127 - 128 ft-bgs. 105 `= ;; 10 110- 115— 115—Bentonite —Bentonite(111'-121') i' CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTe1rra Greenville, South Carolina 29601 s�11 11 Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-28BR PROJECT NO: 1026.107 STARTED: 2/21/17 COMPLETED: 2/21/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995859.216 EASTING: 1983070.26 DRILLING METHOD: Air Hammer G.S. ELEV: 474.07 ft M.P. ELEV: 477.03 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:61.57 ft TOC TOTAL DEPTH: 137.0 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o w v U O U) W 2 U) OJ D E� E WELL Q DESCRIPTION W a CONSTRUCTION p < �v m0 125 - '\ ROCK, hard to very hard, black with white and pink, =' medium to fine grained, some folliation present. _ Plagioclase, quartz, biotite, orthoclase and chlorite SandPack (121'-134') - _ present. Fracture 127 - 128 ft-bgs. (continued) 2" pre -packed well screen (124'-134') 130 135 Boring terminated at 134.0 ft-bgs. 140 145 150 155 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTE'rf'd Phone: 864-421-9999 PAGE 4 OF 4 F- U) F- z z 0 PROJECT: Roxboro Station WELL / BORING NO: MW-29BR PROJECT NO: 1026.107 STARTED: 2/20/07 COMPLETED: 2/20/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995175.506 EASTING: 1983886.56 DRILLING METHOD: Air Hammer G.S. ELEV: 496.06 ft M.P. ELEV: 499.09 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:41.34 ft TOC TOTAL DEPTH: 87.4 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o I^ IL U M6 0 (n W CL O^ U) 0z OJ 0 E WELL Q O DESCRIPTION 2 v � a s CONSTRUCTION o U) mo Protpnfivp rnsino with locking cap SM Orange brown, SILTY SAND, dry to PARTIALY WEATHERED ROCK. 5 10 Gray, PARTIALY WEATHERED ROCK, dry. 15 2" Sch. 40 threaded PVC riser 20 25 —Grout (0'-51') Gray, PARTIALY WEATHERED ROCK, dry, biotite 30 rich. 35 CLIENT: Duke Energy Progress, LLC. 14VT SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MGreenville, South Carolina 29601 s�1 �Tef.ra Phone: 864-421-9999 PAGE 1 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-29BR PROJECT NO: 1026.107 STARTED: 2/20/07 COMPLETED: 2/20/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995175.506 EASTING: 1983886.56 DRILLING METHOD: Air Hammer G.S. ELEV: 496.06 ft M.P. ELEV: 499.09 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:41.34 ft TOC TOTAL DEPTH: 87.4 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w o- O o U 0z O _ o_ E WELL W O < � DESCRIPTION g Q U o w- m 0 a a n CONSTRUCTION 0 U) a U IX 45 - ;; 50 55 `= - _ ROCK, black and white, fine grained, moderatley - weathered to fresh. Plagioclase, quartz and biotite rich. Increase in mafic composition with depth. ;1 —Aquaguard (50'-67') 60 - 65 - �—Bentonite (67'-71') 70- 0 75— 75ROCK, ROCK,very hard, black and white, very fine-grained to aphanitic (80-90% mafic minerals) Fracture at 83—Sand Pack - - ft-bgs. (71'-84') - 2" pre-packed well screen -' (74'-84') CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 2 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-29BR PROJECT NO: 1026.107 STARTED: 2/20/07 COMPLETED: 2/20/17 DRILLING COMPANY: Geologic Exploration NORTHING: 995175.506 EASTING: 1983886.56 DRILLING METHOD: Air Hammer G.S. ELEV: 496.06 ft M.P. ELEV: 499.09 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:41.34 ft TOC TOTAL DEPTH: 87.4 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w o- O o U 0z O _ o_ E WELL W O � DESCRIPTION g Q U o w- m 0 a a n CONSTRUCTION 0 u) a U - _ ROCK, very hard, black and white, very fine grained to - aphanitic (80-90% mafic minerals) Fracture at 83 -' ft-bgs. (continued) 85 Boring terminated at 84.0 ft-bgs. 90 95 100 105 110 115 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n M��r.� Greenville, South Carolina 29601 7�►� Phone: 864-421-9999 PAGE 3 OF 3 PROJECT: Roxboro Station WELL / BORING NO: MW-30BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/10/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994378.854 EASTING: 1984205.869 DRILLING METHOD: Air Hammer G.S. ELEV: 520.86 ft M.P. ELEV: 523.95 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.4 ft TOC TOTAL DEPTH: 144.8 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 Cl) w a O o U) �z O❑ ❑_ E WELL W �'' O < U ❑ DESCRIPTION g ¢ U o W `� m 0 a a �- CONSTRUCTION F7]--*- ❑ C7 U a U locking cap SM Brown orange, SILTY SAND dry to moist with clayey silt to clay mixed within. 5 e SM Brown, SILTY SAND, dry with clayey silt to clay mixed in. 10 e> SM Brown orange, SILTY SAND, dry to moist. 15 2" Sch. 40 threaded PVC riser 20 25 Gray and white PARTIALLY WEATHERED ROCK, dry plagioclase, quartz and hornblende present. Iron -manganese staining observed. 30 —Grout (0'-93') 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC M�e1.� Greenville, South Carolina 29601 .7 ' Phone: 864-421-9999 PAGE 1 OF 4 u PROJECT: Roxboro Station WELL / BORING NO: MW-30BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/10/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994378.854 EASTING: 1984205.869 DRILLING METHOD: Air Hammer G.S. ELEV: 520.86 ft M.P. ELEV: 523.95 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.4 ft TOC TOTAL DEPTH: 144.8 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a- U a0 Cl) w a O o U) �z O❑ ❑ E WELL W O U Z)Q DESCRIPTION g U o w` m 0 a CONSTRUCTION ❑ C7 u) U ROCK, hard, gray-black and white, moderatley weathered to fresh. Quartz, plagioclase and hornblende present. Iron-manganese staining observed. Soft zone at 41 ft-bgs, very little recharge. (continued) 45 ' —Grout (0'-93') 0 50— `= . 5 55- 60— 60ROCK, ROCK,hard to very hard, black and white, fresh. Increase in mafic composition with depth. 65 `= 70 - 75 i' CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTe1rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 2 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-30BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/10/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994378.854 EASTING: 1984205.869 DRILLING METHOD: Air Hammer G.S. ELEV: 520.86 ft M.P. ELEV: 523.95 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.4 ft TOC TOTAL DEPTH: 144.8 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 Cl) w a O o U) �z O❑ ❑ E WELL W O of U ❑ DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION ❑ C7 u) a U i' 5 85- 90- 9095 95- 100 100- - - ROCK, hard to very hard, black and white, fresh. Increase in mafic composition with depth. (continued) e —Aquaguard (93'-115') 105 110 `= 115 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 3 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW-30BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/10/17 DRILLING COMPANY: Geologic Exploration NORTHING: 994378.854 EASTING: 1984205.869 DRILLING METHOD: Air Hammer G.S. ELEV: 520.86 ft M.P. ELEV: 523.95 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.4 ft TOC TOTAL DEPTH: 144.8 ft TOC NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 Cl) w a O o U) �z O❑ ❑ E WELL W O U ❑ DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION ❑ C7 u) a U All Bentonite (116-126.58') 125 - ROCK, hard to very hard, black and white, fresh. - Increase in mafic composition with depth. (continued) 130 - --.' --Sand Pack (126.58'-140') 135 2" pre -packed well screen _ (130'-140') ' ROCK, very hard, black and white, fresh. Quartz, plagioclase, hornblende chlorite and pyrite present. - " = Fracture 136 - 138 ft-bgs. 140 Boring terminated at 140.0 ft-bgs. 145 150 155 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 4 OF 4 PROJECT: Roxboro Station WELL / BORING NO: MW -31 BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/7/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988212.687 EASTING: 1976895.031 DRILLING METHOD: Air Hammer G.S. ELEV: 502.71 ft M.P. ELEV: 505.40 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER: 39.16 ft TOC TOTAL DEPTH: 81.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o �-� U =c9 0-0 W a O^ U) �z OJ 0 E WELL w O � DESCRIPTION U O Ez a CONSTRUCTION F7]--*— p � �Q � m locking cap OL TOPSOIL. 5 10 Tannish -brown, SILTY weathered rock, dry. 15 2" Sch. 40 threaded PVC riser —Grout (0'-36') 20 Tan olive green, silty SAPROLITE, dry. 25 30 MH Dark brown, SAPROLITE - CLAYEY SILT, medium plastisity, moist. 35— A MH Tan brown SAPROLITE - CLAYEY SILT, dry. 1 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTE'rl'd Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station WELL / BORING NO: MW -31 BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/7/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988212.687 EASTING: 1976895.031 DRILLING METHOD: Air Hammer G.S. ELEV: 502.71 ft M.P. ELEV: 505.40 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:39.16 ft TOC TOTAL DEPTH: 81.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Draw ~^ a U a0 U w a O o U) �z O 0 E WELL W O of U) DESCRIPTION g Q U o w` D m 0 FL a CONSTRUCTION C7 U) U 45 - —Aquaguard (36'-56') 50 55 `= ROCK, hard, gray, dry. Dark black minerals " (homblende), quartz, abundant pyrite at 70 ft-bgs. 60—'- ;' —Bentonite (56'-66') 65 70 `= - '�—Sand Pack (66'-78') 6. 2" pre -packed well screen (68'-78') 75 - Boring terminated at 78.0 ft-bgs. CLIENT: Duke Energy Progress, LLC. SynTerra L� 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTerm Greenville, South Carolina 29601 s �11 11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O o f WELL W �'' O < 0 DESCRIPTION g ¢ U o W `� m 0 a a �- CONSTRUCTION F7]--*- C7 a U locking cap r OH Reddish brown, TOPSOIL. 5 10 ML Light brown SILT. 15 2" Sch. 40 threaded PVC riser 20 SC Dark brown, CLAYEY SILT, very soft. 25 30 —Grout (0'-205') - ROCK, hard, black minerals, quartzite and pyrite. ROCK, soft, brown. ROCK, hard, gray, dark minerals, potential fractures at - 74 ft, 85-90ft, and 110-120 ft-bgs. No water observed. CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTe1rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 1 OF 7 PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 u) a U i' 45 - 50 55 `= - _ ROCK, hard, gray, dark minerals, potential fractures at 60 - 74 ft, 85-90ft, and 110-120 ft-bgs. No water observed. -' (continued) 65 70 `= 75 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 2 OF 7 PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 u) a U i' 85 - 90 95 `= - _ ROCK, hard, gray, dark minerals, potential fractures at 100 - 74 ft, 85-90ft, and 110-120 ft-bgs. No water observed. -' (continued) - —Grout (0'-205') 105 115 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 3 OF 7 u PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 u) a U ., ; ROCK, hard, gray, dark minerals, potential fractures at 74 ft, 85-90ft, and 110-120 ft-bgs. No water observed. 125 - - (continued) =' ROCK, soft zone, gray, dark minerals, potential " fracture. 130 ., 135 - 140 ' ROCK, moderately hard, dark minerals, potential 145 ;= ; ' fracture at 148 ft-bgs. Soft zone 155-156 ft-bgs. No " = ' water observed. 50 150- 155 155 i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe1rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 4 OF 7 PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 U) a U i' 165 - 170 175 `= ROCK, moderately hard, dark minerals, potential 180 - fracture at 148 ft-bgs. Soft zone 155-156 ft-bgs. No water observed. (continued) 185- 85190 190—"" " 195 - i' i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTGreenville, South Carolina 29601 s�11erra Phone: 864-421-9999 PAGE 5 OF 7 u PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 U) a U ., ; i' ROCK, moderately hard, dark minerals, potential 205 - fracture at 148 ft-bgs. Soft zone 155-156 ft-bgs. No -' ;; water observed. (continued) 210 215 - 220 - - ;1 �Aquaguard (205'-234.5') 225 -' GNEISS, hard, dark minerals, quartzite, pyroxene. Fracture at 257 ft-bgs. 230 - 235 i' CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTe1rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 6 OF 7 PROJECT: Roxboro Station WELL / BORING NO: MW-32BR PROJECT NO: 1026.107 STARTED: 2/9/17 COMPLETED: 2/14/17 DRILLING COMPANY: Geologic Exploration NORTHING: 989620.793 EASTING: 1976364.1 DRILLING METHOD: Air Hammer G.S. ELEV: 509.26 ft M.P. ELEV: 512.04 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:42.71 ft TOC TOTAL DEPTH: 263.8 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U �z O _ 0 E WELL W O DESCRIPTION g Q U o w` m 0 a a Q CONSTRUCTION C7 U) a U i' 245— . 250 -- GNEISS, hard, dark minerals, quartzite, pyroxene. - Fracture at 257 ft-bgs. (continued) —Sand Pack (245'-260') 255 `= ; ' 2" pre -packed well screen (250'-260') 260 Boring terminated at 260.0 ft-bgs. 265 270 275 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 7 OF 7 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O o f WELL W �'' O < DESCRIPTION g ¢ U o W `� m 0 a a �- CONSTRUCTION F7]--*- C7 a U locking cap Dark brown, TOP SOIL, loam. 5 Light brown SILT with SAPROLITE, dry. 10 Dark brown SILT with SAPROLITE, dry, hard. Abundant mica and pyrite. 15 2" Sch. 40 threaded PVC riser 20 Dark brown - black SILT, dry. Soft zone at 29 ft-bgs. 25- 30– —Grout (0'-240') 35 Red brown CLAYEY SILT dry, very soft. ROCK, black/dark minerals with quartz. CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 U) U ., ; ROCK, black/dark minerals with quartz. (continued) 45 - R-5 ROCK, soft, light gray. - 50 55 `= 60 - ' ROCK, hard, black/dark minerals and quartz. Fracture 1 at 53 ft and 70 ft-bgs. Iron-manganese staining present 65 ', 58-63 ft bgs. Little to no water observed in fractures 70 `= 75 - i' CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 s�11e1rra Phone: 864-421-9999 PAGE 2 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 u) U i' 5 85- 90N 90— N 95 `= - ROCK, hard, black/dark minerals and quartz. Fracture 100 '- - " at 53 ft and 70 ft-bgs. Iron -manganese staining present 58-63 ft bgs. Little to no water observed in fractures (continued) 105 115 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 3 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 u) U i' 125- 25 130— 130N N 135 `= - ROCK, hard, black/dark minerals and quartz. Fracture 140 '- - " at 53 ft and 70 ft-bgs. Iron -manganese staining present 58-63 ft bgs. Little to no water observed in fractures (continued) 145 150 `= 155 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 4 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 u) U i' 165- 65 170— 170N N 175 `= - ROCK, hard, black/dark minerals and quartz. Fracture 180 - " at 53 ft and 70 ft-bgs. Iron -manganese staining present 58-63 ft bgs. Little to no water observed in fractures (continued) 185- 85190 190—"" " 195 - i' i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTGreenville, South Carolina 29601 s�11erra Phone: 864-421-9999 PAGE 5 OF 8 u PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w` m 0D FL a CONSTRUCTION C7 u) U - ROCK, hard, black/dark minerals and quartz. Fracture - at 53 ft and 70 ft-bgs. Iron-manganese staining present 58-63 ft bgs. Little to no water observed in fractures (continued) 205- 05210 210- 215 215—' - 220 - - GRANITIC GNEISS, hard, amphibolite, quartzite, dark ' feldspar dominant minerals. Soft zone 207-209 ft, 209-214ft, 226 ft, 249-254 ft, 263 ft, 271.5 ft, 273 ft, 275.5 ft, 289 ft, and 292 ft bgs. 25 225- 230 230- 235— 235 i' _X CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 sy 11e1rra Phone: 864-421-9999 PAGE 6 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL w O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 U) U 45 245- 250- 250255 255- `= ; ' —Aquaguard (240'-270') - GRANITIC GNEISS, hard, amphibolite, quartzite, dark 260 - - feldspar dominant minerals. Soft zone 207-209 ft, 209-214ft, 226 ft, 249-254 ft, 263 ft, 271.5 ft, 273 ft, 275.5 ft, 289 ft, and 292 ft bgs. (continued) 265- 65270 270- 275- 275 - —Bentonite (270'-280') i' CLIENT: Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 7 OF 8 PROJECT: Roxboro Station WELL / BORING NO: MW-33BR PROJECT NO: 1026.107 STARTED: 2/7/17 COMPLETED: 2/17/17 DRILLING COMPANY: Geologic Exploration NORTHING: 990698.309 EASTING: 1976056.468 DRILLING METHOD: Air Hammer G.S. ELEV: 516.89 ft M.P. ELEV: 520.12 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:64.23 ft TOC TOTAL DEPTH: 301.4 ft TOC NOTES: LOGGED BY: K. Donovan CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O 0 E WELL W O U) DESCRIPTION g Q U o w m 0D FL a CONSTRUCTION C7 U) U 285 - - ;; GRANITIC GNEISS, hard, amphibolite, quartzite, dark Sand Pack (280'-298') feldspar dominant minerals. Soft zone 207-209 ft, 290 - - 209-214ft, 226 ft, 249-254 ft, 263 ft, 271.5 ft, 273 ft, _ 275.5 ft, 289 ft, and 292 ft bgs. (continued)2" pre -packed well screen - _ (283'-298') 95 295- 300— 300Boring Boringterminated at 299.0 ft-bgs. 305 310 315 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 8 OF 8 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W �'' O < U DESCRIPTION g Q U o W `� m 0 a a s CONSTRUCTION F71 C7 U a U ro ec ive casing with locking cap 5- 2" Sch. 40 threaded PVC riser 10- 01520 15- 20— Transition zone Grout (0-97') 25 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Te Greenville, South Carolina 29601 Phone: 864-421-9999 PAGE 1 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 � a U Top of rock at 40 feet bgs. Lithology not recorded, some water observed below surface casing 45- 550 50- 55- 55 60— 60 - - "-X0 Quartzite, feldspar and hornblende identified, hard, fresh, medium to fine grained rock, black and white 65 - 70 `= 75 - i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTGreenville, South Carolina 29601 s�11erra Phone: 864-421-9999 PAGE 2 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) �z O o f WELL W O U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U i' 5 85- 90N 90— N 95 `= - _ Quartzite, feldspar and hornblende identified, hard, 100 - fresh, medium to fine grained rock, black and white (continued) 105 •--Aquaguard (97'-131.2') 115 - CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe�rra Greenville, South Carolina 29601 s)11 11 Phone: 864-421-9999 PAGE 3 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG-1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U i' 125 - „' �—Bentonite seal (120.4'-131.2') 130 135 `= - _ Quartzite, feldspar and hornblende identified, hard, - fresh, medium to fine grained rock, black and white ; (continued) 140 - 145 - - �-SandPack (131.2'-164.4') 150- .`= _ - " Fracture at 154 feet bgs, sulfur odor observed in water 155 2" pre-packed well screen _ _ (150'-160') Quartzite, feldspar and hornblende identified, hard, fresh, medium to fine grained rock, black and white CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 s�11e1rra Phone: 864-421-9999 PAGE 4 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG-1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U 165- 65 170— 170Quartzite, Quartzite,feldspar and hornblende identified, hard, -' fresh, medium to fine grained rock, black and white ' (continued) 175 180 - - 185 - NZ 190- 90 - - - Quartzite, feldspar and hornblende identified, hard, -' fresh, medium to fine grained rock, black and white, higher mafic content with depth 195 CLIENT. Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River T.ra Greenville, South Carolina 29601 Phone:864-421-9999 PAGE 5 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 � a U 205 - ;; 210 - Quartzite, feldspar and hornblende identified, hard, -' fresh, medium to fine grained rock, black and white, higher mafic content with depth (continued) 215—." ; 220- 20 2 2 5 225 YO -l", 230 - Medium to fine grained mafic rock, very hard, fresh, black 235 CLIENT. Duke Energy Progress, LLC. Synra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River T.ra Greenville, South Carolina 29601 Phone: 864-421-9999 PAGE 6 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U - Medium to fine grained mafic rock, very hard, fresh, - - black (continued) 245 - 250 255 260 - Medium to fine grained mafic rock, very hard, fresh, - - black and white 265- 65270 270- 275 275— 1-7- ...... CLIENT. Duke Energy Progress, LLC. Synra 141P 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River mTGreenville, South Carolina 29601 s�11erra Phone: 864-421-9999 PAGE 7 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U " Medium to fine grained mafic rock, very hard, fresh, - -" black and white (continued) Aquaguard (164.4'-400') 285- 85 290 290--1 - - - - - ;; Medium to fine grained mafic rock, very hard, fresh, " black and white, some water observed 295—." ; 300 - 305 - 310 - Medium to fine grained mafic rock, very hard, fresh, black and white, "soft zone" 315 to 326 feet bgs 315 CLIENT. Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River T.ra Greenville, South Carolina 29601 Phone: 864-421-9999 PAGE 8 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG-1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 u) a U Medium to fine grained mafic rock, very hard, fresh, _ black and white, "soft zone" 315 to 326 feet bgs (continued) 325 - 330 - - Medium to fine grained mafic rock, very hard, fresh, " black and white 335— 35 ; D 340 -X. ;; 345 Ao g 350 - Medium to fine grained mafic rock, very hard, fresh, black and white, higher mafic content 355 CLIENT. Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River Greenville, South Carolina 29601 swTffra Phone: 864-421-9999 PAGE 9 OF 10 PROJECT: Roxboro Station WELL / BORING NO: BG -1 BRLR PROJECT NO: 1026.107 STARTED: 2/6/17 COMPLETED: 2/22/17 DRILLING COMPANY: Geologic Exploration NORTHING: 988105.567 EASTING: 1976418.94 DRILLING METHOD: Air Hammer G.S. ELEV: 518.48 ft M.P. ELEV: 521.36 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:37.58 ft TOC TOTAL DEPTH: 163.2 ft TOC NOTES: LOGGED BY: A. Lefitz/J. Gilmer CHECKED BY: L. Draw ~^ a U a0 Cl) w a O o U) �z O o f WELL W O Of U DESCRIPTION g ¢ U o w` m 0 a a CONSTRUCTION C7 � a U 365 - ;; 370 Medium to fine grained mafic rock, very hard, fresh, black and white, higher mafic content (continued) 75 375- 2-n 380— 385 NZ - 390 - -' Very fine grained black rock, very hard, fresh 395 CLIENT. Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River T.ra Greenville, South Carolina 29601 SynPhone: 864-421-9999 PAGE 10 OF 10 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 U w a O o U) 0z O o f WELL W " O < � DESCRIPTION g Q U o w— m 0 a a n CONSTRUCTION F71 0 U a U ro ec roe casing wi ° p ° locking cap p ° ML SILT, orange-brown, some clay lenses, moist to dry. Ff5 1 PT SILT, light grey, sandy, dry. 10 PULVURIZED ROCK, gray with fine crystals, contains _ plagioclase feldspar and biotite, hard, moderately - weathered to fresh, dry. 15 -; ; ' 2" Sch. 40 threaded PVC riser 20—_ - PULVURIZED ROCK, white and black, some pyrite, ;; hard to very hard, moderately weathered to fresh. 25 - PULVURIZED ROCK, light gray with fine palgioclase 30 '- - feldspar and biotite crystals, hard and moderately weathered, some foliation with abundant iron and manganese oxide staining. PULVURIZED ROCK, gneissic, white and black, fine crystals, hard, fresh, some water 36'-37' bgs. CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 1 OF 6 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w a O o U) 0z O 0 f WELL W " O < � DESCRIPTION g Q U o w- m 0 a a n CONSTRUCTION 0 u) a U i' IX 45 - ;; 50 ' PULVURIZED ROCK, gneissic, white and black, fine crystals, hard, fresh, some water 36'-37' bgs. - (continued) 55-.."' 0 60- 70 70- - —Grout (0'-160') PULVURIZED ROCK, white and gray, contains _ plagioclase feldspar, biotite and quart, very fine to fine - crystals, very hard to hard, fresh with water -126' bgs. 75 i' CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 2 OF 6 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w a O o U) 0z O 0 f WELL W " O < � DESCRIPTION g Q U o w— m 0 a a n CONSTRUCTION 0 U) a U i' IX 85 - ;; 90 95— K`= - PULVURIZED ROCK, white and gray, contains 100 '- - " plagioclase feldspar, biotite and quart, very fine to fine crystals, very hard to hard, fresh with water --126' bgs. (continued) 105 110 `= 115 - i' CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 3 OF 6 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a- Z U a0 U w a O o U) 0z O 0 f WELL W " O < � DESCRIPTION g Q U o w- m 0 a d o CONSTRUCTION 0 u) U 2 00 IX i' " = ' PULVURIZED ROCK, white and gray, contains " plagioclase feldspar, biotite and quart, very fine to fine 125 - crystals, very hard to hard, fresh with water -126' bgs. ' (continued) - 130 ;; 135- 35 140-11, 140 - PULVURIZED ROCK, white and gray, contains plagioclase feldspar, biotite and quart, very fine to fine 145 - " crystals, some staining present. Fracture 197-203 ft-bgs. 150- 50 155- 155 - i' K CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 4 OF 6 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w a O o U) 0z O 0 f WELL W " O < � DESCRIPTION g Q U o w— m 0 a a n CONSTRUCTION 0 u) a U 65 165- 170— 170 —Aquaguard (160'-180') 175 `= - PULVURIZED ROCK, white and gray, contains 180 - - plagioclase feldspar, biotite and quart, very fine to fine crystals, some staining present. Fracture 197-203 ft-bgs. (continued) 185 - �—Bentonite (180'-191.5') 190 `= 195 - - —Sand Pack (191.4'-204') 2" pre -packed well screen (194'-204') CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n ��rra Greenville, South Carolina 29601 MPhone:864-421-9999 ) PAGE 5 OF 6 PROJECT: Roxboro Station WELL / BORING NO: MW-23BRR PROJECT NO: 1026.107 STARTED: 2/8/17 COMPLETED: 2/9/17 DRILLING COMPANY: Geologic Exploration NORTHING: 993220.3 EASTING: 1984306.44 DRILLING METHOD: Air Hammer G.S. ELEV: 521.11 ft M.P. ELEV: 523.82 ft BOREHOLE DIAMETER: 6 IN DEPTH TO WATER:4.95 ft TOC TOTAL DEPTH: 206.7 ft BGS NOTES: LOGGED BY: A. Lefitz CHECKED BY: L. Dra o ~^ a U a0 CO w a O o U) 0z O 0 f WELL W " O < � DESCRIPTION g Q U o w— m 0 a a n CONSTRUCTION 0 u) a U " = ' PULVURIZED ROCK, white and gray, contains plagioclase feldspar, biotite and quart, very fine to fine - -crystals, some staining present. Fracture 197-203 K ft-bgs. (continued) 205 210 215 220 225 230 235 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC n M��r.� Greenville, South Carolina 29601 7�►� Phone: 864-421-9999 PAGE 6 OF 6 Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX C.2 DRILLERS LOGS SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: JACOB MESSICK Well Contractor Name A - 4252 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construenon permits (i.e. County, Slate, Variance, etc) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial Non -Water Supply Well: ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Recovery ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 02/22/17 Well ID# BG -1 BRLR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one tat/long is sufficient.) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or [?]No Iftltls is a repair, fill out known well consiruciion infimnaiion and explain the nature gf1he repair under 42/ remarks section or an the hack r f this firm. 8. Number of wells constructed: 1 For multiple itryedion or non-watersupply wells ONLY with the same construction, you can submitonefbrm. 9. Total well depth below land surface: 160'0 For tmdtiple ire/ls list all depths ijdiJJerent (example- 3@200' and 2@100') 10. Static water level below top of casing: 37.58 /f irater leve/ is abore casing, use "+" 11. Borehole diameter: 6.0/10.0 (in.) For Internal Use ONLY - 14. WATER ZONES FROM TO I DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 46.0 ft 6.0 1" 1 SCH 40 PVC 16. INNER CASING OR TUBING(geothermal closed -loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 fL 150.0 ft- 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 150.0ft• 160.0 ft 2.0 in. .010 SCH 40 PVC** ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 79.0 ft' PORTUwDBENTONITE SLURRY 0.0 ft 46.0 ft' PORTLNDBENTOMTE SLURRY ft. ft. 19. SAND/GRAVEL PACK ifapplicable) FROM TO MATERIAL EMPLACEMENT METHOD 131.0 ft 164.0 ft• 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOC attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soill o k type, %min sin, etc. 0.0 ft 1.0 ft. GRAVEL 1.0 ft 5.0 f'• BROWN TOPSOIL 5.0 ft• 41.0 ft• ORANGE/BROWN SANDY STONE 41.0 ft 400.0 ft- GRAY ROCK ft. ft. ft. ft. 164.0 ft- 400.0 ft BENTONITE GROUT 21. REMARKS BENTONITE SEAL FROM 79.0 TO 131.0 FEET **U -PACK SCREEN** 22. Certiffca 'on: /�i���• A� "!"�'"" 02/28/17 Signatu of Certified Well Contractor Date By signing this Jorm, I hereby certify that the ireN(v) was (were) constructed in accordance kith 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy oJ'thi.s record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed Form GW -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: KENNY SARGENT Well Contractor Name A - 4226 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable bell construction permits (i. e. Couniv, State. Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heat ing/Coolmg Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) Non -Water Supply Well: 02/28/17 IZ Monitoring ❑ Recovery Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquiter Test ❑Stormwater Drainage ❑E-xperimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under 021 Remarks) 4. Date Well(s) Completed: 02/09/17 5a. Well Location: ROXBORO STEAM PLANT WellID# MW-23BRR Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (il'well field, one latilong is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): ©Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ElNo /J'tlus is a repair, fill out knmrn Krell construction information andexplain the nature t f ttr repair under':21 retnarkv.vecdon or on the back ofthisJonn. 1 For Internal Use ONLY: 02/28/17 Signature ol'Cenified Well Contractor Date 14. WATER ZONES FROM TO I DESCRIPTION 15. OUTER CASING for multi-cused wells OR LINER ifs licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. I in. 16. INNER CASING OR TUBING(geothermal closed -loo FROM I TO I DIAMETER I THICKNESS I MATERIAL 0.0 ft. 194.0 ft- 1 2.0 in. SCH 40 1 PVC ft. I ft. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 194.0ft. 204.0 ft' 2.0 in. .010 SCH 40 PVC** ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT ft' 0-0O 180.0 ft. PORTLAND BENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if u licable FROM TO MATERIAL EMPLACEMENT METHOD 192.0 ft. 204.0 ft' 20-40 FINE SILICA SAND ft. (t. 20. DRILLING LOC attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soi Crock type, grain sire, etc. 0.0 ft• 14.0 It BROWN SILTY SAND 14.0 ft• 46.0 ft• BROWN SILTY PWR 46.0 ft' 204.0 ft. GRAY ROCK ft. ft. rt. rr. ft. ft. (r. ft. 21. REMARKS BENTONITE SEAL FROM 180.0 TO 192.0 FEET **U -PACK SCREEN** 22. Certification: �/�� 02/28/17 Signature ol'Cenified Well Contractor Date By signing this Jnriu, l herebv certify that the a el/ls) was (here) constructed in accordance with 15A NCAC 02C.0100 or I5A NCAC 01C.(01(10 (Yell Construction Standards and that a copy oJUti,s record Inas been provided to the use/l owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. h or multiple injection or non-vaersupply a-e/Ls ONLY wide the same construction, You can ,rubait one /nrni. SUBMITTAL INSTUCTIONS 9. Total -o ell depth below land surface: 204'0 hor mulaple a e/h hst all depths iJ'diJJirent (erantple- 3 a 200' and 1 « 100') 10. Static water level below top of casing: 4.95 lJlraier level is abore caving. use ". 11. Borehole diameter: 6.0 (in.) (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the forth to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form G W -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: KENNY SARGENT Well Contractor Name A - 4226 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: /.i+t all applicable well construction permit.+• (i.e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Irrigation Non -Water Supply ❑AgUiter Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 02/07/17 Well ID# MW-27BR 5a. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No (PIN) For Internal Use ONLY 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. fr. in. 16. INNER CASING OR TUBING eorhermal closed -loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 fr' 65.0 ft. 2.0 i"' I SCH 40 PVC fr. ff. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 65.0 ft. 75.0 ft. 2.0 "' .010 SCH 40 PVC" fr. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0.0 ft. 58,0 ft. PORTLMlDBENTOWE SLURRY tr. ft. rr. rt. 19. SAND/GRAVEL PACK if a licable FROM TO E MATERIAL MPLACEMENT �IETHOD 63.0 ft. 75.0 ft. 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOC attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soi0rvck type, gnin siu, etc. 0.0 fr• 9.0 ff• GRASS/SILTY BACKFILL 9.0 ft• 31.0 fr• BROWN SILTY PWR 31.0 ft. 75.0 fr• GRAY ROCK R. ft. ft. ft. ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 58.0 TO 63.0 FEET "U -PACK SCREEN" 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22, Certification: (dwell field, one tat/long is sufficient) 360 46' 50.34" N 790 07' 85.65" W 02/28/17 Signature of Certified Well Contractor Date 6. Is (are) the well(s): I211'ermanent or ❑Temporary y i y f (� (were) H signing this art, l hereby curry that the well .r was were constructed in accordance with 15A NCAC 02C.0100 or 15A NC'AC 02C.0200 Well Constructian Standart, and that it 7. Is this a repair to an existing well: ❑Yes or EINo copy ofdris record has been provided to the well owner. lj'thi.v is a repair, Jill out known well construction t ybrmation and explain the nature ojthe repair under #2/ remarkv section or on lire hack ofdri.v frhrn 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. l•irr muhiple injection or non -water supply wells ONLY with the same construction, you can submit onefirm. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 75.0 Fur multiple n•ells list all depths ifdWerent (example- 3 t@200' and 2@100') 10. Static water level below top of casing: 32.91 1J'a•ater leve/ is above caving, use " i ' (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 11. Borehole diameter: 6.0 (in.) 24b. For lniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: Ox auger, rotary, cable, direct push, etc ) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & lniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form Ci W -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 201 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: JOHNNY BURR Well Contractor Name A - 3098 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable tre/l construction permits (i.e. County, Stale, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑Industrial/Commercial Non -Water Supply Well: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) Injection wet): ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquiter Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 02/21/17 Well ID# MW-28BR 5•r. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lat/long is sufficient.) 360 46' 50.34" N 790 07'85.65" W 6. Is (are) the well(s): [OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or E]No lf'this is a repair, Jill out known bell c•onsirhtc•tion iglbrmation and explain the nature oflhe repair under 421 remarks .section or nn the hack t J'this Jbrnh. 1 For Internal Use ONLY: 14. WATER ZONES FROM TOI DESCRIPTION ft. ft. ft. ft, 15. OUTER CASING for multi-crsed wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft' 124.0 ft- 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 124.0"' 134.0 f' 2.0 in. .010 SCH 40 PVC** ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT 0.0 f- 111.0 ft- PORTLAND BENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL I EMPLACEMENT METHOD 121.0 ft• 134.0 ft. 20-40 FINE SILICA SAND it. ft. 20. DRILLING LOC attoch additional sheets if necessary) FROM I TO DESCRIPTION color, hardness, soittrock type, grain sit), etc. 0.0 rr• 1.0 rr• GRAVEL 1.0 rr• 16.0 rr• TAN SILTY CLAY 16.0 rr• 24.0 rr• TAN PWR 24.0 rr• 26.0 rr. BROWN/TAN PWR 26.0 rr• 30.0 fL GRAY ROCK 30.0 rr• 60.0 ft. TAN/BROWN PWR 60.0 ft' 134.0 ft. GRAY ROCK 21. REMARKS BENTONITE SEAL FROM 111.0 TO 121.0 FEET **U -PACK SCREEN** 22. Cer •ficat•on: a4,1/ -,6 &%� 02/28/17 Si�re ofCertitelitkell Contractor Date Rv signing this Jbrtn, l herehv certify that the well(s) uas (were) constructed in accordancewith 15A NC•AC 022.111011 or 15,4 NCAC 01C .0200 IVell C'onstruc•tion Standards and that a copy oflhis record has beet) provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8. Number of wells constructed: construction details. You may also attach additional pages if necessary. hor multiple itjeclion or non -water supply she//s ONLY with the sante construction, you can submit one lbrtn. SUBMITTAL INSTUCTIONS 9. Total well depth below land surface: 134.0 (ft ) Far multiple wells list all depths tfdierent (example- 3 ci1100' and 2@1001 100') 10. Static water level below top of casing: 61.57 l/l raler level is above casing, use "I " 11. Borehole diameter: 6.0 (in.) 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address to 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form Ci W -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: JOHNNY BURR For Internal Use ONLY: Well Contractor Name ft. ft. A - 3098 ft. ft. NC Well Contractor Certification Number 15. OUTER CASING for FROM TO GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i e. Counp,, State, Variance, etc) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) Non -Water Supply Well: M Monitonne ❑ Recovery ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heat inP./Cooling 4. Date Well(s) Completed: 02/20/17 5a. Well Location: ROXBORO STEAM PLANT ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 Remarks) Well IDN MW-29BR Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one lat/long is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or 0No q'dtis i.r a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the hack of this fitrnt. 8. Number of wells constructed: 1 bor multiple injection or non -water supply wells ONLY with the same construction, you can .submit ane firm. 9. Total well depth below land surface: 84'0 (ft.) For nndtiple we//v list all depths i%dWereni (example- 3 a 200' and 2@1001 10. Static water level below top of casing: 41.34 (ft.) /Heater level is above casing, use "+ •• 11. Borehole diameter: 6.0 (in.) 12. Well construction method: AIR (i.e. auger, rotary, cable, direct push, etc.) FOR WATER SUPPLY WELLS ONLY: 13a. Yield (gpm) Method of test: 13b. Disinfection type: Amount: in. 0.0 it' 174.0 it' I 2.0 in. I SCH 40 I PVC ft. ft. in. 74.0 it. 84.0 ft• 2.0 in. .010 1 SCH 40 1 PVC** ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 It. 51.0 ft. PORn-MOSENm]HITE SLURRY ft. ft. ft. rt. 19. SAND/GRAVEL PACK (if applicable) 71.0 fL 184.0 ft. 1 20-40 FINE SILICA SAND ft. I ft. 20. DRILLING LOC attach additional sheets ifnecessary) FROM TO DESCRIPTION color, hardness, soil/mck type, emil 0.0 rt• 2.0 tt STONE 2.0 it• 4.0 it• TAN SANDY CLAY 4.0 it• 10.0 it• BROWN PWR 10.0 ft. 40.0 f' TAN/YELLOW PWR 40.0 ft. 84.0 ft. GRAY ROCK ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 51.0 TO 71.0 FEET **U -PACK SCREEN** 22. ' r ific• tion: 66 4(16*'O� 02/28/17 inure of Certed Well Contractor Date Ili, signing this farm, l herebv certif}, that the wells) tear (were) constructed in accordance with ISA NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy ofthi.s record has been provided to the well owner 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, 1636 Mail Service Center, Raleigh, NC 27699-1636 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of completion of well construction to the county health department of the county where constructed. Form G W -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: KENNY SARGENT Well Contractor Name A - 4226 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well contraction permits (i. e. County, State, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑Irrigation Non -Water Supply Well: ❑Monitoring ❑Aquifer Recharge ❑Aquiter Storage and Recovery ❑Aquiter Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Henti ne/Coolina ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) G ❑Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under 921 1 4. Date Well(s) Completed: 02/10/17 Well ID# MW-30BR 5•r. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) Sb. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (it'well field, one lat/long is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or [?]No /faits is a repair. Jill out known well construction iiilbrutalion and explain the nature r f the repair under ;:21 remarks section or on the back of this Jurat. 8. Number of wells constructed: 1 For i n lliple injection or non -Crater supply u•eRr ONLY with the sante construction, wtu can submit one fitrnt. 9. Total well depth below land surface: 140.0 For nntlliple twe//.s li.sl all depths iJ'diffirent (trample- 3 n 200' and 2@100'.) 100') 10. Static water level below top of casing: 64.4 U'irater level is abo•e casing, use "i For Internal Use ONLY 14. WATER ZONES FROM TO I DESCRIPTION ft. ft. ft. it. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DWMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loo FROM TO I DIAMETER I THICKNESS I MATERIAL 0.0 ft• 130.0 ft. 2.0 i"' I SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 130.0ft• 140.0 ft' 2.0 "' .010 SCH 40 PVC** ft. ft. in. 19. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 1155.0 ft. vonn.woeeuToniTE SLURRY ft. ft. ft. rt. 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENT METHOD 127.0 ft. 140.0 ft' 20-40 FINE SILICA SAND ft. rt. 20. DRILLING LOC attnch additional sheets if necessa FROM TO DESCRIPTION color, hardness, said-ck type, grain sin, etc. 0.0 ft. 21.0 ft- BROWN SILTY SAND 21.0 ft. 39.0 ft. BROWN SILTY PWR 39.0 ft. 140.0 ft. GRAY ROCK ft. ft. ft. ft. ft. ft. ft. rt. 21. REMARKS BENTONITE SEAL FROM 115.0 TO 127.0 FEET **U -PACK SCREEN** 22. Certification: Afir `5""- � 02/28/17 Signature ofCertifted Well Contractor Date By signing this forni, I hereby certify that the well(v) uns (were) constructed in accordance with 15A NC'AC 02C.0100 or 15A NCAC• 02C.0200 Well Construction Standards and that a copy ofthis record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 I. Borehole diameter: 6.0 (in.) 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. auger, rotary, cable, direct push, etc ) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water SRDpIy & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county Where constructed Form G W -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells 1. Well Contractor Information: JOHNNY BURR Well Contractor Name A - 3098 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, Slate, Variance, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural OMuniclpal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrigation Non -Water Supply Well: IZ Monitoring ❑ Recovery Injection Well: OAquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 Remarks) 4. Date Well(s) Completed: 02/07/17 Well ID# MW -31 BR Sa. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifapplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (ifwell field, one tat/long is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): ©Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or E)No Il'dtiv is a repair, Jill out known well construction information and explain the mature oJ'the repair under 921 renharkv section or an the back oJthis Jornt. 8. Number of wells constructed: 1 l,itr multiple ityceiion or non-irarer sthpply irelly ONLY with rhe sante arnstruction, yatt can submit ane,/itrm. 9. Total well depth below land surface: 78.5 I•itr unihiple wells list all depths if different (example- 3@200' and 2e 100') 10. Static water level below top of casing: 39.16 if a ater level is above casing, use "- " For Internal Use ONLY 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi-crsed wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. I ft. I in. 16. INNER CASING OR TUBING(geothermal closed -Iiia FROM TO I DIAMETER I THICKNESS I MATERIAL 0.0 ft- 68.5 IL 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE TIIICKNESS MATERIAL 68.5 fr. 78.5 tt 2.0 in. .010 SCH 40 PVC" ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 56.0 ft' PORTUNDDENTONITE SLURRY ft. ft. ft. R. 19. SAND/GRAVEL PACK if a licable FROM TO MATERIAL EMPLACEMENT METHOD 66.0 ft' 78.5 rr 20-40 FINE SILICA SAND ft. tt. 20. DRILLING LOC attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soiit o k type, grain size, elc. 0.0 fr 1.0 ft. GRAVEL 1.0 it 4.0 fr• BROWN TOPSOIL 4.0 ft 40.0 ft ORANGE/BROWN SANDY STONE 40.0 rr 78.5 fr• GRAY ROCK ft. ft. ft. ft. rr. ft. 21. REMARKS BENTONITE SEAL FROM 56.0 TO 66.0 FEET "U -PACK SCREEN" 22. C 6 66 02/28/17 Si & e ofCertifi �ell Dale Hy signing thiv firm, l hereby certify that the wel/(i) teas (irere) c•onsirucied in accordance with ISA NC'AC 010.0100 or ISA NCAC 02C.0200 Well Construction Slandardv and that a copy ojthis record has been provided to the trell owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 11. Borehole diameter: 6.0 (in.) 24b. For Infection Wells: In addition to sending the form to the address In 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i e. auger, rotary, cable, direct push, etc) Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c, For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount, completion of well construction to the county health department of the county where constructed. Form CeW-I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: JOHNNY BURR Well Contractor Name A - 3098 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction pernnits (i.e. County, Stale, Variance, etc.) 3. Well Use (check well use): ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irrl ation Non -Water Supply Well: mMomtorine ❑Recovery OAquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquiter Test ❑Stormwater Drainage OExperimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) OOther (explain under #21 1 4. Date Well(s) Completed: 02/14/17 Well ID# MW-32BR 5a. Well Location: ROXBORO STEAM PLANT Facility/owner Name Facilitv ID# (ifapphcable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): 121Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or 0No lf*thi.r is a repair, fill our knobs well conslruclion it fnrntation and explain the nature oflhe repair under 921 remarks section or on the back ofThis form. 8. Number of wells constructed: 1 For muhiple ihyection or non -hater supply wells ONI.Y with the sante construction, you can submit oneform. 9. Total well depth below land surface: 260.0 (ft.) h'or multiple bells list all depths l(d#Jerent (example- 3@200' 200' and 2@100') 100') 10. Static water level below top of casing: 42.71 (ft.) Iflrater /ere/ is abore casing, use •' � " 11. Borehole diameter: 6.0 (in.) 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc.) AIR For Internal Use ONLY 14. WATER ZONES FROM TO I DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. I in. 16. INNER CASING OR TUBING filetithermal closed -loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 fL 250.0 ft' 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 250.Oft' 260.0 ff• 2.0 in. .010 SCH 40 PVC" ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft' 234.5 rt- PORK DDENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 245.0 ft' 260.0 fL 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness soil/mck type, amin sim, etc. 0.0 f. 1.0 ft. GRAVEL 1.0 ft- 3.0 ft' BROWN TOPSOIL 3.0 ft' 27.0 ft• ORANGE/BROWN SANDY CLAY 27.0 ft• 260.0 f' GRAY ROCK ft. ft. ft. ft. ft. ft. 21. REMARKS BENTONITE SEAL FROM 234.5 TO 245.0 FEET "U -PACK SCREEN" 22. Cer ati n: 02/28/17 Si . re ofCertifi ell Contractor Date Hy signing this form, l hereby ceriifj, that the bell(.+) Inas (were) constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well ConstructionStandards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c, For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells I. Well Contractor Information: JOHNNY BURR Well Contractor Name A - 3098 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, State, I'arionce, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) Non -Water Supply Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 F 02/16/17 MW-33BR 4. Date Wells) Completed: Well ID# 5•r. Well Location: ROXBORO STEAM PLANT Facility/Owner Name Facility ID# (ifnpplicable) 1700 DUNNAWAY ROAD SEMORA 27343 Physical Address, City, and Zip PERSON County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if yell field, one Int/long is sufficient) 360 46'50.34" N 790 07'85.65" W 6. Is (are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ONo lfthis is a repair. fill our known well construction information and explain the nature ofthe repair under 921 remarks section or on the back r#'this Jbrnh. 8. Number of wells constructed: 1 For multiple h#ection or non -water supply wells ONLY with rhe sante construction, you can submit one.16nn. 9. Total well depth below land surface: 298'0 (ft.) For nnthiple wells list all depths ifdU rent (evanhple- 3Qa 200' and 2@100') 100') 10. Static water level below top of casing: 64.23 (ft.) if water lerel is aborti casing, use ", " 11. Borehole diameter: 6.0 (in.) For Internal Use ONLY 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. 16. INNER CASING OR TUBING(geothermal closed -loo FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft. 282.0 ft. 2.0 in. SCH 40 PVC ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL 282.0" 298.0 ft. 2.0 "' .010 SCH 40 PVC** ft. ft. in. 18. GROUT FROM I TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0-0 ft' G r 270.0 ft' PORTVWDBENTONITE SLURRY ft. ft. ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 280.0 ft. 298.0 ft' 20-40 FINE SILICA SAND ft. ft. 20. DRILLING LOC attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soilfmck type, grain sim, etc. 0.0 ft• 1.0 ft• GRAVEL 1.0 ft• 8.0 rt• ORANGE/BROWN SANDY STONE 8.0 fit- 42.0 ft. BROWN SANDY STONE 42.0 fit' 298.0 ft. GRAY ROCK ft. ft. ft. ft. D. ft. 21. REMARKS BENTONITE SEAL FROM 270.0 TO 280.0 FEET U-PAC.4 SCREEN** 22. r fi i n• '6 02/28/17 gnature of Certified Well Contractor Date By signing this Jbrm, I hereby certify that the wells) was 61,ere) constructed in accordance with ISA NC'AC 02C.0100 or 15A NC'AC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of %veil construction to the following: Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Infection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: AIR construction to the following: (i.e. anger, rotary, cable, direct push, etc ) Division ofWater Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed Form GW -I North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX C.3 WELL DEVELOPMENT LOGS SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx GROUNDWATER $ '))(#' *') +, "'& ( (#!-' ' 11 ERA. (+ROGRESSa))2 10011 synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com ROXBORO STEAM ELECTRIC PLANT WELL DEVE $%&E'( $) FIELD PERSONNEL: JYT, GSD, RLP WELL ID: BG -01 BRLR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 163.22 (FT) DEPTH TO WATER: 37.58 (FT) WEATHER: p SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE (APPROX): F NOTES: START DEVELPOMENT TIME/DATE: 15:12, 02/28/2017 END DEVELOPMENT TIME/DATE: 16:26, 02/28/2017 TOTAL VOL PURGED: --65 GALS DEVELOPMENT METHOD: m Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL (GAL) TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 02/28/2017 1515 1 17.0 5.19 2815 7.9 69.1 XXXX Light gray to gray 02/28/2017 1518 5 16.5 1.85 2830 7.7 52.1 XXXX Light gray to gray 02/28/2017 1534 20 16.8 3.11 1704 7.3 36.2 513 Cloudy 02/28/2017 1540 25 18.4 1.61 1700 7.2 37.0 199 Cloudy 02/28/2017 1544 30 16.8 1.85 1509 7.3 33.2 175 Cloudy 02/28/2017 1551 35 16.7 1.78 1473 7.1 11.7 85.3 Cloudy 02/28/2017 1557 40 16.6 1.75 1506 7.1 -8.9 38.7 Clear 02/28/2017 1602 45 16.8 1.44 1511 7.1 -22.6 37.4 Clear 02/28/2017 1614 55 17.0 1.73 1478 7.1 -29.8 17.2 Clear 02/28/2017 1620 60 16.8 1.67 1480 7.1 -35.9 11.4 Clear 02/28/2017 1626 65 16.7 1.64 1461 7.1 -40.3 6.84 Clear COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Well tag states that the well screen is, "130'-160'," but it is actually 150'-160'. Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD I] BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ D BA[3 NONE 0 GOOD [3BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: ARL WEATHER: ❑ SUNNY [3 OVERCAST ❑ RAIN TEMPERATURE (APPROX): 60 F WELL ID: MW-23BRR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 206.74 (FT) DEPTH TO WATER: 4.82 (FT) NOTES: DEP Roxboro, Semora NC START DEVELPOMENT TIME/DATE: 2/23/17 0945 END DEVELOPMENT TIME/DATE: 2/23/17 1145 TOTAL VOL PURGED: NR DEVELOPMENT METHOD: m Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/23/17 1040 NR 17.0 1.8 416.0 7.3 109 11.5 2/23/17 1045 NR 17.0 1.5 412 7.1 114 9.61 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA[3 NONE 0 GOOD [3 BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: JHG WEATHER: ❑ SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE (APPROX): 50 F WELL ID: MW-27BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 79.07 (FT) DEPTH TO WATER: 32.91 (FT) NOTES: START DEVELPOMENT TIME/DATE: 14152/21/17 END DEVELOPMENT TIME/DATE: 1710 2/21/17 TOTAL VOL PURGED: 200 DEVELOPMENT METHOD: [3 Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/21/17 1654 NR 15.4 0.51 799 7.16 11.7 0.72 2/21/17 1659 NR 15.4 0.12 800 7.15 6.6 0.50 2/21/17 1701 NR 15.4 0.12 801 7.17 13.4 0.42 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA0 NONE 0 GOOD [3 BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER $ ')) (#' *' ) 410 symTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com +, "'& ( (#!-' ' 11 ERA. (+ROGRESSa))2 ROXBORO STEAM ELECTRIC PLANT WELL DEVE $%&E'( $) FIELD PERSONNEL: WAP, RLP, LWD WELL ID: MW-28BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 136.96 (FT) DEPTH TO WATER: 61.57 (FT) WEATHER: ❑ SUNNY 13 OVERCAST ❑ RAIN TEMPERATURE (APPROX): 65 0 F NOTES: Purged over the course of 2 days START DEVELPOMENT TIME/DATE: 16:15, 02/28/2017 END DEVELOPMENT TIME/DATE: 17:03, 03/01/2017 TOTAL VOL PURGED: 23.34 GAL DEVELOPMENT METHOD: [3 Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL (GAL) TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([IS/CM) (Su) (mV) (NTU) 02/28/2017 1618 Day 1- 0 18.7 7.76 463.6 7.7 -18.8 192.0 02/28/2017 1653 Day 1- 7 17.9 7.98 457.2 7.6 -17.5 15.0 02/28/2017 1710 Day 1- 10 18.0 7.81 451.8 7.6 -16.4 13.0 03/01/2017 0735 Day 2- N/A - - - - - - Water Level- 84.28' 03/01/2017 0825 Day 2- 8.59 18.5 6.44 468.6 7.6 -28.3 14.0 03/01/2017 1645 Day 2- N/A - - - - - - Water Level- 107.40' 03/01/2017 1703 Day 2- 4.75 18.0 6.94 466.5 7.8 -35.0 3.04 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Water Column (136.96'-61.57') = 75.39 ' One Well Volume = 12.29 GAL Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA[3 NONE 0 GOOD [3 BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: JHG WEATHER: p SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE (APPROX): 60 F WELL ID: MW-29BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 87.42 (FT) DEPTH TO WATER: 41.34 (FT) NOTES: START DEVELPOMENT TIME/DATE: 2/23/17 1315 END DEVELOPMENT TIME/DATE: 2/23/17 1442 TOTAL VOL PURGED: 190 DEVELOPMENT METHOD: [3 Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/23/17 1323 NR 18.1 2.62 535 7.1 107 >1,000 2/23/17 1425 NR 16.2 4.51 521 7.3 89 4.68 2/23/17 1428 NR 16.0 3.67 514 7.0 102 2.03 2/23/17 1431 NR 15.9 3.87 511 7.0 99 0.96 2/23/17 1437 NR 16.5 3.17 513 7.2 93 0.73 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA0 NONE 0 GOOD [3BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: ARL/JHG WEATHER: ❑ SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE (APPROX): 550 F WELL ID: MW-30BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 144.78 (FT) DEPTH TO WATER: 64.40 (FT) NOTES: Pumped and surged by GeoEx for 2 hrs START DEVELPOMENT TIME/DATE: 16:002/22/17 END DEVELOPMENT TIME/DATE: 18:00 2/22/17 TOTAL VOL PURGED: NR DEVELOPMENT METHOD: [3 Grundfos Pump El 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/22/17 1740 NR 16.6 0.9 883 7.0 -24.7 2.35 2/22/17 1745 NR 16.2 0.9 876 6.9 -23.8 1.66 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA0 NONE 0 GOOD [3 BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: ALA WEATHER: p SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE (APPROX): 55 F WELL ID: MW -31 BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 81.44 (FT) DEPTH TO WATER: 39.16 (FT) NOTES: DEP Roxboro, Semora NC START DEVELPOMENT TIME/DATE: 14402/15/17 END DEVELOPMENT TIME/DATE: 1640 2/15/17 TOTAL VOL PURGED: NR DEVELOPMENT METHOD: [3 Grundfos Pump El 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/15/17 1620 NR 16.4 3.9 617 6.9 189.1 41.6 2/15/17 1630 NR 15.7 1.9 612 7.0 185.6 7.33 2/15/17 1640 NR 15.6 1.7 607 6.8 177.2 5.42 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA[3 NONE 0 GOOD [3BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER($' )) (#' *') +, 111&( (#!-'(' NERA.(+ROGRESSa1"2( ( 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com WELL DEVE $%&E'(! $)! FIELD PERSONNEL: GSD WEATHER: ❑ SUNNY 13 OVERCAST ❑ RAIN TEMPERATURE (APPROX): 50 F WELL ID: MW-32BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: 263.75 (FT) DEPTH TO WATER: 43.14 (FT) NOTES: Well volume = 35 gallons START DEVELPOMENT TIME/DATE: 0848 2/22/17 END DEVELOPMENT TIME/DATE: 1 153 2/22/17 TOTAL VOL PURGED: 105 DEVELOPMENT METHOD: m Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([LS/CM) (Su) (mV) (NTU) 2/22/17 1029 58 17.2 0.4 846 7.7 -52 0.38 2/22/17 1149 103 17.2 0.45 833 7.7 -49 1.29 COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA0 NONE 0 GOOD [3 BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc GROUNDWATER $ '))(#' *') +, "'& ( (#!—' ' 11 ERA. (+ROGRESSa))2 41P synTerra 148 River Street, Suite 220 Greenville, South Carolina 29601 (864) 421-9999. (864) 421-9909 Fax www.synTerracorp.com ROXBORO STEAM ELECTRIC PLANT WELL DEVE $%&E'( $) FIELD PERSONNEL: RLP + LWD WELL ID: MW-33BR MEASURING POINT: TOC WELL DIAMETER: 2 IN WELL DEPTH: (FT) DEPTH TO WATER: (FT) WEATHER: p SUNNY ❑ OVERCAST ❑ RAIN TEMPERATURE(APPROX): 60 OF NOTES: START DEVELPOMENT TIME/DATE: 15:58, 03/02/2017 END DEVELOPMENT TIME/DATE: TOTAL VOL PURGED: DEVELOPMENT METHOD: [3 Grundfos Pump 8 12 Volt Pump A Polyethylene Bailer DATE TIME VOL (GAL) TEMPERATURE DO CONDUCTANCE pH ORP* TURBIDITY* NOTES (° Celsius) (mg/L) ([IS/CM) (Su) (mV) (NTU) 03/02/2017 1558 1 16 0.76 1138 10.2 -22.7 50.9 03/02/2017 1605 5 17 0.41 1120 10.2 -24.6 49.0 03/02/2017 1609 10 17 0.64 1163 10.5 -26.9 46.7 03/02/2017 1622 15 17 2.30 1142 10.6 -27.5 " Generator Turned Off COMMENTS: FIELD VEHICLE ACCESSIBLE 0 YES ❑❑ NO Associated midday/end-of-day DO, conductivity, pH within range? (See calibration sheet for this sample date) p YES [3NO. If NO, which parameter . NOTE that reported data should be considered as flagged accordingly. * SynTerra is not NC -certified for these parameters. Data collected for information purposes only WELL TAG PROTECTIVE CASING LOCK CAP CONCRETE PAD ❑ GOOD ❑ BAD 8 NONE 0 GOOD ❑ BAD ❑ NONE ❑ GOOD ❑ U BA[3 NONE 0 GOOD [3BAD [3NONE ElGOOD [3BAD [3NONE P:1Duke Energy Progress.1026110. NC SiteslWell Development Log.doc Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra APPENDIX D SEDIMENT LOGS APPENDIX D.1 SEDIMENT CORE DESCRIPTION LOGS APPENDIX D.2 SEDIMENT CORE PHOTOS P:\ Duke Energy Progress.1026 \ 107. Roxboro Ash Basin GW Assessment Plan\ 33.Discharge Canal Assessment (EHS)\DC Assessment Report \Final Roxboro Discharge Canal Assess Rpt.docx Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX D.1 SEDIMENT CORE DESCRIPTION LOGS SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CL -02 PROJECT NO: 1026.107.24 STARTED: 4/26/16 COMPLETED: 4/26/16 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 992906.539 EASTING: 1983752.4 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 36.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: R. Graziano CHECKED BY: J. Gilmer v U U) W 2 U) OJ D E� E WELL Q O DESCRIPTION W a CONSTRUCTION p W D < �v m0 -- Water, sediment at 16 feet BWS. 10 rr 'uS3`a:-'i:uS3' ASH in water, fine dark gray. SynTerra CLIENT: Duke Energy Progress, LLC. 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 SynTerra Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL/ BORING NO: CL -02 PROJECT NO: 1026.107.24 STARTED: 4/26/16 COMPLETED: 4/26/16 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 992906.539 EASTING: 1983752.4 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 36.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: R. Graziano CHECKED BY: J. Gilmer ~^ U 0 aQ U w a O o U) O�z o f WELL W O U) DESCRIPTION 2 < Lu J Da EL CONSTRUCTION p mO 25 r=> ASH in water, fine dark gray. (continued) 30— 0 • =_. ..... SAND, coarse, light to medium brown. Probe refusal 36 feet from water surface. SynTerra CLIENT: Duke Energy Progress, LLC. 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC mTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL/ BORING NO: CL-04 PROJECT NO: 1026.107.24 STARTED: 4/27/16 COMPLETED: 4/27/16 DRILLING COMPANY: Mid-Atlantic Drilling (MAD) NORTHING: 992782.777 EASTING: 1984128.857 DRILLING METHOD: Direct-Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 24.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: R. Graziano CHECKED BY: J. Gilmer ~^ U aQ 0 U w a O o U) O�z o f WELL W O U) DESCRIPTION 2 < Lu J Da EL CONSTRUCTION p mO 10 Water. 15 _ __ CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CL -04 PROJECT NO: 1026.107.24 STARTED: 4/27/16 COMPLETED: 4/27/16 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 992782.777 EASTING: 1984128.857 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 24.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: R. Graziano CHECKED BY: J. Gilmer v U U) W 2 U) OJ D E� E WELL Q O DESCRIPTION W a CONSTRUCTION p W D < �v m0 SP a: ASH in water. ASH, stiff. Probe refusal 24 feet from water surface. 25 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerra Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL/ BORING NO: CL -06 PROJECT NO: 1026.107.24 STARTED: 4/27/16 COMPLETED: 4/27/16 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 992663.585 EASTING: 1984513.329 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 20.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: M. Youngblood CHECKED BY: J. Gilmer ~^ a U a0 U w a O o U � O z o f WELL W O U DESCRIPTION g Q U o w` m 0D EL a CONSTRUCTION O U U ===__==-- Water, sediment at 13 feet BWS. 10 ASH. 15 SAND, coarse with silt and clay, poorly sorted, dark to medium gray. Probe refusal 20 feet from water surface. CLIENT: Duke Energy Progress, LLC. Syn Terra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTerm Greenville, South Carolina 29601 s �11 11 Phone: 864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station - Impoundment Evaluation WELL/ BORING NO: CL -07 PROJECT NO: 1026.107.24 STARTED: 4/27/16 COMPLETED: 4/27/16 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 992659.816 EASTING: 1984708.134 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 15.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: M. Youngblood CHECKED BY: J. Gilmer ~^ a U a0 U w a O o U � O z _ o f WELL W O U DESCRIPTION g Q U o w` D m 0 EL a CONSTRUCTION O U U 5 ========= Water, sediment at 10 feet BWS. 10 *: *, ASH. SAND, poorly sorted, gray, gradational contact. 15 Probe refusal 15 feet from water surface. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station - Impoundment Evaluation WELL/ BORING NO: CV-01 PROJECT NO: 1026.107.24 STARTED: 4/27/16 COMPLETED: 4/27/16 DRILLING COMPANY: Mid-Atlantic Drilling (MAD) NORTHING: 992519.925 EASTING: 1984146.377 DRILLING METHOD: Direct-Push G.S. ELEV: NA ft M.P. ELEV: 467.0 ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 19.9 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: R. Graziano CHECKED BY: J. Gilmer ~^ U aQ 0 U w a O o U) O�z o f WELL W O U) DESCRIPTION 2 < Lu J Da EL CONSTRUCTION p mO ----=--- Water, sediment at 11.9 feet BWS. 10 ASH in water, dark. 15 Silty CLAY sediment, high plasticity, light brown. Probe refusal 19.9 feet from water surface. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Terra Greenville, South Carolina 29601 ,synPhone:864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CF-1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid-Atlantic Drilling (MAD) NORTHING: 987817.798 EASTING: 1979924.581 DRILLING METHOD: Direct-Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 38.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black ~^ U 0 U aQ w a O U) O�z o f WELL W o O U) DESCRIPTION 2 < Lu J Da M EL CONSTRUCTION p C7 10 Water, bottom of pond 30 feet from deck surface. 15 _ __ CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CF -1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987817.798 EASTING: 1979924.581 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 38.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black v U OU) W 2 U) ODE E� WELL Q DESCRIPTION WvJ 0 a CONSTRUCTION p WD < === �= == Water, bottom of pond 30 feet from deck surface. == == (continued) 25 ________ ' . Dark gray ASH. 30 Sandy CLAY. 35—M0 Brown Sandy CLAY. PARTIALLY WEATHERED ROCK, gray. Probe refusal 38 feet BWS. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerra Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CF-3 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid-Atlantic Drilling (MAD) NORTHING: 987164.785 EASTING: 1980187.356 DRILLING METHOD: Direct-Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 28.5 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black ~^ U 0 U aQ w a O U) O�z o f WELL W o O U) DESCRIPTION 2 < Lu J Da M EL CONSTRUCTION p C7 10 Water, bottom of pond 24 feet from deck surface. 15 _ __ CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CF -3 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987164.785 EASTING: 1980187.356 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 28.5 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black ~^ U 0 aQ U w a O U) O�z o f WELL o W O U) DESCRIPTION 2 < Lu J Da M EL CONSTRUCTION p C7 == Water, bottom of pond 24 feet from deck surface. == (continued) ASH and SILT mix. 25 Tan Silty SAND, poorly sorted. Probe refusal at 28.5 feet BWS. 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: CF -5 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD)/AMEC NORTHING: 986410.148 EASTING: 1980513.897 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 15.5 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black ~^ U 0 aQ U w a O U) O�z o f WELL W o O U) DESCRIPTION 2 < Lu J Da M EL CONSTRUCTION p C7 == ===== == Water, bottom of pond 10 feet from deck surface. f` 10 Dark gray ASH. Tan Silty SAND. 15 Well sorted Silty SAND to PARTIALLY WEATHERED ROCK. Probe refusal at 15.5 feet BWS. SynTerra CLIENT: Duke Energy Progress, LLC. 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: EF -1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987491.442 EASTING: 1980642.258 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 23.5 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black v U OU) W 2 U) ODE E� WELL Q DESCRIPTION WvJ 0 a CONSTRUCTION p WD < == Water, bottom of pond 20 feet below surface of deck. 10 r?:r 2' of ASH, minor recovery. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerf'd Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: EF -1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987491.442 EASTING: 1980642.258 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 23.5 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black a U O U) w 2 U) OJ D E� E WELL Q DESCRIPTION < Lu a CONSTRUCTION p mO `s 2' of ASH, minor recovery. (continued) No recovery. Refusal at 23.5 feet BWS. 25 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station WELL / BORING NO: EF -3 PROJECT NO: 1026.107 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987710.749 EASTING: 1981586.168 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 21N DEPTH TO WATER: ft TOC TOTAL DEPTH: 15.9 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black ~^ a- U a0 U w a O o U �z O _ o_ E WELL W O < U DESCRIPTION g Q U o w. m 0 a d Q CONSTRUCTION 0 U U -`= Water, bottom of pond 12 feet from deck surface. ASH. Tan gray SILT to Silty SAND. Minimal recovery. • ► GRAVEL, medium sized. �s Probe refusal at 15.9 feet BWS. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC m.ra Greenville, South Carolina 29601 7y ' Phone: 864-421-9999 PAGE 1 OF 1 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: WF-1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid-Atlantic Drilling (MAD) NORTHING: 987777.794 EASTING: 1979334.593 DRILLING METHOD: Direct-Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 28.8 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black a U O U) w 2 U) OJ D E� E WELL Q DESCRIPTION < Lu a CONSTRUCTION p C7 mO 10 Water, bottom of pond at 21.0 feet BWS. 15 _ __ CLIENT: Duke Energy Progress, LLC. ra 148 Rver Street, Suite 220 PROJECT LOCATION: Semora, NC 148 River MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 1 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: WF -1 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987777.794 EASTING: 1979334.593 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 28.8 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black a U O U) w 2 U) OJ D E� E WELL Q DESCRIPTION < Lu a CONSTRUCTION p C7 mO =_= Water, bottom of pond at 21.0 feet BWS. (continued) Dark gray ASH and water. t: za : . Light gray Clayey Ash mix 25 :. Light gray Clayey SAND. Tan Clayey Sand, motteled. Tan Silty SAND. Tan -gray Sandy CLAY. Refusal at 28.8 feet BWS. 30 35 CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC MTe Greenville, South Carolina 29601 S�11 Phone: 864-421-9999 PAGE 2 OF 2 PROJECT: Roxboro Station - Impoundment Evaluation WELL / BORING NO: WF -3 PROJECT NO: 1026.107.24 STARTED: 7/20/17 COMPLETED: 7/20/17 DRILLING COMPANY: Mid -Atlantic Drilling (MAD) NORTHING: 987036.361 EASTING: 1979508.766 DRILLING METHOD: Direct -Push G.S. ELEV: NA ft M.P. ELEV: NA ft BOREHOLE DIAMETER: 2 IN DEPTH TO WATER: ft TOC TOTAL DEPTH: 17.0 ft BWS NOTES: BWS: Below Water Surface LOGGED BY: A. Albert CHECKED BY: E. Black v U OU) W 2 U) ODE E� WELL Q DESCRIPTION WvJ 0 a CONSTRUCTION p WD < -- Water, bottom of pond 10.5 feet BWS. 10 >. Dark gray ASH. Gray Sandy CLAY. Tan Clayey SAND. : Light tan Silty SAND. 15 SAND to PARTIALLY WEATHERED ROCK. Probe refusal at 17 feet BWS. CLIENT: Duke Energy Progress, LLC. SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Semora, NC Greenville, South Carolina 29601 synTerra Phone: 864-421-9999 PAGE 1 OF 1 T2 o 0) Ful 2 k. i krk UtaAA I y 6i,f arft F aAarrCBBeBBS ek W) EE pDo 2:J b J o I EDC-00 T2o0)FuJol G7R4gG7vg- UuC2u)yI -PIG/ Fo( TE) u)yI -pgAG/ y 2:EE:J b Fo ( TCJ 0 UPAuerra Jo2uN:Jbl 33--7WzR )CUu:JbI G3c-z799Wv y2:EE:Jb ( )uNoyI ( a4bryFkre b4Jg)E)81 JCw ( gTg)E)81 JCw Do2)NoE) y:C( )u)21 G:J y)TuNuo WCu)21JCWuoF uouCEy)TuNI GVG>DWU J o u) UI DWUI Deria1 Water UHvane Eo b b) y DO CgEer,BK F N) FY) y DO C Cmert 4 LL LL o' UF2:Tu:o J �� 0 > W) EEFoJUu2xFu:oJ _ U y) L$x y) uC:EU > N a X N LL Water, sand i rand 1 6f aBF S6es 6r,, BH*h kskrg z. . . yard ktaPLEO CUN, BatFFatesg t tsa t P >a ; G7 = _. t tsa t P yard ktaP nraFbP LEO CUN, BatFiratesg Trki e re*Barmt M6\nf e DW Ug G FU PZ -7 -z FE:) J u y Fbe) AerNPTrkUeEB, EEFg UPAuerra G3c 2 EBer Utreet, UFfle FW T2 o 0) F u Eo FCu:o J I UeS kra, J F b reeA5@m, UkFkf FarkrlAa M47G synTerf'd Tf kAel c4919R(33333 TCb Go L G ) I V- cUCTJ Vi 5R ri ,Mats n I V- cUCT,u - J vF3( BPFO WUkk,04o - Vr'Oo,u- J WDC -1 MTy VTUSJ /%%0 C- x I kUTUSJ /%%0 SVrltkN o ,C- x I y u g J MAnTerra u- VTPIO o f 1 700/ Q 03 Uy MTM o f vl 0771 v6(4FF/ SVNtkNo,x UTP- SJ x anEaf,Ci re o B/$UkUbJ uy,® x B QUkUbJ uy,® : - VUP- kU,Slx UTUVJ v,N SUI TP,T- ,WyTUVJ,®,T- C T- Tyk,SUI TPJ (p,®,: WM u- TUMJ : WW: efi ,Water,NErDle k- ooUS,. gJ yE)ke@K CPUCPUS,: gJ 1F;brt a Y SUMCVN TN � m � co> u x C- u MTV8 CTNWUkk u cA V 4 Water Water, 3d,i rrransl,6 ater63fB Sar. ,rrrah-,Mkg ,y W I-,LatErat Sar. ,rrragy M', etFfii i LeF,ii 6 e,i rrrensl,6 atterB I ri Pb,re1ELaf,at,(Q F2&et,: WM3 CkMuT, SE e,UnernAl ri nreLLFkkCB MAnTerra I V- cUCT,k- C TN u �Nt 6 i raHu C v v) 7,Vs br,MreetHM/.Ae,33F Cy TN o reenGffeFM Etd,Cari fsia,31 ( Fv r syn I di ne, 7() 2) 3v2 I I I I yo U„v„- w„v ksrdt,nragCkygUg, MttT, etF6 i Ckratefg1i deL3a aFUhCtant,i rrransl,6 atterB I ri Pb,re1ELaf,at,(Q F2&et,: WM3 CkMuT, SE e,UnernAl ri nreLLFkkCB MAnTerra I V- cUCT,k- C TN u �Nt 6 i raHu C v v) 7,Vs br,MreetHM/.Ae,33F Cy TN o reenGffeFM Etd,Cari fsia,31 ( Fv r syn I di ne, 7() 2) 3v2 I I I I yo U„v„- w„v ( pB°ITCSx prr8nnrn*itatktP WTU6d Bp©OsJ Bx WDC-2 ( p B°ITCSsJ B I h: 911 hO HSApST, x 2V J 0 CB. ( UfST, x 2V J 0 p GW OECB. ( AJ Nx Hi PSerra J B p Sw© Ox YZOzzI E'z39: TAHS© Ox I YOz: 3211: Ohu pGW Os TSwB, x , *6to( Fyl O11 FsTUfbx J Alt . R EsTUTbx J Aft f BpTwBUfs, (A. TSTpx ISO , T( SwsSB§/VASTpxltsSBC SBSALJ> T( Swx 2Euotsf WH J BSTHx f WHxf elTgVaterd-IFr)a6e 1JBOOT, Ef Nx ARJe)fiK CwTC- T, sf Nx AEA-hert fjw = = THCp(i;S�J 5 U m �� WTUJ QO —0 CB HSp7CS�J a� O w ------ _-- Water .". ar Edrai Etrnnb6 Ef BSSB. AHwkjetl�rraryesiraf&IeLE Orai ECLANTNd-iGBIqg etkRnLerate1 s6rrl a foE ( rnnese)Fyatats2Euo)eetEf WHE u Hi PSerra CLUJ S)5 F esTPerdi rnrJreyykU)CE 1 3zq)P%rd-ItreetWF%s : h ( pB°/TCSELECAS(BJ)1eRrrfal6JC �/�''-�r�f'1"d OreePf]�1�Wnftl sCarmfRas Y9hl "1 " ( I nPe)Ez93o3: I oYYYY ( AOTsJ sEBV,,A I V- cUCTJ Vi 5R ri Mats n WUkk,04o - VPOo,u- J WDC-4 I V- cUCT,u - J vF3( BPFO MTy VTUSJ /%%0 C- x I kUTUSJ /%%0 SVI1tkN o ,C- x I y u g J KffinTerra u- VTPIO o f 1 71 33) B)) v3 Uy MTM o f vl 0031 ( B 0077 SVNtkNo,x UTP- SJ S%e1t2 ELd o BJ$UkUbJ uy,® x B QUkUbJ uy,® : - VUP- kU,Slx UTUVJ v,N SUI TP,T- ,WyTUVJ,®,T- C T- Tyk,SUI TPJ / B,®,: W u- TUMJ : WMA: efi ,Water,NErDle k- ooUS,. gJ yE)ke@K CPUCPUS,: gJ flirt Y SUKCVNTN � COa � L9 WUkk u x C- uMTV8CTN u U)V 0 -- Water -.' fa1. ,y MPF,iatErateQFbFiEnCant,i rrransl,6 atterB M OFFtfa1. FyNP, Sd,oVybUkFLi IDH etFB i OaratefA <• s: f 1i deL33zB ksrdt,rrra NPH etFB i OZ ratefg1i deL3GB I ri F--,reaELaf,at,/ IBF2bet,: WM3 4 CkMuT, SE e,UnernAl ri nreLLFkkCB MAnTerra v) 7,Vs(br,K4reetHK/FAe,33F I V- cUCT,k- Cy TN u. NM i raFUC Terra o reenGffeH\A Etd,Cari fsia,31 ( Fv n �I di ne, 7() 2) 3v2 I I I I yo U„v„- w„v I V- cUCTJ Vi 5R ri Mats n WUkk,04o - VrO o,u - J WDC -5 I V- cUCT,u- J vF3(EPFO MTy VTUS J /%%0 C- x I kUTUSJ /%%0 SVNtkN o,C- x I y u g J KffinTerra u- VTPIOoJ 171 1 (OB/v4( UyMTM oJ vl 0( 734P Fl 4) SVNtkN o,x UTP- SJ S %e 1 tO ELd o M/QUkUbJ u y,[D x B QUkUbJ u Y'VD : - VUP- kU,Slx UTUVJ v,N SUI TP,T- WyTUVJ,[DT- C T- Tyk,SUI TPJ 48f,VD,: WM u- TUMJ : WW: efi Water,K/ErDle k- o o US,. gJ y E)ke[AK CPUCPUS,: 9J y E)y flirt 0 SUKCVN TN CO L9 WUkk oo u x C- u N4rV8 CTN u U)> 0 > ----- Water fat. HyK/PFLatErateCFB i aratefAli deL,(bFiaFUnCant i rrTansl,6 atterB . ...... ... ksTdt, rrra" IVP H etFf i OaratefA, 1 i deL-c(bB 4— I ri Pe,reOELaf,at,4DFaet,: WK/B CkMuT, SEe,Unern-Al ri rtreLLFkkCB KffinTerra v) 7,Vs(br,K4reetHK/FAe,33F I V- cUCT,k- Cy TN uAM i raFUC o reenGffeH\A Etd,Cari fsia,31 ( Fv synTerra I di ne, 7( ) 2) 3v2 I I I I yo U,,v,,- w"v I V- cUCTJ Vi 5R ri Mats n WUkk,04o - VrO o,u - J WDC-6 I V- cUCT,u- J vF3(EPFO MTy VTUS J /%%0 C- x I kUTUSJ /%%0 SVNtkN o,C- x I y u g J KffinTerra u- VTPIOoJ I I vv/ FEAI F) I UyMTM oJ vl 0( ) I) EFv31 3 SVNtkN o,x UTP- SJ S %e 1 tO ELd o M/QUkUbJ u y,[D x B QUkUbJ u Y'VD : - VUP- kU,Slx UTUVJ v,N SUI TP,T- WyTUVJ,[DT- C T- Tyk,SUI TPJ )B,®,: WM u- TUMJ : WW: efi Water,K/ErDle k- o o US,. gJ y E)ke[AK CPUCPUS,: 9J y Qy flirt 0 SUKCVN TN CO L9 WUkk oo u x C- u N4rV8 CTN u U)> 0 > ----- Water ---------- Sar. rrraAti Ral. yK/PFLatErateQaF;En(Dant,i rrrDnsl 6 atterB 1 ri Fb,reOELaf,at,) B FZD!et,: WK/B 4— CkMuT, SEe,UnernAl ri rtreLLFkkCB KffinTerra v) 7,Vs(br,K4reetHK/FAe,33F I V- cUCT,k- Cy TN uAM i raFUC o reenGffeFM Etd,Cari fsia,31 ( Fv synTerra I di ne, 7() 2) 3v2 I I I I yo U,,v,,- w"v Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX D.2 SEDIMENT CORE PHOTOS SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC PHOTOGRAPHIC LOG Photograph 1. EDC -00 Photograph 2. WDC -1 Profile SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC PHOTOGRAPHIC LOG Photograph 3. WDC -1 Top Photograph 4. WDC -1 Vertical SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC PHOTOGRAPHIC LOG Photograph 5. WDC -2 Profile Photograph 6. WDC -2 Vertical SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra PHOTOGRAPHIC LOG Photograph 7. WDC -4 Profile Photograph 8. WDC -4 Vertical P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra PHOTOGRAPHIC LOG Photograph 9. WDC -5 Profile Photograph 10. WDC -5 Vertical P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Sediment Core Photos May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra PHOTOGRAPHIC LOG Photograph 11. WDC -6 Profile Photograph 12. WDC -6 Vertical P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS)\DC Assessment Report\ Appendices\ Appendix D- Sediment Logs\b. Sediment Core Photos\DC Photo Log.docx Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant - Semora, NC SynTerra APPENDIX E ANALYTICAL REPORTS APPENDIX E.1 WASTE WATER SAMPLES APPENDIX E.2 SEDIMENT SAMPLES APPENDIX E.3 GROUNDWATER SAMPLES P:\ Duke Energy Progress.1026 \ 107. Roxboro Ash Basin GW Assessment Plan\ 33.Discharge Canal Assessment (EHS)\DC Assessment Report \Final Roxboro Discharge Canal Assess Rpt.docx Ash Basin Extension Impoundments and Discharge Canals Assessment Report May 2017 Roxboro Steam Electric Plant — Semora, NC APPENDIX E.1 WASTEWATER SAMPLES SynTerra P:\Duke Energy Progress.1026\107. Roxboro Ash Basin GW Assessment Plan\33.Discharge Canal Assessment (EHS) \ DC Assessment Report \ Final Roxboro Discharge Canal Assess Rpt.docx Duke Energy Analytical Lab DUE Analytical Laboratory Page 1of44 V'ENERGY 13339 Hagers Ferry Road Huntersville, NC 28078-7929 McGuire Nuclear Complex - MG03A2 Phone: 980-875-5245 Fax: 980-875-4349 Order Summary Report Order Number: J16040675 Project Name: ROXBORO - AB GW ASSESSMENT SURFACE Customer Name(s): Brian Wilker, Tim Hunsucker, Fred Holt, Brandon Russo, Kathy Webb, John To Customer Address: Roxboro Steam Station 1700 Dunnaway Road Semora,NC 27343 Lab Contact: Mary Ann Ogle Phone: 980-875-5274 d,—,.m, dc=duke-energy, dc=ent, do=nam, ou=Accounts, ou=Personal, [,B u=PNTransitional, cn=MA05125 (154363) Report Authorized By:I-MEAGY Iagreetospecifedportionsofthis Date: 5/12/2016 document. (Signature) 2016.05.1316:03:31 -04'00' Mary Ann Ogle Program Comments: Please contact the Program Manager (Mary Ann Ogle) with any questions regarding this report. Data Flags & Calculations: Any analytical tests or individual analytes within a test flagged with a Qualifier indicate a deviation from the method quality system or quality control requirement. The qualifier description is found at the end of the Certificate of Analysis (sample results) under the qualifiers heading. All results are reported on a dry weight basis unless otherwise noted. Subcontracted data included on the Duke Certificate of Analysis is to be used as information only. Certified vendor results can be found in the subcontracted lab final report. Duke Energy Analytical Laboratory subcontracts analyses to other vendor laboratories that have been qualified by Duke Energy to perform these analyses except where noted. Data Package: This data package includes analytical results that are applicable only to the samples described in this narrative. An estimation of the uncertainty of measurement for the results in the report is available upon request. This report shall not be reproduced, except in full, without the written consent of the Analytical Laboratory. Please contact the Analytical laboratory with any questions. The order of individual sections within this report is as follows: Job Summary Report, Sample Identification, Technical Validation of Data Package, Analytical Laboratory Certificate of Analysis, Analytical Laboratory QC Reports, Sub -contracted Laboratory Results, Customer Specific Data Sheets, Reports & Documentation, Customer Database Entries, Test Case Narratives, Chain of Custody (COC) Certification: The Analytical Laboratory holds the following State Certifications : North Carolina (DENR) Certificate #248, South Carolina (DHEC) Laboratory ID # 99005. Contact the Analytical Laboratory for definitive information about the certification status of specific methods. Sample ID's & Descriptions: Sample ID Plant/Station Collection Date and Time Collected By Duke Energy Analytical Lab Page 2 of 44 Sample Description 2016011727 Roxboro 26 -Apr -16 10:50 AM ILLEGIBLE CV -2 2016011729 Roxboro 26 -Apr -16 10:20 AM ILLEGIBLE CL -2S 2016011730 Roxboro 26 -Apr -16 8:20 AM ILLEGIBLE CL -2 2016011731 Roxboro 26 -Apr -16 9:25 AM ILLEGIBLE CL -5S 2016011732 Roxboro 26 -Apr -16 8:50 AM ILLEGIBLE CL -5 2016011733 Roxboro 26 -Apr -16 11:15 AM ILLEGIBLE CL -7 2016011734 Roxboro 26 -Apr -16 5:00 PM FIELD BLANK 2016011735 Roxboro 26 -Apr -16 TRIP BLANK 8 Total Samples Technical Validation Review Checklist: COC and .pdf report are in agreement with sample totals 0 Yes ❑ No and analyses (compliance programs and procedures). All Results are less than the laboratory reporting limits. ❑ Yes No All laboratory QA/QC requirements are acceptable. 0 Yes ❑ No Report Sections Included: %4'1 Job Summary Report S*1* Sample Identification V Technical Validation of Data Package 0 Analytical Laboratory Certificate of Analysis ❑ Analytical Laboratory QC Report Duke Energy Analytical Lab Page 3 of 44 d❑ Sub -contracted Laboratory Results ❑ Customer Specific Data Sheets, Reports, & Documentation ❑ Customer Database Entries ❑ Chain of Custody ❑ Electronic Data Deliverable (EDD) Sent Separately Reviewed By: Anne Pridgeon Date: 5/12/2016 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CV -2 Collection Date: 26 -Apr -16 10:50 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:22 MHH7131 Chloride 6.0 mg/L 0.1 Sulfate 63 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:26 Vendor Parameter Complete 04/29/2016 11:05 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:05 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.006 mg/L 0.005 Barium (Ba) 0.040 mg/L 0.005 Boron (B) 1.18 mg/L 0.05 Iron (Fe) 0.039 mg/L 0.01 Manganese (Mn) 0.302 mg/L 0.005 Strontium (Sr) 0.372 mg/L 0.005 Zinc (Zn) 0.019 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 20.5 mg/L 0.01 Magnesium (Mg) 7.76 mg/L 0.005 Potassium (K) 4.33 mg/L 0.1 Sodium (Na) 11.0 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.173 mg/L 0.005 Barium (Ba) 0.041 mg/L 0.005 Boron (B) 1.10 mg/L 0.05 Iron (Fe) 0.240 mg/L 0.01 Manganese (Mn) 0.322 mg/L 0.005 Strontium (Sr) 0.355 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Duke Energy Analytical Lab Page 4 of 44 Sample #: 2016011727 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:52 TLINN 1 EPA 300.0 05/03/2016 10:17 BGN9034 10 EPA 300.0 05/03/2016 10:17 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 11:22 MHH7131 1 EPA 200.7 04/28/2016 13:26 MHH7131 1 EPA 200.7 04/28/2016 13:26 MHH7131 1 EPA 200.7 04/28/2016 13:26 MHH7131 1 EPA 200.7 04/28/2016 13:26 MHH7131 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE 1 EPA 200.7 04/29/2016 11:05 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CV -2 Collection Date: 26 -Apr -16 10:50 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.75 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 10.9 ug/L 1 Lead (Pb) 1.66 ug/L 1 Molybdenum (Mo) 88.4 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.01 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.628 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 19:44 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 3.48 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 89.2 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.10 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.01 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 150 mg/L 25 TOC 6.0 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Duke Energy Analytical Lab Page 5 of 44 Sample #: 2016011727 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 19:44 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 1 EPA 200.8 04/28/2016 21:43 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CL -2S Collection Date: 26 -Apr -16 10:20 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:34 MHH7131 Chloride 6.0 mg/L 0.1 Sulfate 63 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:38 Vendor Parameter Complete 04/29/2016 11:16 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:16 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.005 mg/L 0.005 Barium (Ba) 0.038 mg/L 0.005 Boron (B) 1.15 mg/L 0.05 Iron (Fe) 0.041 mg/L 0.01 Manganese (Mn) 0.294 mg/L 0.005 Strontium (Sr) 0.360 mg/L 0.005 Zinc (Zn) 0.021 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 20.7 mg/L 0.01 Magnesium (Mg) 7.82 mg/L 0.005 Potassium (K) 4.42 mg/L 0.1 Sodium (Na) 11.1 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.179 mg/L 0.005 Barium (Ba) 0.040 mg/L 0.005 Boron (B) 1.11 mg/L 0.05 Iron (Fe) 0.247 mg/L 0.01 Manganese (Mn) 0.326 mg/L 0.005 Strontium (Sr) 0.356 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Duke Energy Analytical Lab Page 6 of 44 Sample #: 2016011729 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:53 TLINN 1 EPA 300.0 05/03/2016 10:33 BGN9034 10 EPA 300.0 05/03/2016 10:33 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 11:34 MHH7131 1 EPA 200.7 04/28/2016 13:38 MHH7131 1 EPA 200.7 04/28/2016 13:38 MHH7131 1 EPA 200.7 04/28/2016 13:38 MHH7131 1 EPA 200.7 04/28/2016 13:38 MHH7131 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE 1 EPA 200.7 04/29/2016 11:16 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CL -2S Collection Date: 26 -Apr -16 10:20 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.76 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 12.7 ug/L 1 Lead (Pb) 1.71 ug/L 1 Molybdenum (Mo) 89.6 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.628 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 19:15 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 3.67 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 95.2 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.01 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.08 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 160 mg/L 25 TOC 5.9 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Duke Energy Analytical Lab Page 7 of 44 Sample #: 2016011729 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 19:15 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 1 EPA 200.8 04/28/2016 21:50 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Lab cal Certificate of Laboratory Analysis Duke EnergyAPa9 l el8of44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -2 Collection Date: 26 -Apr -16 8:20 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:38 MHH7131 Chloride 6.0 mg/L 0.1 Sulfate 62 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:42 Vendor Parameter Complete 04/29/2016 11:20 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:20 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.008 mg/L 0.005 Barium (Ba) 0.039 mg/L 0.005 Boron (B) 1.15 mg/L 0.05 Iron (Fe) 0.064 mg/L 0.01 Manganese (Mn) 0.328 mg/L 0.005 Strontium (Sr) 0.362 mg/L 0.005 Zinc (Zn) 0.016 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 20.1 mg/L 0.01 Magnesium (Mg) 7.65 mg/L 0.005 Potassium (K) 4.32 mg/L 0.1 Sodium (Na) 10.8 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.347 mg/L 0.005 Barium (Ba) 0.042 mg/L 0.005 Boron (B) 1.12 mg/L 0.05 Iron (Fe) 0.428 mg/L 0.01 Manganese (Mn) 0.390 mg/L 0.005 Strontium (Sr) 0.363 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016011730 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:54 TLINN 1 EPA 300.0 05/03/2016 10:49 BGN9034 10 EPA 300.0 05/03/2016 10:49 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 11:38 MHH7131 1 EPA 200.7 04/28/2016 13:42 MHH7131 1 EPA 200.7 04/28/2016 13:42 MHH7131 1 EPA 200.7 04/28/2016 13:42 MHH7131 1 EPA 200.7 04/28/2016 13:42 MHH7131 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE 1 EPA 200.7 04/29/2016 11:20 JJMACKE Lab cal Certificate of Laboratory Analysis Duke EnergyAPa9 l el9of44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -2 Collection Date: 26 -Apr -16 8:20 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.46 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 9.62 ug/L 1 Lead (Pb) 1.40 ug/L 1 Molybdenum (Mo) 85.2 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.688 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 19:51 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 3.42 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 79.6 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.09 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.35 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 160 mg/L 25 TOC 6.2 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Sample #: 2016011730 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 19:51 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 1 EPA 200.8 04/28/2016 21:15 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Certificate of LaboratoryAnalysis Duke Energy PageAnalytical0Lab y Page 10 of 44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -5S Collection Date: 26 -Apr -16 9:25 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.054 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:42 MHH7131 Chloride 6.0 mg/L 0.1 Sulfate 63 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:46 Vendor Parameter Complete 04/29/2016 11:24 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:24 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.012 mg/L 0.005 Barium (Ba) 0.039 mg/L 0.005 Boron (B) 1.15 mg/L 0.05 Iron (Fe) 0.041 mg/L 0.01 Manganese (Mn) 0.292 mg/L 0.005 Strontium (Sr) 0.361 mg/L 0.005 Zinc (Zn) 0.019 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 20.6 mg/L 0.01 Magnesium (Mg) 7.78 mg/L 0.005 Potassium (K) 4.39 mg/L 0.1 Sodium (Na) 11.1 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.178 mg/L 0.005 Barium (Ba) 0.040 mg/L 0.005 Boron (B) 1.10 mg/L 0.05 Iron (Fe) 0.241 mg/L 0.01 Manganese (Mn) 0.323 mg/L 0.005 Strontium (Sr) 0.355 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016011731 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:55 TLINN 1 EPA 300.0 05/03/2016 11:05 BGN9034 10 EPA 300.0 05/03/2016 11:05 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 11:42 MHH7131 1 EPA 200.7 04/28/2016 13:46 MHH7131 1 EPA 200.7 04/28/2016 13:46 MHH7131 1 EPA 200.7 04/28/2016 13:46 MHH7131 1 EPA 200.7 04/28/2016 13:46 MHH7131 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE 1 EPA 200.7 04/29/2016 11:24 JJMACKE Certificate of LaboratoryAnalysis Duke Energy Page Analytical Lab y Page 11 of 44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -5S Collection Date: 26 -Apr -16 9:25 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.76 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 11.9 ug/L 1 Lead (Pb) 1.67 ug/L 1 Molybdenum (Mo) 91.4 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.01 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.770 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 19:58 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 3.38 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 87.5 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.06 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.00 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 150 mg/L 25 TOC 6.1 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Sample #: 2016011731 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 19:58 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 1 EPA 200.8 04/28/2016 21:57 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Certificate of LaboratoryAnalysis Duke Energy PageAnalytical2Lab y Page 12 of 44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -5 Collection Date: 26 -Apr -16 8:50 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.025 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:46 MHH7131 Chloride 6.4 mg/L 0.1 Sulfate 75 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:50 Vendor Parameter Complete 04/29/2016 11:27 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:27 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.007 mg/L 0.005 Barium (Ba) 0.055 mg/L 0.005 Boron (B) 1.48 mg/L 0.05 Iron (Fe) 0.034 mg/L 0.01 Manganese (Mn) 0.956 mg/L 0.005 Strontium (Sr) 0.457 mg/L 0.005 Zinc (Zn) 0.020 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 24.7 mg/L 0.01 Magnesium (Mg) 9.27 mg/L 0.005 Potassium (K) 4.95 mg/L 0.1 Sodium (Na) 12.2 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.332 mg/L 0.005 Barium (Ba) 0.059 mg/L 0.005 Boron (B) 1.43 mg/L 0.05 Iron (Fe) 0.480 mg/L 0.01 Manganese (Mn) 0.885 mg/L 0.005 Strontium (Sr) 0.463 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016011732 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:57 TLINN 1 EPA 300.0 05/03/2016 15:51 BGN9034 10 EPA 300.0 05/03/2016 15:51 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 11:46 MHH7131 1 EPA 200.7 04/28/2016 13:50 MHH7131 1 EPA 200.7 04/28/2016 13:50 MHH7131 1 EPA 200.7 04/28/2016 13:50 MHH7131 1 EPA 200.7 04/28/2016 13:50 MHH7131 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE 1 EPA 200.7 04/29/2016 11:27 JJMACKE Certificate of LaboratoryAnalysis Duke Energy PageAnalytical3Lab y Page 13 of 44 This report shall not be reproduced, except in full. Order # J16040675 Site: CL -5 Collection Date: 26 -Apr -16 8:50 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.09 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 10.4 ug/L 1 Lead (Pb) 1.55 ug/L 1 Molybdenum (Mo) 94.9 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.08 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.433 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 20:05 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 4.60 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 94.4 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.27 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.36 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 190 mg/L 25 TOC 6.0 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Sample #: 2016011732 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 20:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 1 EPA 200.8 04/28/2016 22:05 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CL -7 Collection Date: 26 -Apr -16 11:15 AM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed by Pace Laboratories) MHH7131 Vendor Parameter Complete MHH7131 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) MHH7131 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.025 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 04/28/2016 11:50 MHH7131 Chloride 5.9 mg/L 0.1 Sulfate 62 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 04/28/2016 13:54 Vendor Parameter Complete 04/29/2016 11:31 JJMACKE DISSOLVED METALS BY ICP 04/29/2016 11:31 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.005 mg/L 0.005 Barium (Ba) 0.038 mg/L 0.005 Boron (B) 1.13 mg/L 0.05 Iron (Fe) 0.041 mg/L 0.01 Manganese (Mn) 0.290 mg/L 0.005 Strontium (Sr) 0.358 mg/L 0.005 Zinc (Zn) 0.016 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 20.6 mg/L 0.01 Magnesium (Mg) 7.78 mg/L 0.005 Potassium (K) 4.37 mg/L 0.1 Sodium (Na) 11.1 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.171 mg/L 0.005 Barium (Ba) 0.041 mg/L 0.005 Boron (B) 1.13 mg/L 0.05 Iron (Fe) 0.244 mg/L 0.01 Manganese (Mn) 0.336 mg/L 0.005 Strontium (Sr) 0.366 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Duke Energy Analytical Lab Page 14 of 44 Sample #: 2016011733 Matrix: GW -WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 04/27/2016 13:58 TLINN 1 EPA 300.0 05/03/2016 16:07 BGN9034 10 EPA 300.0 05/03/2016 16:07 BGN9034 Vendor Method V_PACE 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 11:50 MHH7131 1 EPA 200.7 04/28/2016 13:54 MHH7131 1 EPA 200.7 04/28/2016 13:54 MHH7131 1 EPA 200.7 04/28/2016 13:54 MHH7131 1 EPA 200.7 04/28/2016 13:54 MHH7131 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE 1 EPA 200.7 04/29/2016 11:31 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: CL -7 Collection Date: 26 -Apr -16 11:15 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 2.28 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 11.0 ug/L 1 Lead (Pb) 1.57 ug/L 1 Molybdenum (Mo) 91.3 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.28 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 0.720 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 04/28/2016 20:12 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 3.61 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 95.6 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) 1.30 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 1.15 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories) Vendor Method Vendor Parameter Complete Vendor Method SULFIDE - (Analysis Performed by Pace Laboratories) 1 Vendor Parameter Complete PARMSTR 5 TOTAL DISSOLVED SOLIDS 05/03/201611:39 CJELLIO 1 TDS 160 mg/L 25 TOC 6.0 mg/L 0.5 TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 Duke Energy Analytical Lab Page 15 of 44 Sample #: 2016011733 Matrix: GW -WW DF Method Analysis Date/Time Analyst 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 20:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 1 EPA 200.8 04/28/2016 22:12 MHALL3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 04/28/201614:08 PARMSTR 5 SM5310C/EPA9060A 05/03/201611:39 CJELLIO 1 SM2540D 04/29/201610:30 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: FIELD BLANK Collection Date: 26 -Apr -16 5:00 PM Analyte Result Units Qualifiers RDL DF MERCURY IN WATER - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete Duke Energy Analytical Lab Page 16 of 44 Sample #: 2016011734 Matrix: GW—WW Method Analysis Date/Time Analyst Vendor Method V_PACE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16040675 Site: TRIP BLANK Collection Date: 26 -Apr -16 Analyte Result Units Qualifiers RDL DF MERCURY IN WATER - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete Duke Energy Analytical Lab Page 17 of 44 Sample #: 2016011735 Matrix: GW—WW Method Analysis Date/Time Analyst Vendor Method V_PACE Sample Condition Upon Client Name: Receipt — 1 Project) Courier: []Fed Ex ❑UPS µ❑USP []Client ❑ Commercial ❑i ace ❑Other: WO# 9229544? 11111111111111111111111111 92295447 Custody Seal Present? ❑Yes ffNo Seals Intact? []Yes ❑Na I' Dake/Initials Person Examining Contents: Packing Material: ❑Bubble Wrap []Bubble Bags ❑None ❑Other: Thermometer: p71505 ❑ Type of Ice: QWet ❑Blue []None ❑Samples an ice, cooling process has begun Correction Factor: OVC Cooler Temp Corrected (°C): "� ` Biological Tissue Frozen? ❑Yes ❑No QN/A Temp should be above freezing to 6°C USDA Regulated Soil ( Q N/A, water sample) Did samplesor)ginate in a quarantine zone within the United States: CA, NY, or SC (check maps)? Did samples originate from a foreign source (internationally, I—Ivac .1 i�r, including Hawaii and Puerto Rico)? ❑Yes ❑'No Document Name: Document Revised: 18FEB2016 Sample Condition Upon Receipt(SCUR) Dage td Anal tical Lab aceAnalytrcaI Document No.: Issuing AuthorityPage 42 of 44 1. F-CHR-CS-003-rev.18 Pace Huntersville Quality Office Sample Condition Upon Client Name: Receipt — 1 Project) Courier: []Fed Ex ❑UPS µ❑USP []Client ❑ Commercial ❑i ace ❑Other: WO# 9229544? 11111111111111111111111111 92295447 Custody Seal Present? ❑Yes ffNo Seals Intact? []Yes ❑Na I' Dake/Initials Person Examining Contents: Packing Material: ❑Bubble Wrap []Bubble Bags ❑None ❑Other: Thermometer: p71505 ❑ Type of Ice: QWet ❑Blue []None ❑Samples an ice, cooling process has begun Correction Factor: OVC Cooler Temp Corrected (°C): "� ` Biological Tissue Frozen? ❑Yes ❑No QN/A Temp should be above freezing to 6°C USDA Regulated Soil ( Q N/A, water sample) Did samplesor)ginate in a quarantine zone within the United States: CA, NY, or SC (check maps)? Did samples originate from a foreign source (internationally, I—Ivac .1 i�r, including Hawaii and Puerto Rico)? ❑Yes ❑'No CLIENT NOTIFICATION/RESOLUTION Field Data Required? [:]Yes[]NoPerson Contacted: AMAYUY)A Date/Time: Comments/Resolution: LA.- L-� SNy fy GE;"`f t*9, LAt Project Manager SCURF Review: Date: _ 7 Project Manager SRF Review: Date: Note: Wheneverthere is a discrepancy affecting North Cara na compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office (Le. .Out of hold, incorrect preservative, out of temp, incorrect containers) Page 25 of 26 COMMENTS: Chain of Custody Present? Ej es [-]No ❑N/A 1. Chain of Custody Filled Out? [2Yes ❑No [_]N/A 2. Chain of Custody Relinquished? ❑Yes []No ❑NIA 3. Sampler Name and/or Signature on COC? [__Dr�e ❑No [:]N/A 4. Samples Arrived within Hold Time? �jv Yes [:]No_ ❑N/A 5. Short Hold Time Analysis (<72 hr.)? Cl Yes QNo [I N/A 6, Rush Turn Around Time Requested? ❑Yes . El N; ❑N/A 7. SufficientVolume? DYes ❑No ❑N/A S. Correct Containers Used? 4 -Pace Containers Used? }k."l []Yes .IY 13YM- []No ❑No ❑NIA ❑N/A 9. Containers Intact? ❑Yes ONO ❑N/A 10. a V '5 ,�', .� I ' } •'� . Filtered Volume Received for Dissolved Tests? ❑Yes [:]No ❑NJA 11. Note if sediment is visible in the dissolved container Sample Labels Match COC? 04es ❑No [:1 N/A 12. -Includes Datetrime/ID/Analysis Matrix: ` All containers needing acid/base preservation have been checked? ©Yes ❑No []N/A Alt containers needing preservation are found to be in compliance with EPA recommendation? (HNO3, H2504, KCI<2; NaOH >9 Sulfide, NaOH>12 Cyanide) QYes ❑No ❑NIA Exceptions: VOA, Coliform, TOC, Oil and Grease, DRO/8015 (water) DOC,LLHg Ores [-]No ❑N/A Samples checked for dechlorination OT/es []No ❑NIA 14. Headspace in VOA Vials (>5-6mm)? ❑Yes ❑No []N/A 15. Trip Blank Present? ❑Yes [:]No []N/A 16. Trip Blank Custody Seals Present? ❑Yes [-]No DN/A Pace Trip Blank Lot # (if purchased): CLIENT NOTIFICATION/RESOLUTION Field Data Required? [:]Yes[]NoPerson Contacted: AMAYUY)A Date/Time: Comments/Resolution: LA.- L-� SNy fy GE;"`f t*9, LAt Project Manager SCURF Review: Date: _ 7 Project Manager SRF Review: Date: Note: Wheneverthere is a discrepancy affecting North Cara na compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office (Le. .Out of hold, incorrect preservative, out of temp, incorrect containers) Page 25 of 26 r s ar 4r, 4 Duke Energy Analytical Lab Page 43 of 44 _ s ! a �� �'IZ'� �m ; •._.._.._.._...--- -_'., .._._..._..» .._.._.._.-_:._. ,..w�.. _.,..--� -'---._L_`�.i_.. _I.._.. ......... v_mm 7mm [o41I KI N C w n I ' N n O e (n � m n I C6 py "s a � � Q m 1 0-4- -4obelow)m a. • t � `t Imo• I I - �s4atMRaF� iliifyf3iidill'.-�BdSd�iV��li:l desir-id tuntarotnad A r r TK O Hip6 G a ' c v c < a Duke Energy Analytical Lab Page 43 of 44 _ s ! a �� �'IZ'� �m ; •._.._.._.._...--- -_'., .._._..._..» .._.._.._.-_:._. ,..w�.. _.,..--� -'---._L_`�.i_.. _I.._.. ......... 3 yD.r�g�y a J al m4.5 4 C w n I I O e (n � I "s Metals (see 'r m 1 0-4- -4obelow)m A Imo• 7 > m a ;; a . < i 3107 1 Dissolved O ID metals M p a a :tom m _ rT O IVK f� I� '77 j -C 0 o a o o a a a Total i Contalne � 3 y s CI Ln r w i m W j (•i !D � i 3 a Cj) 'A C.�� a Q Page 26 of 26 a crap m .j?' k h TSS,TDS m i 4 N y� r la Methane(RSK a o 3 1751 V_Pace 3 3 ' } a i A ~ i I Cl. 504,d, 17 TOC, Nitrate- _ w ! S� b I I� Nitrite A . Q m Alkslirtity, p � � v �� BIcatbonate, 8 ! p Carhonatel!_Pace as II � Sulfide c r3 a Na 1 J (V -pace) Hg 1631e s o' )alp S-' N (V -Pace) ' - ------ --- A 4 C w n Metals (see o i m 0-4- -4obelow)m below) < i �I 1 Dissolved O metals M a 0 o a o o a a a Total i Contalne � � !D � C.�� J�i�1J U }�1 � Q Page 26 of 26 CRAIN OF CUSTODY RECORD AND ANALYSIS REQUEST FORM Duke Energy Analytical Lab - - -- ------- I — -------- M —rMw' -Y, -LJ-m- duke Energy PAIdawhory . . Page 44 of 44 No ':�M� pudd�dl�4 ! . 5 MMM.; Gv�.-ww Ana"4%1 11-mbnratuFy 13LI1914.P FMFF�R# DdSTROL"low Synterra EUD ChAhd or CuGtody L "00.kw okmftkL ID LAB. COPY to I I .. :1 a'w UPOES -J-- LOT AD cw Ass*n~ SURFACE COC RFLV DATElftru I b PFS. . ... ..... . pace 047 &LL -vu SIN PO #1699536 j &&in&" Unit 1rv*&M1 b. QM d•40 P0 2 -; In IFM f�u a aMFACXffWnwVWurr*4mL1 zMff 40 MJ 3W A80 284 - Ca VMM*rType RFT UJIM FET W -t FET PIT ow" KrE[HPPE -*Ample DescripUork or U— ujmft,� ft �Ipdtm do EP~ffpp ep+ J9 GPS Lucmkln ;P— E Fbil —Jd 1 -1-705D 40 Frl- E' yb f x IN 1731 -a. f CL 2'— D Filter Blank - 4 Ruld 3"ank Trip 131a nk Iqo m-mEm W pi::P_ms pmw: Am. "CA. (:6.i.+. ca go. M. Pb. 3b. ga Ti FLLIr V rLL j -01hqt __A;SAP_ eUENEWM by ICR 0111MI: AJr 93kr H. l'iF. NK IG Zn lep - Lptapnipus G; Mg K- No Ho too ZA9.1 -Aad Gpo Will Awty ixwwmdnn"- 0 I R I I fbiquuMed Turrimmind TOW 7-7 -14 DwVw m-mEm W pi::P_ms pmw: Am. "CA. (:6.i.+. ca go. M. Pb. 3b. ga Ti FLLIr V rLL j -01hqt __A;SAP_ eUENEWM by ICR 0111MI: AJr 93kr H. l'iF. NK IG Zn lep - Lptapnipus G; Mg K- No Ho too ZA9.1 -Aad Gpo Will Awty ixwwmdnn"- If& DUE Analytical Laboratory N,'ENERGY 13339 Hagers Ferry Road Huntersville, NC 28078-7929 McGuire Nuclear Complex - MG03A2 Phone: 980-875-5245 Fax: 980-875-4349 Order Summary Report Order Number: J16070479 Project Name: ROXBORO - AB GW ASSESSMENT SURFACE Customer Name(s): Brian Wilker, Tim Hunsucker, Fred Holt, Brandon Russo, Kathy Webb, John To Customer Address: Roxboro Steam Station 1700 Dunnaway Road Semora,NC 27343 Lab Contact: Mary Ann Ogle Phone: 980-875-5274 I.— dc=duke-energy, 1--1,d=nam,—Accou nts,o Personal, [,� ,u=PNTransitional,cn=MA05125(154363) Report Authorized By: ragreetospecifiedportionsotthis pate: 8/4/2016 ` ��- document. (Signature) 2016.08.0511:5522-04'00' Mary Ann Ogle Program Comments: Please contact the Program Manager (Mary Ann Ogle) with any questions regarding this report. Data Flags & Calculations: Analytical lab Page 1 of 70 Any analytical tests or individual analytes within a test flagged with a Qualifier indicate a deviation from the method quality system or quality control requirement. The qualifier description is found at the end of the Certificate of Analysis (sample results) under the qualifiers heading. All results are reported on a dry weight basis unless otherwise noted. Subcontracted data included on the Duke Certificate of Analysis is to be used as information only. Certified vendor results can be found in the subcontracted lab final report. Duke Energy Analytical Laboratory subcontracts analyses to other vendor laboratories that have been qualified by Duke Energy to perform these analyses except where noted. Data Package: This data package includes analytical results that are applicable only to the samples described in this narrative. An estimation of the uncertainty of measurement for the results in the report is available upon request. This report shall not be reproduced, except in full, without the written consent of the Analytical Laboratory. Please contact the Analytical laboratory with any questions. The order of individual sections within this report is as follows: Job Summary Report, Sample Identification, Technical Validation of Data Package, Analytical Laboratory Certificate of Analysis, Analytical Laboratory QC Reports, Sub -contracted Laboratory Results, Customer Specific Data Sheets, Reports & Documentation, Customer Database Entries, Test Case Narratives, Chain of Custody (COC) Certification: The Analytical Laboratory holds the following State Certifications : North Carolina (DENR) Certificate #248, South Carolina (DHEC) Laboratory ID # 99005. Contact the Analytical Laboratory for definitive information about the certification status of specific methods. Sample ID's & Descriptions: Collection Sample ID Plant/Station Date and Time Collected By Sample Description 2016022306 Roxboro 18 -Jul -16 3:00 PM NOT GIVEN WF-2SW 2016022314 Roxboro 18 -Jul -16 2:45 PM NOT GIVEN WF-2DW 2016022315 Roxboro 18 -Jul -16 2:10 PM NOT GIVEN WF-4SW 2016022316 Roxboro 18 -Jul -16 1:50 PM NOT GIVEN WF-4DW 2016022317 Roxboro 18 -Jul -16 4:55 PM NOT GIVEN EF-2SW 2016022318 Roxboro 18 -Jul -16 4:45 PM NOT GIVEN EF-21DW 2016022319 Roxboro 18 -Jul -16 4:20 PM NOT GIVEN EF-4SW 2016022320 Roxboro 18 -Jul -16 4:10 PM NOT GIVEN EF-41DW 2016022321 Roxboro 18 -Jul -16 5:30 PM NOT GIVEN Filter Blank 2016022322 Roxboro 18 -Jul -16 5:30 PM NOT GIVEN FIELD BLANK 10 Total Samples Analytical lab Page 2 of 70 Technical Validation Review Checklist: COC and .pdf report are in agreement with sample totals 0 Yes No and analyses (compliance programs and procedures). All Results are less than the laboratory reporting limits. ❑ Yes 0 No All laboratory QA/QC requirements are acceptable. 0 Yes ❑Ivo Report Sections Included: 0 Job Summary Report ❑� Sample Identification Technical Validation of Data Package ❑� Analytical Laboratory Certificate of Analysis ❑ Analytical Laboratory QC Report Analytical lab Page 3 of 70 ❑�/ Sub -contracted Laboratory Results ❑ Customer Specific Data Sheets, Reports, & Documentation ❑ Customer Database Entries W Chain of Custody ❑d Electronic Data Deliverable (EDD) Sent Separatel Reviewed By: DBA Account Date: $/2/2016 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-2SW Collection Date: 18 -Jul -16 3:00 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:22 JJMACKE Chloride 24 mg/L B2 1 Sulfate 41 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 11:41 Vendor Parameter Complete 07/21/2016 12:38 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 12:38 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.018 mg/L 0.005 Barium (Ba) 0.054 mg/L 0.005 Boron (B) 0.786 mg/L 0.05 Iron (Fe) < 0.01 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.256 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 25.1 mg/L 0.01 Magnesium (Mg) 8.33 mg/L 0.005 Potassium (K) 4.84 mg/L 0.1 Sodium (Na) 8.52 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.139 mg/L 0.005 Barium (Ba) 0.058 mg/L 0.005 Boron (B) 0.799 mg/L 0.05 Iron (Fe) 0.163 mg/L 0.01 Manganese (Mn) 0.053 mg/L 0.005 Strontium (Sr) 0.258 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022306 Matrix: GW WW Analytical lab Page 4 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:21 LSTARL1 10 EPA 300.0 07/20/2016 11:07 BGN9034 10 EPA 300.0 07/20/2016 11:07 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:22 JJMACKE 1 EPA 200.7 07/22/2016 11:41 JJMACKE 1 EPA 200.7 07/22/2016 11:41 JJMACKE 1 EPA 200.7 07/22/2016 11:41 JJMACKE 1 EPA 200.7 07/22/2016 11:41 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE 1 EPA 200.7 07/21/2016 12:38 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-2SW Collection Date: 18 -Jul -16 3:00 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.51 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.29 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.5 ug/L 1 Nickel (Ni) 1.37 ug/L 1 Selenium (Se) 1.73 ug/L 1 Thallium (TI) Low Level 0.273 ug/L 0.2 Vanadium (V) Low Level 5.99 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.09 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.56 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 51.0 ug/L 1 Nickel (Ni) 1.62 ug/L 1 Selenium (Se) 1.88 ug/L 1 Thallium (TI) Low Level 0.239 ug/L 0.2 Vanadium (V) Low Level 7.19 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 170 mg/L 25 Total Carbon TOC 6.6 mg/L 0.5 Sample #: 2016022306 Matrix: GW WW Analytical lab Page 5 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 23:13 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA 1 EPA 200.8 07/29/2016 14:23 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 6 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: WF-2SW Sample #: 2016022306 Collection Date: 18 -Jul -16 3:00 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-2DW Collection Date: 18 -Jul -16 2:45 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:35 JJMACKE Chloride 24 mg/L B2 1 Sulfate 21 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 11:53 Vendor Parameter Complete 07/21/2016 12:42 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 12:42 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.009 mg/L 0.005 Barium (Ba) 0.114 mg/L 0.005 Boron (B) 0.780 mg/L 0.05 Iron (Fe) 2.05 mg/L 0.01 Manganese (Mn) 4.16 mg/L 0.005 Strontium (Sr) 0.327 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 30.0 mg/L 0.01 Magnesium (Mg) 9.27 mg/L 0.005 Potassium (K) 5.19 mg/L 0.1 Sodium (Na) 9.68 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 1.78 mg/L 0.005 Barium (Ba) 0.147 mg/L 0.005 Boron (B) 0.798 mg/L 0.05 Iron (Fe) 13.4 mg/L 0.01 Manganese (Mn) 4.42 mg/L 0.005 Strontium (Sr) 0.345 mg/L 0.005 Zinc (Zn) 0.008 mg/L 0.005 Sample #: 2016022314 Matrix: GW WW Analytical lab Page 7 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:23 LSTARL1 10 EPA 300.0 07/20/2016 12:19 BGN9034 10 EPA 300.0 07/20/2016 12:19 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:35 JJMACKE 1 EPA 200.7 07/22/2016 11:53 JJMACKE 1 EPA 200.7 07/22/2016 11:53 JJMACKE 1 EPA 200.7 07/22/2016 11:53 JJMACKE 1 EPA 200.7 07/22/2016 11:53 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE 1 EPA 200.7 07/21/2016 12:42 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-2DW Collection Date: 18 -Jul -16 2:45 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 32.3 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) 2.02 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 39.2 ug/L 1 Nickel (Ni) 1.24 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 2.29 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 138 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) 1.93 ug/L 1 Cobalt (Co) 3.20 ug/L 1 Copper (Cu) 2.71 ug/L 1 Lead (Pb) 1.40 ug/L 1 Molybdenum (Mo) 44.2 ug/L 1 Nickel (Ni) 2.73 ug/L 1 Selenium (Se) 1.56 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 14.8 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 210 mg/L 25 Total Carbon TOC 8.2 mg/L 0.5 Sample #: 2016022314 Matrix: GW WW Analytical lab Page 8 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 22:18 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA 1 EPA 200.8 07/29/2016 14:30 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 9 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: WF-21DW Sample #: 2016022314 Collection Date: 18 -Jul -16 2:45 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 53 mg/L 17 1 SM2540D 07/20/201611:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-4SW Collection Date: 18 -Jul -16 2:10 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.038 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:39 JJMACKE Chloride 24 mg/L B2 1 Sulfate 41 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 11:57 Vendor Parameter Complete 07/21/2016 12:47 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 12:47 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.015 mg/L 0.005 Barium (Ba) 0.052 mg/L 0.005 Boron (B) 0.772 mg/L 0.05 Iron (Fe) 0.018 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.250 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 24.6 mg/L 0.01 Magnesium (Mg) 8.20 mg/L 0.005 Potassium (K) 4.80 mg/L 0.1 Sodium (Na) 8.42 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.171 mg/L 0.005 Barium (Ba) 0.056 mg/L 0.005 Boron (B) 0.773 mg/L 0.05 Iron (Fe) 0.243 mg/L 0.01 Manganese (Mn) 0.066 mg/L 0.005 Strontium (Sr) 0.252 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022315 Matrix: GW WW Analytical lab Page 10 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:24 LSTARL1 10 EPA 300.0 07/20/2016 12:37 BGN9034 10 EPA 300.0 07/20/2016 12:37 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:39 JJMACKE 1 EPA 200.7 07/22/2016 11:57 JJMACKE 1 EPA 200.7 07/22/2016 11:57 JJMACKE 1 EPA 200.7 07/22/2016 11:57 JJMACKE 1 EPA 200.7 07/22/2016 11:57 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE 1 EPA 200.7 07/21/2016 12:47 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-4SW Collection Date: 18 -Jul -16 2:10 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.03 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.18 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.7 ug/L 1 Nickel (Ni) 1.32 ug/L 1 Selenium (Se) 1.84 ug/L 1 Thallium (TI) Low Level 0.206 ug/L 0.2 Vanadium (V) Low Level 5.67 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.78 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.58 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.7 ug/L 1 Nickel (Ni) 1.56 ug/L 1 Selenium (Se) 1.92 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 6.94 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 170 mg/L 25 Total Carbon TOC 6.4 mg/L 0.5 Sample #: 2016022315 Matrix: GW WW Analytical lab Page 11 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 23:20 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA 1 EPA 200.8 07/29/2016 14:37 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 12 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: WF-4SW Sample #: 2016022315 Collection Date: 18 -Jul -16 2:10 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 5.6 mg/L 5 1 SM2540D 07/20/201611:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-4DW Collection Date: 18 -Jul -16 1:50 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:48 JJMACKE Chloride 24 mg/L B2 1 Sulfate 41 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 12:01 Vendor Parameter Complete 07/21/2016 12:51 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 12:51 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.013 mg/L 0.005 Barium (Ba) 0.052 mg/L 0.005 Boron (B) 0.774 mg/L 0.05 Iron (Fe) 0.017 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.251 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 24.7 mg/L 0.01 Magnesium (Mg) 8.19 mg/L 0.005 Potassium (K) 4.81 mg/L 0.1 Sodium (Na) 8.47 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.221 mg/L 0.005 Barium (Ba) 0.056 mg/L 0.005 Boron (B) 0.770 mg/L 0.05 Iron (Fe) 0.288 mg/L 0.01 Manganese (Mn) 0.077 mg/L 0.005 Strontium (Sr) 0.251 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022316 Matrix: GW WW Analytical lab Page 13 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:28 LSTARL1 10 EPA 300.0 07/20/2016 12:55 BGN9034 10 EPA 300.0 07/20/2016 12:55 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 11:48 JJMACKE 1 EPA 200.7 07/22/2016 12:01 JJMACKE 1 EPA 200.7 07/22/2016 12:01 JJMACKE 1 EPA 200.7 07/22/2016 12:01 JJMACKE 1 EPA 200.7 07/22/2016 12:01 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE 1 EPA 200.7 07/21/2016 12:51 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: WF-4DW Collection Date: 18 -Jul -16 1:50 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 5.60 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.44 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 49.7 ug/L 1 Nickel (Ni) 1.21 ug/L 1 Selenium (Se) 1.77 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 5.43 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.07 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.63 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 51.4 ug/L 1 Nickel (Ni) 1.59 ug/L 1 Selenium (Se) 1.97 ug/L 1 Thallium (TI) Low Level 0.203 ug/L 0.2 Vanadium (V) Low Level 7.30 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 180 mg/L 25 Total Carbon TOC 6.4 mg/L 0.5 Sample #: 2016022316 Matrix: GW WW Analytical lab Page 14 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 23:27 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA 1 EPA 200.8 07/29/2016 15:11 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 15 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: WF-41DW Sample #: 2016022316 Collection Date: 18 -Jul -16 1:50 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 20 mg/L 8.3 1 SM2540D 07/20/201611:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-2SW Collection Date: 18 -Jul -16 4:55 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.036 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:52 JJMACKE Chloride 24 mg/L B2 1 Sulfate 41 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 12:05 Vendor Parameter Complete 07/21/2016 13:18 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 13:18 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.020 mg/L 0.005 Barium (Ba) 0.055 mg/L 0.005 Boron (B) 0.778 mg/L 0.05 Iron (Fe) 0.013 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.252 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 24.7 mg/L 0.01 Magnesium (Mg) 8.15 mg/L 0.005 Potassium (K) 4.75 mg/L 0.1 Sodium (Na) 8.47 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.118 mg/L 0.005 Barium (Ba) 0.060 mg/L 0.005 Boron (B) 0.797 mg/L 0.05 Iron (Fe) 0.137 mg/L 0.01 Manganese (Mn) 0.045 mg/L 0.005 Strontium (Sr) 0.259 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022317 Matrix: GW WW Analytical lab Page 16 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:30 LSTARL1 10 EPA 300.0 07/20/2016 13:13 BGN9034 10 EPA 300.0 07/20/2016 13:13 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 11:52 JJMACKE 1 EPA 200.7 07/22/2016 12:05 JJMACKE 1 EPA 200.7 07/22/2016 12:05 JJMACKE 1 EPA 200.7 07/22/2016 12:05 JJMACKE 1 EPA 200.7 07/22/2016 12:05 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE 1 EPA 200.7 07/21/2016 13:18 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-2SW Collection Date: 18 -Jul -16 4:55 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.75 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.32 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.6 ug/L 1 Nickel (Ni) 1.42 ug/L 1 Selenium (Se) 1.71 ug/L 1 Thallium (TI) Low Level 0.224 ug/L 0.2 Vanadium (V) Low Level 6.14 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.15 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.64 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.4 ug/L 1 Nickel (Ni) 1.73 ug/L 1 Selenium (Se) 1.81 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 6.77 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 180 mg/L 25 Total Carbon TOC 6.3 mg/L 0.5 Sample #: 2016022317 Matrix: GW WW Analytical lab Page 17 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 07/29/2016 23:34 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA 1 EPA 200.8 08/01/2016 12:36 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 18 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: EF-2SW Sample #: 2016022317 Collection Date: 18 -Jul -16 4:55 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-2DW Collection Date: 18 -Jul -16 4:45 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 11:56 JJMACKE Chloride 21 mg/L B2 1 Sulfate 31 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 12:09 Vendor Parameter Complete 07/21/2016 13:22 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 13:22 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.016 mg/L 0.005 Barium (Ba) 0.094 mg/L 0.005 Boron (B) 0.724 mg/L 0.05 Iron (Fe) 3.14 mg/L 0.01 Manganese (Mn) 2.37 mg/L 0.005 Strontium (Sr) 0.269 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 24.9 mg/L 0.01 Magnesium (Mg) 7.57 mg/L 0.005 Potassium (K) 4.57 mg/L 0.1 Sodium (Na) 8.29 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 1.42 mg/L 0.005 Barium (Ba) 0.107 mg/L 0.005 Boron (B) 0.731 mg/L 0.05 Iron (Fe) 6.08 mg/L 0.01 Manganese (Mn) 2.44 mg/L 0.005 Strontium (Sr) 0.277 mg/L 0.005 Zinc (Zn) 0.008 mg/L 0.005 Sample #: 2016022318 Matrix: GW WW Analytical lab Page 19 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:31 LSTARL1 10 EPA 300.0 07/20/2016 13:30 BGN9034 10 EPA 300.0 07/20/2016 13:30 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 11:56 JJMACKE 1 EPA 200.7 07/22/2016 12:09 JJMACKE 1 EPA 200.7 07/22/2016 12:09 JJMACKE 1 EPA 200.7 07/22/2016 12:09 JJMACKE 1 EPA 200.7 07/22/2016 12:09 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE 1 EPA 200.7 07/21/2016 13:22 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-2DW Collection Date: 18 -Jul -16 4:45 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 40.1 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) 2.78 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 44.2 ug/L 1 Nickel (Ni) 2.71 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 4.96 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 54.3 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) 1.78 ug/L 1 Cobalt (Co) 3.68 ug/L 1 Copper (Cu) 2.09 ug/L 1 Lead (Pb) 1.21 ug/L 1 Molybdenum (Mo) 52.4 ug/L 1 Nickel (Ni) 3.97 ug/L 1 Selenium (Se) 1.50 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 12.6 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 180 mg/L 25 Total Carbon TOC 7.2 mg/L 0.5 Sample #: 2016022318 Matrix: GW WW Analytical lab Page 20 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 23:41 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA 1 EPA 200.8 07/29/2016 15:25 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 21 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: EF-21DW Sample #: 2016022318 Collection Date: 18 -Jul -16 4:45 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 48 mg/L 17 1 SM2540D 07/20/201611:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-4SW Collection Date: 18 -Jul -16 4:20 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) 0.012 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 12:24 JJMACKE Chloride 21 mg/L B2 1 Sulfate 38 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 12:35 Vendor Parameter Complete 07/21/2016 13:26 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 13:26 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.014 mg/L 0.005 Barium (Ba) 0.053 mg/L 0.005 Boron (B) 0.722 mg/L 0.05 Iron (Fe) < 0.01 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.239 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 22.9 mg/L 0.01 Magnesium (Mg) 7.58 mg/L 0.005 Potassium (K) 4.55 mg/L 0.1 Sodium (Na) 8.12 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.153 mg/L 0.005 Barium (Ba) 0.055 mg/L 0.005 Boron (B) 0.701 mg/L 0.05 Iron (Fe) 0.181 mg/L 0.01 Manganese (Mn) 0.050 mg/L 0.005 Strontium (Sr) 0.234 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022319 Matrix: GW WW Analytical lab Page 22 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:32 LSTARL1 10 EPA 300.0 07/20/2016 13:48 BGN9034 10 EPA 300.0 07/20/2016 13:48 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:24 JJMACKE 1 EPA 200.7 07/22/2016 12:35 JJMACKE 1 EPA 200.7 07/22/2016 12:35 JJMACKE 1 EPA 200.7 07/22/2016 12:35 JJMACKE 1 EPA 200.7 07/22/2016 12:35 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE 1 EPA 200.7 07/21/2016 13:26 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-4SW Collection Date: 18 -Jul -16 4:20 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 5.43 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.14 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 47.2 ug/L 1 Nickel (Ni) 1.23 ug/L 1 Selenium (Se) 1.63 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 4.72 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.24 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.44 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 48.7 ug/L 1 Nickel (Ni) 1.59 ug/L 1 Selenium (Se) 1.76 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 5.82 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 160 mg/L 25 Total Carbon TOC 6.3 mg/L 0.5 Sample #: 2016022319 Matrix: GW WW Analytical lab Page 23 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 23:47 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA 1 EPA 200.8 07/29/2016 15:32 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 24 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: EF-4SW Sample #: 2016022319 Collection Date: 18 -Jul -16 4:20 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-4DW Collection Date: 18 -Jul -16 4:10 PM Analyte Result Units Qualifiers RDL ALKALINITY - (Analysis Performed bV Pace Laboratories) JJMACKE Vendor Parameter Complete JJMACKE 1 EPA 200.7 NITRITE + NITRATE (COLORIMETRIC) JJMACKE 1 EPA 200.7 Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L 0.01 INORGANIC IONS BY IC 1 EPA 200.7 07/22/2016 12:28 JJMACKE Chloride 20 mg/L B2 1 Sulfate 36 mg/L 1 MERCURY IN WATER - (Analysis Performed by Pace Laboratories) 07/22/2016 12:39 Vendor Parameter Complete 07/21/2016 13:37 JJMACKE DISSOLVED METALS BY ICP 07/21/2016 13:37 JJMACKE 1 EPA 200.7 Aluminum (AI) 0.008 mg/L 0.005 Barium (Ba) 0.050 mg/L 0.005 Boron (B) 0.680 mg/L 0.05 Iron (Fe) 0.013 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.231 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP Calcium (Ca) 22.1 mg/L 0.01 Magnesium (Mg) 7.33 mg/L 0.005 Potassium (K) 4.46 mg/L 0.1 Sodium (Na) 7.89 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (AI) 0.333 mg/L 0.005 Barium (Ba) 0.064 mg/L 0.005 Boron (B) 0.696 mg/L 0.05 Iron (Fe) 0.444 mg/L 0.01 Manganese (Mn) 0.105 mg/L 0.005 Strontium (Sr) 0.236 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022320 Matrix: GW WW Analytical lab Page 25 of 70 DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:38 LSTARL1 10 EPA 300.0 07/20/2016 14:06 BGN9034 10 EPA 300.0 07/20/2016 14:06 BGN9034 Vendor Method V_PACE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:28 JJMACKE 1 EPA 200.7 07/22/2016 12:39 JJMACKE 1 EPA 200.7 07/22/2016 12:39 JJMACKE 1 EPA 200.7 07/22/2016 12:39 JJMACKE 1 EPA 200.7 07/22/2016 12:39 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE 1 EPA 200.7 07/21/2016 13:37 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Site: EF-4DW Collection Date: 18 -Jul -16 4:10 PM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) EPA 200.8 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 5.44 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 47.4 ug/L 1 Nickel (Ni) 1.35 ug/L 1 Selenium (Se) 1.51 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 4.06 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS JAHERMA 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.10 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.50 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 47.3 ug/L 1 Nickel (Ni) 1.77 ug/L 1 Selenium (Se) 1.80 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 5.98 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 160 mg/L 25 Total Carbon TOC 6.6 mg/L 0.5 Sample #: 2016022320 Matrix: GW WW Analytical lab Page 26 of 70 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 23:54 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA 1 EPA 200.8 07/29/2016 15:39 JAHERMA Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/21/201614:03 PARMSTR 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Analytical lab Certificate of Laboratory Analysis Page 27 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: EF-41DW Sample #: 2016022320 Collection Date: 18 -Jul -16 4:10 PM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 11 mg/L 5 1 SM2540D 07/20/201611:25 PARMSTR Analytical lab Certificate of Laboratory Analysis Page 28 of 70 This report shall not be reproduced, except in full. Order # J16070479 Site: Filter Blank Collection Date: 18 -Jul -16 5:30 PM Analyte Result Units Qualifiers RDL DF DISSOLVED METALS BY ICP Aluminum (AI) < 0.005 mg/L Barium (Ba) < 0.005 mg/L Boron (B) < 0.05 mg/L Iron (Fe) < 0.01 mg/L Manganese (Mn) < 0.005 mg/L Strontium (Sr) < 0.005 mg/L Zinc (Zn) < 0.005 mg/L TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L Arsenic (As) < 1 ug/L Beryllium (Be) < 1 ug/L Cadmium (Cd) < 1 ug/L Chromium (Cr) < 1 ug/L Cobalt (Co) < 1 ug/L Copper (Cu) < 1 ug/L Lead (Pb) < 1 ug/L Molybdenum (Mo) < 1 ug/L Nickel (Ni) < 1 ug/L Selenium (Se) < 1 ug/L Thallium (TI) Low Level < 0.2 ug/L Vanadium (V) Low Level < 0.3 ug/L Sample #: 2016022321 Matrix: GW WW Method Analysis Date/Time Analyst 0.005 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.005 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.05 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.01 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.005 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.005 1 EPA 200.7 07/22/2016 12:32 JJMACKE 0.005 1 EPA 200.7 07/22/2016 12:32 JJMACKE 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 1 1 EPA 200.8 07/30/2016 00:01 JAHERMA 0.2 1 EPA 200.8 07/30/2016 00:01 JAHERMA 0.3 1 EPA 200.8 07/30/2016 00:01 JAHERMA Site: FIELD BLANK Collection Date: 18 -Jul -16 5:30 PM Analytical lab Certificate of Laboratory Analysis Page 29 of 70 This report shall not be reproduced, except in full. Order # J16070479 Sample #: 2016022322 Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst MERCURY IN WATER - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete Vendor Method V_PACE Qualifiers: B2 Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. Analytical lab Certificate of Laboratory Analysis Page 30 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary 016070554 C NO2NO3 NITRITE + NITRATE (COLORIMETRIC) Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate -0.0022 -0.0022 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) 110 (Colorimetric) Blank # 2 LCS # 3 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate 0 0 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) mg-N/L 10 3.01 93.9 90 110 (Colorimetric) Blank # 3 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate -0.0003 -0.0003 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) UCL Qualifier Nitrite + Nitrate 1.2 1.2 mg-N/L 1 LCS #I Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.295 2.95 mg-N/L 10 3.01 98 90 110 (Colorimetric) LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.287 2.87 mg-N/L 10 3.01 95.3 90 110 (Colorimetric) LCS # 3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.283 2.83 mg-N/L 10 3.01 93.9 90 110 (Colorimetric) MS #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 1.2 1.2 mg-N/L 1 0.25 99.8 90 110 (Colorimetric) MSD #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Nitrite + Nitrate 1.2 1.2 mg-N/L 1 0.25 99.7 90 110 0.0802 (Colorimetric) MS #2 Parent Sample: J16070479 -- 2016022320 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.23 0.23 mg-N/L 1 0.25 90.6 90 110 (Colorimetric) MSD #2 Parent Sample: J16070479 -- 2016022320 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Nitrite + Nitrate 0.231 0.231 mg-N/L 1 0.25 91.2 90 110 0.704 (Colorimetric) Analytical lab Certificate of Laboratory Analysis Page 31 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070482 Dionex INORGANIC IONS BY IC Blank # 1 Parameter Measured Final Chloride 0.0673 0.0673 Sulfate 0.0082 0.0082 ISD # 1 IS #2 I W 11M.3 PA LCS # 1 Parameter Measured Final Chloride 7.18 7.18 Sulfate 8.86 8.86 Parameter Measured Final Chloride 7.22 7.22 Sulfate 8.9 8.9 Parameter Measured Final Chloride 5.89 5.89 Sulfate 9.04 9.04 Parameter Measured Final Chloride 5.9 5.9 Sulfate 9.04 9.04 Parameter Measured Final Chloride 4.85 4.85 Sulfate 4.84 4.84 Units: Dil RDL Relative Concentration Qualifier mg/L 1 0.1 > 1/2 RDL mg/L 1 0.1 < 1/2 RDL Units: Dil Spike % Recovery LCL UCL Qualifier mg/L 1 5 96.2 80 120 mg/L 1 5 95.4 80 120 Units: Dil Spike % Recovery LCL UCL RPD Qualifier mg/L 1 5 97 80 120 0.764 mg/L 1 5 96.2 80 120 0.85 Units: Dil Spike % Recovery LCL UCL Qualifier mg/L 1 5 101 80 120 mg/L 1 5 100 80 120 Units: Dil Spike % Recovery LCL UCL RPD Qualifier mg/L 1 5 101 80 120 0.208 mg/L 1 5 100 80 120 0.0957 Units: Dil Spike % Recovery LCL UCL Qualifier mg/L 1 5 97 80 120 mg/L 1 5 96.8 80 120 Analytical lab Certificate of Laboratory Analysis Page 32 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070580 ICP Dissolved DISSOLVED METALS BY ICP Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Aluminum (AI) 0.000071 0.000071 mg/L 1 0.005 < 1/2 RDL Barium (Ba) 0.000037 0.000037 mg/L 1 0.005 < 1/2 RDL Boron (B) 0.00235 0.00235 mg/L 1 0.05 < 1/2 RDL Iron (Fe) -0.000461 -0.000461 mg/L 1 0.01 < 1/2 RDL Manganese (Mn) 0.000182 0.000182 mg/L 1 0.005 < 1/2 RDL Strontium (Sr) 0.000071 0.000071 mg/L 1 0.005 < 1/2 RDL Zinc (Zn) -0.000736 -0.000736 mg/L 1 0.005 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Aluminum (AI) 2.05 2.05 mg/L Barium (Ba) 0.999 0.999 mg/L Boron (B) 1.99 1.99 mg/L Iron (Fe) 2.06 2.06 mg/L Manganese (Mn) 0.989 0.989 mg/L Strontium (Sr) 1.92 1.92 mg/L Zinc (Zn) 1.03 1.03 mg/L MS #1 115 1 Parameter Measured Final Units: Aluminum (AI) 5.68 5.68 mg/L Barium (Ba) 5.57 5.57 mg/L Boron (B) 6 6 mg/L Iron (Fe) 5.32 5.32 mg/L Manganese (Mn) 5.62 5.62 mg/L Strontium (Sr) 5.5 5.5 mg/L Zinc (Zn) 5.48 5.48 mg/L MSD #1 Parameter Measured Final Units: Aluminum (AI) 5.72 5.72 mg/L Barium (Ba) 5.58 5.58 mg/L Boron (B) 6.02 6.02 mg/L Iron (Fe) 5.33 5.33 mg/L Manganese (Mn) 5.64 5.64 mg/L Strontium (Sr) 5.47 5.47 mg/L Zinc (Zn) 5.5 5.5 mg/L MS #2 115 1 Parameter Measured Final Units: Aluminum (AI) 5.66 5.66 mg/L Dil Spike % Recovery LCL UCL Qualifier 1 2 103 85 115 1 1 99.9 85 115 1 2 99.7 85 115 1 2 103 85 115 1 1 98.9 85 115 1 2 96 85 115 1 1 103 85 115 Parent Sample: 716070479 -- 2016022306 Dil Spike % Recovery LCL UCL Qualifier 1 5 113 70 130 1 5 110 70 130 1 5 104 70 130 1 5 106 70 130 1 5 112 70 130 1 5 105 70 130 1 5 110 70 130 Parent Sample: 716070479 -- 2016022306 Dil Spike % Recovery LCL UCL RPD Qualifier 1 5 114 70 130 0.616 1 5 111 70 130 0.217 1 5 105 70 130 0.402 1 5 107 70 130 0.339 1 5 113 70 130 0.338 1 5 104 70 130 0.478 1 5 110 70 130 0.273 Parent Sample: 716070489 -- 2016022368 Dil Spike % Recovery LCL UCL Qualifier 1 5 113 70 130 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070580 ICP Dissolved DISSOLVED METALS BY ICP MS #2 Measured Final Units: Dil Spike Parameter Measured Final Units: Dil Spike Barium (Ba) 5.48 5.48 mg/L 1 5 Boron (B) 5.97 5.97 mg/L 1 5 Iron (Fe) 5.22 5.22 mg/L 1 5 Manganese (Mn) 5.54 5.54 mg/L 1 5 Strontium (Sr) 5.41 5.41 mg/L 1 5 Zinc (Zn) 5.46 5.46 mg/L 1 5 MSD # 2 Parameter Measured Final Units: Dil Spike Aluminum (AI) 5.72 5.72 mg/L 1 5 Barium (Ba) 5.54 5.54 mg/L 1 5 Boron (B) 6.05 6.05 mg/L 1 5 Iron (Fe) 5.31 5.31 mg/L 1 5 Manganese (Mn) 5.63 5.63 mg/L 1 5 Strontium (Sr) 5.45 5.45 mg/L 1 5 Zinc (Zn) 5.54 5.54 mg/L 1 5 Analytical lab Page 33 of 70 Parent Sample: J16070489 -- 2016022368 % Recovery LCL UCL Qualifier 108 70 130 103 70 130 104 70 130 111 70 130 103 70 130 109 70 130 Parent Sample: J16070489 -- 2016022368 % Recovery LCL UCL RPD Qualifier 114 70 130 1.08 110 70 130 1.14 105 70 130 1.5 106 70 130 1.77 113 70 130 1.63 104 70 130 0.794 111 70 130 1.46 Analytical lab Certificate of Laboratory Analysis Page 34 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070582 ICP Undigested UNDIGESTED METALS BY ICP Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Calcium (Ca) 0.00123 0.00123 mg/L 1 0.01 < 1/2 RDL Magnesium (Mg) -0.000203 -0.000203 mg/L 1 0.005 < 1/2 RDL Potassium (K) 0.0077 0.0077 mg/L 1 0.1 < 1/2 RDL Sodium (Na) 0.0035 0.0035 mg/L 1 0.05 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 1.99 1.99 mg/L 1 2 99.7 85 115 Magnesium (Mg) 2.03 2.03 mg/L 1 2 102 85 115 Potassium (K) 3.9 3.9 mg/L 1 4 97.5 85 115 Sodium (Na) 8.12 8.12 mg/L 1 8.1 100 85 115 MS #1 Parent Sample: J16070479 -- 2016022306 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 29.8 29.8 mg/L 1 5 93.9 70 130 Magnesium (Mg) 13.2 13.2 mg/L 1 5 97.1 70 130 Potassium (K) 10.1 10.1 mg/L 1 5 106 70 130 Sodium (Na) 13.6 13.6 mg/L 1 5 101 70 130 MSD #1 Parent Sample: J16070479 -- 2016022306 Parameter Measured Final Units: Dil Spike % Recover v LCL UCL RPD Qualifier Calcium (Ca) 29.9 29.9 mg/L 1 5 94.8 70 130 0.954 Magnesium (Mg) 13.2 13.2 mg/L 1 5 97.4 70 130 0.329 Potassium (K) 10.1 10.1 mg/L 1 5 105 70 130 0.891 Sodium (Na) 13.5 13.5 mg/L 1 5 99.6 70 130 1.26 MS #2 Parent Sample: J16070489 -- 2016022369 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 30.4 30.4 mg/L 1 5 101 70 130 Magnesium (Mg) 13.3 13.3 mg/L 1 5 103 70 130 Potassium (K) 10.2 10.2 mg/L 1 5 114 70 130 Sodium (Na) 13.3 13.3 mg/L 1 5 104 70 130 MSD # 2 Parent Sample: J16070489 -- 2016022369 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Calcium (Ca) 29.7 29.7 mg/L 1 5 86.1 70 130 15.5 Magnesium (Mg) 13 13 mg/L 1 5 96.8 70 130 5.86 Potassium (K) 9.96 9.96 mg/L 1 5 108 70 130 4.87 Sodium (Na) 13 13 mg/L 1 5 97.2 70 130 6.57 Analytical lab Certificate of Laboratory Analysis Page 35 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070484 1CP_TRM TOTAL RECOVERABLE METALS BY ICP Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Aluminum (AI) 0.000785 0.000785 mg/L 1 0.005 < 1/2 RDL Barium (Ba) 0.000284 0.000284 mg/L 1 0.005 < 1/2 RDL Boron (B) 0.00198 0.00198 mg/L 1 0.05 < 1/2 RDL Iron (Fe) -0.000577 -0.000577 mg/L 1 0.01 < 1/2 RDL Manganese (Mn) -0.000024 -0.000024 mg/L 1 0.005 < 1/2 RDL Strontium (Sr) 0.000116 0.000116 mg/L 1 0.005 < 1/2 RDL Zinc (Zn) -0.000372 -0.000372 mg/L 1 0.005 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Aluminum (AI) 5.19 5.19 mg/L 1 5 104 85 115 Barium (Ba) 5.02 5.02 mg/L 1 5 100 85 115 Boron (B) 4.9 4.9 mg/L 1 5 97.9 85 115 Iron (Fe) 4.96 4.96 mg/L 1 5 99.3 85 115 Manganese (Mn) 5.16 5.16 mg/L 1 5 103 85 115 Strontium (Sr) 4.87 4.87 mg/L 1 5 97.4 85 115 Zinc (Zn) 5.01 5.01 mg/L 1 5 100 85 115 MS #1 Parent Sample: 716070079 -- 2016020135 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Aluminum (AI) 5.46 5.46 mg/L 1 5 105 70 130 Barium (Ba) 4.99 4.99 mg/L 1 5 99.1 70 130 Boron (B) 4.89 4.89 mg/L 1 5 97.6 70 130 Iron (Fe) 5.18 5.18 mg/L 1 5 96.7 70 130 Manganese (Mn) 5.1 5.1 mg/L 1 5 101 70 130 Strontium (Sr) 4.84 4.84 mg/L 1 5 96.7 70 130 Zinc (Zn) 4.92 4.92 mg/L 1 5 98.3 70 130 MSD #1 Parent Sample: 716070079 -- 2016020135 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Aluminum (AI) 5.37 5.37 mg/L 1 5 104 70 130 1.64 Barium (Ba) 4.93 4.93 mg/L 1 5 98 70 130 1.12 Boron (B) 4.89 4.89 mg/L 1 5 97.5 70 130 0.082 Iron (Fe) 5.1 5.1 mg/L 1 5 95.1 70 130 1.63 Manganese (Mn) 5.02 5.02 mg/L 1 5 99.5 70 130 1.64 Strontium (Sr) 4.87 4.87 mg/L 1 5 97.3 70 130 0.618 Zinc (Zn) 4.83 4.83 mg/L 1 5 96.3 70 130 1.99 Analytical lab Certificate of Laboratory Analysis Page 36 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070605 IMS_DIS_TRM TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Antimony (Sb) -0.042 -0.042 ug/L 1 1 < 1/2 RDL Arsenic (As) 0.006 0.006 ug/L 1 1 < 1/2 RDL Beryllium (Be) 0.021 0.021 ug/L 1 1 < 1/2 RDL Cadmium (Cd) -0.001 -0.001 ug/L 1 1 < 1/2 RDL Chromium (Cr) -0.068 -0.068 ug/L 1 1 < 1/2 RDL Cobalt (Co) 0.001 0.001 ug/L 1 1 < 1/2 RDL Copper (Cu) -0.046 -0.046 ug/L 1 1 < 1/2 RDL Lead (Pb) 0.002 0.002 ug/L 1 1 < 1/2 RDL Molybdenum (Mo) 0.002 0.002 ug/L 1 1 < 1/2 RDL Nickel (Ni) 0.018 0.018 ug/L 1 1 < 1/2 RDL Selenium (Se) -0.003 -0.003 ug/L 1 1 < 1/2 RDL Thallium (TI) Low Level 0.02 0.02 ug/L 1 0.2 < 1/2 RDL Vanadium (V) Low Level -0.028 -0.028 ug/L 1 0.3 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recover v LCL UCL Qualifier Antimony (Sb) 53.4 53.4 ug/L 1 50 107 85 115 Arsenic (As) 50 50 ug/L 1 50 100 85 115 Beryllium (Be) 51.7 51.7 ug/L 1 50 103 85 115 Cadmium (Cd) 49.5 49.5 ug/L 1 50 99 85 115 Chromium (Cr) 48.6 48.6 ug/L 1 50 97.3 85 115 Cobalt (Co) 48.9 48.9 ug/L 1 50 97.8 85 115 Copper (Cu) 48.4 48.4 ug/L 1 50 96.9 85 115 Lead (Pb) 48.3 48.3 ug/L 1 50 96.5 85 115 Molybdenum (Mo) 49.3 49.3 ug/L 1 50 98.5 85 115 Nickel (Ni) 49.3 49.3 ug/L 1 50 98.6 85 115 Selenium (Se) 46.6 46.6 ug/L 1 50 93.2 85 115 Thallium (TI) Low Level 49.2 49.2 ug/L 1 50 98.5 85 115 MS #1 Parent Samples J16070479 -- 2016022314 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 54.8 54.8 ug/L 1 50 109 70 130 Arsenic (As) 82.7 82.7 ug/L 1 50 101 70 130 Beryllium (Be) 53.6 53.6 ug/L 1 50 107 70 130 Cadmium (Cd) 49.7 49.7 ug/L 1 50 99.3 70 130 Chromium (Cr) 49.1 49.1 ug/L 1 50 97.7 70 130 Cobalt (Co) 50.4 50.4 ug/L 1 50 96.8 70 130 Copper (Cu) 47.7 47.7 ug/L 1 50 95.2 70 130 Lead (Pb) 48.9 48.9 ug/L 1 50 97.7 70 130 Molybdenum (Mo) 89.3 89.3 ug/L 1 50 100 70 130 Analytical lab Certificate of Laboratory Analysis Page 37 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070605 IMS_DIS_TRM TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) MS #1 Parent Sample: J16070479 -- 2016022314 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nickel (Ni) 50.3 50.3 ug/L 1 50 98.1 70 130 Selenium (Se) 48.9 48.9 ug/L 1 50 96.7 70 130 Thallium (TI) Low Level 49.1 49.1 ug/L 1 50 98.1 70 130 MSD #1 Parent Sample: J16070479 -- 2016022314 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Antimony (Sb) 54.7 54.7 ug/L 1 50 109 70 130 0.222 Arsenic (As) 82.3 82.3 ug/L 1 50 100 70 130 0.701 Beryllium (Be) 56.7 56.7 ug/L 1 50 113 70 130 5.55 Cadmium (Cd) 49.6 49.6 ug/L 1 50 99.3 70 130 0.0745 Chromium (Cr) 49.3 49.3 ug/L 1 50 98.2 70 130 0.453 Cobalt (Co) 50.4 50.4 ug/L 1 50 96.8 70 130 0.0269 Copper (Cu) 48.1 48.1 ug/L 1 50 95.8 70 130 0.664 Lead (Pb) 49.2 49.2 ug/L 1 50 98.3 70 130 0.604 Molybdenum (Mo) 88 88 ug/L 1 50 97.5 70 130 2.77 Nickel (Ni) 50.1 50.1 ug/L 1 50 97.7 70 130 0.484 Selenium (Se) 49.7 49.7 ug/L 1 50 98.3 70 130 1.73 Thallium (TI) Low Level 48.2 48.2 ug/L 1 50 96.4 70 130 1.76 Analytical lab Certificate of Laboratory Analysis Page 38 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070487 IMS_TRM TOTAL RECOVERABLE METALS BY ICP -MS Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Antimony (Sb) 0.024 0.024 ug/L 1 1 < 1/2 RDL Arsenic (As) 0.008 0.008 ug/L 1 1 < 1/2 RDL Beryllium (Be) -0.002 -0.002 ug/L 1 1 < 1/2 RDL Cadmium (Cd) 0.004 0.004 ug/L 1 1 < 1/2 RDL Chromium (Cr) -0.005 -0.005 ug/L 1 1 < 1/2 RDL Cobalt (Co) 0.003 0.003 ug/L 1 1 < 1/2 RDL Copper(Cu) -0.044 -0.044 ug/L 1 1 < 1/2 RDL Lead (Pb) 0.006 0.006 ug/L 1 1 < 1/2 RDL Molybdenum (Mo) 0.003 0.003 ug/L 1 1 < 1/2 RDL Nickel (Ni) 0.012 0.012 ug/L 1 1 < 1/2 RDL Selenium (Se) 0.013 0.013 ug/L 1 1 < 1/2 RDL Thallium (TI) Low Level 0.031 0.031 ug/L 1 0.2 < 1/2 RDL Vanadium (V) Low Level 0.008 0.008 ug/L 1 0.3 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recover v LCL UCL Qualifier Antimony (Sb) 53.3 53.3 ug/L 1 50 107 85 115 Arsenic (As) 50.1 50.1 ug/L 1 50 100 85 115 Beryllium (Be) 47.3 47.3 ug/L 1 50 94.7 85 115 Cadmium (Cd) 49.9 49.9 ug/L 1 50 99.8 85 115 Chromium (Cr) 48.6 48.6 ug/L 1 50 97.3 85 115 Cobalt (Co) 49.6 49.6 ug/L 1 50 99.3 85 115 Copper(Cu) 49 49 ug/L 1 50 98 85 115 Lead (Pb) 49.9 49.9 ug/L 1 50 99.8 85 115 Molybdenum (Mo) 49.5 49.5 ug/L 1 50 99 85 115 Nickel (Ni) 49.7 49.7 ug/L 1 50 99.4 85 115 Selenium (Se) 49.6 49.6 ug/L 1 50 99.2 85 115 Thallium (TI) Low Level 46.7 46.7 ug/L 1 50 93.3 85 115 Vanadium (V) Low Level 48.7 48.7 ug/L 1 50 97.4 85 115 MS #1 Parent Sample: 716070079 -- 2016020145 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 53.1 53.1 ug/L 1 50 106 70 130 Arsenic (As) 50 50 ug/L 1 50 99.6 70 130 Beryllium (Be) 48.9 48.9 ug/L 1 50 97.6 70 130 Cadmium (Cd) 50.2 50.2 ug/L 1 50 100 70 130 Chromium (Cr) 49.8 49.8 ug/L 1 50 99.1 70 130 Cobalt (Co) 51.9 51.9 ug/L 1 50 99.1 70 130 Copper(Cu) 50.6 50.6 ug/L 1 50 98.5 70 130 Lead (Pb) 50.2 50.2 ug/L 1 50 100 70 130 Level II QC Summary Q16070487 IMS_TRM Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070479 TOTAL RECOVERABLE METALS BY ICP -MS MS #1 Measured Final Units: Dil Spike Parameter Measured Final Units: Dil Spike Molybdenum (Mo) 49.1 49.1 ug/L 1 50 Nickel (Ni) 51.9 51.9 ug/L 1 50 Selenium (Se) 49.4 49.4 ug/L 1 50 Thallium (TI) Low Level 47.5 47.5 ug/L 1 50 Vanadium (V) Low Level 50.1 50.1 ug/L 1 50 MSD #1 Parameter Measured Final Units: Dil Spike Antimony (Sb) 53.6 53.6 ug/L 1 50 Arsenic (As) 50.3 50.3 ug/L 1 50 Beryllium (Be) 48.4 48.4 ug/L 1 50 Cadmium (Cd) 50.3 50.3 ug/L 1 50 Chromium (Cr) 49.9 49.9 ug/L 1 50 Cobalt (Co) 52.1 52.1 ug/L 1 50 Copper(Cu) 50.8 50.8 ug/L 1 50 Lead (Pb) 50.5 50.5 ug/L 1 50 Molybdenum (Mo) 49.4 49.4 ug/L 1 50 Nickel (Ni) 51.8 51.8 ug/L 1 50 Selenium (Se) 49.4 49.4 ug/L 1 50 Thallium (TI) Low Level 47.7 47.7 ug/L 1 50 Vanadium (V) Low Level 49.9 49.9 ug/L 1 50 Analytical lab Page 39 of 70 Parent Sample: 716070079 -- 2016020145 % Recovery LCL UCL Qualifier 98.1 70 130 101 70 130 98.8 70 130 94.8 70 130 99.4 70 130 Parent Sample: 716070079 -- 2016020145 % Recovery LCL UCL RPD Qualifier 107 70 130 0.997 100 70 130 0.764 96.7 70 130 0.98 101 70 130 0.205 99.2 70 130 0.115 99.6 70 130 0.499 98.8 70 130 0.29 101 70 130 0.497 98.8 70 130 0.715 101 70 130 0.127 98.7 70 130 0.0466 95.2 70 130 0.455 98.9 70 130 0.442 Analytical lab Certificate of Laboratory Analysis Page 40 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070529 TDS TOTAL DISSOLVED SOLIDS Blank # 1 Parameter Measured TDS Duplicate # 1 Parameter Measured TDS Duplicate # 2 Parameter Measured TDS LCS # 1 Parameter Measured TDS Final Units: Dil RDL Relative Concentration Qualifier 0 mg/L 1 25 < 1/2 RDL Parent Sample: J16070448 -- 2016022212 Final Units: Dil RPD Qualifier 324 mg/L 1 1.56 Parent Sample: 716070448 -- 2016022213 Final Units: Dil RPD Qualifier 92 mg/L 1 5.29 Final Units: Dil Spike % Recovery LCL UCL Qualifier 100 mg/L 1 100 100 90 110 Analytical lab Certificate of Laboratory Analysis Page 41 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070522 Total Carbon Total Carbon Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TOC 0.022 mg/L 1 0.1 < 1/2 RDL Blank # 2 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TOC 0.054 mg/L 1 0.1 > 1/2 RDL IS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 3.22 mg/L 1 2 108 80 120 ISD # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 3.08 mg/L 1 2 101 80 120 6.53 IS #2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 2.43 mg/L 1 2 104 80 120 ISD # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 2.49 mg/L 1 2 107 80 120 2.84 IS #3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 6.05 mg/L 1 2 95 80 120 ISD # 3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 5.99 mg/L 1 2 91.8 80 120 3.43 LCS # 1 Parameter Measured Final Units: Dil Spike % Recover v LCL UCL Qualifier TOC 2.92 mg/L 1 2.87 102 85 115 LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 3 mg/L 1 2.87 105 85 115 Analytical lab Certificate of Laboratory Analysis Page 42 of 70 This report shall not be reproduced, except in full. Order # J16070479 Level II QC Summary Q16070478 TSS TOTAL SUSPENDED SOLIDS Blank # 1 Parameter Measured TSS Duplicate # 1 Parameter Measured TSS Duplicate # 2 Parameter Measured TSS LCS # 1 Parameter Measured TSS Final Units: Dil RDL Relative Concentration Qualifier 0 mg/L 1 5 < 1/2 RDL Parent Sample: J16070489 -- 2016022368 Final Units: Dil RPD Qualifier 3 mg/L 1 0 Parent Sample: J16070489 -- 2016022370 Final Units: Dil RPD Qualifier 3.2 mg/L 1 0 Final Units: Dil Spike % Recovery LCL UCL Qualifier 53.6 mg/L 1 50 107 90 110 Ar aceAnalytical R Sample Condition Upon Receipt(SCU Document No.: F-CHR-CS-003-rev.19 ample■ Client Name: Receipt Project #: Courier: ❑Fed Ex ❑UPS ❑USPS ❑Client ❑ Commercial ❑Pace ❑Other: Document rsevisea:Hpf l 25, 2U10 nalytical lab Page 1 of Issuing AuthaFiq. -- - - Pace Huntersville Quality Office Paee Z of 2 for Internal Use ONLY W0#:92305787 1111111111111111111111 92303787 Custody Seal Present? []Yes ❑NO Seals Intact? ❑Yes ONO Date/Initials Person Examining Contents>, Packing Material: ❑Bubble Wrap [Bubble Bags ❑None ❑Other: Thermometer:T1505 Type of ice; ❑Wet ❑ [:]None None Samples on ice, cooling process has begun Correction Factor: 0.0°C Cooler Temp Corrected (°C): Biological Tissue Frozen? [-]Yes []No ❑N/A Temp should be above freezing to 6'C USDA Regulated Soil ( ❑ N/A, water sample) Did samples originate in a quarantine zone within the United States: CA, NY, or SC (check maps)? Did samples originate from a foreign source (internationally, ❑Yes ❑No indudinR Hawaii and Puerto Rico)? ❑Yes ❑No CLIENT NOTIFICATION/RESOLUTION Person Contacted: Comments/Sample Discrepancy: Date/Time: Field Data Required? Des ❑No Project Manager SCURF Review: + G�,> _ Date: Project Manager SRF Review: - Date: / 4! Note: Whenever there Is a discrepancy affecting North Carolina compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office (i.e. Out of hold, incorrect preservative, out of temp, incorrect containers) Page 26 of 27 Comments/Discrepancy: Chain of Custody Present? ❑Yes ❑No ❑N/A 1. Samples Arrived within Hold Time? ❑res ❑No ❑N/A Z. Short Hold Time Analysis (<72 hr.)? ❑Yes ❑No ❑N/A 3. Rush Turn Around Time Requested? ❑Yes ❑No []NIA 4. Sufficient Volume? ❑Yes ❑No [-]N/A 5. Correct Containers Used? []Yes ❑No ❑N/A 6. -Pace Containers Used? ❑yes [:]NO ❑N/A Containers Intact? ❑Yes ❑No ❑N/A 7. Samples Field Filtered? ❑Yes ❑No ❑N/A 8. Note if sediment is visible in the dissolved container Sample Labels Match COC? []Yes ❑No []N/A 9. -Includes Date/Time/ID/Analysis Matrix: All containers needing acid/base preservation have been 10. HN©pH<2 checked? All containers needing preservation are found to be in HtlpH`= compliance with EPA recommendation? H2504 pH<2 (HNO3, H2504, HCI<2; NaOH >9 Sulfide, NaOH>12 Cyanide) ❑Yes [:]No ❑N/A Exceptions: VOA, Coliform, TOC, Oil and Grease, N.OH pH112 DRO/8015 (water) DOC,LLHg []Yes ❑No ❑N/A NaOHJ2p0A6 pM Samples checked for dechlorination? ❑Yes ❑No ❑N/A 11. Headspace in VOA Vials (>5-6mm)? ❑Yes [:]No ❑N/A 12. Frip Blank Present? ❑Yes []No ❑N/A 13. rrip Blank Custody Seals Present? [-]Yes []No ON/A pace Trip Blank Lot # (if purchased): CLIENT NOTIFICATION/RESOLUTION Person Contacted: Comments/Sample Discrepancy: Date/Time: Field Data Required? Des ❑No Project Manager SCURF Review: + G�,> _ Date: Project Manager SRF Review: - Date: / 4! Note: Whenever there Is a discrepancy affecting North Carolina compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office (i.e. Out of hold, incorrect preservative, out of temp, incorrect containers) Page 26 of 27 Analytical lab Page 69 of 70 � +r ----'----'- ............ I f 0. o e N ax P I I l '� C $ 111 N ~^ 8e�r� i Ste, I �i Smm I a -moi -4 k � n - N N p 1 g 3 3° a rob \ � J � I m � ..I N'; m• CD 7; In ctmn a `� I I J�� � -.;1; 34�, * 3}+O 3 lb m I L7t�l ern �w • �i a'd' y y I c' �� 0 3 °! :c 3 0 W , D 'Z 3 C1 n o'Ip 'O O I _ IU q � '"�3 iI# :C • I� a 1r - , I _ 2 i h II fl V Z i .. ti 1I T_ C -a o ,'" 1'1 31 �- 1. J � 4 v �.� n S a 1 r� C i.� — f a s i� p n I a= P. i m s a 0— -4 n IO r•'8 tr+ I Z .�� ? iZ D jA TSS,TOS Methane (ASK n 1 I N III t✓ lnr LJ v� s l _i Nw � 1751 V- PACE u ]rn u i in �A,� — — — TOC, Nitrate- y ' �. I I't'Y Nitrite O m !m ` + I Alkalinity, ��� � i BicarE onete, c Ne pr Carbonate a I z i v PACE Sulfide CLs-tomer,lmpattant: please indicate _ �. tlaslrad tUrtl'.tfonnfi j I I _ m f ;am .t - _ N Hg 1831e V PACE 3 l A r I O m 1➢ n C n Metals {see o o m o;j 4 CL �' J below m { zl� Dissolved o o s h N metals r,m Z, m LTI REEo a o q o n o 0 0 � Talal A Container p pl c� J'oc W P' coq AE .11� vJ C7 Page 27 of 27 CHAIN OF CUSTODY RECORD AND ANALYSIS REQ------------------------ I EST FORM Analytical lab •-•-•-•-•------ -•---•-•....... -•-•------- --- - - - - - - - - •- - - -•-•- - - - - - - Page 70 of Ante rrd EDD Ana,vlicaI Uttontcry Vs, Dnly - - --- - - - - - - ---- ---- g E uuKe energy M.N CL40ow (E A" F�DM I e -order r IN,t,;x Gw W W Aaalydcal Laborabory „ur aw.+r.rryaa I I .)xk&' -Q�7 r Chain of Custody a „ f+e+liraaue2wra LeIgM da0.i Twr sampw t-oY I �"� I4 ISb --------------- _._-v._._._. F-�2i.i n-- - •-.-----.-•-•I _ �-+`.. '� AB GW Assessent RFACIE �• a mSU Clbltt rrer Mo: M-676403 Pace 11trsdon (0.46 urn) j8ush7Ew�ssUnft: T°� PO 1699536preservanve "'s'� 1° "a" Cod ' ....siner Volurne (ML) MG03AS " Container Type xhu� Sample Description or 1D P P cuarornrr ro rvmprHs •M.plwnpn.ra n shades ar.aa _ _ f[` GPS LocatlOTl Data Collectlon IntemuHea Iu moo PET N pmi VV1- F roc z— ---- — S`� SAMPLE PROGRAM wr— NPOEs ori, Wa4r� lJ9T D.6* , RCRAri..i. a unfi terad k. kr k* 40 ml 900 126 000 600 plass PET PET PET PET w ¢ a E }� al :z' �' o a W m 0 n i1 Q e3 71 L%1 dL J 40 mL Blast m ui n U Z 71 Page -1,_ ar _1- vI8TR16UTfCH ORIGINAL to LAB. COPY to CLIENT � e� 300 260 HOPE HOPE on y +R+ it r7 I r •La1r.OZL��^ yy ry^I r- �l•J /�f 6 �'S� x 1 2 1 1 t 1 2 l 1 11 3140 WE- _ 8. ked By Dat,%fim, k op■rrd By LT,OarTlm, E N 0 m W -- I SG� !D k 7 Cu, Mo, Ni, Pb, Sb, Se• TI (LL), V (LLl 1 I / 1 ! ! 0 31to F- Y 13Sa 1 2121 / / u a 0 r ya k l 1 I 1 ! ' I 0 0 I 0 0 1 rIIII 0 t O i � 0 Pular Blank 1 1 s jt? Fuld Blank � 1 i 0 I TOTAL 4 1 2 i t 1 1 4 0 tl 0 1 t 0 14 r-u.m mean:, r Rrllnqu DetelTinw /,q`� !_ asphd • � D,terllMe '] � �� � � u Requested Turnaround Re G. Aw p6ad Hy: 0 1330 E ,d Days !�✓LG►� 7 Days Rellnqul Ud,liaae Acu,ptsd -V �--.. E a ❑ _ 8. ked By Dat,%fim, k op■rrd By LT,OarTlm, E N m ELEMENTS by ICP_MS (TR M): As, Be, Cd, Co. Cr. Cu, Mo, Ni, Pb, Sb, Se• TI (LL), V (LLl EE ELEMENTS by ICP ITRMI: Al. Ba, B, Fe. Mn, Sr, 2n ICP Undigested Ca, Mg, K, Na Mg by 745-1 *Add Cost Will Apply Dissolved metals 1 all metals fCP. IMS.Hg 2121 Total 1141 Lab DUKE Analytical Laboratory Duke Energy APagei1aof577 ENERGY 13339 Hagers Ferry Road Huntersville, NC 28078-7929 McGuire Nuclear Complex - MG03A2 Phone: 980-875-5245 Fax: 980-875-4349 Order Summary Report Order Number: J16070489 Project Name: ROXBORO - AB GW ASSESSMENT SURFACE Customer Name(s): Brian Wilker, Tim Hunsucker, Fred Holt, Brandon Russo, Kathy Webb, John To Customer Address: Roxboro Steam Station 1700 Dunnaway Road Semora,NC 27343 Lab Contact: Anne Pridgeon Phone: 980-875-6610 Reason: I have reviewed �LL this document. Report Authorized By: //�'� �-y��- Date: 2016.08.05 Date: 8/5/2016 (Signature) !� 13:02:16-04'00' Anne Pridgeon Program Comments: Please contact the Program Manager (Anne Pridgeon) with any questions regarding this report. Data Flags & Calculations: Any analytical tests or individual analytes within a test flagged with a Qualifier indicate a deviation from the method quality system or quality control requirement. The qualifier description is found at the end of the Certificate of Analysis (sample results) under the qualifiers heading. All results are reported on a dry weight basis unless otherwise noted. Subcontracted data included on the Duke Certificate of Analysis is to be used as information only. Certified vendor results can be found in the subcontracted lab final report. Duke Energy Analytical Laboratory subcontracts analyses to other vendor laboratories that have been qualified by Duke Energy to perform these analyses except where noted. Data Package: This data package includes analytical results that are applicable only to the samples described in this narrative. An estimation of the uncertainty of measurement for the results in the report is available upon request. This report shall not be reproduced, except in full, without the written consent of the Analytical Laboratory. Please contact the Analytical laboratory with any questions. The order of individual sections within this report is as follows: Job Summary Report, Sample Identification, Technical Validation of Data Package, Analytical Laboratory Certificate of Analysis, Analytical Laboratory QC Reports, Sub -contracted Laboratory Results, Customer Specific Data Sheets, Reports & Documentation, Customer Database Entries, Test Case Narratives, Chain of Custody (COC) Certification: The Analytical Laboratory holds the following State Certifications : North Carolina (DENR) Certificate #248, South Carolina (DHEC) Laboratory ID # 99005. Contact the Analytical Laboratory for definitive information about the certification status of specific methods. Sample ID's & Descriptions: Collection Sample ID Plant/Station Date and Time Collected By 2016022368 2016022369 2016022370 2016022371 2016022372 2016022373 6 Total Samples Duke Energy Analytical Lab Page 2 of 57 Sample Description Roxboro 19 -Jul -16 9:45 AM Unknown CF-2SW Roxboro 19 -Jul -16 9:30 AM Unknown CF-2DW Roxboro 19 -Jul -16 9:05 AM Unknown CF-4SW Roxboro 19 -Jul -16 8:50 AM Unknown CF-4DW Roxboro 19 -Jul -16 8:18 AM Unknown FILTER BLK Roxboro 19 -Jul -16 10:30 AM Unknown FIELD BLANK Technical Validation Review Checklist: COC and .pdf report are in agreement with sample totals 0 Yes ❑ No and analyses (compliance programs and procedures). All Results are less than the laboratory reporting limits. ❑ Yes F./] No All laboratory QA/QC requirements are acceptable. 0 Yes ❑ No Report Sections Included: Job Summary Report Sample Identification Technical Validation of Data Package ❑ Analytical Laboratory Certificate of Analysis ❑ Analytical Laboratory QC Report Duke Energy Analytical Lab Page 3 of 57 d❑ Sub -contracted Laboratory Results ❑ Customer Specific Data Sheets, Reports, & Documentation ❑ Customer Database Entries ❑ Chain of Custody ❑ Electronic Data Deliverable (EDD) Sent Separatel Reviewed By: DBA Account Date: 8/2/2016 Certificate of LaboratoryAnalysis Duke EnergyAnalyti4 Lab y Page 4 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-2SW Collection Date: 19 -Jul -16 9:45 AM Analyte Result Units Qualifiers ALKALINITY - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete NITRITE + NITRATE (COLORIMETRIC) Nitrite + Nitrate (Colorimetric) 0.017 mg-N/L INORGANIC IONS BY IC Chloride 25 mg/L B2 Sulfate 43 mg/L MERCURY IN WATER - (Analysis Performed by Pace Laboratories) RDL 0.01 1 1 Vendor Parameter Complete 07/26/2016 13:12 DMFRANC MERCURY (COLD VAPOR) IN WATER 07/22/2016 12:36 JJMACKE Mercury (Hg) < 0.05 ug/L 0.05 Mercury Dissolved (cold vapor) in Water (Filtered) JJMACKE 1 EPA 200.7 Mercury (Hg) < 0.05 ug/L 0.05 DISSOLVED METALS BY ICP 1 EPA 200.7 07/22/2016 12:36 JJMACKE Aluminum (Al) 0.023 mg/L 0.005 Barium (Ba) 0.057 mg/L 0.005 Boron (B) 0.813 mg/L 0.05 Iron (Fe) 0.010 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.261 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP JJMACKE 1 EPA 200.7 07/23/2016 13:21 Calcium (Ca) 25.2 mg/L 0.01 Magnesium (Mg) 8.12 mg/L 0.005 Potassium (K) 4.51 mg/L 0.1 Sodium (Na) 8.07 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (Al) 0.126 mg/L 0.005 Barium (Ba) 0.058 mg/L 0.005 Boron (B) 0.800 mg/L 0.05 Iron (Fe) 0.128 mg/L 0.01 Manganese (Mn) 0.045 mg/L 0.005 Strontium (Sr) 0.257 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022368 Matrix: GW WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:42 LSTARLI 10 EPA 300.0 07/20/2016 18:17 BGN9034 10 EPA 300.0 07/20/2016 18:17 BGN9034 Vendor Method V_PACE 1 EPA 245.1 07/27/2016 14:47 DMFRANC 1 EPA 245.1 07/26/2016 13:12 DMFRANC 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:36 JJMACKE 1 EPA 200.7 07/22/2016 12:47 JJMACKE 1 EPA 200.7 07/22/2016 12:47 JJMACKE 1 EPA 200.7 07/22/2016 12:47 JJMACKE 1 EPA 200.7 07/22/2016 12:47 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE 1 EPA 200.7 07/23/2016 13:21 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Site: CF-2SW Collection Date: 19 -Jul -16 9:45 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.99 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.51 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 50.9 ug/L 1 Nickel (Ni) 1.66 ug/L 1 Selenium (Se) 1.90 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 6.80 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 07/27/2016 13:37 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.97 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.51 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 55.1 ug/L 1 Nickel (Ni) 1.85 ug/L 1 Selenium (Se) 1.82 ug/L 1 Thallium (TI) Low Level 0.258 ug/L 0.2 Vanadium (V) Low Level 8.07 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analvsis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 200 mg/L 25 Total Carbon TOC 6.3 mg/L 0.5 Duke Energy Analytical Lab Page 5 of 57 1 EPA 200.8 Sample #: 2016022368 1 EPA 200.8 07/21/2016 20:08 Matrix: GW WW 07/21/2016 20:08 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/27/2016 13:37 JAHERMA 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 1 EPA 200.8 07/21/2016 20:08 CWSPEN3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/22/201614:31 JASTOWE 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Site: CF-2SW Collection Date: 19 -Jul -16 9:45 AM Certificate of LaboratoryAnalysis Duke EnergyAnalyti6 Lab y Page 6 of 57 This report shall not be reproduced, except in full. Order # J16070489 Sample #: 2016022368 Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of LaboratoryAnalysis Duke EnergyAnalyti7 Lab y Page 7 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-2DW Collection Date: 19 -Jul -16 9:30 AM Analyte Result Units Qualifiers ALKALINITY - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete NITRITE + NITRATE (COLORIMETRIC) Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L INORGANIC IONS BY IC Chloride 21 mg/L B2 Sulfate 17 mg/L MERCURY IN WATER - (Analysis Performed by Pace Laboratories) RDL 0.01 1 1 Vendor Parameter Complete 07/26/2016 13:14 DMFRANC MERCURY (COLD VAPOR) IN WATER 07/22/2016 12:49 JJMACKE Mercury (Hg) < 0.05 ug/L 0.05 Mercury Dissolved (cold vapor) in Water (Filtered) JJMACKE 1 EPA 200.7 Mercury (Hg) < 0.05 ug/L 0.05 DISSOLVED METALS BY ICP 1 EPA 200.7 07/22/2016 12:49 JJMACKE Aluminum (Al) 0.040 mg/L 0.005 Barium (Ba) 0.114 mg/L 0.005 Boron (B) 0.712 mg/L 0.05 Iron (Fe) 11.7 mg/L 0.01 Manganese (Mn) 2.49 mg/L 0.005 Strontium (Sr) 0.270 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP JJMACKE 1 EPA 200.7 07/23/2016 13:25 Calcium (Ca) 25.4 mg/L 0.01 Magnesium (Mg) 8.13 mg/L 0.005 Potassium (K) 4.54 mg/L 0.1 Sodium (Na) 8.09 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (Al) 1.66 mg/L 0.005 Barium (Ba) 0.125 mg/L 0.005 Boron (B) 0.708 mg/L 0.05 Iron (Fe) 13.2 mg/L 0.01 Manganese (Mn) 2.51 mg/L 0.005 Strontium (Sr) 0.271 mg/L 0.005 Zinc (Zn) 0.009 mg/L 0.005 Sample #: 2016022369 Matrix: GW WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:43 LSTARLI 10 EPA 300.0 07/20/2016 18:35 BGN9034 10 EPA 300.0 07/20/2016 18:35 BGN9034 Vendor Method V_PACE 1 EPA 245.1 07/27/2016 14:50 DMFRANC 1 EPA 245.1 07/26/2016 13:14 DMFRANC 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 12:49 JJMACKE 1 EPA 200.7 07/22/2016 13:37 JJMACKE 1 EPA 200.7 07/22/2016 13:37 JJMACKE 1 EPA 200.7 07/22/2016 13:37 JJMACKE 1 EPA 200.7 07/22/2016 13:37 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE 1 EPA 200.7 07/23/2016 13:25 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Site: CF-2DW Collection Date: 19 -Jul -16 9:30 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 110 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) 2.24 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 21.7 ug/L 1 Nickel (Ni) 1.02 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 10.8 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 07/27/2016 13:44 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 134 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) 2.36 ug/L 1 Cobalt (Co) 3.56 ug/L 1 Copper (Cu) 2.73 ug/L 1 Lead (Pb) 1.71 ug/L 1 Molybdenum (Mo) 44.2 ug/L 1 Nickel (Ni) 3.98 ug/L 1 Selenium (Se) 1.77 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 20.9 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analvsis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 190 mg/L 25 Total Carbon TOC 9.2 mg/L 0.5 Duke Energy Analytical Lab Page 8 of 57 1 EPA 200.8 Sample #: 2016022369 1 EPA 200.8 07/21/2016 20:34 Matrix: GW WW 07/21/2016 20:34 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/27/2016 13:44 JAHERMA 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 1 EPA 200.8 07/21/2016 20:34 CWSPEN3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/22/201614:31 JASTOWE 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Certificate of LaboratoryAnalysis Duke EnergyAnalyti9 Lab y Page 9 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-21DW Sample #: 2016022369 Collection Date: 19 -Jul -16 9:30 AM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 49 mg/L 17 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of LaboratoryAnalysis Duke Energy PageAnalytical0Lab y Page 10 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-4SW Collection Date: 19 -Jul -16 9:05 AM Analyte Result Units Qualifiers ALKALINITY - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete NITRITE + NITRATE (COLORIMETRIC) Nitrite + Nitrate (Colorimetric) 0.073 mg-N/L INORGANIC IONS BY IC Chloride 23 mg/L B2 Sulfate 40 mg/L MERCURY IN WATER - (Analysis Performed by Pace Laboratories) RDL 0.01 1 1 Vendor Parameter Complete 07/26/2016 13:10 DMFRANC MERCURY (COLD VAPOR) IN WATER 07/22/2016 12:52 JJMACKE Mercury (Hg) < 0.05 ug/L 0.05 Mercury Dissolved (cold vapor) in Water (Filtered) JJMACKE 1 EPA 200.7 Mercury (Hg) < 0.05 ug/L 0.05 DISSOLVED METALS BY ICP 1 EPA 200.7 07/22/2016 12:52 JJMACKE Aluminum (Al) 0.020 mg/L 0.005 Barium (Ba) 0.054 mg/L 0.005 Boron (B) 0.753 mg/L 0.05 Iron (Fe) 0.029 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) 0.241 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP JJMACKE 1 EPA 200.7 07/23/2016 13:29 Calcium (Ca) 24.7 mg/L 0.01 Magnesium (Mg) 8.17 mg/L 0.005 Potassium (K) 4.82 mg/L 0.1 Sodium (Na) 8.64 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (Al) 0.142 mg/L 0.005 Barium (Ba) 0.057 mg/L 0.005 Boron (B) 0.772 mg/L 0.05 Iron (Fe) 0.241 mg/L 0.01 Manganese (Mn) 0.053 mg/L 0.005 Strontium (Sr) 0.249 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 Sample #: 2016022370 Matrix: GW WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:44 LSTARLI 10 EPA 300.0 07/20/2016 18:53 BGN9034 10 EPA 300.0 07/20/2016 18:53 BGN9034 Vendor Method V_PACE 1 EPA 245.1 07/27/2016 14:52 DMFRANC 1 EPA 245.1 07/26/2016 13:10 DMFRANC 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 12:52 JJMACKE 1 EPA 200.7 07/22/2016 13:49 JJMACKE 1 EPA 200.7 07/22/2016 13:49 JJMACKE 1 EPA 200.7 07/22/2016 13:49 JJMACKE 1 EPA 200.7 07/22/2016 13:49 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE 1 EPA 200.7 07/23/2016 13:29 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Site: CF-4SW Collection Date: 19 -Jul -16 9:05 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 6.30 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.37 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 48.3 ug/L 1 Nickel (Ni) 1.38 ug/L 1 Selenium (Se) 1.91 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 6.14 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 07/27/2016 13:52 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 7.11 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) 1.40 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 52.0 ug/L 1 Nickel (Ni) 1.64 ug/L 1 Selenium (Se) 1.70 ug/L 1 Thallium (TI) Low Level 0.200 ug/L 0.2 Vanadium (V) Low Level 7.21 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analvsis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 190 mg/L 25 Total Carbon TOC 6.4 mg/L 0.5 Duke Energy Analytical Lab Page 11 of 57 1 EPA 200.8 Sample #: 2016022370 1 EPA 200.8 07/21/2016 20:40 Matrix: GW WW 07/21/2016 20:40 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/27/2016 13:52 JAHERMA 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 1 EPA 200.8 07/21/2016 20:40 CWSPEN3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/22/201614:31 JASTOWE 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Certificate of LaboratoryAnalysis Duke Energy PageAnalytical2Lab y Page 12 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-4SW Sample #: 2016022370 Collection Date: 19 -Jul -16 9:05 AM Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS < 5 mg/L 5 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of LaboratoryAnalysis Duke Energy PageAnalytical3Lab y Page 13 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: CF-4DW Collection Date: 19 -Jul -16 8:50 AM Analyte Result Units Qualifiers ALKALINITY - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete NITRITE + NITRATE (COLORIMETRIC) Nitrite + Nitrate (Colorimetric) < 0.01 mg-N/L INORGANIC IONS BY IC Chloride 21 mg/L B2 Sulfate 33 mg/L MERCURY IN WATER - (Analysis Performed by Pace Laboratories) RDL 0.01 1 1 Vendor Parameter Complete 07/26/2016 13:17 DMFRANC MERCURY (COLD VAPOR) IN WATER 07/22/2016 12:56 JJMACKE Mercury (Hg) < 0.05 ug/L 0.05 Mercury Dissolved (cold vapor) in Water (Filtered) JJMACKE 1 EPA 200.7 Mercury (Hg) < 0.05 ug/L 0.05 DISSOLVED METALS BY ICP 1 EPA 200.7 07/22/2016 12:56 JJMACKE Aluminum (Al) 0.019 mg/L 0.005 Barium (Ba) 0.095 mg/L 0.005 Boron (B) 0.709 mg/L 0.05 Iron (Fe) 5.30 mg/L 0.01 Manganese (Mn) 2.46 mg/L 0.005 Strontium (Sr) 0.266 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 UNDIGESTED METALS BY ICP JJMACKE 1 EPA 200.7 07/23/2016 13:32 Calcium (Ca) 24.7 mg/L 0.01 Magnesium (Mg) 7.49 mg/L 0.005 Potassium (K) 4.57 mg/L 0.1 Sodium (Na) 8.21 mg/L 0.05 TOTAL RECOVERABLE METALS BY ICP Aluminum (Al) 1.49 mg/L 0.005 Barium (Ba) 0.109 mg/L 0.005 Boron (B) 0.740 mg/L 0.05 Iron (Fe) 6.57 mg/L 0.01 Manganese (Mn) 2.61 mg/L 0.005 Strontium (Sr) 0.280 mg/L 0.005 Zinc (Zn) 0.009 mg/L 0.005 Sample #: 2016022371 Matrix: GW WW DF Method Analysis Date/Time Analyst Vendor Method V_PACE 1 EPA 353.2 07/21/2016 13:46 LSTARLI 10 EPA 300.0 07/20/2016 19:11 BGN9034 10 EPA 300.0 07/20/2016 19:11 BGN9034 Vendor Method V_PACE 1 EPA 245.1 07/27/2016 14:55 DMFRANC 1 EPA 245.1 07/26/2016 13:17 DMFRANC 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 12:56 JJMACKE 1 EPA 200.7 07/22/2016 13:53 JJMACKE 1 EPA 200.7 07/22/2016 13:53 JJMACKE 1 EPA 200.7 07/22/2016 13:53 JJMACKE 1 EPA 200.7 07/22/2016 13:53 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE 1 EPA 200.7 07/23/2016 13:32 JJMACKE Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Site: CF-4DW Collection Date: 19 -Jul -16 8:50 AM Analyte Result Units Qualifiers RDL TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Antimony (Sb) < 1 ug/L 1 Arsenic (As) 46.9 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) 2.58 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) 32.3 ug/L 1 Nickel (Ni) 1.24 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 5.59 ug/L 0.3 TOTAL RECOVERABLE METALS BY ICP -MS EPA 200.8 07/27/2016 13:59 Antimony (Sb) < 1 ug/L 1 Arsenic (As) 60.2 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) 1.72 ug/L 1 Cobalt (Co) 3.67 ug/L 1 Copper (Cu) 1.86 ug/L 1 Lead (Pb) 1.42 ug/L 1 Molybdenum (Mo) 56.7 ug/L 1 Nickel (Ni) 4.24 ug/L 1 Selenium (Se) 1.42 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level 12.2 ug/L 0.3 METHANE - (Analysis Performed by Pace Laboratories Vendor Parameter Complete SULFIDE - (Analvsis Performed by Pace Laboratories) Vendor Parameter Complete TOTAL DISSOLVED SOLIDS TDS 200 mg/L 25 Total Carbon TOC 7.1 mg/L 0.5 Duke Energy Analytical Lab Page 14 of 57 1 EPA 200.8 Sample #: 2016022371 1 EPA 200.8 07/21/2016 19:42 Matrix: GW WW 07/21/2016 19:42 DF Method Analysis Date/Time Analyst 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/27/2016 13:59 JAHERMA 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 1 EPA 200.8 07/21/2016 19:42 CWSPEN3 Vendor Method V_PACE Vendor Method V_PACE 1 SM2540C 07/22/201614:31 JASTOWE 5 SM5310C/EPA9060A 07/21/201614:06 CJELLIO Site: CF-4DW Collection Date: 19 -Jul -16 8:50 AM Certificate of LaboratoryAnalysis Duke Energy PageAnalytical5Lab y Page 15 of 57 This report shall not be reproduced, except in full. Order # J16070489 Sample #: 2016022371 Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst TOTAL SUSPENDED SOLIDS TSS 45 mg/L 17 1 SM2540D 07/20/2016 11:25 PARMSTR Certificate of LaboratoryAnalysis Duke Energy PageAnalytical6Lab y Page 16 of 57 This report shall not be reproduced, except in full. Order # J16070489 Site: FILTER BILK Collection Date: 19 -Jul -16 8:18 AM Analyte Result Units Qualifiers RDL Mercury Dissolved (cold vapor) in Water (Filtered) EPA 245.1 07/26/2016 13:19 Mercury (Hg) < 0.05 ug/L 0.05 DISSOLVED METALS BY ICP 1 EPA 200.7 07/22/2016 13:00 Aluminum (Al) < 0.005 mg/L 0.005 Barium (Ba) < 0.005 mg/L 0.005 Boron (B) < 0.05 mg/L 0.05 Iron (Fe) < 0.01 mg/L 0.01 Manganese (Mn) < 0.005 mg/L 0.005 Strontium (Sr) < 0.005 mg/L 0.005 Zinc (Zn) < 0.005 mg/L 0.005 TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) 1 Antimony (Sb) < 1 ug/L 1 Arsenic (As) < 1 ug/L 1 Beryllium (Be) < 1 ug/L 1 Cadmium (Cd) < 1 ug/L 1 Chromium (Cr) < 1 ug/L 1 Cobalt (Co) < 1 ug/L 1 Copper (Cu) < 1 ug/L 1 Lead (Pb) < 1 ug/L 1 Molybdenum (Mo) < 1 ug/L 1 Nickel (Ni) < 1 ug/L 1 Selenium (Se) < 1 ug/L 1 Thallium (TI) Low Level < 0.2 ug/L 0.2 Vanadium (V) Low Level < 0.3 ug/L 0.3 Sample #: 2016022372 Matrix: GW WW DF Method Analysis Date/Time Analyst 1 EPA 245.1 07/26/2016 13:19 DMFRANC 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.7 07/22/2016 13:00 JJMACKE 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA 1 EPA 200.8 07/27/2016 14:06 JAHERMA Site: FIELD BLANK Collection Date: 19 -Jul -16 10:30 AM Certificate of LaboratoryAnalysis Duke Energy PageAnalytical7Lab y Page 17 of 57 This report shall not be reproduced, except in full. Order # J16070489 Sample #: 2016022373 Matrix: GW WW Analyte Result Units Qualifiers RDL DF Method Analysis Date/Time Analyst MERCURY IN WATER - (Analysis Performed by Pace Laboratories) Vendor Parameter Complete Vendor Method V_PACE Qualifiers: 62 Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte concentration in sample is valid and may be used for compliance purposes. Certificate of LaboratoryAnalysis Duke Energy PageAnalytical8Lab y Page 18 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070554 C_NO2NO3 NITRITE + NITRATE (COLORIMETRIC) Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate -0.0022 -0.0022 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) Blank # 2 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate 0 0 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) Blank # 3 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Nitrite + Nitrate -0.0003 -0.0003 mg-N/L 1 0.01 < 1/2 RDL (Colorimetric) LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.295 2.95 mg-N/L 10 3.01 98 90 110 (Colorimetric) LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.287 2.87 mg-N/L 10 3.01 95.3 90 110 (Colorimetric) LCS # 3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.283 2.83 mg-N/L 10 3.01 93.9 90 110 (Colorimetric) MS #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 1.2 1.2 mg-N/L 1 0.25 99.8 90 110 (Colorimetric) MSD #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Nitrite + Nitrate 1.2 1.2 mg-N/L 1 0.25 99.7 90 110 0.0802 (Colorimetric) MS #2 Parent Sample: J16070479 -- 2016022320 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nitrite + Nitrate 0.23 0.23 mg-N/L 1 0.25 90.6 90 110 (Colorimetric) MSD #2 Parent Sample: J16070479 -- 2016022320 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Nitrite + Nitrate 0.231 0.231 mg-N/L 1 0.25 91.2 90 110 0.704 (Colorimetric) Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070482 Dionex INORGANIC IONS BY IC Blank # 1 Duke Energy Analytical Lab Page 19 of 57 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Chloride 0.0673 0.0673 mg/L 1 0.1 > 1/2 RDL Sulfate 0.0082 0.0082 mg/L 1 0.1 < 1/2 RDL IS #1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Chloride 7.18 7.18 mg/L 1 5 96.2 80 120 Sulfate 8.86 8.86 mg/L 1 5 95.4 80 120 ISD #1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Chloride 7.22 7.22 mg/L 1 5 97 80 120 0.764 Sulfate 8.9 8.9 mg/L 1 5 96.2 80 120 0.85 IS #2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Chloride 5.89 5.89 mg/L 1 5 101 80 120 Sulfate 9.04 9.04 mg/L 1 5 100 80 120 ISD # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Chloride 5.9 5.9 mg/L 1 5 101 80 120 0.208 Sulfate 9.04 9.04 mg/L 1 5 100 80 120 0.0957 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Chloride 4.85 4.85 mg/L 1 5 97 80 120 Sulfate 4.84 4.84 mg/L 1 5 96.8 80 120 Certificate of LaboratoryAnalysis Duke Energy Analytical Lab Y Page 20 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070698 HG 245.1 MERCURY (COLD VAPOR) IN WATER Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.013 0.013 ug/L 1 0.05 < 1/2 RDL Blank # 2 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.016 0.016 ug/L 1 0.05 < 1/2 RDL Blank # 3 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.013 0.013 ug/L 1 0.05 < 1/2 RDL Blank # 4 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.015 0.015 ug/L 1 0.05 < 1/2 RDL IS #1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.981 19.6 ug/L 20 20 96.7 70 130 ISD # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.983 19.7 ug/L 20 20 97 70 130 0.258 IS #2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.992 19.8 ug/L 20 20 86.8 70 130 ISD # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.992 19.8 ug/L 20 20 86.8 70 130 0.0576 IS #3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.885 0.885 ug/L 1 1 87.2 70 130 ISD # 3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.879 0.879 ug/L 1 1 86.6 70 130 0.69 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 1.94 1.94 ug/L 1 2 96.9 85 115 LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 1.91 1.91 ug/L 1 2 95.5 85 115 Certificate of LaboratoryAnalysis Duke Energy Page Analytical Lab y Page 21 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070698 HG 245.1 MERCURY (COLD VAPOR) IN WATER MS #1 Parent Sample: J16070322 -- 2016021431 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.985 0.985 ug/L 1 1 97 70 130 MSD #1 Parent Sample: J16070322 -- 2016021431 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.959 0.959 ug/L 1 1 94.4 70 130 2.72 Certificate of LaboratoryAnalysis Duke Energy Analytical Lab Y Page 22 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070666 HG 245.1 Dissolved Mercury Dissolved (cold vapor) in Water (Filtered) Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) -0.001 -0.001 ug/L 1 0.05 < 1/2 RDL Blank # 2 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.001 0.001 ug/L 1 0.05 < 1/2 RDL Blank # 3 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Mercury (Hg) 0.003 0.003 ug/L 1 0.05 < 1/2 RDL IS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.998 0.998 ug/L 1 1 100 70 130 ISD #1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.993 0.993 ug/L 1 1 99.7 70 130 0.5 IS #2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.954 0.954 ug/L 1 1 94 70 130 ISD # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.955 0.955 ug/L 1 1 94.1 70 130 0.106 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 1.93 1.93 ug/L 1 2 96.5 85 115 LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 1.87 1.87 ug/L 1 2 93.6 85 115 MS #1 Parent Sample: J16070322 -- 2016021430 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.427 0.427 ug/L 1 1 42.9 70 130 MSD #1 Parent Sample: J16070322 -- 2016021430 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.438 0.438 ug/L 1 1 44 70 130 2.53 MS #2 Parent Sample: J16070322 -- 2016021432 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Mercury (Hg) 0.97 0.97 ug/L 1 1 97.2 70 130 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical3Lab y Page 23 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070666 HG 245.1 Dissolved Mercury Dissolved (cold vapor) in Water (Filtered) MSD #2 Parent Sample: J16070322 -- 2016021432 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Mercury (Hg) 0.97 0.97 ug/L 1 1 97.2 70 130 0 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical4Lab y Page 24 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070580 ICP Dissolved DISSOLVED METALS BY ICP Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Aluminum (AI) 0.000071 0.000071 mg/L 1 0.005 < 1/2 RDL Barium (Ba) 0.000037 0.000037 mg/L 1 0.005 < 1/2 RDL Boron (B) 0.00235 0.00235 mg/L 1 0.05 < 1/2 RDL Iron (Fe) -0.000461 -0.000461 mg/L 1 0.01 < 1/2 RDL Manganese (Mn) 0.000182 0.000182 mg/L 1 0.005 < 1/2 RDL Strontium (Sr) 0.000071 0.000071 mg/L 1 0.005 < 1/2 RDL Zinc (Zn) -0.000736 -0.000736 mg/L 1 0.005 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Aluminum (AI) 2.05 2.05 mg/L Barium (Ba) 0.999 0.999 mg/L Boron (B) 1.99 1.99 mg/L Iron (Fe) 2.06 2.06 mg/L Manganese (Mn) 0.989 0.989 mg/L Strontium (Sr) 1.92 1.92 mg/L Zinc (Zn) 1.03 1.03 mg/L MS #1 Parameter Measured Final Units: Aluminum (AI) 5.68 5.68 mg/L Barium (Ba) 5.57 5.57 mg/L Boron (B) 6 6 mg/L Iron (Fe) 5.32 5.32 mg/L Manganese (Mn) 5.62 5.62 mg/L Strontium (Sr) 5.5 5.5 mg/L Zinc (Zn) 5.48 5.48 mg/L MSD #1 Parameter Measured Final Units: Aluminum (AI) 5.72 5.72 mg/L Barium (Ba) 5.58 5.58 mg/L Boron (B) 6.02 6.02 mg/L Iron (Fe) 5.33 5.33 mg/L Manganese (Mn) 5.64 5.64 mg/L Strontium (Sr) 5.47 5.47 mg/L Zinc (Zn) 5.5 5.5 mg/L MS #2 115 1 Parameter Measured Final Units: Aluminum (AI) 5.66 5.66 mg/L Dil Spike % Recovery LCL UCL Qualifier 1 2 103 85 115 1 1 99.9 85 115 1 2 99.7 85 115 1 2 103 85 115 1 1 98.9 85 115 1 2 96 85 115 1 1 103 85 115 Parent Sample: J16070479 -- 2016022306 Dil Spike % Recovery LCL UCL Qualifier 1 5 113 70 130 1 5 110 70 130 1 5 104 70 130 1 5 106 70 130 1 5 112 70 130 1 5 105 70 130 1 5 110 70 130 Parent Sample: J16070479 -- 2016022306 Dil Spike % Recovery LCL UCL RPD Qualifier 1 5 114 70 130 0.616 1 5 111 70 130 0.217 1 5 105 70 130 0.402 1 5 107 70 130 0.339 1 5 113 70 130 0.338 1 5 104 70 130 0.478 1 5 110 70 130 0.273 Parent Sample: J16070489 -- 2016022368 Dil Spike % Recovery LCL UCL Qualifier 1 5 113 70 130 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070580 ICP Dissolved DISSOLVED METALS BY ICP MS #2 Parameter Measured Final Units: Dil Spike Barium (Ba) 5.48 5.48 mg/L 1 5 Boron (B) 5.97 5.97 mg/L 1 5 Iron (Fe) 5.22 5.22 mg/L 1 5 Manganese (Mn) 5.54 5.54 mg/L 1 5 Strontium (Sr) 5.41 5.41 mg/L 1 5 Zinc (Zn) 5.46 5.46 mg/L 1 5 MSD #2 Parameter Measured Final Units: Dil Spike Aluminum (AI) 5.72 5.72 mg/L 1 5 Barium (Ba) 5.54 5.54 mg/L 1 5 Boron (B) 6.05 6.05 mg/L 1 5 Iron (Fe) 5.31 5.31 mg/L 1 5 Manganese (Mn) 5.63 5.63 mg/L 1 5 Strontium (Sr) 5.45 5.45 mg/L 1 5 Zinc (Zn) 5.54 5.54 mg/L 1 5 Duke Energy Analytical Lab Page 25 of 57 Parent Sample: J16070489 -- 2016022368 % Recovery LCL UCL Qualifier 108 70 130 103 70 130 104 70 130 111 70 130 103 70 130 109 70 130 Parent Sample: J16070489 -- 2016022368 % Recovery LCL UCL RPD Qualifier 114 70 130 1.08 110 70 130 1.14 105 70 130 1.5 106 70 130 1.77 113 70 130 1.63 104 70 130 0.794 111 70 130 1.46 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical6Lab y Page 26 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070582 ICP Undigested UNDIGESTED METALS BY ICP Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Calcium (Ca) 0.00123 0.00123 mg/L 1 0.01 < 1/2 RDL Magnesium (Mg) -0.000203 -0.000203 mg/L 1 0.005 < 1/2 RDL Potassium (K) 0.0077 0.0077 mg/L 1 0.1 < 1/2 RDL Sodium (Na) 0.0035 0.0035 mg/L 1 0.05 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 1.99 1.99 mg/L 1 2 99.7 85 115 Magnesium (Mg) 2.03 2.03 mg/L 1 2 102 85 115 Potassium (K) 3.9 3.9 mg/L 1 4 97.5 85 115 Sodium (Na) 8.12 8.12 mg/L 1 8.1 100 85 115 IVIS #1 Parent Sample: J16070479 -- 2016022306 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 29.8 29.8 mg/L 1 5 93.9 70 130 Magnesium (Mg) 13.2 13.2 mg/L 1 5 97.1 70 130 Potassium (K) 10.1 10.1 mg/L 1 5 106 70 130 Sodium (Na) 13.6 13.6 mg/L 1 5 101 70 130 MSD #1 Parent Sample: J16070479 -- 2016022306 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Calcium (Ca) 29.9 29.9 mg/L 1 5 94.8 70 130 0.954 Magnesium (Mg) 13.2 13.2 mg/L 1 5 97.4 70 130 0.329 Potassium (K) 10.1 10.1 mg/L 1 5 105 70 130 0.891 Sodium (Na) 13.5 13.5 mg/L 1 5 99.6 70 130 1.26 MS #2 Parent Sample: J16070489 -- 2016022369 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Calcium (Ca) 30.4 30.4 mg/L 1 5 101 70 130 Magnesium (Mg) 13.3 13.3 mg/L 1 5 103 70 130 Potassium (K) 10.2 10.2 mg/L 1 5 114 70 130 Sodium (Na) 13.3 13.3 mg/L 1 5 104 70 130 MSD #2 Parent Sample: J16070489 -- 2016022369 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Calcium (Ca) 29.7 29.7 mg/L 1 5 86.1 70 130 15.5 Magnesium (Mg) 13 13 mg/L 1 5 96.8 70 130 5.86 Potassium (K) 9.96 9.96 mg/L 1 5 108 70 130 4.87 Sodium (Na) 13 13 mg/L 1 5 97.2 70 130 6.57 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070518 ICP_TRM TOTAL RECOVERABLE METALS BY ICP Blank # 1 Duke Energy Analytical Lab Page 27 of 57 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Aluminum (AI) 0.00109 0.00109 mg/L 1 0.005 < 1/2 RDL Barium (Ba) 0.000186 0.000186 mg/L 1 0.005 < 1/2 RDL Boron (B) -0.000474 -0.000474 mg/L 1 0.05 < 1/2 RDL Iron (Fe) 0.000233 0.000233 mg/L 1 0.01 < 1/2 RDL Manganese (Mn) -0.000141 -0.000141 mg/L 1 0.005 < 1/2 RDL Strontium (Sr) 0.000099 0.000099 mg/L 1 0.005 < 1/2 RDL Zinc (Zn) 0.000136 0.000136 mg/L 1 0.005 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Aluminum (AI) 5.47 5.47 mg/L 1 5 109 85 115 Barium (Ba) 4.99 4.99 mg/L 1 5 99.7 85 115 Boron (B) 4.98 4.98 mg/L 1 5 99.6 85 115 Iron (Fe) 4.93 4.93 mg/L 1 5 98.6 85 115 Manganese (Mn) 5.16 5.16 mg/L 1 5 103 85 115 Strontium (Sr) 4.94 4.94 mg/L 1 5 98.8 85 115 Zinc (Zn) 5.03 5.03 mg/L 1 5 101 85 115 MS #1 Parent Sample: J16070325 -- 2016021445 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Aluminum (AI) 5.4 5.4 mg/L 1 5 107 70 130 Barium (Ba) 5 5 mg/L 1 5 99.5 70 130 Boron (B) 5.08 5.08 mg/L 1 5 100 70 130 Iron (Fe) 4.91 4.91 mg/L 1 5 97.8 70 130 Manganese (Mn) 5.46 5.46 mg/L 1 5 101 70 130 Strontium (Sr) 5.25 5.25 mg/L 1 5 98.1 70 130 Zinc (Zn) 4.86 4.86 mg/L 1 5 97.1 70 130 MSD #1 Parent Sample: J16070325 -- 2016021445 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Aluminum (AI) 5.49 5.49 mg/L 1 5 109 70 130 1.65 Barium (Ba) 5.08 5.08 mg/L 1 5 101 70 130 1.59 Boron (B) 5.18 5.18 mg/L 1 5 102 70 130 1.96 Iron (Fe) 4.98 4.98 mg/L 1 5 99.2 70 130 1.42 Manganese (Mn) 5.54 5.54 mg/L 1 5 103 70 130 1.49 Strontium (Sr) 5.33 5.33 mg/L 1 5 99.6 70 130 1.54 Zinc (Zn) 4.91 4.91 mg/L 1 5 98.2 70 130 1.09 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical8Lab y Page 28 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070606 IMS_DIS_TRM TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Antimony (Sb) -0.115 -0.115 ug/L 1 1 < 1/2 RDL Arsenic (As) 0.0004 0.0004 ug/L 1 1 < 1/2 RDL Beryllium (Be) -0.075 -0.075 ug/L 1 1 < 1/2 RDL Cadmium (Cd) 0.0023 0.0023 ug/L 1 1 < 1/2 RDL Chromium (Cr) 0.0026 0.0026 ug/L 1 1 < 1/2 RDL Cobalt (Co) -0.0052 -0.0052 ug/L 1 1 < 1/2 RDL Copper (Cu) 0.0408 0.0408 ug/L 1 1 < 1/2 RDL Lead (Pb) -0.0009 -0.0009 ug/L 1 1 < 1/2 RDL Molybdenum (Mo) -0.007 -0.007 ug/L 1 1 < 1/2 RDL Nickel (Ni) -0.0025 -0.0025 ug/L 1 1 < 1/2 RDL Selenium (Se) 0.0143 0.0143 ug/L 1 1 < 1/2 RDL Thallium (TI) Low Level -0.152 -0.152 ug/L 1 0.2 < 1/2 RDL Vanadium (V) Low Level -0.0797 -0.0797 ug/L 1 0.3 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 52.1 52.1 ug/L 1 50 104 85 115 Arsenic (As) 51.2 51.2 ug/L 1 50 102 85 115 Beryllium (Be) 47.2 47.2 ug/L 1 50 94.3 85 115 Cadmium (Cd) 49.2 49.2 ug/L 1 50 98.4 85 115 Chromium (Cr) 49.6 49.6 ug/L 1 50 99.1 85 115 Cobalt (Co) 50.1 50.1 ug/L 1 50 100 85 115 Copper (Cu) 50 50 ug/L 1 50 100 85 115 Lead (Pb) 51.1 51.1 ug/L 1 50 102 85 115 Molybdenum (Mo) 49.8 49.8 ug/L 1 50 99.5 85 115 Nickel (Ni) 48.8 48.8 ug/L 1 50 97.5 85 115 Selenium (Se) 51.6 51.6 ug/L 1 50 103 85 115 Thallium (TI) Low Level 47.9 47.9 ug/L 1 50 95.8 85 115 MS #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 52.3 52.3 ug/L 1 50 105 70 130 Arsenic (As) 50.9 50.9 ug/L 1 50 102 70 130 Beryllium (Be) 48.5 48.5 ug/L 1 50 97 70 130 Cadmium (Cd) 50.4 50.4 ug/L 1 50 100 70 130 Chromium (Cr) 49 49 ug/L 1 50 97.7 70 130 Cobalt (Co) 60.7 60.7 ug/L 1 50 97 70 130 Copper (Cu) 57.3 57.3 ug/L 1 50 101 70 130 Lead (Pb) 52.2 52.2 ug/L 1 50 102 70 130 Molybdenum (Mo) 51.3 51.3 ug/L 1 50 102 70 130 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical9Lab y Page 29 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070606 IMS_DIS_TRM TOTAL RECOVERABLE METALS BY ICP -MS (DISSOLVED) MS #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Nickel (Ni) 84.3 84.3 ug/L 1 50 95.9 70 130 Selenium (Se) 51.7 51.7 ug/L 1 50 103 70 130 Thallium (TI) Low Level 49 49 ug/L 1 50 98 70 130 MSD #1 Parent Sample: J16070533 -- 2016022580 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier Antimony (Sb) 53 53 ug/L 1 50 106 70 130 1.29 Arsenic (As) 50.6 50.6 ug/L 1 50 101 70 130 0.572 Beryllium (Be) 49.9 49.9 ug/L 1 50 99.8 70 130 2.91 Cadmium (Cd) 49.9 49.9 ug/L 1 50 99.3 70 130 0.962 Chromium (Cr) 48.9 48.9 ug/L 1 50 97.5 70 130 0.225 Cobalt (Co) 62.3 62.3 ug/L 1 50 100 70 130 3.11 Copper(Cu) 56.5 56.5 ug/L 1 50 99.4 70 130 1.76 Lead (Pb) 51.8 51.8 ug/L 1 50 102 70 130 0.627 Molybdenum (Mo) 49.2 49.2 ug/L 1 50 97.7 70 130 4.25 Nickel (Ni) 86.9 86.9 ug/L 1 50 101 70 130 5.44 Selenium (Se) 51.7 51.7 ug/L 1 50 103 70 130 0 Thallium (TI) Low Level 49.2 49.2 ug/L 1 50 98.5 70 130 0.428 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical0Lab y Page 30 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070521 IMS_TRM TOTAL RECOVERABLE METALS BY ICP -MS Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier Antimony (Sb) 0.0171 0.0171 ug/L 1 1 < 1/2 RDL Arsenic (As) 0.0115 0.0115 ug/L 1 1 < 1/2 RDL Beryllium (Be) 0.0975 0.0975 ug/L 1 1 < 1/2 RDL Cadmium (Cd) 0.0027 0.0027 ug/L 1 1 < 1/2 RDL Chromium (Cr) 0.0389 0.0389 ug/L 1 1 < 1/2 RDL Cobalt (Co) 0.0026 0.0026 ug/L 1 1 < 1/2 RDL Copper (Cu) -0.307 -0.307 ug/L 1 1 < 1/2 RDL Lead (Pb) 0.0033 0.0033 ug/L 1 1 < 1/2 RDL Molybdenum (Mo) 0.0047 0.0047 ug/L 1 1 < 1/2 RDL Nickel (Ni) 0.006 0.006 ug/L 1 1 < 1/2 RDL Selenium (Se) -0.166 -0.166 ug/L 1 1 < 1/2 RDL Thallium (TI) Low Level -0.0297 -0.0297 ug/L 1 0.2 < 1/2 RDL Vanadium (V) Low Level -0.0405 -0.0405 ug/L 1 0.3 < 1/2 RDL LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 52.9 52.9 ug/L 1 50 106 85 115 Arsenic (As) 51.4 51.4 ug/L 1 50 103 85 115 Beryllium (Be) 52.7 52.7 ug/L 1 50 105 85 115 Cadmium (Cd) 51.6 51.6 ug/L 1 50 103 85 115 Chromium (Cr) 52.3 52.3 ug/L 1 50 105 85 115 Cobalt (Co) 50.5 50.5 ug/L 1 50 101 85 115 Copper (Cu) 51.1 51.1 ug/L 1 50 102 85 115 Lead (Pb) 52.7 52.7 ug/L 1 50 105 85 115 Molybdenum (Mo) 52 52 ug/L 1 50 104 85 115 Nickel (Ni) 51.4 51.4 ug/L 1 50 103 85 115 Selenium (Se) 51.1 51.1 ug/L 1 50 102 85 115 Thallium (TI) Low Level 51.1 51.1 ug/L 1 50 102 85 115 Vanadium (V) Low Level 52.1 52.1 ug/L 1 50 104 85 115 MS #1 Parent Sample: J16070489 -- 2016022371 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier Antimony (Sb) 51 51 ug/L 1 50 101 70 130 Arsenic (As) 110 110 ug/L 1 50 100 70 130 Beryllium (Be) 51.8 51.8 ug/L 1 50 103 70 130 Cadmium (Cd) 51.8 51.8 ug/L 1 50 104 70 130 Chromium (Cr) 53.8 53.8 ug/L 1 50 104 70 130 Cobalt (Co) 53.8 53.8 ug/L 1 50 100 70 130 Copper (Cu) 53.2 53.2 ug/L 1 50 103 70 130 Lead (Pb) 54.4 54.4 ug/L 1 50 106 70 130 Level II QC Summary Q16070521 IMS_TRM MS #1 Certificate of Laboratory Analysis This report shall not be reproduced, except in full. Order # J16070489 TOTAL RECOVERABLE METALS BY ICP -MS Parameter Measured Final Units: Dil Spike Molybdenum (Mo) 108 108 ug/L 1 50 Nickel (Ni) 55.5 55.5 ug/L 1 50 Selenium (Se) 45.8 45.8 ug/L 1 50 Thallium (TI) Low Level 53 53 ug/L 1 50 Vanadium (V) Low Level 65 65 ug/L 1 50 MSD #1 Parameter Measured Final Units: Dil Spike Antimony (Sb) 51.8 51.8 ug/L 1 50 Arsenic (As) 114 114 ug/L 1 50 Beryllium (Be) 53.8 53.8 ug/L 1 50 Cadmium (Cd) 52.4 52.4 ug/L 1 50 Chromium (Cr) 54.9 54.9 ug/L 1 50 Cobalt (Co) 55 55 ug/L 1 50 Copper (Cu) 54.1 54.1 ug/L 1 50 Lead (Pb) 54.6 54.6 ug/L 1 50 Molybdenum (Mo) 110 110 ug/L 1 50 Nickel (Ni) 55.5 55.5 ug/L 1 50 Selenium (Se) 48.4 48.4 ug/L 1 50 Thallium (TI) Low Level 53.8 53.8 ug/L 1 50 Vanadium (V) Low Level 66.1 66.1 ug/L 1 50 Duke Energy Analytical Lab Page 31 of 57 Parent Sample: J16070489 -- 2016022371 % Recovery LCL UCL Qualifier 102 70 130 102 70 130 88.8 70 130 106 70 130 106 70 130 Parent Sample: J16070489 -- 2016022371 % Recovery LCL UCL RPD Qualifier 103 70 130 1.62 108 70 130 7.28 107 70 130 3.71 105 70 130 1.21 106 70 130 1.99 103 70 130 2.4 104 70 130 1.59 106 70 130 0.21 107 70 130 4.21 103 70 130 0.116 93.9 70 130 5.51 107 70 130 1.56 108 70 130 2.09 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical2Lab y Page 32 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070578 TDS TOTAL DISSOLVED SOLIDS Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TDS 0 mg/L 1 25 < 1/2 RDL Duplicate # 1 Parent Sample: J16070490 -- 2016022384 Parameter Measured Final Units: Dil RPD Qualifier TDS 422 mg/L 1 0.237 Duplicate # 2 Parent Sample: J16070561 -- 2016022779 Parameter Measured Final Units: Dil RPD Qualifier TDS 324 mg/L 1 0.922 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TDS 101 mg/L 1 100 101 90 110 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical3Lab y Page 33 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070522 Total Carbon Total Carbon Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TOC 0.022 mg/L 1 0.1 < 1/2 RDL Blank # 2 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TOC 0.054 mg/L 1 0.1 > 1/2 RDL IS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 3.22 mg/L 1 2 108 80 120 ISD #1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 3.08 mg/L 1 2 101 80 120 6.53 IS #2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 2.43 mg/L 1 2 104 80 120 ISD # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 2.49 mg/L 1 2 107 80 120 2.84 IS #3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 6.05 mg/L 1 2 95 80 120 ISD # 3 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL RPD Qualifier TOC 5.99 mg/L 1 2 91.8 80 120 3.43 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 2.92 mg/L 1 2.87 102 85 115 LCS # 2 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TOC 3 mg/L 1 2.87 105 85 115 Certificate of LaboratoryAnalysis Duke Energy PageAnalytical4Lab y Page 34 of 57 This report shall not be reproduced, except in full. Order # J16070489 Level II QC Summary Q16070478 TSS TOTAL SUSPENDED SOLIDS Blank # 1 Parameter Measured Final Units: Dil RDL Relative Concentration Qualifier TSS 0 mg/L 1 5 < 1/2 RDL Duplicate # 1 Parent Sample: J16070489 -- 2016022368 Parameter Measured Final Units: Dil RPD Qualifier TSS 3 mg/L 1 0 Duplicate # 2 Parent Sample: J16070489 -- 2016022370 Parameter Measured Final Units: Dil RPD Qualifier TSS 3.2 mg/L 1 0 LCS # 1 Parameter Measured Final Units: Dil Spike % Recovery LCL UCL Qualifier TSS 53.6 mg/L 1 50 107 90 110