HomeMy WebLinkAboutNC0003425_CAMA Assessment Report PART 1.4 FIGURES_20180526COOLING
TOWER POND
:_f m -'
GPMW-0 B3 R
8B
,G MW -02 GPMW-02BR
*�
EDC -04
GRAPHIC SCALE
'1
250 125 0 250 500
I
•
GPMW-01 BR S-14
GYPSUM
STORAGE
AREA
r
GPMW-01SO
��♦
\SH BASIN
J GPMW-01 D
1, y.♦ MW -27B R
r , EDC -03 ,
MW-_22BRL, MW -22D
♦ �
.♦�
} r
MW-22BR
♦•♦
•
'
�
{ 4' -♦ r
GMW-10 + 4 MW-01BR� - f'
.♦ GMW-02 �' _
,�♦ GMW 11 CW -1
♦' � GMW-06 EDC
♦ - EAB -01 �,3
GMW-01A
ABMW-05D�ABMW-05 -
ABMW-07BRL-
BMW -07
SBM ; O7BR * r
• EAST ASH S-10
f BASIN i EDC -00
ABMW-04 LINED
L)
ABMW-04BR LANDFILL S-11
ABMW-06 PZ -12 S
u
IL
L y.t
M
MW-21BRL'kMW-21BRL!
wp� -111r.11
V.
L
1EG�IL7T_T! '.
ELECTRICAL
SUBSTATION AV
ti .
FIGURE 5-3
SAMPLE LOCATIONS
EASTERN EXTENSION IMPOUNDMENT AND
EASTERN DISCHARGE CANAL
ROXBORO STEAM ELECTRIC PLANT
SEMORA, NORTH CAROLINA
roe Canal Assessment\Fia,re 5 -3 -Roxboro Samole Locations East Imooundment 20170509.mxd
*�
GRAPHIC SCALE
'1
250 125 0 250 500
LEGEND
(p SOILAND GROUNDWATER SAMPLING
\SH BASIN
MW-23BRR
O GROUNDWATER SAMPLING LOCATION
ATORDIKE
GREENVILLE, SOUTH CAROLINA 29601
`-xij,`''•'*
MW-23BR
PHONE 864-421-9999
SEEP/AOW AND SEDIMENT SAMPLE
MW-20BRL
'
SEEP/AREA OF WETNESS (AOW) SAMPLING LOCATION
;L-02
synTerm
DRAWN BY: B. YOUNG DATE: 05/26/2017
PROJECT MANAGER: C. EADY
y
f kr
SURFACE WATER SAMPLING LOCATION
:L -02S NL -04
CHECKED BY: A. LEFITZ
= r.
] ".•I7 i4.
+
.�' _
*•
NL -08
�-; SURFACE WATER/SEDIMENT SAMPLING LOCATION
CL -04
SW -06
Q SEDIMENT SAMPLE LOCATION
CL -06
SL -08
GPMW - SOLID WASTE SAMPLING LOCATION
CL -05
LINED LANDFILL AREA
CL -05S
CL -07
WASTE BOUNDARY
01
♦
EASTERN IMPOUNDMENT
COMPLIANCE BOUNDARY
I
CV-02„�
DUKE ENERGY PROGRESS ROXBORO PLANT
♦� '
BOUNDARY
MW-24BR
STREAM
NOTES:
MW-17BR
2014 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIAL
•
E
I
DATA GATEWAY (https://gdg.sc.egov.usda.gov/GDGOrder.aspx).
-
fir
MW-25BR
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83/2011).
`
THE UNLINED LANDFILL BOUNDARY IS NOT SHOWN FOR DRAWING CLARITY.
FIGURE 5-3
SAMPLE LOCATIONS
EASTERN EXTENSION IMPOUNDMENT AND
EASTERN DISCHARGE CANAL
ROXBORO STEAM ELECTRIC PLANT
SEMORA, NORTH CAROLINA
roe Canal Assessment\Fia,re 5 -3 -Roxboro Samole Locations East Imooundment 20170509.mxd
*�
GRAPHIC SCALE
250 125 0 250 500
IN FEET
148 RIVER STREET, SUITE 220
f -Lr
GREENVILLE, SOUTH CAROLINA 29601
`-xij,`''•'*
-
PHONE 864-421-9999
'
•A'
•
synTerm
DRAWN BY: B. YOUNG DATE: 05/26/2017
PROJECT MANAGER: C. EADY
y
f kr
J =
r� {
CHECKED BY: A. LEFITZ
= r.
] ".•I7 i4.
+
.�' _
P:\Duke Enerav Proaress.1026\00 GIS BASE DATA\Roxboro\Mao
FIGURE 5-3
SAMPLE LOCATIONS
EASTERN EXTENSION IMPOUNDMENT AND
EASTERN DISCHARGE CANAL
ROXBORO STEAM ELECTRIC PLANT
SEMORA, NORTH CAROLINA
roe Canal Assessment\Fia,re 5 -3 -Roxboro Samole Locations East Imooundment 20170509.mxd
LEGEND
MW -12B CSA MONITORING WELL
CW -1 COMPLIANCE MONITORING WELL
❑ BG -1D BACKGROUND COMPLIANCE MONITORING WELL
O GPMW-1 GYPSUM STORAGE AREA MONITORING WELL
SiGMW-8 LANDFILL MONITORING WELL
7M W-21 MONITORING WELL
G Fp-z-1-2-1 PIEZOMETER
• RM NC DEQ SUPPLY WELL SAMPLE ID (APPROXIMATE)
-- DUKE ENERGY PROGRESS PARCEL LINE
-- COMPLIANCE BOUNDARY
ASH BASIN WASTE BOUNDARY
LINED LANDFILL LIMIT (APPROXIMATE)
THE UNLINED LANDFILL IS NOT SHOWN FOR DRAWING CLARITY.
SOURCE:
JUNE 13, 2016 AERIAL PHOTOGRAPH WAS OBTAINED FROM GOGGLE EARTH PRO
f
HYCO LAKE
i
HEATED WATER DISCHARGE POND
MW
MW
i
CN
CN
IW 9BR di _ MW -1
ASH BASIN MAIN DAM
/ MW -2 &
113
v
_ _ s �_/� G
EASTASH BASIN MAIN DAM
VoTi—& of
MW -5D
MW -BR
5
CW 5 „
FDF
R-:
ABMW-3
ABMW-3BR
ABMW-3BRL
J �6
I
WEST
EAST
FGD
POND)
�FGD FLUSHW
POND
ABMW-2
ABMW 2BR
I
MW 32BR ti 1
CW -3
CW -3D
�-k-
1
1
BG-1BRL
�`�..
BG-1BRLR `� MW 31BR
BG -1D MW
r BG-1BR BG 1 MW
I MW -15D
Sen, _ M W 15 B R
ELEMENTARY SCHOOL
1
AV GMW 10
ar GMW 11
/ 1 /
/
��1, MW-16BR
�♦ = MW 19BRL'%
MW -14S
MW -14D
MW 14BR
f R05
♦ 1 MW-10BR __
1 R03 I _ R02 F20 oU�NAw�rRa R015
-R06
/j 12
— o
MW26BR- - - -
TER DIKE
100,
BR I /
BRL OV /
III" CW 4 ,
��
MW-18DOr
♦����
MW 18BR
1 4
r
nnn
FIGURE 8-2
SITE CROSS-SECTION LOCATION MAP
ROXBORO STEAM ELECTRIC PLANT
1700 DUNAWAY RD
SEMORA, NORTH CAROLINA
GRAPHIC SCALE
500 0 500 1000
VIP
synTerra
IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
DRAWN BY: JOHN CHASTAIN DATE: 05/15/2017
PROJECT MANAGER: CRAIG EADY
LAYOUT: FIG 8-2 (CROSS-SECTION LOC MAP)
GPMW-3D
yl
GPMW-3BR
KE BASIN
sGPMW-1S
GPMW-1D
GPMW-2D
4
GPMW-1BR
GPMW-2BR
AV GMW 10
ar GMW 11
/ 1 /
/
��1, MW-16BR
�♦ = MW 19BRL'%
MW -14S
MW -14D
MW 14BR
f R05
♦ 1 MW-10BR __
1 R03 I _ R02 F20 oU�NAw�rRa R015
-R06
/j 12
— o
MW26BR- - - -
TER DIKE
100,
BR I /
BRL OV /
III" CW 4 ,
��
MW-18DOr
♦����
MW 18BR
1 4
r
nnn
FIGURE 8-2
SITE CROSS-SECTION LOCATION MAP
ROXBORO STEAM ELECTRIC PLANT
1700 DUNAWAY RD
SEMORA, NORTH CAROLINA
GRAPHIC SCALE
500 0 500 1000
VIP
synTerra
IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
DRAWN BY: JOHN CHASTAIN DATE: 05/15/2017
PROJECT MANAGER: CRAIG EADY
LAYOUT: FIG 8-2 (CROSS-SECTION LOC MAP)
A-
(NORTH)
0
WEST ASH BASIN o 0
MAIN DAM ao
J Q
W �
c2
HEATED WATER
DISCHARGE POND
W E-412' msl
ASH
TD=400.6
FGD PONDS
- A'
(SOUTH)
DUKE ENERGY ROXBORO STEAM ELECTRIC PLANT PROPERTY
COMPLIANCE BOUNDARY
WEST ASH BASIN
TOPOGRAPHY OUTLETSTRUCTURE
BASED ON 2014 WSP MAP FILTER DIKE
ISOUTHERN EXTENSION IMPOUNDMENT
,CURRENT
WE=446'msl
WE -462' msl O
O
O
---------------- V
ASH
ASH
WELLCASING MONITORING
TD6•►PROFILE BASED ON 1968 FORMER SARGENTS CREEK
USGS TOPOGRAPHIC MAP
GENERALIZED GROUNDWATER FLOW DIRECTION --M$mmM�
)FILE SOUTH OF FILTER DIKE BASED
CF BORINGS BY AMEC IN 2016
LEGEND
SURFACE
WELLCASING MONITORING
IGROUND
WELL SCHEMATIC
SCREENEDINTERVAL
HORIZONTAL GRAPHIC SCALE
250 0 250 500
GENERALIZED WATER TABLE
_ — _ INFERRED WATER TABLE
SEDIMENT CORE SAMPLE LOCATION
ABMW-1 MONITORING WELL
TOTAL DEPTH ELEVATION OF BOREHOLE
TD 233' msl. IN FEET MEAN SEA LEVEL (msl)
IN FEET
VERTICAL GRAPHIC SCALE
50 0 50 100
IN FEET
Terra
VERTICAL EXAGGERATION 5X
FIGURE 8-3
SITE CROSS-SECTION A -A'
DUKE ENERGY PROGRESS
ROXBORO STEAM ELECTRIC PLANT
1 O S D U N N ELECTRIC
RD
SENORA NORTH CAROLINA
SOURCE INFORMATION:
EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED 'ROXBORO FINAL", DATED JUNE 8, 2015.
HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR OLIVE HILL, INC DATED 1968, REVISED 1994.
THE SURFACE BOTTOM IN THE EASTERN EXTENSION IMPOUNDMENT WAS BASED ON INFORMATION OBTAINED FROM THE AMEC FOSTER WHEELER
DOCUMENT TITLED "SUMMARY REPORT FOR INVESTATION RESULTS EAST ASH POND SEDIMENT SAMPLING (ISSUE ROX-115)", DATED SEPTEMBER 16, 2015.
MONITORING WELL DATA WAS OBTAINED FROM THE COMPREHENSIVE SITE ASSESSMENT REPORT PREPAREED BY SYNTERRA, DATED SEPTEMBER 2, 2015.
MONITORING WELL WATER LEVELS WERE COLLECTED BY SYNTERRA ON JUNE 14, 2017.
148 RIVER STREET, SUITE 220
GREENVPHONE ILLE, SOUTH 9CAROLINA 29601
PHONEnterrac 1-99 9
BY: JOHN CHASTAIN DATE: 05/25/2017
GER:cRAIG EADv
PROJECT MALAYOUT:
LAYOUT: FIG NA (SECTION A -A' WEST)
1 05/26/201710:01AM P:\Duke Energy Pmgress.1026\107. Roxboro
Ash Basin GW Assessment Plan 33.Dischar a canal Assessment(EHS)\DWG DE ROXBORO CROSS-SEOTIONS REVISIED.ow
B ---a-
(NORTHWEST)
COOLING
TOWER POND
DUKE ENERGY ROXBORO STEAM ELECTRIC PLANT PROPERTY
COMPLIANCE BOUNDARY
EAST ASH BASIN
1I1►1=I11W_1►U];lIII
ASH
Q APPROXIMATE L
0 -- /FOR THE LINED
W
Q
\ i /\ ASH TD 456
PROFILE BASED ON HISTORIC
USGS TOPOGRAPHIC MAP INFERRED FROM DRILLING
LOGS FOR MW-23BR \
GENERALIZED GF
SOURCE INFORMATION:
EXISTING GROUND SURFACE BASED ON A DRAWING PROVIDED BY THE WSP GROUP, TITLED "ROXBORO FINAL", DATED JUNE 8, 2015.
HISTORIC GROUND SURFACE BASED ON THE 7-1/2' USGS TOPOGRAPHIC MAP FOR OLIVE HILL, NC DATED 1968, REVISED 1994.
THE SURFACE BOTTOM IN THE EASTERN EXTENSION IMPOUNDMENT WAS BASED ON INFORMATION OBTAINED FROM THE AMEC FOSTER WHEELER
DOCUMENT TITLED "SUMMARY REPORT FOR INVESTATION RESULTS EAST ASH POND SEDIMENT SAMPLING (ISSUE ROX-115)", DATED SEPTEMBER 16, 2015.
MONITORING WELL DATA WAS OBTAINED FROM THE COMPREHENSIVE SITE ASSESSMENT REPORT PREPAREED BY SYNTERRA, DATED SEPTEMBER 2, 2015.
PRIVATE WATER SUPPLY WELL INFORMATION WAS OBTAINED FROM A LIST PROVIDED BY DUKE ENERGY PROGRESS
MONITORING WELL WATER LEVELS WERE COLLECTED BY SYNTERRA ON APRIL 10, 2017.
MW-20BRL
ARTESIAN WELL
EASTERN EXTENSION IMPOUNDMENT
ASH �..�. _ _ ✓
ASH DEPTHS IN THE EASTERN
IMPOUNDMENT BASED ON REPORT BY AMEC
^lAl r,IDmTION FOSTER WHEELER DATED JUNE 3, 2016
synTerra
369'
276'
B'
(SOUTHEAST)
0
W W Of
W Z ZLu Lu
J
Z 0 0
Wcn
w w MNw
Er
W 0
d' G
JTTD
REGOLITH[TD ?
TD ?D ?
,In GROUNDNIATER FLOW DIRECTION
LEGEND
GROUND SURFACE
�WELLCASING MONITORING
WELL SCHEMATIC
SCREENED INTERVAL
GENERALIZED WATER TABLE
INFERRED WATER TABLE
HORIZONTAL GRAPHIC SCALE
250 0 250 500 R04 NCDEQ SUPPLY WELL SAMPLE ID
IN FEET DW -26 RECEPTOR SURVEY WELL ID
VERTICAL GRAPHIC SCALE MW-17BR MONITORING WELL
50 0 50 100 TO 233' TOTAL DEPTH ELEVATION OF BOREHOLE
IN FEET msl. IN FEET MEAN SEA LEVEL (mSI)
VERTICAL EXAGGERATION 5X FIGURE 8-4
SITE CROSS-SECTION B -B'
148 RIVER STREET, SUITE 220 DUKE ENERGY PROGRESS
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999 ROXBORO STEAM ELECTRIC PLANT
www.synterracorp.com 1700 DUNNAWAY RD
PRAWN OJECTMJ HN AGER: CRAIG DATE: 05/25/2017 SEMORA, NORTH CAROLINA
PROJECT MANAGER: CRAIG EADY