HomeMy WebLinkAboutNCS000354_Draft Permit Letter_20081120Mr. Michael D. Crabtree
Starpet Inc.
801 Pineview Road
Asheboro, NC 27203.
Dear Mr. Crabtree:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins; Director
Division of Water Quality
November 20, 2008
Subject: Draft NPDES Stormwater Permit
Permit No. NCS000354
Starpet Inc.
Randolph County
Enclosed with this letter is a copy of the draft stormwater permit for your facility. Please review the draft
very carefully to ensure thorough understanding of the conditions and requirements it contains.
The draft permit contains the following significant changes from this facility's current permit:
Analytical monitoring changes:,
1. All analytical monitoring parameters have been continued from the previous permit term.
2. pH has been added to the analytical monitoring requirements as per our current monitoring strategy.
3. All analytical monitoring has been set to semi-annually during a representative storm event as defined in
Part II Section B. The permittee must also document the total precipitation for each event. If no discharge
occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow"
within 30 days of the end of the six-month sampling period. Additionally, samples must be taken a
minimum of 60 days apart, as specified in Table 2.
4. Benchmarks for analytical monitoring have been added to this draft permit. Exceedances of benchmark
values require the permittee to increase monitoring, increase management actions, increase record
keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. If the
sampling results are above a benchmark'dalue, or outside of the benchmark range, for any parameter at
any outfall then the facility shall follow the Tier 1 guidelines which require a facility inspection within
two weeks and implementation of a mitigation plan within two months. If during the term of this permit,
the sampling results are above the benchmark values, or outside of the benchmark range, for any specific
parameter at a specific discharge outfall two times in a row (consecutive), then the facility shall follow the
Tier 2 guidelines which require a repetition of the steps listed for Tier 1 and also immediately institute
monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark
value for two consecutive samples.
5. You are required to collect all of the analytical and qualitative monitoring samples during representative
storm events as defined in Part II Section B. Qualitative monitoring is required regardless of
representative outfall status.
6. You are responsible for all monitoring until the renewal permit is issued. See Footnote 1 of Tables 1, 4,
and 5.
7. The flow reporting requirement has been removed per DWQ revised strategy. (The total rainfall
parameter is in this permit, however:)
8. Vehicle maintenance monitoring has been revised to semi-annually in order to coincide with analytical one
and Qualitative monitoring This real ' men aEpea_rs in all Individ al Stormo� a r erinit how ver iN MA(ra ling
p_� �113rrturat/y
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service
Internet h2o.encstate.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 807-6494 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer— 50°% RecycleNlO%Post Consumer Paper
Mr. Michael D. Crabtree
Starpet Inc.
Permit No. NCS000354
only applies to facilities that do vehicle maintenance. If the facility begins vehicle maintenance during the
permitted timeframe then the requirements shall apply.
Other permit changes:
1. Additional guidance is provided about the Site Plan requirements. The site map must now identify if the
receiving stream is impaired and if it has a TMDL established. It must also describe potential pollutants
in each outfall. The map requirements are stated more explicitly. And, the site plan must contain a list of
significant spills that have occurred in the past three years and also must certify that the outfalls have
been inspected to ensure that they do not contain non-stormwater discharges. Additional information is
provided in Part II Section A.
2. Additional requirements for the Stormwater Management Plan have been specified in Part Il Section A.
More details regarding secondary containment are provided.
3. Additional requirements for the Stormwater Pollution Prevention Plan have been specified in Part lI
Section A. The plan must also be updated annually to include a list of significant spills and to certify that
the outfalls do not contain non-stormwater discharges.
4. The facility must now implement a semi-annual Facility Inspection Program of the site's stormwater
management controls as specified in Part II Section A.
5. Information regarding the No Exposure Exclusion has been added to this draft permit. If industrial
materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122.26(g), the
facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit
requirements. Additional information is provided in Part I Section A.
Please submit any comments tome no later than thirty (30) days following your receipt of the draft.
Comments should be sent to the address listed at the bottom of this page. If no adverse comments are
received from the public or from you, this permit will likely be issued in about two months.
If you have any questions or comments concerning this draft permit, contact Robert Patterson at (919) 807-
6375 or robert.patterson@ncmail.net
Sincerely,
Robert D. Patterson, PE
Environmental Engineer
Stormwater Permitting Unit
cc: Winston-Salem Regional Office
Stormwater Permitting Unit _
Attachments