HomeMy WebLinkAboutNCS000346_Draft Permit Letter_20090216North Carolina
Beverly Eaves Perdue
Governor
Russell Cockerham
lnsteel Wire Products
129 Carter Street
Mount Airy NC 27030
Dear Mr. Cockerham:
NC ENR
Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
February 16, 2009
Subject: Draft NPDES Stormwater Permit
Permit No. NCS000346
Insteel Wire Products
Sorry County
Dee Freeman
Secretary
Enclosed with this letter is a copy of the draft stormwater permit for your facility. Please review the draft
very carefully to ensure thorough understanding of the conditions and requirements it contains.
The draft permit contains the following significant changes from this facility's current permit:
Analytical monitoring changes:
1. Analytical monitoring parameters, TSS, COD, Cd and Pb, have been maintained in this permit.
Additional monitoring will include Al and Zn.
2. pH has been added to the analytical monitoring requirements.
3. All analytical monitoring has been set to semi-annually during a representative storm event as defined in
Part II Section B. The permittee must also document the total precipitation for each event. If no discharge
occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow"
within 30 days of the end of the six-month sampling period. Additionally, samples must be taken a
minimum of 60 days apart, as specified in Table 2.
4. Benchmarks for analytical monitoring have been added to this draft permit. Exceedances of benchmark
values require the permittee to increase monitoring, increase management actions, increase record
keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. If the
sampling results are above a benchmark value, or outside of the benchmark range, for any parameter at
any outfall then the facility shall follow the Tier 1 guidelines which require a facility inspection within
two weeks and implementation of a mitigation plan within two months. If during the term of this permit,
the sampling results are above the benchmark values, or outside of the benchmark range, for any specific
parameter at a specific discharge outfall two times in a row (consecutive), then the facility shall follow the
Tier 2 guidelines which require a repetition of the steps listed for Tier 1 and also immediately institute
monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark
value for two consecutive samples.
5. You are required to conduct all of the analytical and qualitative monitoring during representative storm
events as defined in Part II Section B. Qualitative monitoring is required at every outfall regardless of
representative outfall status.
6. In the event that this permit expires, you are responsible for all monitoring until the renewal permit is
issued. See Footnote 1 of Tables 1, 4, and 5.
Wetlands and Stormwater Branch One
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NorthCarolina
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 �a�fK/N�I��
Internet: www.ncwaterquality.org < s
An Eaual O000rlunily k Affirmative Action Emolover
Mr. Russell Cockerham
Insteel Wire Products
Permit No. NCS000346
7. The flow reporting requirement has been removed per DWQ revised strategy. (The total rainfall
parameter is still required in this permit, however.)
8. Vehicle maintenance monitoring has been revised to semi-annually in order to coincide with analytical
and qualitative monitoring. This requirement appears in all Individual Stormwater permits, however it
only applies to facilities that do vehicle maintenance. If the facility begins vehicle maintenance during the
permitted timeframe then the requirements in Section II.D shall apply.
Other permit changes:
1. Additional requirements for the Stormwater Pollution Prevention Plan have been specified in Part II
Section A. The plan must also be updated annually to include a list of significant spills and to certify that
the outfalls do not contain non-stormwater discharges.
2. Additional guidance is provided about the Site Plan requirements. The site map must now identify if the
receiving stream is impaired and if it has a TMDL established. It must also describe potential pollutants
in each outfall. The map requirements are stated more explicitly. And, the site plan must contain a list of
significant spills that have occurred in the past three years and also must certify that the outfalls have
been inspected to ensure that they do not contain non-stormwater discharges. Additional information is
provided in Part II Section A.
3. Additional requirements for the Stormwater Management Plan have been specified in Part II Section A.
More details regarding secondary containment are provided.
4. The facility must now implement a semi-annual Facility Inspection Program of the site's stormwater
management controls as specified in Part II Section A.
5. Information regarding the No Exposure Exclusion has been added to this draft permit. If industrial
materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122.26(g), the
facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit
requirements. Additional information is provided in Part I Section A.
Please submit any comments to me no later than thirty (30) days following your receipt of the draft.
Comments should be sent to the address listed at the bottom of this page. If no adverse comments are
received from the public or from you, this permit will likely be issued in about two months.
If you have any questions or comments concerning this draft permit, contact me at (919) 807-6368 or
brian.lowther@ncmail.net
Sincerely,
=c 2s
Brian C. Lowther
Environmental Engineer
Stormwater Permitting Unit
cc: Winston-Salem Regional Office, Gary Hudson
Stormwater Permitting Unit
Attachments: Draft Permit