Loading...
HomeMy WebLinkAbout20090093 Ver 1_DCM Permit_20090416I h T f. w n. .. -w. .?. O¢?Y Ov ,...t Ptrm t `umber F r nit Class NNW STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission erm t for 35-09 i X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to David Fortuna, 110 Butterbiggins Lane, Apex, NC 27539 Authorizing development in Brunswick County at Lot 31 Barnes Bluff Drive, Southport, NC 28461 as requested in the permittee's application dated l l/7/08 (MP-1) & 12/5/08 (MP-4) including the attached workplan drawings (3) 1/ 2 dated 9/4/08, 2 /2 dated 12/19/08 & drawing 3 dated 7/08 This permit, issued on AnrT it 13, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) This permit authorizes a maximum of four formalized boat slips associated with the docking facility. 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James FfAiregson, Director XI "V Division of Coastal Management This permit and its conditions are hereby accepted. December 31, 2012 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee David Fortuna Permit #?5-09 Page 2 of 3 ' } ADDITIONAL CONDITIONS 4) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not I" exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 9) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 10) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with T15A:07fl.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. Gazebo 11) The authorized gazebo shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 12) The roof of the gazebo shall not be designed for second story use. David Fortuna r ADDITIONAL CONDITIONS General Permit #35-09 Page 3 of 3 13) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Array or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. NOTE: The permittee is cautioned that this permit does not authorize the placement of tie piles in association with the docking facility. Furthermore, due to the proximity of the AIWW, boats utilizing the docking facility will be subject to frequent wavewash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the structure and the safety of moored boats. The permittee shall not hold the State of North Carolina or the United States liable for any damage to the structure or moored boats. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 09-0093. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2009-00419 which was issued on 3/10/09. o. 0 0 I J ) ?. I I °. t9. f f 3 I ? IQ I ?CO f H i?0N O O rq T I ?. C C Z ' 10 0 ?-74- // - < I CII ,? ? ? IBS f Q N SON Q? °. f CIO O ?Q LL- 9 SHOO OON? - a\ sI m -7L w _? tz? ? ? O I e 5 I QCOQO ? :, ? ? , DJ C ?? ? o Qa- o Cy) o 0 0 Yy W F- V I I- Ln > u 3 ?, - O I O n N cn 5 Z Z? ?? j Z Q ~O ?o? J Qw? I v?mr I I Li I o w CL ? LL- _0 ' 0 0 O W z LLI w J O Ln z z S L I- O o O O o U u mo z o L o = Q Lo a_ Of o z >- w w o ?O O z v zz >- Lu a m w Q o N / o (n m O N 0 LLJ w U U U 0 z z LL- Q ' N O O Z O Q w CU 1- z F- I- z Q ry o 0 w z a_ U) (n = O 0 O O C E W ww J Q 00 z w X w w m LO y U W U W II II w w m w cn cn o II II m W Q Q O LL D (n W > - X W z ? Q Q W I - w - w U w / m _ }r _ _ (U J ° 0 CO LL Q i o cu v o Ln F i'+ y M ? r I I W I I ci I I I I RS ? I I U I I i i 1 ; i i n \ 1 i i CD C m Cl) x m ti r m ? ~_ D N N O 00 mm 0 °° f1 ^¦ 0 ? LZ z 0 vo 0 m m ? O O N ? m N O cn 0 I? N O North ct 5 Q ' ? a 7 U o o \ li bI 1 N ZW ~ U ?y ma Vw= V 1 11. W o? ?N LOT) ? ° 1ry3rv ? .tsp£ / SS,,j?r3 SZS! N . l [ 98 -7 .6£, l b10 ly o z ,f9 ?Z? .L1 w? / £B aw H 1?JO-N ali yo DN 0 n Q. h... ? N M NN O a?? ? z=m 8 x 2 h \ W$ N 00' 17'39 W 478.07' U ? )"ON ?q o°a W= ?°m N z ZE 9 H N JZ:? a IK j ¢ ? zOm / / ? a W ZN U ow4? F S LL n 1? m N S 2 LL N ?Al N Q a ?41b ti b N N aMJ °z o cn r ` yI C 1 z LJJ (t co co <3 ?2 z Li- S p Z O N Q UO q -j ?,c Q? C) O O ' U ? F zti w w C? Z F x r)mzz o C) 1 / v L6 I 1 r I L _ :firm g : / a / o h ato nruva 0 6Z,aAJN o) 0 ? p 3 ? O ? ? 2 oJU S6 0 99'1 W m mfuvo v711Y N N N wnLVaMnw Q ?? r sr oo ? II II A II II II II a _ = W ? QNQ .3i3 ? qG z a 0 WRLda M77W N a? I ? Q V- 2 .`.? ,O W Q :. •w I(l) J ?9f `? o 5 F CA: mod, 3<?m, e ¢ 1 I ? r ? I ?• mw (n w ???Ln zi I Lo N 1 Lu 0 x 0 W a N 0o i I Z y? I I I I va ,ozl r 1 .as t 1 11 ° a,, I I x I I I 1 N7 t 1 N^ r I 1 I? N. I m 1 1 I 0• m \ x O+ t? y W \ 1 K 'I'3 I o I? ^ I IQ I ' 2 N\ ? m I X I I r. ? I / NMlrydly I ° m I o. I°er I K W d t' I t I ? I r, ? \ t 1 I\ I \11,x_ N 1 0. sc ; I 1 ? t,\ <a 1 x r I ' ?'1 1 '` ? I o I Q .ci I r m 1 t . I ?\ 1 Co I " I / t 1 / 56 I I ( 1 ? Z H o `Ot ? x ij 1 I ? ? n I O I I Q V a I O I 1 ? I I \ 1 Q I 1 ??n o n 1 Q I I aON a I J r ?¢o I I Q I W '4 t°i (} I 1 ` I 1 , b m c m n I I 5 m ,c `m 1 I m c` °5 am of °y a ? O m ` 1 I m m ° b ;£g •a n ? r r c cq b., ? °o 1 V ? 1 Q ? 4 m ?ZI bpi oC a? E uj J ? Q ut u ¢ 2 ? O Z 2 ? O ¢ b •," ? G a°° b ? 0 in d U ca 0 2¢ n a Q a w °o o z z> 3 O v) O 3 y?U °N <u.°c c O ¢ N It 1k: 30 O a ? ` ? U ? p y? 10 T W y W W W W?? t °p 3 Zm :' ? ` ? o ? o ®€ v) O I ¢ O O O ¢ W E/1 c II II II II II U 3 3 o mn ° ,?L m C 2 ._ N C lU 4i 4i o-- '.F j g o r3