Loading...
HomeMy WebLinkAboutNC0051161_20180402_Compliance Evaluation Inspection x.w nines uhl -f ROY COOPER Governor MICHAEL S.REGAN Secretary Water Resources LINDA CULPEPPER Environmental Quality Interim Director April 2,2018 Mr.James Stanley, Operations Manager RECEIVED/DENR/DWR Plantation Pipe Line Company 6907-A West Market Street APR 11 2018 Greensboro,NC 27409 Water Resources Permitting Section SUBJECT: Compliance Evaluation Inspection Plantation Pipe Line—Greensboro Breakout Tank Farm NPDES Permit No.NC0051161 Guilford County Dear Mr. Stanley: On March 22, 2018, Jenny Graznak of this office met with you and Kelly Joyce to perform a Compliance Evaluation Inspection on the stormwater discharge from the Plantation Pipe Line Greensboro Breakout Tank Farm located at 6907-A West Market Street. The facility was found to be compliant with the NPDES permit. The inspection findings are detailed below and an inspection checklist is attached. 1.Permit The current permit became effective on January 1, 2017 and will expire on August 31, 2021. The facility had a copy of the permit on file for review during the inspection. 2. Self-Monitoring Program The monthly Discharge Monitoring Reports (DMRs)were reviewed for calendar year 2017. The facility was compliant with the NPDES effluent limits for this period. Also, it was noted that all sampling was performed per the frequencies specified in the permit. 3.Records/Reports A review of the facility files showed that all records are maintained according to the permit. A comparison of the January 2017 DMR with the corresponding certified laboratory data sheets from R&A Labs showed that all results were properly transcribed onto the self-monitonng report. All records and data associated with the permit appear to be well organized and maintained. 4.Flow Measurement The periodic flow at Outfall 001 is estimated by measuring the water height through a small trapezoidal flume.An ultrasonic flow meter is used to measure the discharge volume from Outfall 002(constant flow). The calibration of the meter was checked by the operators on August 29, 2017 with a bucket test. 5.Facility Site Review The Plantation Pipeline facility has the following stormwater control structures: • Secondary containment berms surrounding the petroleum bulk-storage tanks drain to either catch basin 001 or 002. • Catch basin 001 typically does not discharge via Outfall 001, but is activated if needed during significant rainfall events. Activation occurred in April,June,and September of 2017.Catch basin -� °thirng Co wares .� State of North Carolina I Environmental Quality 450 W Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105 Phone 336-776-98001 FAX 336-776-9797 001 has duplex pumps that routh the collected stormwater to the 300,000-gallon above ground equalization pool and treatment building • The treatment building contains two pumps and four granular activated carbon vessels(GAC)that receive stormwater from the equalization pool. • Flow from the GAC units is routed to the retention pond at Outfall 002 (constant flow)which has a skimmer device and an ultrasonic flow sensor. 6.Effluent/Receiving Waters Both outfalls discharge to a ditch that flows toward Burnt Poplar Road. The effluent eventually reaches a tributary of East Fork Deep River, class WS-N* waters of the Cape Fear River Basin. The discharge at Outfall 002 appeared clear durmg the inspection. This office appreciates your continued efforts to comply with the permit conditions. Should you have any questions concerning this report,please contact Jenny Graznak or me at(336)776-9800. Sincerely, 7 Sherri V.Knight,P E. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources cc: Johnny Tapia(johnnyytapia@kindermorgan.com) Jimmy Stamey(jimmy stamey@kindermorgan.com) Central Files WSRO 1�V United States Environmental Protection Agency Form Approved EPA Washington,D C 20460 OMB No 2040-0057 - Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding(i.e,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 I5 3 I NC0051161 111 12 1 18/03/22 117 181,•1 19 I c I 20 21111111 IIIIII11111111111111111I �=� IIIII � IIII rs Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved 671 I 7012 LJI I 711 72 s J J 731 I 174 751 1 1 1 1 1 1 180 Section B Facility Data L Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 11 OOAM 18/03/22 17/01/01 Greensboro Petroleum Breakout Facility 6907-A W Market St Exit Time/Date Permit Expiration Date Greensboro NC 27409 12 30PM 18/03/22 21/08/31 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data 1// Michael Kelly Joyce/ORC/336-601-2211/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted James L Stamey,6907-A W Market St Greensboro NC 27409/Operations Manager/336-547-3673/ No Section C Areas Evaluated Dunng Inspection(Check only those areas evaluated) Permit • Flow Measurement in Effluent/Receiving Waters Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Jenn er F Graznak WSRO WQ//336-771-5000/ 4'Z/21 r ` 1 ) 'r de Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date /26-4,t-A/(--`f i,/ EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# 1 I .r kg. NPDES yr/mo/day Inspection Type (Cont.) 1 31 NC0051161 11 1 121 18/03/22 117 18 LI I Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) 1 Permit The current permit became effective on January 1,2017 and will expire on August 31, 2021.The facility had a copy of the permit on file for review during the inspection. 2. Self-Monitoring Program The monthly Discharge Monitoring Reports(DMRs)were reviewed for calendar year 2017. The facility was compliant with the NPDES effluent limits for this period. Also, it was noted that all sampling was performed per the frequencies specified in the permit. 3 Records/Reports A review of the facility files showed that all records are maintained according to the permit. A comparison of the January 2017 DMR with the corresponding certified laboratory data sheets from R&A Labs showed that all results were properly transcribed onto the self-monitoring report.All records and data associated with the permit appear to be well organized and maintained. 4. Flow Measurement The periodic flow at Outfall 001 is estimated by measuring the water height through a small trapezoidal flume An ultrasonic flow meter is used to measure the discharge volume from Outfall 002 (constant flow). The calibration of the meter was checked by the operators on August 29,2017 with a bucket test. • 5 Facility Site Review The Plantation Pipeline facility has the following stormwater control structures •Secondary containment berms surrounding the petroleum bulk-storage tanks drain to either catch basin 001 or 002 • Catch basin 001 typically does not discharge via Outfall 001, but is activated if needed during a significant rainfall events. Activation occurred ir,April, June, and September of 2017. Catch basin 001 has duplex pumps that route the collected storrrwater to the 300,000-gallon above ground equalization pool and treatment building •The treatment building contains two pumps and four granular activated carbon vessels(GAC)that receive stormwater from the equalization pool. • Flow from the GAC units is routed to the retention pond at Outfall 002(constant flow)which has a skimmer device and an ultrasonic flow sensor. 6. Effluent/Receiving Waters Both outfalls discharge to a'ditch that flows toward Burnt Poplar Road The effluent eventually reaches a tributary of East Fork Deep River, class WS-IV*waters of the Cape Fear River Basin.The discharge at Outfall 002 appeared clear during the inspection. Page# 2 Permit. NC0051161 Owner-Facility. Greensboro Petroleum Breakout Facility Inspection Date: 03/22/2018 Inspection Type Compliance Evaluation Permit Yes No NA NE _ (If the present permit expires in 6 months or less) Has the permittee submitted a new 0 0 • 0 application? Is the facility as described in the permit? • 0 0 0 #Are there any special conditions for the permit? 0 • 0 0 Is access to the plant site restricted to the general public? • 0 0 0 Is the inspector granted access to all areas for inspection? • 0 0 0 Comment. The current permit became effective on January 1, 2017 and will expire on August 31,2021. The facility had a copy of the permit on file for review during the inspection. Flow Measurement-Effluent Yes No NA NE #Is flow meter used for reporting? • 0 0 0 Is flow meter calibrated annually? • 0 0 0 Is the flow meter operational? • 0 0 0 (If units are separated) Does the chart recorder match the flow meter? 0 0 • 0 Comment The periodic flow at Outfall 001 is estimated by measuring the water height through a small trapezoidal flume.An ultrasonic flow meter is used to measure the discharge volume from Outfall 002 (constant flow) The calibration of the meter was checked by the operators on August 29,2017 with a bucket test. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? • 0 0 0 Are the receiving water free of foam other than trace amounts and other debris? • 0 0 0 If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0 Comment No discharge was observed at Outfall 001, since this outfall is only activated during high rainfall events.The discharge at Outfall 002 appeared clear during the inspection. Page# 3