Loading...
HomeMy WebLinkAbout20091224 Ver 1_Meeting Minutes_20090421ON) STA fE OE Nowrui CAROLINA DEPARTMENT OF TRANSPORTATION BcVERLY EAVES PERDU: GOVERNOR April 21, 2009 Memorandum To: Meeting Attendees Subject: B-3611 Causeway Discussion /4/V///Ilk ?V W '?H EUGENL' A. CO\TI. JR. SR RIEARY Meeting Minutes for B-3611 Causeway Discussion April 16, 2009 Purpose: Town of Belhaven to discuss leaving in causeway on the Belhaven side of the existing bridge with NCDOT and Environmental Agencies. Brief Summary: The Town of Belhaven expressed the benefits of leaving in the causeway. They stated that fishing is a primary source of income for the Town as well as food for many of the residents and requested that the causeway remain to be used as access for a future fishing pier. Issues: Environmental agencies that were present US Fish and Wildlife, NC Wildlife Resource Commission, NC Division of Water Quality, NC Division Coastal Management, & US Anny Corp of Engineers all concurred with leaving in the existing causeway with their only concern that the current storm water drainage plan would affect vehicular access. Course of Action: The Hydraulics Unit (Paul Atkinson) is currently studying stone water issues and vehicle access. MAILING ADDRESS: NC DEPARTME14T OF TRAIISPORTATION PROJECT DEVELOPMENT AIJD ENVIRONMENTAL ANALYSIS BRIDGE PROJECT DEVELOPMENT Unit 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-431-2000 FAX'. 919431-2001 WEBSITE" WVnV.NCDOT.ORG LOCATION: PLEA ENVIRONMENTAL RESOURCE CENTER 4701 ATLANTIC AVENUE -SUITE 116 RALEIGH NC 27604 B-3611 Meeting Attendees Natalie Lockhart PDEA - Environmental Resource Center 1598 MAIL SERVICE CENTER (MAIL) Raleigh NC 2769971598 919-850-2187 John Williams, PE PDEA - Environmental Resource Center 1598 MAIL SERVICE CENTER (MAIL) Raleigh NC 27699-1598 919-850-2730 Mark Staley, EI, CPESC, CPSW Roadside Environmental Unit 1557 Mail Service Center (MAIL) Raleigh NC 27699-1557 919-733-2920 James S. Goodnight, PE Roadway Design Unit 1582 Mail Service Center (MAIL) Raleigh, 27699-1582 919-250-4016 Mark Hussey Roadway Design Unit 1582 Mail Service Center (MAIL) Raleigh, 27699-1582 919-250-4016 Paul Atkinson, PE Hydraulics Unit 1590 Mail Service Center (MAIL) Raleigh, 27699-1590 919-250-4100 Ed Eatmon, PE Highway Division 2 RD Box 1587 Greenville, 27835 252-830-3490 Mack Bailey, PE Structure Design Unit 1581 Mail Service Center (MAIL) Raleigh, 27699-1581 919-250-4055 Bruce Klappenbach, PE Structure Design Unit 1581 Mail Service Center (MAIL) Raleigh, 27699-1581 919-250-4057 RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek nea... Subject: RE: B-361 1 Replacement of bridge in NC 99 over Pantego Creek near Belhaven,N.C. From: "Twisdale, John W" <jtwisdale@ncdot.gov> Date: Mon, 30 Mar 2009 15:46:19 -0400 To: "Williams, John L" <jlwilliams@ncdot.gov>, "Lockhart, Natalie N" <nnlockhart@ncdot.gov>, "Goodwin, William T" <bgoodwin@ncdot.gov>, "Goodnight, James S" <joodnight@ncdot.gov>, "Hussey, Mark R" <mrhussey@ncdot.gov>, "Rivenbark, Chris" <crivenbark@ncdot.gov>, "Bailey, Mack" <mbailey2@ncdot.gov>, "Eatmon, Bryce E" <beatmon@ncdot.gov>, "Stanton, Tyler P" <tstanton@ncdot.gov>, "Jarvis, Elwood C" <wjarvis@ncdot.gov>, "Lassiter, Neil E" <nlassiter@ncdot.gov>, "Bunn, Eddie J" <ebunn@ncdot.gov>, "Walker, Warren F" <wwalker@ncdot.gov>, "Klappenbach, Bruce" <bklappenbach@ncdot.gov>, "townmanager@belhavennc.us" <townmanager@belhavennc.us>, "William.G.Wescott@usace.army.mill" <William.G.Wescott@usace.army.mill>, "Wilson, Travis W.' <travis.wilson@ncwildlife.org>, "David.Wainwright@ncmail.net" <David.Wainwright@ncmail.net>, "Steve.Sollod@ncmail.net" <Steve.SoIlod@ncmail.net> CC: "Goodwin, William T" <bgoodwin@ncdot.gov>, "Atkinson, Paul" <patkinson@ncdot.gov> John, Unfortunately, Hydraulics will be unable to attend this meeting due to other meetings and prior commitments. Our only concern, that may come, is related to the proposed grass swale that will be built in the footprint of the existing pavement of NC 99 on the North (Belhaven) end of the project. This proposed 3 foot base grass swale will run from 60+00 to 62+25 -L- right (Details "H" and "J"). This proposed grass swale is needed to provide treatment of the storm water from the bridge and proposed shoulder berm gutter. The Regional DWQ Office in Little Washington has reviewed the current drainage design and found it be acceptable. If the existing R/W is reduced in this area due to a change in ownership, the proposed grass swale will need to remain inside of R/W or PDE. If there are any other drainage related issues that anyone might have prior to the meeting, we will be glad to address them. Thanks Jay From: Williams, John L Sent: Tuesday, March 24, 2009 3:53 PM To: Lockhart, Natalie N; Goodwin, William T; Goodnight, James S; Hussey, Mark R; Rivenbark, Chris; Bailey, Mack; Eatmon, Bryce E; Twisdale, John W; Stanton, Tyler P; Jarvis, Elwood C; Lassiter, Neil E; Bunn, Eddie J; Walker, Warren F; Klappenbach, Bruce; townmanager@belhavennc.us; William.G.Wescott@usace.army.mill; Wilson, Travis W.; David. Wainwright@ncmai1.net; Steve.Sollod@ncmai1.net Cc: Goodwin, William T Subject: RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek near Belhaven,N.C. All: A meeting has been scheduled for B-36119-10:30 on Apr 16 in one of the merger slots but is not a merger project. The purpose of the meeting is for the town to present a request, to leave the existing northern (Belhaven side) causeway in place as a fishing/ recreational location, to the agencies who have helped shepherd this project so far. I of 2 4/15/2009 3:14 PM RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek nea... The town manager will be in attendance. As most of you are very familiar with the project I'm not sure there's much in the way of information package to send although I'm open if any feel that there is early information that would be beneficial. The town would simply like to discuss w/ NCDOT and the agencies the feasibility of leaving the causeway in. We'll have a full size set of plans available at the meeting for discussion The reason for using the merger slot was that many, though perhaps not all, of the normal merger team members would be involved in this discussion. To that end, if there are others that the agencies feel would be important to include in on the discussion (eg. DMF, USFWS, etc.) let me know and I'll be glad to include them. As an FYI this project has just begun the right of way stage and is scheduled for Let March 2010. Thanks John Williams PDEA Bridge Unit (919) 850-2730 From: Lockhart, Natalie N Sent: Tuesday, March 24, 2009 10:09 AM To: Williams, John L; Goodwin, William T; Goodnight, James S; Hussey, Mark R; Rivenbark, Chris; Bailey, Mack; Eatmon, Bryce E; Twisdale, John W; Stanton, Tyler P; Jarvis, Elwood C; Lassiter, Neil E; Bunn, Eddie J; Walker, Warren F; Klappenbach, Bruce Subject: B-3611 When: Thursday, April 16, 2009 9:00 AM-10:30 AM (GMT-05:00) Eastern Time (US & Canada). Where: TBD B-3611 Merger Meeting Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 of 2 4/15/2009 3:14 PM