Meeting Minutes for B-3611 Causeway Discussion April 16, 2009
Purpose: Town of Belhaven to discuss leaving in causeway on the Belhaven side of the
existing bridge with NCDOT and Environmental Agencies.
Brief Summary: The Town of Belhaven expressed the benefits of leaving in the
causeway. They stated that fishing is a primary source of income for the Town as well as
food for many of the residents and requested that the causeway remain to be used as
access for a future fishing pier.
Issues: Environmental agencies that were present US Fish and Wildlife, NC Wildlife
Resource Commission, NC Division of Water Quality, NC Division Coastal
Management, & US Anny Corp of Engineers all concurred with leaving in the existing
causeway with their only concern that the current storm water drainage plan would affect
vehicular access.
Course of Action: The Hydraulics Unit (Paul Atkinson) is currently studying stone water
issues and vehicle access.
MAILING ADDRESS:
NC DEPARTME14T OF TRAIISPORTATION
PROJECT DEVELOPMENT AIJD ENVIRONMENTAL ANALYSIS
BRIDGE PROJECT DEVELOPMENT Unit
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-431-2000
FAX'. 919431-2001
WEBSITE" WVnV.NCDOT.ORG
LOCATION:
PLEA ENVIRONMENTAL RESOURCE CENTER
4701 ATLANTIC AVENUE -SUITE 116
RALEIGH NC 27604
B-3611 Meeting Attendees
Natalie Lockhart
PDEA - Environmental Resource Center
1598 MAIL SERVICE CENTER (MAIL)
Raleigh NC 2769971598
919-850-2187
John Williams, PE
PDEA - Environmental Resource Center
1598 MAIL SERVICE CENTER (MAIL)
Raleigh NC 27699-1598
919-850-2730
Mark Staley, EI, CPESC, CPSW
Roadside Environmental Unit
1557 Mail Service Center (MAIL)
Raleigh NC 27699-1557
919-733-2920
James S. Goodnight, PE
Roadway Design Unit
1582 Mail Service Center (MAIL)
Raleigh, 27699-1582
919-250-4016
Mark Hussey
Roadway Design Unit
1582 Mail Service Center (MAIL)
Raleigh, 27699-1582
919-250-4016
Paul Atkinson, PE
Hydraulics Unit
1590 Mail Service Center (MAIL)
Raleigh, 27699-1590
919-250-4100
Ed Eatmon, PE
Highway Division 2
RD Box 1587
Greenville, 27835
252-830-3490
Mack Bailey, PE
Structure Design Unit
1581 Mail Service Center (MAIL)
Raleigh, 27699-1581
919-250-4055
Bruce Klappenbach, PE
Structure Design Unit
1581 Mail Service Center (MAIL)
Raleigh, 27699-1581
919-250-4057
RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek nea...
Subject: RE: B-361 1 Replacement of bridge in NC 99 over Pantego Creek near Belhaven,N.C.
From: "Twisdale, John W" <jtwisdale@ncdot.gov>
Date: Mon, 30 Mar 2009 15:46:19 -0400
To: "Williams, John L" <jlwilliams@ncdot.gov>, "Lockhart, Natalie N" <nnlockhart@ncdot.gov>,
"Goodwin, William T" <bgoodwin@ncdot.gov>, "Goodnight, James S" <joodnight@ncdot.gov>,
"Hussey, Mark R" <mrhussey@ncdot.gov>, "Rivenbark, Chris" <crivenbark@ncdot.gov>, "Bailey,
Mack" <mbailey2@ncdot.gov>, "Eatmon, Bryce E" <beatmon@ncdot.gov>, "Stanton, Tyler P"
<tstanton@ncdot.gov>, "Jarvis, Elwood C" <wjarvis@ncdot.gov>, "Lassiter, Neil E"
<nlassiter@ncdot.gov>, "Bunn, Eddie J" <ebunn@ncdot.gov>, "Walker, Warren F"
<wwalker@ncdot.gov>, "Klappenbach, Bruce" <bklappenbach@ncdot.gov>,
"townmanager@belhavennc.us" <townmanager@belhavennc.us>,
"William.G.Wescott@usace.army.mill" <William.G.Wescott@usace.army.mill>, "Wilson, Travis W.'
<travis.wilson@ncwildlife.org>, "David.Wainwright@ncmail.net" <David.Wainwright@ncmail.net>,
"Steve.Sollod@ncmail.net" <Steve.SoIlod@ncmail.net>
CC: "Goodwin, William T" <bgoodwin@ncdot.gov>, "Atkinson, Paul" <patkinson@ncdot.gov>
John,
Unfortunately, Hydraulics will be unable to attend this meeting due to other meetings and prior
commitments. Our only concern, that may come, is related to the proposed grass swale that will be built in
the footprint of the existing pavement of NC 99 on the North (Belhaven) end of the project. This proposed
3 foot base grass swale will run from 60+00 to 62+25 -L- right (Details "H" and "J"). This proposed grass
swale is needed to provide treatment of the storm water from the bridge and proposed shoulder berm
gutter. The Regional DWQ Office in Little Washington has reviewed the current drainage design and
found it be acceptable. If the existing R/W is reduced in this area due to a change in ownership, the
proposed grass swale will need to remain inside of R/W or PDE. If there are any other drainage related
issues that anyone might have prior to the meeting, we will be glad to address them.
Thanks
Jay
From: Williams, John L
Sent: Tuesday, March 24, 2009 3:53 PM
To: Lockhart, Natalie N; Goodwin, William T; Goodnight, James S; Hussey, Mark R; Rivenbark, Chris;
Bailey, Mack; Eatmon, Bryce E; Twisdale, John W; Stanton, Tyler P; Jarvis, Elwood C; Lassiter, Neil E;
Bunn, Eddie J; Walker, Warren F; Klappenbach, Bruce; townmanager@belhavennc.us;
William.G.Wescott@usace.army.mill; Wilson, Travis W.; David. Wainwright@ncmai1.net;
Steve.Sollod@ncmai1.net
Cc: Goodwin, William T
Subject: RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek near Belhaven,N.C.
All:
A meeting has been scheduled for B-36119-10:30 on Apr 16 in one of the merger slots but is
not a merger project.
The purpose of the meeting is for the town to present a request, to leave the existing northern
(Belhaven side) causeway in place as a fishing/ recreational location, to the agencies who have
helped shepherd this project so far.
I of 2 4/15/2009 3:14 PM
RE: B-3611 Replacement of bridge in NC 99 over Pantego Creek nea...
The town manager will be in attendance.
As most of you are very familiar with the project I'm not sure there's much in the way of
information package to send although I'm open if any feel that there is early information that
would be beneficial. The town would simply like to discuss w/ NCDOT and the agencies the
feasibility of leaving the causeway in. We'll have a full size set of plans available at the meeting
for discussion
The reason for using the merger slot was that many, though perhaps not all, of the normal
merger team members would be involved in this discussion. To that end, if there are others
that the agencies feel would be important to include in on the discussion (eg. DMF, USFWS,
etc.) let me know and I'll be glad to include them.
As an FYI this project has just begun the right of way stage and is scheduled for Let March
2010.
Thanks
John Williams
PDEA Bridge Unit
(919) 850-2730
From: Lockhart, Natalie N
Sent: Tuesday, March 24, 2009 10:09 AM
To: Williams, John L; Goodwin, William T; Goodnight, James S; Hussey, Mark R; Rivenbark, Chris; Bailey, Mack; Eatmon,
Bryce E; Twisdale, John W; Stanton, Tyler P; Jarvis, Elwood C; Lassiter, Neil E; Bunn, Eddie J; Walker,
Warren F; Klappenbach, Bruce
Subject: B-3611
When: Thursday, April 16, 2009 9:00 AM-10:30 AM (GMT-05:00) Eastern Time (US & Canada).
Where: TBD
B-3611 Merger Meeting
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
2 of 2 4/15/2009 3:14 PM