HomeMy WebLinkAbout20210789 Ver 1_U-5896 InternalExternal_ScopingMtgSummary_draft_20180410STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
April 4, 2018
7AMES H. TROGDON, III
SECRETARY
Subject: InternaUExternal Scoping Meeting Summary
Proposed reconstruction of the US 29-70/ I-85 Business and S.R. 1009 (South Main Street)
interchange in High Point, Guilford County, WBS 44674.1.1, STIP U-5896
From: Verrol McLeary
Project Development Engineer
An InternaUExternal Scoping Meeting for the subject project was held on March 28, 2018 at
8:30 a.m. in the Structure Design Conference Room located in the Century Center. The following
people were in attendance:
Felix Davila
April Norton
Verrol McLeary
Beverly Robinson
Laura Sutton
Carla Dagnino
Jeff Hemphill
Harrison Marshall
Bernie Bumgarner
Nick Lineberger
Jamshid Hafshejani
Tim Jordan
Jordan Woodard
Aileen Mayhew
Rebecca Jackson
Alexandria Sentilles
Via Skype Meeting:
David Bailey
Greg Venable
Patty Eason
Mark Staley
David Langston
Rick Lakata
Jeff Hess
Paige Hunter
FHWA
NCDWR
Project Management Unit
Project Management Unit
Project Management Unit
Environmental Analysis Unit
Environmental Analysis Unit
PI & Comm. Studies
Utilities
Congestion Management
DMP Inc.
Mott MacDonald
Mott MacDonald
Mott MacDonald
Mott MacDonald
Mott MacDonald
USACE
High Point Urban Area MPO
Highway-Division 7
Roadside Environmental Unit
Location & Surveys
STIP
HNTB
HNTB
felix.davila@dot.gov
april.norton@ncdenr.gov
vmclearyl @ncdot.gov
brobinson@ncdot.gov
lsutton@ncdot.gov
cdagnino@ncdot.gov
jhemphill@ncdot.gov
hmarshall@ncdot.gov
bbumgarner@ncdot.gov
nclineberger@ncdot.gov
j hafshej ani@ dmp.inc. com
tim.j ordan@mottmac.com
j ordan.woodard@mottmac.com
aileen.mayhew@mottmac. com
rebecca.j ackson@mottmac. com
alexandria. s entilles @mottmac. com
david. e.bailey2@usace. army.mil
greg.venable@highpointnc.gov
peason@ncdot.gov
mstaley@ncdot.gov
DLangston@ncdot.gov
rjlakata@ncdot.gov
jhess@hntb.com
phunter@hntb. com
The purpose of the meeting was to transfer pertinent information from NCDOT staff to the Project
Development Engineer, as well as begin early coordination efforts by discussing the project with
resource agencies and other stakeholders. The meeting began with introductions and a brief
MailingAddress: Telephone: (919) 707-6200 Location:
NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE
DIVISION OF HIGHWAYS RALEIGH, NC 27610
1582 MAIL SERVICE CENTER T�ebsite: www.ncdot.gov
RALEIGH, NC 27699-1582
description of the federally funded project. A slide presentation provided a review of the
information included in the proj ect data sheet. The presentation included a brief description of each
of the potential alternative concepts, including:
• Alternative 1- Tight Diamond Interchange
• Alternative 2- Partial Cloverleaf Interchange
• Alternative 3- Partial Cloverleaf Interchange with Ramps and Loops in opposite (Northwest
and Southeast) Quadrants
During the presentation, HNTB discussed the results of the preliminary traffic capacity analysis:
• All three Alternatives exhibit acceptable traffic operations; Alternative 2(Partial Cloverleaf
Interchange) operates best in the preliminary analysis
• Under Alternatives 1 and 3, recommends allowing left turns into Greenview Terrace but
restricting left turns out of Greenview Terrace
• Under Alternative 2, recommends limiting the turning movements on Greenview Terrace to
right-in and right-out only
• All Alternatives include traffic signals at the ramp terminals on South Main Street
The Meeting Agenda and Project Data Sheet (including maps) are attached. Information relayed to
the project team by each group is provided below:
USACE
• The existing wetland in the proj ect area contains a stream within it, which runs towards
Richland Creek
• Alternative 3(Partial Cloverleaf Interchange with Ramps and Loops in Opposite Quadrants)
may require a Section 404 Individual Permit and may have more stream impacts than the
other alternatives
1�:►�.�L1
Inquired about Section 4(� resources in the project area
Asked for additional information on the buildings being acquired during right of way
acquisition
Joe Geigle will be the point of contact for FHWA for this project
NCDWR
• Randleman Lake Water Supply Watershed buffer rules apply
• Project is located within a Critical Supply Watershed
• Richland Creek is classified as Class WS-IV
Hi�h Point Metropolitan Plannin� Or�anization (HPMPO�
• City of High Point Bicycle Master Plan is currently under development; there is no draft
available for review nor any funding allocated for the plan
• The proposed greenway located south of the US 29-70/I-85 Business Interchange is part of a
long-range greenway plan; currently there is no funding allocated for the greenway trail
• Stated a preference for Alternative 1(Tight Diamond Interchange)
Division 7
• NCDOT is pursuing advanced ROW acquisition in interchange area
• Stated a preference for Alternative 1(Tight Diamond Interchange)
U-5896 Internal/External Scoping Meeting Page � 2
Apri14, 2018
Public Involvement & Community Studies
• Noted the presence of Environmental Justice (E� and Limited English Proficiency (LEP)
populations in the area
• Stated that impacts to populations during construction should be considered and minimized
• The High Point Furniture Market (April and November) will generate a lot of traffic on South
Main Street
• Consider avoiding construction during High Point Furniture Market timeframe to minimize
impacts
Natural Environment
• Stream located through the wetland in the northwest ramp quadrant is subject to the
Randleman Lake Water Supply Watershed
STIP
• Cost estimates for Right-of-Way have increased to $13.4 million due to new estimates for
acquisition of properties within the proposed interchange
Con�estion Mana e� ment
• No additional comments
Roadside Environmental
• No additional comments
Location and Survevs
• Surveys are being completed now and should be finished by the end of April 2018
Utilities
• Stated all three project alternatives would have high impacts on utilities
• Requested roadway plans with hydraulic design to better determine the utility conflicts
OPEN DISCUSSION
• Merger Process
o USACE and NCDWR agreed this project does not need to go through Merger if
Alternative 3 is removed from consideration
• STIP Project Nos. B-5353 and U-5896 will be let for construction together.
• Proposed project may impact culvert carrying Richland Creek under S.R. 1009 (South Main
Street)
• Design Considerations
o Bicycle and pedestrian accommodations on South Main Street
• Project schedule is aggressive. The current schedule is below:
o Categorical Exclusion: July 2018
o Right-of-Way: February 2019
o Construction: August 2020
U-5896 Internal/External Scoping Meeting Page � 3
Apri14, 2018
ACTION ITEMS/ NEXT STEPS
PMU will forward Final Surveys to Mott MacDonald when transmitted
A copy of the presentation was requested by Patty Eason, Division 7
o The presentation was uploaded to SharePoint under `Project Develop�nent:
Reference Info and Links " on 04/04/18
If any meeting participants have any comments, questions, or edits to this memorandum, please
contact Verrol McLeary at vmclearyl@ncdot.gov or 919.707.6044.
After the �neeting, NCDOT's Structures Manage�nent Unit expressed a preference for Alternative 1,
which would include a bridge with a s�naller deck area than the other alternatives.
cc: Meeting Attendees
Attachments
Agenda; Project Data Sheet (including maps)
U-5896 Internal/External Scoping Meeting Page � 4
Apri14, 2018