Loading...
HomeMy WebLinkAbout20140802 Ver 2_More Info Received_20180314Moore, Andrew W From: Wyatt Edsel <wedsel@anchorgea.com> Sent: Wednesday, March 14, 2018 4:24 PM To: Moore, Andrew W Cc: 'David.W.Brown@usace.army.mil'; Leslie, Andrea J Subject: [External] RE: Request for Additional Information, North Pacolet River Reach 4, Polk County (DWR Project #20140802V2) Attachments: Details-S.PDF External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to m. Andrew, Please find the attached details you requested. The plans were originally prepared by Zan Price in 2014. Conditions have changed since then that required modification of the plans. This has required modifications to Zan's plans. Zans original plans were included to show the portions of the project on C-6.0 that were not revised. The more recently certified sheet C-6.0 which was signed by Tony Hauser shows revisions in Phase 3 of construction which are currently underway. We have not made revisions to Zan's plans in Phase 4 so his original plan is included to show what is proposed in that area. Let me know if you have additional questions or if you would like to discuss. Thank you, Wyatt Edsel, PE ANCHOR QEA OF NORTH CAROLINA, PLLC (Formerly Altamont Environmental, Inc.) T: 828.348.2180 C: 828.707.6120 From: Moore, Andrew W [mailto:andrew.w.moore@ncdenr.gov] Sent: Wednesday, March 14, 2018 2:08 PM To: Wyatt Edsel <wedsel@anchorqea.com> Cc: 'David.W.Brown@usace.army.mil' <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: Request for Additional Information, North Pacolet River Reach 4, Polk County (DWR Project #20140802V2) Wyatt, On February 26, 2018, the Division of Water Resources (Division) received your application dated February 26, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until the following items are addressed: Please provide construction details for the Longitudinal Peaked Stone Toe (LPST), LPST Tie-back/keyway, and Stream Barb. Please clarify the design approach for approximate station 38+50 to 42+50. Two Sheet C-6.0 were provided with the Pre -Construction Notification, which appear to show two separate designs within the same area. Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received within 30 days, the Division will be unable to approve the application and it will be returned. Feel free to contact me if you have any questions or would like to discuss further. Andrew W. Moore, P.G. Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.