Loading...
HomeMy WebLinkAbout20070924 Ver 1_Notice of Violation_20090407LVI-IWA NCDENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretarv April 1, 2009 Cypress Grove Land, LLC Mr. Steve Shuttleworth 7741 Market Street, Suite H Wilmington NC 28411 Cypress Grove Land, LLC Mr. Steve Shuttleworth 720 North 3`d Street Wilmington NC 28401 ?, _ ? : It t APR `?Lf)n 1WRANDS AND S70RSVf?NA?ER BRANGM Subject: Tarin Woods NOTICE OF VIOLATION (NOV-2009-PC-0320) Construction Stormwater Permit NCGO10000 (NCR000877), 401 Water Quality Certification (DWQ # 2007-0924) New Hanover County Dear Mr. Shuttleworth: On March 23, 2009, Mr. Chad Coburn from the Wilmington Regional Office of the Division of Water Quality conducted a site inspection for the tract/project known as Tarin Woods, located off of US421, Wilmington, North Carolina. The site visit and file review revealed that the subject project has an approved Erosion and Sedimentation Control Plan and is covered by Stormwater General Permit NCG010000. A Construction Stormwater General Permit (NCG010000) is issued upon the approval of an Erosion and Sedimentation Control Plan. This permit applies to projects that receive a Division of Land Resources (DLR) (or local delegated program) Erosion and Sedimentation Control Plan for land disturbance of 1 acre or greater. Specifically, the General Permit (NCGO10000) authorizes the discharge of stormwater under the National Pollutant Discharge Elimination System (NPDES) in accordance with Title 15A North Carolina Administrative Code 211.0100. In addition, this project was inspected for compliance with the 401 Water Quality Certification with Additional Conditions covered by certification number 3631 granted on June 20, 2007. These inspections revealed that the subject property has the following violations as detailed below: (I) Construction Stormwater General Permit NCG010000 (II) 401 Water Quality Certification I. Construction Stormwater General Permit NCG010000 a) Maintenance of Erosion Control Measures (Part I Section C• No 2.) According to the Sedimentation Inspection Report from New Hanover County dated March 17, 2009, the project was cited for failing to maintain the erosion control measures. b) Following the Approved Plan (Part I Section A No 2.) According to the Sedimentation Inspection Report from New Hanover County dated March 17, 2009, the project was cited for failing to follow the approved plan. North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington Regional Office Wilmington, NC 28405-3845 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Phone (910) 796-7215 FAX (910) 350-2004 Natural Resources One orthCarolina Customer Servicel-877-623-67 6l wrally Internet: h2o.enr.state.nc.us 2 Tarin Woods New Hanover County NOV-2009-PC-0320 II. 401 Water Quality Certification - The 401 WQC approved the impact of 173 linear feet of perennial stream to complete your project as described in your May 2007 application. a) Condition 2 of the 401 WQC states, "No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the PCN." b) Condition 3 of the 401 WQC states, "Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation, and operation & maintenance of such BMP's in order to protect surface water standards." Required Response - You are directed to respond to this letter in writing within 30 days of receipt. Your response should include the following: 1. Provide all inspection records from the date of land disturbance up to the date of your response. If you do not have records, explain why. 2. Submission of a Stream Restoration Plan for our review and approval. Sediment in the stream at depths greater than two (2) inches must be removed to high ground and stabilized. Sediment must be removed manually using shovels and buckets. The streambed must be restored to the original profile and the stream banks must be stabilized where necessary. Also, include a detailed implementation schedule. 3. List and explain all actions you have taken or plan to take to achieve full compliance with the approved Erosion & Sedimentation Control Plan, the Construction Stormwater general permit NCGO10000. Include a detailed implementation schedule with a final date of compliance. This office requires that the violations, as detailed above, be immediately and properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters, please contact Chad Coburn at (910) 796-7215. Sincerely, 4 Rick Shiver Surface Water Protection Section Wilmington Regional Supervisor cc: John Hennessey - NPS-ACO Unit, Archdale Building Cyndi Karoly - 401 Oversight/Express Review Permitting Unit Emily Hughes - USACE Wilmington Field Office WiRO