HomeMy WebLinkAboutNC0024970_Compliance Evaluation Inspection_20180410United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCO024970 111 12 I 18/03/29 I17 18 I S i 19 LG] i 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 2.0 70 Id I 71 [ I 72 I I 73 �74 751 1 1 1 1 1 1 180
I—I I�
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:15AM 18/03/29
17/10/01
McAlpine Creek WWTP
12701 Lancaster Hwy
Exit Time/Date
Permit Expiration Date
Pineville NC 28134
04:15PM 18/03/29
21/06/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Sandy Kim Neely/ORC/704-542-0736/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jacqueline A Jarrell,5100 Brookshire Blvd Charlotte NC 282163371/Operations
Chief/704-336-5433/ Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Wes Bell D"' Signedby: MRO WQ//704-663-1699 Ext.2192/ 4/10/2018
�PiY 24
A:6)96D90CC3437...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
4/11/2018
Page#
EA14CC681AF27425...
NPDES yr/mo/day Inspection Type
NC0024970 111 121 18/03/29 1 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On-site Representatives:
The following Charlotte Water personnel were in attendance during the inspection: Ms. Jacqueline
Jarrell, Mr. Kim Neely, Mr. Joseph Lockler, Mr. Keith Purgason, Mr. Eric Knabb, Mr. Shannon Sypolt,
and Mr. Doug Wise.
Page#
Permit: NCO024970 Owner - Facility: McAlpine Creek WWTP
Inspection Date: 03/29/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
E
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The last compliance evaluation inspection was performed at the facility on 5/12/16 by DWR
staff.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
❑
❑
❑
❑
Dates, times and location of sampling
Monitoring Reports (DMRs) were reviewed for the period January 2017 through
December
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
0
Comment: The records reviewed during the inspection were organized and well maintained. Discharge
Monitoring Reports (DMRs) were reviewed for the period January 2017 through
December
2017. No effluent limit violations were reported and all monitoring frequencies were correct.
Laboratory
Yes No NA NE
Page# 3
Permit: NCO024970 Owner - Facility: McAlpine Creek WWTP
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
Inspection Date: 03/29/2018 Inspection Type: Compliance Evaluation
❑
Is sample collected above side streams?
0
❑
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
0
❑
Celsius)?
0
❑
❑
❑
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
0
❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
0
❑
Comment: Influent and effluent analyses (including field) are performed under the Charlotte Water
Environmental Laboratory Services Certification #192. Prism Laboratories (low level
mercury and phenols) ETT (toxicity), and R&A Labs (toxicity) have also been contracted to
provide analytical support.
Influent Sampling
Yes No NA NE
# Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is sampling performed according to the permit?
0
❑
❑
❑
Comment: The subject permit requires BOD and TSS composite samples. Aliquot verifications are
Performed (by operations staff) five days per week (minimum) and documented. The
composite sampler was collecting over 100 mis. per aliquot and the internal temperature
was less than four degrees Celsius at the time of the inspection.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes No NA NE
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
N ❑ ❑ ❑
Comment: The subject permit requires composite and grab effluent samples. Aliquot verifications are
Performed (by operations staff) five days per week (minimum) and documented. The
composite sampler was collecting over 100 mis. per aliquot and the internal temperature
was less than four degrees Celsius at the time of the inspection.
Page# 4
Permit: NCO024970 Owner - Facility: McAlpine Creek WWTP
Inspection Date: 03/29/2018 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The wastewater treatment facilitv aDDeared to be Droaerly operated and well maintained
The ORC and staff incorporate a comprehensive process control program with all
measurements being properly documented and maintained on-site. In-depth operation and
maintenance records were also being maintained on-site. The facility is equipped with a
SCADA System that is accessible at fourteen separate locations throughout the wastewater
facility. The on-site operators are also notified of alarm conditions via paging system.
Odor control systems are connected to selected treatment processes/units including_
influent pump station, primary clarifiers, sludge thickening/dewatering, and Residual
Management Facility.
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
❑
b.Mechanical
0
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Grit Removal
Yes No NA NE
Type of grit removal
a.Manual
❑
b.Mechanical
Is the grit free of excessive organic matter?
❑
❑
❑
Is the grit free of excessive odor?
0
❑
❑
❑
# Is disposal of grit in compliance?
0
❑
❑
❑
Page# 5
Permit: NC0024970
Owner - Facility: McAlpine Creek WWTP
Is the basin aerated?
0
❑
Inspection Date: 03/29/2018
Inspection Type: Compliance Evaluation
Is the basin free of bypass lines or structures to the natural environment?
0
❑
Grit Removal
Yes No NA NE
Comment: Screenings and grit are disposed by a contracted company at the CMS Landfill in Cabarrus
0
❑
County.
❑
Are all pumps present?
0
❑
Pump Station - Influent
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
0
Comment:
Equalization Basins
Yes No NA NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Are audible and visual alarms operable?
❑
❑
0
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Comment:
Flow Measurement - Influent
Yes No NA NE
# Is flow meter used for reporting?
❑
0
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter has been calibrated annually by CITI, LLC.
Primary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑
Page# 6
Permit: NCO024970
Inspection Date: 03/29/2018
Owner - Facility: McAlpine Creek WWTP
Inspection Type: Compliance Evaluation
Primary Clarifier
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the sludge blanket level acceptable?
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
Comment: All eight primaries (4 - North Train and 4 - South Train) are covered and were in service.
Nutrient Removal
# Is total nitrogen removal required?
# Is total phosphorous removal required?
Type
# Is chemical feed required to sustain process?
Is nutrient removal process operating properly?
Comment: Phosphorus levels are reduced biologically and chemically (ferric chloride).
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
■
❑
❑
❑
■
❑
1:11:1
❑
Biological
■
❑
■
❑
❑
❑
■
❑
❑
❑
Ext. Air
Diffused
■
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
Comment: All twenty-eight aeration basins (12 — North Train and 16 — South Train) were in service.
Magnesium hydroxide is added to maintain appropriate alkalinity/pH levels.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Yes No NA NE
■ ❑ ❑ ❑
Page# 7
Permit: NCO024970 Owner - Facility:
McAlpine Creek WWTP
Are pumps in place?
0
❑
Inspection Date: 03/29/2018 Inspection Type:
Compliance Evaluation
Are pumps operational?
0
❑
Secondary Clarifier
Yes No NA NE
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately 1/4 of the sidewall depth)
0
❑
❑
❑
Comment: All sixteen secondaries (6 - North Train and 10 - South Train) were in service.
Pumps -RAS -WAS
Yes No NA NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
0
❑
❑
❑
Comment:
Filtration (High Rate Tertiary)
Yes No NA NE
Type of operation:
Down flow
❑
❑
Is the filter media present?
0 ❑
❑
❑
Is the filter surface free of clogging?
❑
❑
❑
Is the filter free of growth?
❑
❑
❑
Is the air scour operational?
❑
❑
❑
Is the scouring acceptable?
❑
❑
❑
Is the clear well free of excessive solids and filter media?
❑
❑
❑
Comment: All nineteen tertiary sand filters were in service.
Disinfection -Liquid
Yes No NA NE
Is there adequate reserve supply of disinfectant?
0
❑
❑
❑
(Sodium Hypochlorite) Is pump feed system operational?
0
❑
❑
❑
Is bulk storage tank containment area adequate? (free of leaks/open drains)
0
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Page# 8
Permit: NC0024970
Inspection Date: 03/29/2018
Owner - Facility: McAlpine Creek WWTP
Inspection Type: Compliance Evaluation
Disinfection -Liquid
Yes No NA NE
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
0
❑
❑
❑
Comment: Aqueous sodium hypochlorite is used for disinfection. Both chlorine contact chamber trains
were in service.
De -chlorination
Yes No NA NE
Type of system ?
Liquid
❑
❑
❑
Is the feed ratio proportional to chlorine amount (1 to 1)?
0
❑
❑
❑
Is storage appropriate for cylinders?
❑
❑
0
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Are the tablets the proper size and type?
❑
❑
0
❑
Comment: Aqueous sodium bisulfite is used for dechlorination.
Are tablet de -chlorinators operational? ❑ ❑ ❑
Number of tubes in use?
Comment:
Chemical Feed
Yes No NA NE
Is containment adequate?
0
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Are backup pumps available?
0
❑
❑
❑
Is the site free of excessive leaking?
0
❑
❑
❑
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The flow meter is calibrated quarterly and was last calibrated on 1/22/18 by CITI, LLC.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑
Page# 9
Permit: NCO024970
Inspection Date: 03/29/2018
Owner - Facility: McAlpine Creek WWTP
Inspection Type: Compliance Evaluation
Effluent Pipe Yes No NA NE
If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑
Comment: The effluent appeared clear with no floatable solids and foam (entrained air). The receiving
stream did not appear to be negatively impacted.
Anaerobic Digester
Yes No NA NE
Type of operation:
Fixed cover
❑
Is the capacity adequate?
❑
❑
❑
❑
# Is gas stored on site?
❑
❑
❑
❑
Is the digester(s) free of tilting covers?
❑
❑
❑
❑
Is the gas burner operational?
❑
❑
❑
❑
Is the digester heated?
❑
❑
❑
❑
Is the temperature maintained constantly?
❑
❑
❑
❑
Is tankage available for properly waste sludge?
❑
❑
❑
❑
Comment: The facility is equipped with ten digesters (8 — primary/fixed cover and 2 — storage/floating
cover). Only one of the floating cover digesters was in service.
Digester gas (non -flared) is connected to a scrubber system.
The Combined Heat & Power (CHP) system was operational and in service.
Solids Handling Equipment
Yes No NA NE
Is the equipment operational?
0
❑
❑
❑
Is the chemical feed equipment operational?
0
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
❑
❑
0
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
❑
❑
0
❑
Is the site free of excessive moisture in belt filter press sludge cake?
❑
❑
0
❑
The facility has an approved sludge management plan?
E
❑
❑
❑
Comment: The facilitv is eauiDDed with four aravitv thickeners (covered) and six centrifuaes (3
thickening and 3 — dewatering). Two of the gravity thickeners was in service and one of the
dewatering centrifuges was in the process of being repaired. The centrate was free of high
level of solids and the sludge cake was free of excessive moisture.
The primary and waste activated sludges from the Sugar Creek WWTP are processed at
this facility.
Dewated bio -solids are land applied by a contracted company (Svnagro) under the authority
of Permit No. W00000057.
Standby Power
Is automatically activated standby power available?
Yes No NA NE
■ ❑ ❑ ❑
Page# 10
Permit: NC0024970
Inspection Date: 03/29/2018
Owner - Facility: McAlpine Creek WWTP
Inspection Type: Compliance Evaluation
Standby Power
Yes No NA NE
Is the generator tested by interrupting primary power source?
0
❑
❑
❑
Is the generator tested under load?
0
❑
❑
❑
Was generator tested & operational during the inspection?
❑
❑
❑
0
Do the generator(s) have adequate capacity to operate the entire wastewater site?
0
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
0
❑
❑
❑
Is the generator fuel level monitored?
0
❑
❑
❑
Comment: The facility is equipped with six backup generators. Generators are placed under load
monthly and serviced by a contracted company (Cummings) quarterly.
Page# 11