Loading...
HomeMy WebLinkAbout20180491 Ver 1_Riparian Buffer Authorization_20180405DWRState of North Carolina 2 0 1 8 4 D�epa1 tment of Environmental Quality Divislon of Water Resources Division of Water Resources 15A NCAC 0213.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) -Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: Jones Farm Rd Culvert Repair 1 b. County: Wake 1c. Nearest municipality: Wake Forest 1 d. Subdivision name: North Hampton 1e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ❑ Yes x❑ No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes x❑ No 2. Owner Information 2a. Name on Recorded Deed: North Hampton HOA 2b. Deed Book and Page No. 11797 1386 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2005 01247 2d. Responsible Party for Corporations): Scott Miles, PE, Assistant Town Engineer 2e. Street address: 0 Jones Farm Rd 2f. City, state, zip: Wake Forest, NC 27587 2g. Telephone no.: 919-435-9442 2h. Fax no.: 919-435-9539 2i. Email address: SMiles@wakeforestnc.gov 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent x❑ Other, specify: Town of Wake Forest 3b. Name: Scott Miles 3c. Business name Town of Wake Forest if applicable): 3d. Street address: 301 S Brooks St 3e. City, state, zip: Wake Forest, NC 27587 3f. Telephone no.: 919-435-9442 3g. Fax no.: 919-435-9539 3h. Email address: SMiles(a)-wakeforestnc.gov 4. Agent/Consultant Information (if applicable) ,A1 APR 05 241g 4a. Name: 4b. Business name if applicable): ' 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 4 C ���oL B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 1850420293 1 b. Site coordinates (in decimal degrees): Latitude: 35.952885 Longitude: -78.478842 1c. Property size: 0.1 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Smith Creek 2b. Water Quality Classification of nearest receiving water: Smith Creek 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential Subdivision 3b. Attach an 8 Y x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/ x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 100 feet 3e. Explain the purpose of the proposed project: Repair stormwater culvert and stabilize bank along edge of easement 3f. Describe the overall project in detail, including the type of equipment to be used: Heavy equipment will be used due to the large size of pipe to be repaired 42" RCP 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project(including all priorphases) in thepast? ❑ Yes ❑ No x❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project(including all priorphases) in thepast? I ❑ Yes ❑ No x❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes x❑ No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Designing roject to stay within drainage easement. 1. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1a. Project is in which protected basin? x❑ Neuse ❑ Tar -Pamlico ❑ Catawba Zone 1 3 (2 for Catawba) ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? ❑ Yes ❑ No Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ required? (sq ft) (sq ft) or Temporary mitigation) T B1 ❑ P x❑ T Repair of culvert allowable ❑ Yeso x❑ 0 150 B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1 c. Comments: work will occur within a drainage easement with small impact to the buffer area to ensure proper stabilization D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Designing roject to stay within drainage easement. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Will make every effort to stay within drainage easement 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes x❑ No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier (square feet Required mitigation square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. Buffer will be restored to stable condition 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of x❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 b. If you answered "yes" to the above, does the project require preparation of an If due to site constraints, a BMP other than a level spreader is proposed, please provide a environmental document pursuant to the requirements of the National or State (North plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Carolina) Environmental Policy Act NEPA/SEPA ? Manual and attach a BMP Supplement Form. 1c. If you answered "yes" to the above, has the document been finalized by the State F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the x❑ Yes ❑ use of public (federal/state) land? No 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes x❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes x❑ No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes x❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Applicant/Agent's Printed Name fig Applicant/Agent's Signature ire is valid only if an authorization letter from the Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service 3 06 Date is For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): Karen Higgins Karen Higgins NCDWR — 401 & Buffer Permitting Branch OR NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 d zs \ \ � 'ILI 09 r6 ( 1 Il) — 1 \\..' - - I / . �'49 06 69 \ z 91, Sz 99i`o Oz Ov 1 !TZ Rlly QIM YN53 ons&d I mum to g . Its _-� -t-- ins -- dt Sf-13N-- 1 ( b•we* r �Q 3.3#1W _ 0'9 '" k 3,� Win 1 T' !. Tom'{i V� '4' •11'Q Y•+' "41. t, t .t^) �: _ �/ G o` / / \ dRN,dl�i -j 3NS' ��3�lrGns ( M sxr�x Axi�n�a�' rrr�r �" O5£� / �,NolionMLSlV00 33S en