Loading...
HomeMy WebLinkAbout20171356 Ver 1_Pipe Revision_20180406Carpenter,Kristi From: Ferguson, Darrell <darrell.ferguson@volkert.com> Sent: Friday, Apri) 06, 2018 4:36 PM To: Norton, April R; david.e.bailey@usace.army.mil Cc: Brandenburg, Jennifer; Murray, Emily; Kirchner, Chuck Subject: RE: [External] Pipe Revision April, Emily Murray of our office will provide you the information you requested next week. Thanks for your help. Darrell Ferguson Volkert North Carolina Area CEI Manager 5540 Centerview Drive Suite 305 Raleigh, NC 27606 Ce I I : 336-665-0467 Visit Our Website � � ,��, , �� � ,. Or Follow Us! I�CI ���II� ���,����� IIIII �I��IIIIIIIIIIIIII From: Norton, April R <april.norton@ncdenr.gov> Sent: Thursday, April 5, 2018 3:47 PM To: Ferguson, Darrell <darrell.ferguson@volkert.com>; david.e.bailey@usace.army.mil Cc: Brandenburg, Jennifer <jennifer.brandenburg@volkert.com>; Murray, Emily <emily.murray@volkert.com>; Kirchner, Chuck <chuck.kirchner@ncdenr.gov> Subject: RE: [External] Pipe Revision Hi Darrell, After reviewing the revised drawings, there do not appear to be any proposed impacts which would require a 401 modification. However, I am concerned about sediment and erosion control. Is outlet protection provided? If so, could you describe it? What are the stormwater velocity calculations for the proposed changes (is the slope and pipe size an issue)? Is additional riprap required? Have the proposed changes been approved by DEMLR (Chuck Kirchner)? It is important to ensure that the correct measures and protections are used to ensure that water quality is not impaired in the future. Thanks, April From: Ferguson, Darrell [rrr�a_i.ltcr.:da_rre.l_I_.�er�uscr_n_�vca.l_ke_rt..�ca.rrr�] Sent: Thursday, April 05, 2018 11:22 AM To: Norton, April R<a.�a_ri.l..:_n_crrtcr_n_..C,�_n_cd_e_n_r.:.�crv>; davi_d_:e.._k�a.il_e.y(c�_usa�e_:arm�.y.._m�.%I Cc: Brandenburg, Jennifer <°ennifer.k�randenk�ur (c�vcrlkert.ccrrn�>; Murray, Emily <ern�il�.rn�urray(c�vcrlkert.ccrrn�> ........................................................ ... ......................................................... Subject: [External] Pipe Revision April and David, Attached you will find the revised drawings you requested. The blue are the changes we need for you to review. The red line changes have been completed. We placed that pipe outlet in the wingwall as we constructed the wingwall however we just discovered that the 15 inch pipe over the 60 inch pipe cannot be placed deep enough to place backfill around it. We would like to outlet the 15 inch beside the wingwall instead of through it. Thanks for reviewing this. Darrell Ferguson Volkert North Carolina Area CEI Manager 5540 Centerview Drive Suite 305 Raleigh, NC 27606 Ce I I : 336-665-0467 Visit Our Website � � ,��, , �� � ,. Or Follow Us! I�CI ���II� ���,����� IIIII �I��IIIIIIIIIIIIII