HomeMy WebLinkAboutNC0020761_Audit Inspection Report_20180319 J
ROY COOPER
?. Governor
MICHAEL S.REGAN
Secretary
Water Resources LINDA CULPEPPER
Environmental Quality Interim Director
March 19, 2018
Mr.Justin Shell, Pretreatment Coordinator
Town of North Wilkesboro
PO Box 218
North Wilkesboro, NC 28659 RECENED/DENPJ®WR
Subject: Pretreatment Audit Inspection Report APR ® 6 2018
NPDES Permit# NC0020761
Water Resources
Town of North Wilkesboro WWTP, Wilkes County Permitting Section
Dear Mr. Shell:
On March 1, 2018, Paul DiMatteo and Jim Gonsiewski of the Division of Water Resources Winston-
Salem Regional Office conducted a Pretreatment Audit Inspection at the above referenced wastewater
treatment system. Mr.Justin Shell, Pretreatment Coordinator, and Mr. Scott Pyrtle, WWTP ORC, were present
for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's
pretreatment program,which included: a detailed file review, review of the POTW facility performance,
sampling and compliance judgement program, adherence to the enforcement response plan (ERP), and
observing an industrial user inspection.
Background
The Town operates a 2.0 MGD facility, and has two significant industrial users, both of which are
categorically regulated under 40 CFR Part 433 (metal finishing).
Pretreatment Program Elements Review
The Headworks Analysis (HWA) renewal was submitted on June 27, 2013 and was approved on
December September 24, 2013. The next HWA is due on July 31, 2018.
The last Industrial Waste Survey(IWS) was submitted on August 11, 2017 and was approved on
October 31, 2017.The next IWS is due October 31, 2022.
The last Short Term Monitoring Plan (STMP)was submitted on January 16, 2015 and approved on April
6, 2015.
The Sewer Use Ordinance (SUO) was approved on April 30, 2012.
The ERP was approved on November 24, 2003. Note that a copy of the Division's ERP approval letter
was not available during the inspection. A copy is attached to this report.
ing Compares
State of North Carolina I Environmental Quality
450 W Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105
Phone 336-776-98001 FAX,336-776-9797
STMP Review
The STMP is being conducted at the proper locations and frequencies.
Industrial User Permit(IUP) File Review
A review of the file for Gardner Glass Products (#0001) revealed that the monitoring data was well
organized and compliant. However, a copy of the industry's most recent IUP application was not available
during the file review. Mr. Shell was able to obtain a copy during the IU inspection.
A review of the file for Johnston Casuals, Inc. (#0002) revealed that the monitoring data was well
organized and compliant.
The slug control plans for these industries were in good order.
Action Items
1. Please be sure to keep copies of approval letters and applications as described in this report.
The pretreatment audit inspection was satisfactory. The program is being implemented in an excellent
manner. If you should have any questions, please do not hesitate to contact Paul DiMatteo at (336) 776-9691
or our office at (336) 776-9800.
Sincerely,
-12.1„4„,4
Sherri V. Knight, P.E.,'Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Enclosures—PAI Report, Copy of ERP Approval Letter
CC: PERCS Unit—Monti Hassan
WSRO Files
Central Files
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT AUDIT REPORT
Water Resources
ENVIRONMENTAL QUALITY
Background Information [Complete prior to audit; review Program Info Database Sheet(s)]
1 Control Authority(POTW)Name: Town of North Wilkesboro
2. Control Authority Representative(s): Justin Shell,Scott Pyrtle
3. Title(s) Pretreatment Coordintor,WWTP ORC
4 Address of POTW:
Mailing PO Box 218
City North Wilkesboro Zip Code 28659
Phone Number 336-838-5001 Fax Number E-Mail jshell(iinorth-wilkesboro.com
5 Audit Date 03/01/2018
6. Last Inspection Date:09/26/2017 Inspection Type. ®PCI ❑Audit
7 Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ®Yes El No
If No,Explain.
8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ❑Yes ® No
If Yes,Explain.
•
9. Is POTW under an Order That Includes Pretreatment Conditions? ❑Yes // No
Order Type and Number: Are Milestone Dates Being Met? ❑Yes ❑ No ® NA
Parameters Covered Under Order
ICIS Coding
Main Program Permit Number MM/DD/YY
1N1C101012 Io 17 16 11 I 103101 1 18 1
10 Current Number of Significant Industrial Users(SIUs)? 2
11 Number of SIUs with No IUP,or with an Expired IUP? 0
12. Number of SIUs Not Inspected by POTW m Last Calendar Year? 0
13. Number of SIUs Not Sampled by POTW m Last Calendar Year? 0
14 Number of SIUs m SNC for Limits Violations Durmg Either of Last 2 Semi-Annual Periods? 0
.,15. Number of SIUs m SNC for Reporting During Either of Last 2 Semi-Annual.Periods? 0
16. Number of SIUs in SNC with Pretreatment Schedule? 0
17. Number of SIUs on Schedules? 0
18. Current Number of Categorical Industrial Users(CIUs)72
19. Number of CIUs in SNC? 0
i�T( nWu Promina+.A„r A1,,114 F,,,-n, no..; nA,.c.rnt,Pr
20. PRETREATMENT PROGRAM ELEMENTS REVIEW-Review POTW files,verify POTW has copy of each Program Element ,
in their File,complete with all supporting documents and PERCS Approval Letter,and dates consistent with Program Info:
Program Element Last Submittal Last Approval Date Next Due,
Date In file? Date In file If Applicable
Headworks Analysis(HWA) 6/27/2013 ®Yes❑ No 9/24/2013 ®Yes❑ No 7/31/2018
Industrial Waste Survey(IWS) 8/11/2017 ®Yes❑ No 10/31/2017 ®Yes❑ No 10/31/2022
Sewer Use Ordinance(SUO) 4/11/2012 El Yes❑ No 4/30/2012 ®Yes ❑ No
Enforcement Response Plan(ERP) 11/17/2003 ®Yes❑ No 11/24/2003 ❑Yes® No
Long Term Monitoring Plan(LTMP) 1/16/2015 ®Yes❑ No 4/6/2015 ®Yes❑ No
Legal Authority(Sewer Use Ordinance-SUO)
21. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction?
❑Yes // No If yes,Please list these towns and/or areas.
22. If yes to#21,Do you have current Interjurisdictional Agreements(IJAs)or other Contracts? ❑Yes❑ No ®NA
A copy,if not already submitted,should be sent to Division.
23. If yes to#21,Have you had any trouble working with these towns or districts? ❑Yes❑ No ®NA
If yes,Explain.
24 Date of Last SUO Adoption by Local Council 4/3/2012
25 Have you had any problems interpreting or enforcing any part of the SUO7 ❑Yes® No
If yes,Explain.
Enforcement(Enforcement Response Plan-ERP)
26 Did you send a copy of the ERP to your mdustries9 ®Yes❑ No
If no,POTW must send copy within 30 days.
27. Have you had any problems interpreting or enforcing any part of the ERP(i.e.any adjudication,improper enforcement,etc?
❑Yes® No If yes,Explain.
28. List Industries under a Schedule or Order and Type of Schedule or Order
None
Resources
29 Please Rate the Following S=Satisfactory M=Marginal U=Unsatisfactory
Rating Explanation,if Unsatisfactory
Personnel Available for Maintaining
POTW's Pretreatment Program IS EM❑U
Access to POTW Vehicles for
Samplmg,Inspections,and IS❑M❑U
Emergencies
Access to Operable Sampling Gardner has a composite sampler;Johnston composites by
Equipment ®S❑M❑U hand.
Availability of Funds if Needed for
Additional Sampling and/or Analysis ®S❑M❑U
Reference Materials
ZS EM EU
Staff Training(i.e.Annual and
Regional Workshops,Etc.) IS❑M❑U
Computer Equipment(Hardware and
Software) ®S ❑M❑u
NC DWR Pretreatment Audit Form Revised December 2016 Page 9
•
. INDUSTRIAL USER PERMIT(IUP)FILE REVIEW(3 IUP FILE REVIEWS AND 1 IU INSPECTION)
66 User Name 1 Gardner Glass Products 2 Johnston Casuals 3.
67 IUP Number 0001 0002
68. Does File Contain Current Permit'? /1 Yes El No ®Yes El No El Yes El No
69 Permit Expiration Date 9/30/2022 9/30/2020
70 Categorical Standard Applied(I E 40 CFR,Etc)Or N/A 433 433
71 Does File Contam Permit Application Completed Within One Year Prior ®Yes ❑ No ®Yes ❑ No ❑Yes ❑ No
to Permit Issue Date?
72. Does File Contain Inspection Completed Within Last Calendar Year? ®Yes ❑ No ®Yes El No ❑Yes El No
73. a.Does File Contain Slug/Spill Control Plan? a ®Yes❑No a ®Yes ONo a.❑Yes No
b.If No,is One Needed'?(See Inspection Form from POTW) b. ❑Yes No b. ❑Yes No b.❑Yes ❑No
74. For 40 CFR 413 and 433 TTO Certification,Does File Contam a Toxic ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A
Organic Management Plan(TOMP)?
75. a.Does File Contain Original Permit Review Letter from Division'? a EYes❑No a ®Yes❑No a.❑Yes❑No
b All Issues Resolved? b❑Yes❑NooN/A b❑Yes❑No®N/A b❑Yes❑No❑N/A
76 During Most Recent Semi-Annual Period,Did POTW Complete its ®Yes ❑ No ®Yes ❑ No ❑Yes ❑ No
Sampling as Required by IUP,including Flow'?
77. Does File Contain POTW Sampling Chain-Of-Custody Forms? ®Yes ❑ No ®Yes El No El Yes ❑ No
78 During Most Recent Semi-Annual Period,Did SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A
Sampling as Required by IUP,including Flow'?
79 During Most Recent Semi-Annual Period,Did SIU submit all reports on ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A
time'?
80a For categorical IUs with Combined Wastestream Formula(CWF),does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No❑N/A
file include process/dilution flows as Required by IUP?
80b For categorical IUs with Production based limits,does file include ❑Yes❑No®N/A ❑Yes❑NoDN/A ❑Yes❑No❑N/A
production rates and/or flows as Required by IUP?
81. During Most Recent Semi-Annual Period,Did POTW Identify All ®Yes ❑ No ®Yes ❑ No ❑Yes ❑ No
Limits Non-Compliance from Both POTW and SRI Sampling'?
82 During Most Recent Semi-Annual Period,Did POTW Identify All ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A
Reporting Non-Compliance from SIU Sampling'?
83 a Was POTW Notified by SIU(Within 24 Hours)of All Self- a.❑Yes❑No®N/A a❑Yes❑No_'N/A a❑Yes❑No❑N/A
Monitoring Violations'?
b.Did Industry Resample and submit results to POTW within 30 Days'? b❑Yes❑No®N/A b❑Yes❑NooN/A b❑Yes❑No❑N/A
c.If applicable,did POTW resample and obtain results within 30 days of c❑Yes❑No®N/A
becoming aware of SIU limit violations in the POTW's sampling of SIU c❑Yes❑No®N/A c❑Yes❑No❑N/A
84. During Most Recent Semi-Annual Period,Was SIU m SNC'? El Yes ® No ❑Yes ® No ❑Yes ❑ No
85 During Most Recent Semi-Annual Period,Was Enforcement Taken as ❑Yes®No❑N/A ❑Yes®No❑N/A ❑Yes❑No❑N/A
Specified m POTW's ERP(NOVs,Penalties,timing,etc)'
86. Does File Contain Penalty Assessment Notices'? _ ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No❑N/A
87. Does File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No❑N/A
88 a.Does File Contain Any Current Enforcement Orders? a❑Yes❑No®N/A a.❑Yes❑NooN/A a❑Yes❑No❑N/A
b Is SIU in Compliance with Order? b❑Yes❑No•_•N/A b❑Yes❑No®N/A b❑Yes❑No❑N/A
89 Did POTW Representative Have Difficulty in Obtaining Any Requested El Yes ® No El Yes ® No ❑Yes ❑ No
Information For You'?
FILE REVIEW COMMENTS:
20 ERP Approval Letter could not be located durmg the inspection A copy will be attached to this report.
71.Gardner Glass Products' IUP application was not in the POTW's file.We concluded that they probably sent the original and only copy
to the Division for review POTW obtained a copy from the industry when we did the site visit
INDUSTRY INSPECTION ICIS CODING:
1
Main Program Permit Number MM/DD/YY
INICIO I0 12 In 17 16 11 I 103101 I1xi
1.Industry Inspected: Gardner Glass Products Inc_
2.Industry Address: 301 Elkin Hwy
3.Type of Industry/Product: Glass,Mirrors
4 Industry Contact: Jill Edwards Title: Plant Chemist Phone: 336-651-9300 Fax:
5.Does the POTW Use the Division Model Inspection Form or Equivalent? ❑Yes ❑ No
6 Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview ®Yes ❑ No
B. Plant Tour ®Yes ❑ No
C. Pretreatment Tour ®Yes ❑ No
D Sampling Review ®Yes ❑ No
E Exit Interview II Yes ❑ No
Industrial Inspection Comments:
No concerns were noted during the industrial inspection.Mr. Shell's inspection included a thorough review
of all areas, and the SIU's pretreatment system appeared adequately maintained.
Audit SUMMARY AND COMMENTS:
Audit Comments: Please be sure to keep copies of submittals and approval letters.
Requirements:
Recommendations:
NOD: ❑Yes ® No
NOV: ❑Yes ® No
QNCR: ❑Yes ® No
POTW Rating:
Satisfactory ® °'‘);-1/(44
Marginal ❑ Unsatisfactory 1=1Audit COMPLETED BY: _ `"1 DATE: 3/1/2018
Paul DiMatteo and Jim Gonsiewski, Winston-Salem Regional Office
NC fWR Pretreatment Amitt Pnrm Reviceri flenemher 211 F Pave i
Michael
ow a rF19 l F.Easley
C\ QG Governor
William G Ross,Jr,Secretary
Cjj • r North Carolina Department of Environment and Natural Resources
Alan W Klimek,P.E,Director
Coleen H.Sullins,Deputy Director
Division of Water Quality
November 24, 2003
The Honorable Steve Foster, Mayor
Town of North Wilkesboro
P.O. Box 218
North Wilkesboro,NC 28659
Subject Pretreatment Unit Review of Enforcement Response Plan
Town of North Wilkesboro
Wilkes County
NPDES #: NC0020761
Dear Mr. Foster:
The Pretreatment Unit has reviewed the Enforcement Response Plan (ERP) submitted by the
Town of North Wilkesboro. This ERP was received by the Division on November 17, 2003.
The review indicates that the ERP is adequate and the minimum requirements of 15A NCAC
2H 0900 and 40 CFR 403 are met. Proper implementation of an Enforcement Response Plan is
also required by Part III (B), of your NPDES permit. Please refer to the Comprehensive
Guidance for North Carolina Pretreatment Programs for additional information and examples
The Town Board of Commissioners approved the ERP on November 6, 2003.
During the review it was noted that Section 5.0 is a repeat of Section 4.0.
Thank you for your continued cooperation with the pretreatment program. If you have any
questions or comments, please contact Deborah Gore of the Pretreatment Unit at 733-5083, ext.
593, [email: Deborah.Gore@ncmail.net].
Sincerely,
b
WL-t-7-'1`
)%-)Alan W. Klimek, P.E.
dg/noi thwilkesboroerp.004
Hank Perkins,Town Manages,Town ul North Wilkesboro
Jimmy Martin,ORC/Pretreatment Cootdinator,Town of North Wilkesboro
Deborah Gore,Pretreatment Unit
Central Files
George Smith,Winston-Salem Regional Office
NC—DENR,DWQ,PRETREATMEN I UN!1' Telephone: 919-733-5083 Fax: 919-715-29416.
1617 MAIL SERVICE CENTER, RALEIGH, NC 27699-1617 An Equal Opportunity Affirmative Action Employer AO
Woh,if P. httnc//h2o.enr.state.nc.us/frets eat/index html 50%recycled/10%post-consumer paper NCDENR
1 —w.5M TAM T,S":"."7.1".er ! - 1`..33. -IM' .,t ,�,4-Tv^V —
ir Program Name North Wilkesboro 't . `
,Stream I"f01T1tafion IWC%at 7Q10 1 56 I
WWTP Name Town of North Wilkesboror
'rogram Approval Date 07/01/1985 Flo cfs/mgd 196 1 126.62
Pretreatment Status Modified 1Q10 Flow cfs/mgd 159 23 / 102 91
Stream Classification C
Region WSRO Basin Number YADO1
County Wilkes ,
Receiving Stream Name YADKIN RIVER
NPDES Number NC0020761
NPDES Effective DateLast PAR Rec PAR Due Date 03/01/2018 mercury
07/01/2015 1631
NPDES Expire Date Current Fiscal required
p 06/30/2020 Year PCI Done
BTW is Primary WWTP TRUE Last Audit on 02/07/2013 Audit Year Next 17/18 yes
Design Flow mgd 2 0000 % Design mgd is SIU permitted 4 23 Permitted SIU flow(mgd)[Pt SIU) 0845
M/TP SIU's 2 Program SIU: ...-. - ,-.-"- --•-- - ~. - --'5
IWTP CIU's 2 Program Ms HWA ' �,, LTMP w 3 ,MfS - , -, ,,SUO '` ' „---'5- -.'
-;,-,ERPF.', ')/
to Inactive ”" - Date Next Due €^ 07/31/2018 j i , - - 1 10/31/20,22 M1^ zY,
Date Received by DWR 06/27/2013 01/16/2015 08/11/2017 , 04/11/2012 ' 11/17/2003
DateApproved i 09/24/2013 I E 04/06/2015 i t 10/31/2017 04/30/2012 ' '11/24/2003
Adopt Date Required
- Date Adopted _ . ; v_ _ 03/06/2412 S'
Ifo in this Box from P't�,Contacts Date _ D'ate Date
PT_PT- , _ Attended -Attended Attended `
Foimal Name - e g,Priine - Phone/ ext'' ' Fax ` HVA Wksp : IUP Wksp PAR Wksp , : ` _
, LarrySouth - 1(336)667-7129'' ' 1(336) 838-1779 II ' - I r., I - A
, ' _ -Town Manager r -" , , " ° PO Boz 218 `7, -- ', ' r -_ - 28659 "_ ' ,
.Scotty Perry - , 1 11(336)838-5001 13401 (336)"838-1779',ll 2 " I ' 1/24/2008 I _-' -
:rry@north-wilkesboro.corri„- , `i, % ORC _ ° . , , ,. „ PO Box`218 . , -' - ' ' 28659- , _
Justin Shell _ Prim 11(336)838-5001 1 -: I - II - I- - - 11/24/2008 I_ - _
ell@north-wilkesboro.com v-- - _ °, Pretreatment Coordinator , , ,'- ' PO BoX 218 28659 ,
J
treatment Related NOVs from DWQ '. , -NDWR Central Office Contact Monti Hassan
,, DWR Regional Contact Jim Gonsiewski