Loading...
HomeMy WebLinkAbout20090418 Ver 1_Application_200904162oFWATfiA p D qN?, G" f) Office Use Only: '?`o 2? Corps action ID no. O DWQ project no. 411 orm Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: X Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: to. Has the NWP or GP number been verified by the Corps? X Yes No Id. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit ? 401 Water Quality Certification--Express X Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: " ? Yes X No For the record only for Corps Permit: ? Yes X No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes X No 1g. Is the project located in any of NC's twenty coastal counties'. If yes, answer 1 h below. X Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No 2. Project Information 2a. Name of project: Beaufort 68 8-4424 2b. County: Beaufort 2c. Nearest municipality / town: Chocowinity ' 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 33697 3. Owner Information N/A 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): . 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: X Agent ? Other, specify: 4b. Name: Jay B. Johnson 4c. Business name (if applicable): North Carolina Department of Transportation 4d. Street address: P.O. Box 1587 4e. City, state, zip: Greenville, NC 27835 4f. Telephone no.: 252.8303490 4g. Fax no.: 252-830-3341 4h. Email address: jbjohnson@ncdot.gov 5. Agent/Consultant Information (if applicable) N/A 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): Beaufort 68 B-4424 1b. Site coordinates (in decimal degrees): Latitude: N 35.471804 Degrees Longitude: W 77.090818 Degrees (DD.DDDDDD) (-DD.DDDDDD) tc. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Bay Branch 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Agriculture,Woodlands,and Residential 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60' 3d. Explain the purpose of the proposed project: Bridge to Bridge Replacement 3e. Describe the overall project in detail, including the type of equipment to be used: The Existing Timber Bridge will be replaced with a 21" Cored Slab Bridge with BST Riding Surface. Excavators,Dump Trucks, Cranes, and Front End Loaders 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes X No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? N/A ? Preliminary E] Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: NCDOT,NCDWQ, and NCDCM 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes X No Unknown ? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes X No 6b. If yes, explain. Page 3 of 1J PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): X Wetlands Streams - tributaries X Buffers Open Waters ? Pond Construction 2. Wetland Impacts if there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 21b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary (T W1 XP-]T Wetland Bottomland Hardwood X Yes X Corps 0 005 Fill Forest ? No ?DWQ . W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes. ? Corps ? No ? DWQ WS ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 200 Sq.Ft. 0.005 Acres 2h. Comments: 555 Square Feet of Existing Fill Will Be Removed; 355 Sq.Ft. Credit 3. Stream Impacts N/A If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3e. 3f. 3g. Stream impact Type of impact Stream nam nnial Type of jurisdiction Average Impact number - R) or T (Corps - 404, 10 stream length Permanent (P) or mitt i ent DWQ - non-404, width (linear Temporary (T) T)? other) (feet) , feet) S1 P ? T PER ? Corps ?.INT DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 [] P F-1 T ? PER ? Corps 1:1 INT ? DWQ S4 ? P ? T ? PER ? Corps , ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 0.0 3i. Comments: Page 4 of 1,1 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts N/A If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually. list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0.0 4g. Comments: 5. Pond or Lake Construction N/A If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 Sf. Total 0.0 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page5 of 11 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Neuse X Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 X P ? T Bridge Constru Bay Branch El Yes es 4,195 2,555 ction Bridge ? Yes B2 P ? T Constru ction No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 4,195 2,555 6i. Comments: Page 8 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The Proposed Bridge is Longer than the Existing Bridge and the Proposed Alignment is in the same Footprint as the Existing Alignment. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Slopes will be Vegetated instead of Rip Rap for Slope Stabilization and Protection and a longer structure 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes X No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank NIA 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program N/A 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan N/A 5a. If using a permittee responsible mitigation plan,,provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ N/A 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes X No. buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c: 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone.2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee, responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: ,E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan I a . Does the project include or is it adjacent to protected riparian buffers identified X Yes ? No within one of the NC Riparian Buffer Protection Rules? 1b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: Existing Side Ditches are not Relocated and will diffuse flow through X Yes No vegetated uplands before entering wetlands 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 1% 2b . Does this project require a Stormwater Management Plan? . X Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: There Are No Drain Holes On The Proposed Bridge. Stormwater Will Be Directed To Drop Inlet At Station 16+98 And Then Filtered Through Vegetation and Rip Rap. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government StormWater Review N/A 3a. In which local government's jurisdiction is this project? NIA ? Phase II 3b. Which of the following locally-implemented stormwater management programs NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review Coastal counties ? HOW 4a. Which of the following state-implemented stormmter management programs apply ? ORW (check all that apply): ? Session Law 2006-246 X Other: NPDES Permit 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes XNo 5. DWQ 401 Unit Stormwater Review N/A 5a. Does the Stormwater Management Plan meet the appropriate requirements? X Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? X Yes ? No Page 9 of 1'1 PCN Form-Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ®Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ®No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s); 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ?Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," providea short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 11 , PCN Form = Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or El Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® El Yes No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Department of Transportation Biologists 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC Wildlife Resources Commission 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? yes No status (e.g., National Historic Trust designation or properties significant in. North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: The Proposed Bridge is Longer and a Portion of the Existing Causeway Will Be Removed; Thus Creating a Larger Hydraulic Opening. Reduces Chance of Up-Stream Flooding 8c. What source(s) did you use to make the floodplain determination? NC Flood Mapping Jay B. Johnson 1 February 25, 2009 Applicant/Agent's Printed Name Applic I A 0 nature ' Date lo (Agent s signature is valid y if a n letter fro m the applicant is Page 11 of 11, 1 1 i Y B ®® ? l i; ? ®i 7 8 0 0 i e s t • ? o°! ?? B? W r _ L^ ° 8 a g , ,a fi0 x ? 3 o E g , 3'_ ? ? a? g g '? 2OO P S v °? W s _? g z r $ '- 33 gg g g g rr????? Nn.? CIO 0y ?. N 3 ® 0 ® P i tl 1 g ? g 33s 3 3 3 3 .! w z? w a?? N U? 4 ? X J 00 z n- z w® o ^w^, J Y ? G O Z w Z O V I o ? j F ? a ? x s g? I I p? 3 S Y Y o ? ? fr = o F 0 ipx C I 3 l 1 .o{?e®m®I ? a t r o b x g 3 s o 2 o > $ € D o 3 s° ? t° I?????IIIIII o sS;3„se?%= a e?€ a . % 3 B '6a Su € E 2. E r w ? z c 3 _ u ?- s gel g g I I ? II IIII 'i u aE e as pp o a° ppp$? aa?=?"o u E 5? S S? X e g2' B£ S= E a?? F?€ g u ?tl i 3 s w E © ° 1 o I ens g . Ey 2 ? 30 : II N l ! III I,IT ?o V ° S RSS €,oa? O ?- a E c x E E y[ g e '° _ C_ a g q y?? E C o C ,? E g g BRIDGE REPLACEMENT BEAUFORT 68 SR 1136 OVER RAYRRANCH HAC'ICNEYESGS QUAD MAPAND SHEET NUMBER 12 OF THE SOIL SURVEY OF BEA UFORT COUNTY "S.ELEMENT.NUMBER 33697 TIP NUMBER B-4424 0 `1'? QP N in9Rd i°p'6 elter e^ ow Sh ? s BEAUFORT68 pa VOW Y= 632106.2417 X= 2568397.6372 N 35^-28'-18" W 77"!5 7" ?m a P tR ? -2 he ? N 35.471804 vJen? W 77:09081,8 eO1' d pr ? 06OD68 ?ytr Ra E B Rd 060067 060065 04 3 52 c?° Ra 060256 071 ^ m ® ^ CIOZ Windmill Rif z a h ?m r ,? °kRy a U A' l V 0 Q1 n m m C 0 1,750 3,50 7, 00 10,500 14,000 a wes Feet m L A O 0] ?mmA TT wmor g 8 I fi a ?<°t n A T ?hn a°w A p1?x ?O? i a rn ?IT•ggY'' t F ? A = A n l Al ? g ` t N tr ? .a m 2 2? CD ti S A a F77 -D g ar i ? c ?? ?? 1 AAA[ Vl 31 °n W ??A I '^maA p .A pNCy? bb ?pg?? w?or q m• ?? €? m ?yy n ? `C2 an A? O ?!?° IN * A amWA ? QQ m m s3 EA I m m Tado im I ?u m n m? In ~ cn cg m W g On LJ r m k y o T m m A T 3 ? N S m? p p m t rn a ?g m `n ?q o m mm CID 6 ? ? CO W? /S g ? mr ? m Tx v2 NA L p m A g 16 .ro9?•v\\ I I g? Q m° y I mz /oo? m ¢i a 33 aR t 1 a ? 6 op ?. )y ?N p R? 9? d II a? I R'991 I I Ny II 40 / J 5 21 m` m 10'281 9 ?1 ,SO'b51 3 .61.50.8[ N r a " I N CmmN 3 Neu ? ? ? ?uO YZ ? I' 1 $ w ?m5 s m Nnn I ? I am A? I O OM -Wdos 1 ? , w Noon I " „mm> I winos I N?eimN ?r9m J 3.92, 95. i1 11 1 N? 1 11 \ i IIII' I .1 p I ?? n m F? q3 2yE NN N -I n 0 n ? mmm ?t uoK y Ole ^ N? BRIDGE REPLACEMENT BEAUFORT 68 SR H36 OVER BAYBRANCH WBS ELEMENT NUMBER 33697 i h Pud ?i I I I N Mgf tL sir li - " BEAUFORT 68 • ?.':.j / . /' 'i'ce§?;'''?•t? Y= 632106.2417 X= 2568397.6372 N 35'28'-18 w n o5'-2r'? , ?F k . " ' , ^ N 35.471804 a ?. K W 77 090816 _Y s Nr? r 1 ?'-gfJ S p rya IPd AEBr ? ? !nJC f I .k '?F M1 06005 & 't1' r _ 1 1 ? fr:1 iii f'J r.? .mot a Y4r ?R L E fz 1 ?! 7@ 6 _ I ? •a _0 1 750 5D© r, 7 00 7IPNUMBER B-4424 l (( _ , IS ?i ti 1 1 i ? ??` tS?sossj ?` nt„ . RI1 ,,; M 1 it 5?. .w l? 7 i ? 11\VI ' '; i ?M1 ?vl VY ,11 ri ' 1?f0;500 X1'4,000 ?. fFeet I