Loading...
HomeMy WebLinkAbout20180372 Ver 1_More Info Received_20180406Homewood, Sue From: Will Larsen <wlarsen@thewootencompany.com> Sent: Friday, April 06, 2018 3:53 PM To: Homewood, Sue Subject: RE: [External] EDGECOMBE: Kingsboro IP External email. Do not click links or open attaclnnents unle-- a O—a -" ------ Sue, Thank you for the review and insight into our Kingsboro project. Attached in the link below you will find the gravity sewer plan sheets with the contour layers cut on. Also you will find the additional detail page providing the details on temporary ditch/stream crossing. With respect to the proposed alignment for the gravity outfall: We have proposed this alignment on the basis of 1) constructability and 2) elevation of the gravity main. 1)The overall industrial park site is bisected by Walnut Creek and its primary unnamed tributary. This creek and its tributaries are contained on each side by steep banks including natural ridges. This topography creates a difficult constructability scenario in that a gravity alignment running parallel to the creek will have to bisect ridges creating extreme side hill cuts of greater than 25 feet. By selecting an alignment generally closer to the stream and adjoining buffers, we are reducing the opportunity for additional disturbance and potential negative impacts. 2) Additionally, the alignment was selected to maximize the service area of the proposed gravity outfall. The intent of this line is to provide the wastewater backbone to serve the park and thus the sewer needs to be as low in elevation as possible. Given streams and ditches represent the lowest natural topography, it is reasonable to utilize these general locations to construct gravity sewer outfalls to minimize the need for additional sewer outfalls and pump stations dispersed throughout the park. As mentioned in Point 1, this particular topography contains extremely steep banks and thus a shift in the alignment by 20- 30 feet may result in the loss of 5-10 feet in sewer elevation (assuming the same depth of cover). This loss in elevation reduces the potential service area by up to 2,000 feet in each direction as well as creates an elevation profile in which the sewer shares a similar elevation with the bottom of the creek thus making potential future connections more difficult in that the future lines would be required to cross through the stream's wetted perimeter. ShareFile Attachments Expires May 06, 2018 C.4. l .pdf 3.9 MB C.4.2.pdf 3.6 MB C.4.3.pdf 3.5 MB C.4.4.pdf 3.3 MB C.8.2.pdf 3.7 MB Will Larsen uses ShareFile to share documents securely. Learn More. We anticipate providing the additional impact pages to you early next week. If there are any other questions or concerns, please do not hesitate to call. Regards, William A. Larsen, PE Project Engineer The Wooten Company 301 West 14th Street Greenville, NC 27834 0 252.757.1096 Fax 252.757.3221 www.thewootencompany.com IFW 3L.el X THE WOOTEN COMPANY From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov] Sent: Wednesday, April 04, 2018 11:42 AM To: Will Larsen Subject: RE: [External] EDGECOMBE: Kingsboro IP Hi Will, I'm sorry I didn't call you back last week, I had a busy week. I will let you know if I need any additional information once I've reviewed the project. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood(cDncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Will Larsen[mailto:wlarsengthewootencompany.com] Sent: Tuesday, April 03, 2018 5:11 PM To: Homewood, Sue <sue.homewoodgncdenr.gov> Subject: [External] EDGECONME: Kingsboro IP ICAUTION: ess verified. Send all suspicious email as an attachment to Report Spam. Ms. Homewood, We have been informed that you are the reviewer for the recently submitted PCN application for the Edgecombe County: Kingsboro Industrial Site project. Do you have an anticipated schedule for this project's review? If there are any questions or any additional material that we may supply to assist in your review, please do not hesitate to let us know. Regards, William A. Larsen, PE Project Engineer The Wooten Company 301 West 14th Street Greenville, NC 27834 0 252.757.1096 Fax 252.757.3221 www.thewootencomoanv.com THE WOOTEN COMPANY Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org ��d IJ 50' 25' 0 50' 100' 150' SCALE: 1" = 50' 36+00 36+50 37+00 37+50 BUFFER IMPACT B16 TOTAL ZONE 1 IMPACT= 330 SQ.FT. TOTAL ZONE 2 IMPACT- 1,922 SQ_FT. NEW 244.78 OF 18" PVC / \ \ \ e��NEW MH -13f _ GRAVITY SEWER @ 0.35% // \ \ \ RIM ELEV. 73.84' / -INV. IN 63.15' INV. OUT 62.95'— Ex. Wetlandsit\\�+--fir.. f /- We/ -- / / / Ex. e / NEW 183.42 OF 18 PVC — Ex. io8 — = ` , — \ GRAVITY SEWER @ 0.35% LIMITED OF DISTURBANCE / o� TH U 3 PVC NEW MH -14 .33 EW 6_O GRAVITY SEWER $035 (J� — ,ft,RIM ELEV. 76.14 W % o INV. IN 64.00 \ \ \ \ \ 7 '� Z -1 \ \ ✓ / � �_ �ri©/ \ oo '� \ W �+ INV. OUT 63.80 _ T Ex. Swale .. ,/�_ i- �, 3 OO - — — __ _ SO; � Ex. We tlonds \/ (n \ �.-j� was % / N 2 v/ i / Q W6 IMPACT (I lit \ /� (0.09 AC)v. S \�--�`— \\ ZONE 1 ���:., apo �. / I /'NEW 531 LF OF �� _ /" ,\�� \ _ _ �j' / / ° STREAM CROSSING S3 _ _ \ SILT FENCE / SILT FENCE _ A CLEAR & GRUBBING (PERENNIAL) �Q / \\ / \BBING IMPACT LENGTH- 17 FT. / \NEW PERMANENT EASEMENT --------1,831 SY. 30' WIDE (15' EACH SIDE OF — _— V c��, ZONE t �,\ \-c \� � NEW 197 LF OF / \P� , SILT FENCE CIO , \ / r \ �I I GRAVITY SEWER LINE).%� ZONE 2 Ex. TOE it / i Ex. TOE SILT FENCE _OUTLET % / �� m : ,-f� I /I NEW MH -15 (WATERTIGHT SLID W/ VENT) \ (IfI14, RIM ELEV. 77.96Ex. Buffer \ �_ INV. OUT 65.00' �� BUFFER IMPACT B17 TOTAL ZONE 1 IMPACT- 2,724 SQ\.FT. TOTAL ZONE 2 IMPACT- 4.212SQ.F �- I � / If x NOTE THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM / / // / / ,-'j % /1> OF THIS PROJECT IS 60.0'. r__ 3800 �p h h j j N .— N W h W y It -0 ♦ O" 2 a00, 5 M fY (1) 38+50 2 W ry Lo W F- h h ¢w h > �>� a N W Lo3:M W NO i o I E O 0 _Z o �OH W U <ry�CC Lr -J � 0CcO QZ0 LL O m 75 70 45 40 35 cn z O N LU tr zz w 0 O U W co 2 W 2 cr 0 z V a � v DRAWN BY: DRS CHECKED BY: r o O N V Z N M U -^o c \y- U V LL N L W � d w9 = p Z o, y O N L O b a w N u') N 8 m Z Q 00 �q) O O O \ Q_ �Lna__jI- Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc8ll.org ��d IJ 50' 25' 0 50' 100' 150' SCALE: 1" = 50' 36+00 36+50 37+00 37+50 BUFFER IMPACT B16 TOTAL ZONE 1 IMPACT= 330 SQ.FT. TOTAL ZONE 2 IMPACT- 1,922 SQ_FT. NEW 244.78 OF 18" PVC / \ \ \ e��NEW MH -13f _ GRAVITY SEWER @ 0.35% // \ \ \ RIM ELEV. 73.84' / -INV. IN 63.15' INV. OUT 62.95'— Ex. Wetlandsit\\�+--fir.. f /- We/ -- / / / Ex. e / NEW 183.42 OF 18 PVC — Ex. io8 — = ` , — \ GRAVITY SEWER @ 0.35% LIMITED OF DISTURBANCE / o� TH U 3 PVC NEW MH -14 .33 EW 6_O GRAVITY SEWER $035 (J� — ,ft,RIM ELEV. 76.14 W % o INV. IN 64.00 \ \ \ \ \ 7 '� Z -1 \ \ ✓ / � �_ �ri©/ \ oo '� \ W �+ INV. OUT 63.80 _ T Ex. Swale .. ,/�_ i- �, 3 OO - — — __ _ SO; � Ex. We tlonds \/ (n \ �.-j� was % / N 2 v/ i / Q W6 IMPACT (I lit \ /� (0.09 AC)v. S \�--�`— \\ ZONE 1 ���:., apo �. / I /'NEW 531 LF OF �� _ /" ,\�� \ _ _ �j' / / ° STREAM CROSSING S3 _ _ \ SILT FENCE / SILT FENCE _ A CLEAR & GRUBBING (PERENNIAL) �Q / \\ / \BBING IMPACT LENGTH- 17 FT. / \NEW PERMANENT EASEMENT --------1,831 SY. 30' WIDE (15' EACH SIDE OF — _— V c��, ZONE t �,\ \-c \� � NEW 197 LF OF / \P� , SILT FENCE CIO , \ / r \ �I I GRAVITY SEWER LINE).%� ZONE 2 Ex. TOE it / i Ex. TOE SILT FENCE _OUTLET % / �� m : ,-f� I /I NEW MH -15 (WATERTIGHT SLID W/ VENT) \ (IfI14, RIM ELEV. 77.96Ex. Buffer \ �_ INV. OUT 65.00' �� BUFFER IMPACT B17 TOTAL ZONE 1 IMPACT- 2,724 SQ\.FT. TOTAL ZONE 2 IMPACT- 4.212SQ.F �- I � / If x NOTE THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM / / // / / ,-'j % /1> OF THIS PROJECT IS 60.0'. r__ 3800 �p h h j j N .— N W h W y It -0 ♦ O" 2 a00, 5 M fY (1) 38+50 2 W ry Lo W F- h h ¢w h > �>� a N W Lo3:M W NO i o I E O 0 _Z o �OH W U <ry�CC Lr -J � 0CcO QZ0 LL O m 75 70 45 40 35 cn z O N LU tr zz w 0 O U W co 2 W 2 cr 0 z V a 9 z M O 0 W m 0 LU O 0 W z J 0 U 2 z i Z O U W CD 0 W 0 0 W Y CL Z Q O z U w Z CDw W cr F– O z5 Z Y cr W W 0 � Z W O H O CC O M ao Q co T''^^ W Z DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: r WAL O N V Z N M U -^o c FEBRUARY 2018 V LL N L W � d w9 = p Z o, y O N L O y N u') N 8 m Z 9 z M O 0 W m 0 LU O 0 W z J 0 U 2 z i Z O U W CD 0 W 0 0 W Y CL Z Q O z U w Z CDw W cr F– O z5 Z Y cr W W 0 � Z W O H O CC O M ao Q co T''^^ W Z DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: HORZ.: 1" = 50' VERT.: 1'= 5' M14:41 C.4.4 Elm! i If =1 Noti NC811 Three Full W ark' g Days Before Digging Di 811 or 1-800-632-4949, or visit www =811.oxg `\ \\ f \ I \ \ \ R VNEW , 73.03 TERTIGHT W o o D S LID W// VENT) , W5 IMPACT INV. IN 62.09' (0.06 AC)\ \1,, INV. OUT 61.89' — — sa NEW 244.78 OF 18" PVC BUFFER IMPACT 814 — GRAVITY SEWER Q 0.35/. ° Ex. Wetlands TOTAL ZONE 1 IMPACT= 0 SQ.FT. o I - _ = \ \ TOTAL ZONE 2 IMPACT= 738 SQ.FT. \ \ _ ^ ee/ Ex. Swale W 0 O D S i %../ Ex- TOB \ \x0 x i Ex. wetlan W4 IMPACT - 3 \ \ 0 BUFFER IMPACT B9 \\ \ ry \\ TOTAL ZONE 1IMPACT= 45 SQ.FT. _ (0.04 AC) � _. � \ --TOTAL ZONE 2 IMPACT\ ,572 SQ.FT. ` � � �j � - NEW 288.42 OF 18" PVC ,' / � / r/ — f I / ° � � O I \ � \w o o D s / , GRAVITY SEWER Q 0.35/. o / �\ �'/SOD V_ I` \\mss NEW 370.74 LF 18 PVC 0 GRAVITY SEWER 0.35% I / CLEAR & GRUBBING L / \ BUFFER IMPACT 610 LIMITED OF DISTURBANCE / - iY_ / TOTAL ZONE 1 IMPACT- 0 SQ.FT. 30 FT. WIDTH 4,334 SY. Ex. Wetlands TOTAL ZONE 2 IMPACT- 425 SQ.FT. /' NEW MH -11, NEW MH -9 (WATERTIGHT ---eo------ NEW PERMANENT EASEMENT / / RIM ELEV. 75.83 / - 30' WIDE (15' EACH SIDE OF / INV. IN 60.89' RIM ELEV. 71.95' / / - / / INV. OUT 60.69 - tick / ' /� / n \ \ \\ LID W/ VENT) — — — GRAVITY SEWER LINE). / — — -- ' / \ INV. IN 58.52' \oNFa INV. OUT 58.32' \ NEW MH -10 _ — / // j: / \ \ ��C✓� `\1 \� \ \ \ \� ' RIM ELEV. 74.94' / / NEW 301.30 OF 18" PVC --NEW 261.72 OF 18" PVC �/ \ \ INV. IN 59.64' / GRAVITY SEWER 0.35% / / \ \•. \ I \ \ \ \ \ GRAVITY_ SEWER 0.35% \ INV. OUT 59.44 / / / _< f /_/ W3 IMPACT i'.,. ' 2 + - — / i - -- — — / --i3 / I \ \\ (0.05 AC) — \ \ 00 4`- �� \ \ \ �/ BUFF IMPACT B15 \ 27+pp "•f / o ' / ER — \ p I s 1 / — —� ����' , __ __- �v 2800 29}� ��= �� /BUFFER IMPA 613 TOTAL ZONE 2I�IMPACT-025Q3�3 SQ.FT. - - I I l 14 — - _TOT1 � Ex. Swate --- TOTAL ZONE 1 IMPACT= 0 SQ -FT. \ \ -- Q2 i / ----------'` 1,921 LF OF — i°� i� / / TOTAL ZONE 2 IMPACT- 668 SQ.FT.�- / FENCE - —� �— — !E g fer \ SILT FENCE OUTLET / / \ / /' - BUFFER IMPACT B12 I \ / — � _ � _ — I - -� I — -cree ` � \ f v , � �` � � / � `./' i ,. TOTAL ZONE 1 IMPACT= 0 SQ.FT. k �% \ �i i— ✓ / i TOTAL ZONE 2 IMPACT- 560 SQ.FT. y / JJuu �--- -'- �- BUFFER IMPACT B11 NOTE: \ \ \ TOTAL ZONE 1 IMPACT- 0 SQ.FT. —/ i THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD \ \ TOTAL ZONE 2 IMPACT- 1,142 SQ.FT. INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES / THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM / \ OF THIS PROJECT IS 60.0'. / \ 50' 25' 0 50' 100' 150' SCALE: 1" = 50' cq — ---- — - 000 r1 ai r- 80 11)0 Lo L0 [If CD cy) ____-. ~ N N W r MCr) W N W F n _ � I- �_ CD O M W w 2+ E O Q W —_—.- I FW --W I� iN t72'U' //\ >M NW :204tL0 — — — — \W \ _0 LA 70 —`—__— O O 65 N N QU (n F- 60 W W z =. J cn W 55 50 45 W 35 - - - - -- 23+00 23+50 24+00 25+50 25+00 25+50 370.74 LF 18" PVC @ 0.35'/. N N d) o600 >> z? 261.72 LF 18" PVC @ 0.35% 26+00 26+50 27+00 27+50 301.30 LF 18" PVC a 0.35% 28+00 28+50 29+00 29+50 30+00 30+50 c QU DESIGNED BY: WAL x (n 1- DRS 244.78 LF 18" PVC @ 0.35% 50 W PROJECT NO.: N � o N� o J � rJ U mo N N Ut W CD W 4� U W cn O N i q) 0 0\� i If =1 Noti NC811 Three Full W ark' g Days Before Digging Di 811 or 1-800-632-4949, or visit www =811.oxg `\ \\ f \ I \ \ \ R VNEW , 73.03 TERTIGHT W o o D S LID W// VENT) , W5 IMPACT INV. IN 62.09' (0.06 AC)\ \1,, INV. OUT 61.89' — — sa NEW 244.78 OF 18" PVC BUFFER IMPACT 814 — GRAVITY SEWER Q 0.35/. ° Ex. Wetlands TOTAL ZONE 1 IMPACT= 0 SQ.FT. o I - _ = \ \ TOTAL ZONE 2 IMPACT= 738 SQ.FT. \ \ _ ^ ee/ Ex. Swale W 0 O D S i %../ Ex- TOB \ \x0 x i Ex. wetlan W4 IMPACT - 3 \ \ 0 BUFFER IMPACT B9 \\ \ ry \\ TOTAL ZONE 1IMPACT= 45 SQ.FT. _ (0.04 AC) � _. � \ --TOTAL ZONE 2 IMPACT\ ,572 SQ.FT. ` � � �j � - NEW 288.42 OF 18" PVC ,' / � / r/ — f I / ° � � O I \ � \w o o D s / , GRAVITY SEWER Q 0.35/. o / �\ �'/SOD V_ I` \\mss NEW 370.74 LF 18 PVC 0 GRAVITY SEWER 0.35% I / CLEAR & GRUBBING L / \ BUFFER IMPACT 610 LIMITED OF DISTURBANCE / - iY_ / TOTAL ZONE 1 IMPACT- 0 SQ.FT. 30 FT. WIDTH 4,334 SY. Ex. Wetlands TOTAL ZONE 2 IMPACT- 425 SQ.FT. /' NEW MH -11, NEW MH -9 (WATERTIGHT ---eo------ NEW PERMANENT EASEMENT / / RIM ELEV. 75.83 / - 30' WIDE (15' EACH SIDE OF / INV. IN 60.89' RIM ELEV. 71.95' / / - / / INV. OUT 60.69 - tick / ' /� / n \ \ \\ LID W/ VENT) — — — GRAVITY SEWER LINE). / — — -- ' / \ INV. IN 58.52' \oNFa INV. OUT 58.32' \ NEW MH -10 _ — / // j: / \ \ ��C✓� `\1 \� \ \ \ \� ' RIM ELEV. 74.94' / / NEW 301.30 OF 18" PVC --NEW 261.72 OF 18" PVC �/ \ \ INV. IN 59.64' / GRAVITY SEWER 0.35% / / \ \•. \ I \ \ \ \ \ GRAVITY_ SEWER 0.35% \ INV. OUT 59.44 / / / _< f /_/ W3 IMPACT i'.,. ' 2 + - — / i - -- — — / --i3 / I \ \\ (0.05 AC) — \ \ 00 4`- �� \ \ \ �/ BUFF IMPACT B15 \ 27+pp "•f / o ' / ER — \ p I s 1 / — —� ����' , __ __- �v 2800 29}� ��= �� /BUFFER IMPA 613 TOTAL ZONE 2I�IMPACT-025Q3�3 SQ.FT. - - I I l 14 — - _TOT1 � Ex. Swate --- TOTAL ZONE 1 IMPACT= 0 SQ -FT. \ \ -- Q2 i / ----------'` 1,921 LF OF — i°� i� / / TOTAL ZONE 2 IMPACT- 668 SQ.FT.�- / FENCE - —� �— — !E g fer \ SILT FENCE OUTLET / / \ / /' - BUFFER IMPACT B12 I \ / — � _ � _ — I - -� I — -cree ` � \ f v , � �` � � / � `./' i ,. TOTAL ZONE 1 IMPACT= 0 SQ.FT. k �% \ �i i— ✓ / i TOTAL ZONE 2 IMPACT- 560 SQ.FT. y / JJuu �--- -'- �- BUFFER IMPACT B11 NOTE: \ \ \ TOTAL ZONE 1 IMPACT- 0 SQ.FT. —/ i THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD \ \ TOTAL ZONE 2 IMPACT- 1,142 SQ.FT. INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES / THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM / \ OF THIS PROJECT IS 60.0'. / \ 50' 25' 0 50' 100' 150' SCALE: 1" = 50' cq — ---- — - 000 r1 ai r- 80 11)0 Lo L0 [If CD cy) ____-. ~ N N W r MCr) W N W F n _ � I- �_ CD O M W w 2+ E O Q W —_—.- I FW --W I� iN t72'U' //\ >M NW :204tL0 — — — — \W \ _0 LA 70 —`—__— O O 65 N N QU (n F- 60 W W z =. J cn W 55 50 45 W 35 - - - - -- 23+00 23+50 24+00 25+50 25+00 25+50 370.74 LF 18" PVC @ 0.35'/. N N d) o600 >> z? 261.72 LF 18" PVC @ 0.35% 26+00 26+50 27+00 27+50 301.30 LF 18" PVC a 0.35% 28+00 28+50 29+00 29+50 30+00 30+50 c QU 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 ,tt00 00 ri n h j > N I, N W M W + _co E O ic) LI) 0) N M z? 36+50 0 z ZO W H Q¢cr_ D or o t-' U QZO z U. m 75 70 65 .• N N O O o � W CD z LL, Lu 0 0 0 cca i w cc a - w C IL M CIO O � U as z J c U 9 z ZD 0 W 00 m O W f7 0 W .PA mm rai Q C V C Z H Z W cr nm z DESIGNED BY: WAL ji (n 1- DRS 244.78 LF 18" PVC @ 0.35% 50 W PROJECT NO.: 288.42 LF 18" PVC @ 0.35% W z_= W N J � 0 mo N = W CD cam U W cn 60 Zz W Q O $ � J Orn 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 ,tt00 00 ri n h j > N I, N W M W + _co E O ic) LI) 0) N M z? 36+50 0 z ZO W H Q¢cr_ D or o t-' U QZO z U. m 75 70 65 .• N N O O o � W CD z LL, Lu 0 0 0 cca i w cc a - w C IL M CIO O � U as z J c U 9 z ZD 0 W 00 m O W f7 0 W .PA mm rai Q C V C Z H Z W cr nm z DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: 50 WAL PROJECT NO.: 2488 - GX DATE: N 45 SCALE: 0 U z N VERT.: V= 5' SHEET >�o Z C d tV N LL W O $ � J Orn �i N W 0 F_ LU cD W co ce) F_ O cc CDCD 0 O ap 11- r N Lu F--' W � Z 55 DESIGNED BY: WAL DRAWN BY: DRS CHECKED BY: 50 WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 45 SCALE: HORZ.:1' = 50' VERT.: V= 5' SHEET 40 0 � U Q)Ei of V p / "07 I , Ex. 4 Wo ter Main - / Notify NC811 Three Full Worki � Days Before Digging Dial 811 or 1-800-632-4949, off' 'sib w\.nc811.org /�:- /// �� / /// TEMPORARY CONSTRUCTION ENTRANCE. SEE DETAIL o / / \ \ 1; _ _ _ - - BUFFER IMPACT B5\ / / FUTURE ACCEROAD ! \ TOTAL ZONE 1 IMPACT= 871 SQ.FT. / / /' 1/ / e / / / BY OTHERS TOTAL ZONE 2 IMPACT- 1,668 SQ.FT. / / i / �\ / / AD s `� -� — / / NEW MH -7 (WATERTIGHT K _ \ — / / A� b A LID W/ VENT) OUTSIDE DROP RIM ELEV. 64.57' INV. IN 55.40' ` -� _ ao+ _ - \`', W 370.74 OF 18" PVC - �__ / INV. IN 51.18 � ` � NEW a e / INV. OUT 50.98 GRAVITY SEWER 0 0.35%P� NEW 225.92 OF 30" PVC o ` / / NEW PERMANENT EASEMENTGRAVITY SEWER 0 0.09/ / /`� \ �."lp\ � % 30 WIDE (15EACH SIDE OF \ \ � CLEAR &GRUBBING • `- NE).4,308 SY.UNEW MH -6 // \ \ \\/RIM ELEV. 67.10' \ BUFFER IMPACT B6: = ,' /// GRAVITY SEWER ` ,\ - - oc ��� NEW 352.59 OF 18 PVCINV. IN 50.70 - TOTAL ZONE 1 IMPACT- 99 SQ.FT. - / / Ex. wetlands n - �' GRAVITY SEWER 0.351 s o \ l INV. OUT 50.50' TOTAL ZONE 2 IMPACT- 1,624 SQ.FT. ��/ // j-- \ NEW 314.39 OF 30" DIP(v III 22 Ex. Floodplain L 1 oo \ `� ---- GRAVITY SEWER @ 0.097_- -SILT FENCE OUTLET/"- / / 30 FT. WIDTH LIMITED OF DISTURBANCE — — � K '� NEW MH -8 (WATERTIGHT Ex. Buffer' ' .,1' Lam. �\ \ \ i\\\ t , \ _ / -- _ - �= _ i LID W/ VENT) / / j / /. W IMPACT i/ j \� /\ RIM ELEV.71 `.\ \, �\ \ - !. (0 2AC) �� Ex. roe \ INV. IN 57.0398. Ex. roe A j A /, `.SILT FENCE OUTLET r %/" _ \ T 56.83' � SIN OUT i 1 i �a'l'F l // �, f�0, -- �/ o i� Ex. Wetlands 2 I - _ -- - - - BUFFER IMPACT B8/ zp m,' i � `\ � / � � - _ _ TOTAL ZONE 1 IMPACT= 547 SQ.FT.99—�1 STREAM CROSSING 52 TOTAL Z 2 IMPACT 3 4 SQ.FT., (PERENNIAL) ONE 85 T., IMPACT LENGTH 70 FT.- 7 - T. Ex. Wetlands -1- - — - 7\FUTURE 2 @ 9'xT -� - i \ - _BUFFER IMPACT B7- RCBC BY OTHERS zo F \ TOTAL ZONE 1 IMPACT- 2743 SQ.FT. NOTE: TOTAL ZONE 2 IMPACT= 628 SQ.FT. THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 37203799001 DATED NOVEMBER 03 2004 NEW 181 0 SILT FENCEv AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES �V I( `v _\ I THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM --� 1 �� A'� NEW 213.57 OF 18 DIP l � OF THIS PROJECT IS 60.0. I � GRAVITY SEWER Q 0.35% \ 50' 25' 0 50' 100' 150'\ \� / / / \ \ \ "' � �! - � �_ �'\� 1 NEW MH -16 1 � RIM ELEV. 72.57 ---- � INV. OUT 51.92' SCALE: 1" - 50' ----- ------ -- -- - ---- --- -- ------ FUTURE ACCESS ROAD Q BY OTHERS 8 0 ' I 75 s' U) o 2 6 to C7 N 65 � U z_ N LLX F W (D > Q U � "00 0 Ld a� 65 Uj LO W o a io E z_= 00 w L6 J '1 oW I o = W - 55 L 1 (n O o � Q)Ei of V p / "07 I , Ex. 4 Wo ter Main - / Notify NC811 Three Full Worki � Days Before Digging Dial 811 or 1-800-632-4949, off' 'sib w\.nc811.org /�:- /// �� / /// TEMPORARY CONSTRUCTION ENTRANCE. SEE DETAIL o / / \ \ 1; _ _ _ - - BUFFER IMPACT B5\ / / FUTURE ACCEROAD ! \ TOTAL ZONE 1 IMPACT= 871 SQ.FT. / / /' 1/ / e / / / BY OTHERS TOTAL ZONE 2 IMPACT- 1,668 SQ.FT. / / i / �\ / / AD s `� -� — / / NEW MH -7 (WATERTIGHT K _ \ — / / A� b A LID W/ VENT) OUTSIDE DROP RIM ELEV. 64.57' INV. IN 55.40' ` -� _ ao+ _ - \`', W 370.74 OF 18" PVC - �__ / INV. IN 51.18 � ` � NEW a e / INV. OUT 50.98 GRAVITY SEWER 0 0.35%P� NEW 225.92 OF 30" PVC o ` / / NEW PERMANENT EASEMENTGRAVITY SEWER 0 0.09/ / /`� \ �."lp\ � % 30 WIDE (15EACH SIDE OF \ \ � CLEAR &GRUBBING • `- NE).4,308 SY.UNEW MH -6 // \ \ \\/RIM ELEV. 67.10' \ BUFFER IMPACT B6: = ,' /// GRAVITY SEWER ` ,\ - - oc ��� NEW 352.59 OF 18 PVCINV. IN 50.70 - TOTAL ZONE 1 IMPACT- 99 SQ.FT. - / / Ex. wetlands n - �' GRAVITY SEWER 0.351 s o \ l INV. OUT 50.50' TOTAL ZONE 2 IMPACT- 1,624 SQ.FT. ��/ // j-- \ NEW 314.39 OF 30" DIP(v III 22 Ex. Floodplain L 1 oo \ `� ---- GRAVITY SEWER @ 0.097_- -SILT FENCE OUTLET/"- / / 30 FT. WIDTH LIMITED OF DISTURBANCE — — � K '� NEW MH -8 (WATERTIGHT Ex. Buffer' ' .,1' Lam. �\ \ \ i\\\ t , \ _ / -- _ - �= _ i LID W/ VENT) / / j / /. W IMPACT i/ j \� /\ RIM ELEV.71 `.\ \, �\ \ - !. (0 2AC) �� Ex. roe \ INV. IN 57.0398. Ex. roe A j A /, `.SILT FENCE OUTLET r %/" _ \ T 56.83' � SIN OUT i 1 i �a'l'F l // �, f�0, -- �/ o i� Ex. Wetlands 2 I - _ -- - - - BUFFER IMPACT B8/ zp m,' i � `\ � / � � - _ _ TOTAL ZONE 1 IMPACT= 547 SQ.FT.99—�1 STREAM CROSSING 52 TOTAL Z 2 IMPACT 3 4 SQ.FT., (PERENNIAL) ONE 85 T., IMPACT LENGTH 70 FT.- 7 - T. Ex. Wetlands -1- - — - 7\FUTURE 2 @ 9'xT -� - i \ - _BUFFER IMPACT B7- RCBC BY OTHERS zo F \ TOTAL ZONE 1 IMPACT- 2743 SQ.FT. NOTE: TOTAL ZONE 2 IMPACT= 628 SQ.FT. THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD INSURANCE MAP 37203799001 DATED NOVEMBER 03 2004 NEW 181 0 SILT FENCEv AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES �V I( `v _\ I THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM --� 1 �� A'� NEW 213.57 OF 18 DIP l � OF THIS PROJECT IS 60.0. I � GRAVITY SEWER Q 0.35% \ 50' 25' 0 50' 100' 150'\ \� / / / \ \ \ "' � �! - � �_ �'\� 1 NEW MH -16 1 � RIM ELEV. 72.57 ---- � INV. OUT 51.92' SCALE: 1" - 50' ----- ------ -- -- - ---- --- -- ------ FUTURE ACCESS ROAD Q BY OTHERS 8 0 ' I 75 m 35 I - C) / \ (D w \ X S2 L0 >\ F- LL Lo 0) Ld Ex. Grade of 1-- N 0 4 LD \ W NO H 2 2 00 m CE W H - -- - - -- Z Lo -- - - 75 oo3(6Wa �JNd'C7 70 W/ Zof t0 --_ ON / '-- \ Q>0 2� E / --` WCO NW / W g�00a0 f0 / / 225.92 LF 30" PVC @ 0.09% 13+50 14+00 \ U) 70 2 6 to C7 N 65 H M(O z_ N LLX F W (D > Q U � "00 0 Ld 60 65 Uj LO W o a io E z_= 00 w - - -- - - - J 75 oW I o = W - 55 L 1 (n 60 — \+� c� - - - - I WLq 1-0 Z Q U � cn 55 w zcf) J 50W 0N 0 0 45 z Z m 35 I - C) / \ (D w \ X S2 L0 >\ F- LL Lo 0) Ld Ex. Grade of 1-- N 0 4 LD \ W NO H 2 2 00 m CE W H - -- - - -- Z Lo -- - - 75 oo3(6Wa �JNd'C7 70 W/ Zof t0 --_ ON / '-- \ Q>0 2� E / --` WCO NW / W g�00a0 f0 / / 225.92 LF 30" PVC @ 0.09% 13+50 14+00 14+50 15+00 15+50 16+00 314.39 LF 30" DIP @ 0.09% 16+50 17+00 17+50 18+00 0 z 00 00 m o ,n >> zz 18+50 19+00 352.59 LF 18" 370.74 LF 18" PVC to 0.351 M I 0o LO� >> ZZ 1 \ U) r- 6 6 to LO 65 Z z_ 14+50 15+00 15+50 16+00 314.39 LF 30" DIP @ 0.09% 16+50 17+00 17+50 18+00 0 z 00 00 m o ,n >> zz 18+50 19+00 352.59 LF 18" 370.74 LF 18" PVC to 0.351 M I 0o LO� >> ZZ 1 \ O \\�/ 0 65 - N d- Q U w 60 W W z_= 00 w - - -- - - - J 75 oW I o = W - 55 U (n I Q - c� - - - - 50 19+50 20+00 20+50 21+00 21+50 22+00 22+50 - 1- — -40 35 23+00 23+50 24+00 Z O �~ wL Q¢cc LU C/3 �ccO ~ U QZcr O zLL LL cc z w o� C� w w Ir caa 0 O U CI 9 Z O V LU m O w O 0 W z z J 0 U x 0 z 9 M ZD 0 U w co m 0 w t'3 0 LU Y Q EL z J O Q U) cr z I— LU U ZL 173 II O w m O CD z Y Ir W W O co + M } N Q III - co (3 0 aO � o� C7 M Q co W z r..i .941 415 \ W n N W \ � � O Lq Lit y g 65 \ JONtL'C� \ Ex. Grade ! 60 ' / o -- \` - - - - -- 5 5 DESIGNED BY: � FINAL - - DRAWN BY: IF 213.57 LF 18" DIP 0.357. z DRS CHECKED BY: N - 50 WAL 6 m PROJECT NO.: L0 - - 2488 • GX -- z - - -- - > DATE: - - -- - z - FEBRUARY 2018 SCALE: — VERT.: 1"= 5' --- - 140 SHEET - - 35 C.4.2 - - 0+00 0+50 1+00 1+50 2+00 80 Lr)0 00 w - - -- - - - - - 75 oW I o c� r ,n WLq 1-0 Z � 70 cc z w o� C� w w Ir caa 0 O U CI 9 Z O V LU m O w O 0 W z z J 0 U x 0 z 9 M ZD 0 U w co m 0 w t'3 0 LU Y Q EL z J O Q U) cr z I— LU U ZL 173 II O w m O CD z Y Ir W W O co + M } N Q III - co (3 0 aO � o� C7 M Q co W z r..i .941 415 \ W n N W \ � � O Lq Lit y g 65 \ JONtL'C� \ Ex. Grade ! 60 ' / o -- \` - - - - -- 5 5 DESIGNED BY: � FINAL - - DRAWN BY: IF 213.57 LF 18" DIP 0.357. z DRS CHECKED BY: N - 50 WAL 6 m PROJECT NO.: L0 - - 2488 • GX -- z - - -- - > DATE: - - -- - z - FEBRUARY 2018 SCALE: — VERT.: 1"= 5' --- - 140 SHEET - - 35 C.4.2 - - 0+00 0+50 1+00 1+50 2+00 N ti NOTES: PAINT TOP OF CONCRETE AND ALL PIPE NOT ENCASED BY FOOTING WITH 6 MIL. SAFETY YELLOW D SMOOTH RADIUS CONCRETE FILL . ° 4' STEEL PIPE COST TO BE INCLUDED IN D PRICE FOR METER VAULT CONCRETE FILL D . 0 a FIN. GRADE Q D ' CONCRETE FOOTING • . D e ° ° . ° . . ° ° . ' D METER VAULT ° D ' 30" MIN. 18" DIAMETER MIN. �I 1 Y k 00 ro CF N c1_ U CF U L � U 41 b Q= r" � CID o\Q_ Lob ti PIPE BOLLARD C.8.2 NOT TO SCALE VARIE FINISH GRADE 0 N �+ N CAP GATE 7'-9" POST (TYP.) FENCE BOARD: SW X 6"X 8' DOG-EARED TREATED SYP I PROVIDE 4 MIL POLYETHYLENE AROUND PIPE TO PREVENT CONC. FROM BONDING TO PIPE. •A V-6" GREATER THAN OUT- SIDE DIAMETER OF PIPE AT TOP OF PIPE (\ FINISH GRADE 1 � W (i PIPE & CONC. p ° 4"MIN. i+ SECTION \\ ' •A• p - \ p CONC.THRUST BLOCK 4"MIN-y CONC. TO BE POURED 90° AGAINST FIRM MIN. BEARING AREA OF UN- UNDISTURBED EARTH DISTURBED EARTH REQUIRED 30D0 PSI CONCRETE TO HOLD LINE IN PLACE FOR FITTING AS LISTED IN CHART. DA" GATE HINGE: HEAVY BULLDOG r TRUSS ROD: 318" EXCAVATE AS NEARLY VERTICAL AS POSSIBLE 2� HORIZONTAL THRUST BLOCK NOT TO SCALE GATE FRAME: 2" O.D. GALV. STEEL SCH. 40 SQ. FT. BEARING AREA CONCRETE ANCHOR (SIZE AND SPACING) FITTING 4' PIPE 6' PIPE 8' PIPE 12" PIPE 90A BEND 1 3 5.5 40.8 D.E. OR TEE 1 2.5 3.8 31.5 45AOR LESS 1 2 3 22.1 GATE HINGE: HEAVY BULLDOG r TRUSS ROD: 318" EXCAVATE AS NEARLY VERTICAL AS POSSIBLE 2� HORIZONTAL THRUST BLOCK NOT TO SCALE GATE FRAME: 2" O.D. GALV. STEEL SCH. 40 SPAN, S DEPTH (MIN) CONCRETE ANCHOR (SIZE AND SPACING) 0'-0"<S54'-0" 1 1/2' II IIII II II II II II II II II j1 II II II II II II 11 11 II II � r' I I 11 it 11 1_1 11 11 11 11 11 I lit II 1 I I I I i I I 11 I I I I IIII I I I I i l 1 1 I I I I I I xl I F 8,000 4,300 I I L_I 1,100 i I. 11 11 _U 11 11 11 I III I I I I1 11 I1 I1 11 I1 I I I I1 I1 f I I I I I 1 10" 14,500 2" X 4" X 8' 11,100 LATCH &DROP ROD X 10' 12" BACK RAILS 29,600 ASSEMBLY. EQUIPPED S 4,000 4 NAILERS 36" FOR PADLOCK 21,100 11,000 PER SECTION 18" 35,700 50,400 27,300 14,000 7,000 NOTES: 44,800 63,400 34,400 " 6" 8,800 20" 55,000 77,800 42,100 1. PROVIDE LOCKING LATCHING DEVICES 10,800 24" 78,500 111,000 FOR SECURITY. (PADLOCKS BY OWNER) 31,600 15,400 30" 120,600 2. PROVIDE LATCHING DEVICES TO HOLD GATES IN 92,300 47,100 23,600 36" OPEN POSITION. 244,400 132,300 67,500 33,906 3. IF ROCK IS ENCOUNTERED WHEN SETTING POSTS, DRILL HOLES 233,300 330,000 176,600 91,000 4 -INCHES LARGER IN DIAMETER THAN POSTS AND BACKFILL TO 48' 304,000 430,000 232,700 GRADE WITH CLASS "B" CONCRETE. 59,600 54' 384,100 543,200 4. NAILS: USE 2 114" NAILS FOR FENCE BOARDS. USE W SPIRAL SHANK NAILS 149,000 75,300 FOR 2 X 4 BACK RAILS. NAILS TO BE HOT DIPPED GALVANIZED. TOP OF CONC ETE 5. UNIFORM TOP ELEVATIONS. 5 BOARD ON BOARD FENCE WITH GATE DETAIL NOT TO SCALE BLOW OFF VALVE SPAN, S DEPTH (MIN) CONCRETE ANCHOR (SIZE AND SPACING) 0'-0"<S54'-0" 1 1/2' 1/2'0x5 1/2" Q 18" 4'-0"< S:95' -O" 1 3t4- 4'5'-0"<Ss5'-6" 5/8"04" Q 18- 5' -O"< S -'g 5'-6" 2" 5'-6"< S s6'-0" 2 1 4" 6'-0"< S:96'-6 2 1/2' SCHEDULE BASED ON 150 PSF I /-AL GRATING F ----- L_____ AT WALL AL 1_300/8, CONT 316 SST CONCRETE ANCHOR SPAN, S g ALUMINIUM GRATING C.8.2 NOT TO SCALE �1/8" CLEARANCE CLEARANCE ALL AROUND _ EXTRUDED \ ALUMINUM FRAME ` . CONTINUOUS i ANCHOR STRAPS 1 "xt /4"x6" 0 18" (WELD TO FRAME) MIN 2 EACH SIDE AT FLOOR CONCRETE THRUST COLLAR D.I.P. 5' MIN. D. . GATE POST: 6 SB" O.D. GALV. STEEL SCH 40 CONCRETE CONCRETE THRUST BLOCK MECHANICAL JOINT CAPI TYPES OF THRUST BLOCKING NOT TO SCALE IT -I .ICJI� - I I F 31H1 THRU LINE CONNECTION THRU LINE CONNECTION DIRECTION CHANGE DIRECTION CHANGE TEE CROSS USED AS TEE ELBOW TEE USED AS ELBOW BEARING LOAD SOIL (LB./SQ. FT.) MUCK 0 SOFT CLAY 1,000 SILT 1,500 SANDY SILT 3,000 SAND 4,000 SANDY CLAY 6,000 HARD CLAY 9,000 RESULTANT THRUST AT FITTING AT 150 PSI PRESSURE TOTAL POUNDS NOPMINAL DIA. DEAD END 90° BEND 45° BEND 221/ BEND 11% ° BEND 3^ 1,848 2,613 1,415 722 382 4^ 2,700 3,800 2,100 1,100 530 6" 5,600 8,000 4,300 2,200 1,100 B' 9,700 13,600 7,400 3,800 1,900 10" 14,500 20,500 11,100 5,700 2,900 12" 20,500 29,600 15,700 8,000 4,000 14" 27,600 39,000 21,100 11,000 5,400 18" 35,700 50,400 27,300 14,000 7,000 18" 44,800 63,400 34,400 17,500 8,800 20" 55,000 77,800 42,100 21,500 10,800 24" 78,500 111,000 60,000 31,600 15,400 30" 120,600 170,600 92,300 47,100 23,600 36" 172,800 244,400 132,300 67,500 33,906 42" 233,300 330,000 176,600 91,000 45,700 48' 304,000 430,000 232,700 118,600 59,600 54' 384,100 543,200 294,000 149,000 75,300 C - NOTES: " 1. TO DETERMINE THE SIZE OF A CONCRETE THRUST BLOCK, DIVIDE THE TOTAL FORCE BY THE BEARING VALUES OF l-"-I ' r THE SOIL THE QUOTIENT WILL BE THE SIZE OF THE _�-�=- H1 -IT CHANGE LINE SIZE DIRECTION CHANGE DIRECTION CHANGE REDUCER CROSS USED AS ELBOW L CONCRETE THRUST BLOCKING _�-�=- 4" DIA. WATER KI NGSBORO SEDIMENT TRAPS DRS MAIN MARKER SHEET L 111111 �w WEIR SIDE SLOPES X:1 BLIND FLANGE C.2A 45.0 22.5 THREADED RODS 5.0 'D. 2 m 28.0 14.0 ELBOWS BOLT TOGETHER 2.0 2 3 FLOW 28.0 14.0 0.99 2.0 _ 6'X87(' CONCRETE 4 C.2.4 28.0 PAD DI RECTED TO 3.64 (EACH SIDE)o 2 . •D 11 v~i .LLI9. D DO'�D. AREA ( EE NOTE #3) CONCRETE PAD AROUND DrO-D. 6 •.D VALVE AT FINISHED GRADE D r p -I I 5.0 2 VERTICAL C.3.1 ' 20.0 D s0 �--ii Z 8 I I-III-III-IIIt I 1- I I III-111-11IIIIII-III-I-III i 1 1 II ISI I�(T i I -III -III IIIIII-IIIIII-I ISI i 30.0 D.I. PIPE 1'-2"xt'-2" CONCRETE PAD UNDISTURBED 5.0 2 THREADED TO BE POURED SO THAT NO SOIL 30.0 20.0 RODS (EACH SIDE) FITTINGS OR FLANGES ARE 2 10 COVERED NOTE: THIS DETAIL SHALL APPLY TO TEMPORARY CAPPING. PERMANENT DEAD END LINES TO BE EQUIPPED WITH BLOW OFF ASSEMBLY. STANDARD CAPPING DETAIL NOT TO SCALE NOT TO SCALE DE -WATERING BAG VELOCITY DISSIPATION AREA 10' MIN LENGTH 1 PUMPS SHALL DISCHARGE ONTO SANDBAGS OR RIP RAP TO DISSIPATE VELOCITY DOWN REACH SEDIMENT DIKE TO FORM VELOCITY DISSIPATION POOL SEDIMENT - DIKE SCHARGE HOSES P ~DU PATERING BEARING AREA OF THE THRUST BLOCK IN SQUARE FEET. APPROXIMATE VALUES FOR VARIOUS TYPES OF SOIL ARE LISTED IN THE TABLE ABOVE. 2. CONCRETE SHALL HAVE A 28 -DAY COMPRESSIVE STRENGTH OF 3,000 PSI. 3. LEAVE JOINTS CLEAR OF CONCRETE. 4. POLYETHYLENE SHALL BE WRAPPED AROUND FITTING WHERE CONCRETE BLOCKING MAY BE REMOVED. STREAM DIVERSION PUMP !-INTAKE HOSE _ SUMP HOLE OR POOL (12' TO 18" DEEP, 2' DIA.) FLOW CLEAN WATER WORK AREA DIKE LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY 500 LF MAXIMUM NOTES: 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIP RAP OR SANDBAGS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A DE -WATERING BASIN, SEDIMENT BAG, OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SILT BAG AND STREAM. 3. AT THE END OF EACH WORK DAY. THE DISTURBED CHANNEL SHALL BE MATTED. PUMP AROUND AND VELOCITY DISSIPATOR NOT TO SCALE NOT TO SCALE TOP OF STREAM BANK BYPASS PUMP PIBYPASS PUMP - PIPE 4" DIA. WATER KI NGSBORO SEDIMENT TRAPS DRS MAIN MARKER SHEET L MIN. 2 X DIAMETER D WEIR SIDE SLOPES X:1 BLIND FLANGE C.2A 45.0 22.5 WITH TWO BOLTS 5.0 2 -FLANGE X FLANGE 2 C.2.1 28.0 14.0 ELBOWS BOLT TOGETHER 2.0 2 3 FLOW 28.0 14.0 0.99 2.0 _ 6'X87(' CONCRETE 4 C.2.4 28.0 PAD DI RECTED TO 3.64 2.0 2 NATUR NL DRAINAGE C.3A 45.0 22.5 AREA ( EE NOTE #3) CONCRETE PAD AROUND 2 6 C.3.4 VALVE AT FINISHED GRADE FLANGE X FLANGE 3.01 5.0 2 VERTICAL C.3.1 25.0 20.0 3.01 5.0 2 8 C.3.2 30.0 20.0 3.01 5.0 2 i" WEEPHOLE C.2.8 30.0 20.0 3.01 5.0 2 10 C.2.8 #67 WASH STO E 3.01 5.0 2 FLANGE X (SEE NOTE #1) 6" MIN. -- FLANGE ELBOW MAIL log TOP OF CONC ETE BLOW OFF VALVE CONCRETE BLOCKING NOTES: SEE DETAILS W-8 & 1. DRILL 1/4" WEEP HOLE FOR STACK DRAINAGE INTO STONE. W-9 FOR THRUST 2. DOUBLE 3/4" BRIDLE RODS ON BOTH SIDES. BLOCK INFORMATION 3. A RIP -RAP SWALE FROM FROM CONCRETE SPLASH PAD TO POSITIVE DRAINAGE AREA IS REQUIRED. 4. BOTTOM 90 ELBOW SHALL HAVE BLIND FLANGE ATTACHED WITH TWO BOLTS. S. INSTALL WATER MAIN MARKER AT RAN OR P/L TO LOCATE MAIN. 6.3/4" RODS AND BOLTS TO BE HOT DIPPED GALVANIZED. 7. END PIPE SIZE 6" MIN. OR AS APPROVED BY PUBLIC UTLITIES. PERMANENT WATER MAIN �o BLOW OFF ASSEMBLY NOT TO SCALE TOP OF STREAM BANK BYPASS PUMP PIBYPASS PUMP - PIPE r4 SEDIMENT TRAP TABLE C.8.2 NOT TO SCALE tTOP OF STREAM BANK STREAM FLOW COFFERDAM rnWATER TRANSMISSION MAIN WATER TRANSMISSION MAIN WATER TRANSMISSION m MAIN TRENCH �? ' JT - --SILT FENCE BYPASS PUMP COFFERDAM TOP OF STREAM BANK TOP OF STREAM BANKS STREAM FLOW NOTES: 1. COFFERDAM SHALL BE DESIGNED AND CONSTRUCTED BY THE CONTRACTOR. COFFERDAM SHALL BE IMPERVIOUS AND SPAN THE ENTIRE WIDTH OF THE CHANNEL. 2. BYPASS PUMP MUST BE RUN AT ALL TIMES. 3. AFTER UTILITY INSTALLATION, RETURN STREAM BED AND BANK TO THEIR ORIGINAL GRADE, STABILIZE BANKS, REMOVE COFFERDAM AFTER STABILIZATION. 4. CONSTRUCTION AREA SHOULD BE DE -WATERED WITH A PUMP THAT SHOULD DISCHARGE INTO A SILT BAG LOCATED ON TOP OF A 6 -INCH THICK COARSE AGGREGATE BASE. 5. CONSTRUCTION ENTRANCE RAMPS SHOULD BE INSTALLED ON EACH SIDE OF THE CROSSING FOR APPROXIMATELY 50 FEET WITH SILT FENCE AROUND FOUR CORNERS OF CROSSING. 6. FOR TEMPORARY CROSSING USE TIMBER MAT/COMPOSITE MAT OR OTHER TEMPORARY CROSSING METHOD. WET WEATHER DITCH/STREAM CROSSING NOT TO SCALE m A MASONRY BULKHEAD AT THE DISCONNECTED PIPE PRIOR TO PLACING CONCRETE MECHANICAL PLUG FOR PIPES 15" & SMALLER CONCRETE 3000 PSICONCRETE THRUST BLOCK PLUGS POURED IN PLACE MECHANICAL JOINT END CAP RODDED TO ANCHOR BLOCK 24" ACTIVE MAIN U3 Z O cn > W KI NGSBORO SEDIMENT TRAPS DRS # SHEET L W D WEIR SIDE SLOPES X:1 1 C.2A 45.0 22.5 3.01 5.0 2 2 C.2.1 28.0 14.0 3.48 2.0 2 3 C.2.4 28.0 14.0 0.99 2.0 2 4 C.2.4 28.0 14.0 3.64 2.0 2 5 C.3A 45.0 22.5 3.01 5.0 2 6 C.3.4 45.0 22.5 3.01 5.0 2 7 C.3.1 25.0 20.0 3.01 5.0 2 8 C.3.2 30.0 20.0 3.01 5.0 2 9 C.2.8 30.0 20.0 3.01 5.0 2 10 C.2.8 33.0 22.0 3.01 5.0 2 r4 SEDIMENT TRAP TABLE C.8.2 NOT TO SCALE tTOP OF STREAM BANK STREAM FLOW COFFERDAM rnWATER TRANSMISSION MAIN WATER TRANSMISSION MAIN WATER TRANSMISSION m MAIN TRENCH �? ' JT - --SILT FENCE BYPASS PUMP COFFERDAM TOP OF STREAM BANK TOP OF STREAM BANKS STREAM FLOW NOTES: 1. COFFERDAM SHALL BE DESIGNED AND CONSTRUCTED BY THE CONTRACTOR. COFFERDAM SHALL BE IMPERVIOUS AND SPAN THE ENTIRE WIDTH OF THE CHANNEL. 2. BYPASS PUMP MUST BE RUN AT ALL TIMES. 3. AFTER UTILITY INSTALLATION, RETURN STREAM BED AND BANK TO THEIR ORIGINAL GRADE, STABILIZE BANKS, REMOVE COFFERDAM AFTER STABILIZATION. 4. CONSTRUCTION AREA SHOULD BE DE -WATERED WITH A PUMP THAT SHOULD DISCHARGE INTO A SILT BAG LOCATED ON TOP OF A 6 -INCH THICK COARSE AGGREGATE BASE. 5. CONSTRUCTION ENTRANCE RAMPS SHOULD BE INSTALLED ON EACH SIDE OF THE CROSSING FOR APPROXIMATELY 50 FEET WITH SILT FENCE AROUND FOUR CORNERS OF CROSSING. 6. FOR TEMPORARY CROSSING USE TIMBER MAT/COMPOSITE MAT OR OTHER TEMPORARY CROSSING METHOD. WET WEATHER DITCH/STREAM CROSSING NOT TO SCALE m A MASONRY BULKHEAD AT THE DISCONNECTED PIPE PRIOR TO PLACING CONCRETE MECHANICAL PLUG FOR PIPES 15" & SMALLER CONCRETE 3000 PSICONCRETE THRUST BLOCK PLUGS POURED IN PLACE MECHANICAL JOINT END CAP RODDED TO ANCHOR BLOCK 24" ACTIVE MAIN U3 Z O cn > W < Z J It < U Z O W m 2 O U W CD 0 Lu Z W m O U W D W 'y Z < EY U) Z W X in W Z cn W_ c J M N N J W J cc W Z W 0 ,,pu uq"4 �?:pFES 4ry; 041415 •.,FNG INE: QS: """;SAM A- DESIGN ONLY FOR CAST IRON PIPE OR FILL W/ RESTRAINED TO DUCTILE IRON PLOWABLE PIPE WITH APPROVED GLAND GROUT DESIGNED BY: ° WAL a a as a - a a a v a ] 11 X111-111=111-11 [;=1 11-111=111-111-11 I I 11=1 I I -III -I 1=1 1-111-111-111--111 .1 I PI I C=1 I1=1 11=1 I C=1 I rI 11=1 I I� 11 -III= I I� I I -I 11=1 I -I 11 I I I 111=1 11=1 I I 11 111= REMOVE A 2' MIN. 20" MIN. OF EXISTING PIPE (TYP.) ABANDONED PIPE TYPICAL WATERMAIN ABANDONMENT NOT TO SCALE DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: ^^z M o0 2488 - GX c G N ^_ U N 0 d cn U >�o � Z C N d N LL LL1 N � uj � d w � z pomp, O y t � Q, a, o � R � J y N N � 0 < Z J It < U Z O W m 2 O U W CD 0 Lu Z W m O U W D W 'y Z < EY U) Z W X in W Z cn W_ c J M N N J W J cc W Z W 0 ,,pu uq"4 �?:pFES 4ry; 041415 •.,FNG INE: QS: """;SAM A- DESIGN ONLY FOR CAST IRON PIPE OR FILL W/ RESTRAINED TO DUCTILE IRON PLOWABLE PIPE WITH APPROVED GLAND GROUT DESIGNED BY: ° WAL a a as a - a a a v a ] 11 X111-111=111-11 [;=1 11-111=111-111-11 I I 11=1 I I -III -I 1=1 1-111-111-111--111 .1 I PI I C=1 I1=1 11=1 I C=1 I rI 11=1 I I� 11 -III= I I� I I -I 11=1 I -I 11 I I I 111=1 11=1 I I 11 111= REMOVE A 2' MIN. 20" MIN. OF EXISTING PIPE (TYP.) ABANDONED PIPE TYPICAL WATERMAIN ABANDONMENT NOT TO SCALE DRAWN BY: DRS CHECKED BY: WAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 SCALE: AS NOTED SHEET C.8.2 11AwarnAV�p�� { w - _ - - Q , NEW PUMP STATION - - - - 1 SEE SHEET C.5.2 \ 1� v _ Worn — 40X3\';st� 1 NEW 10" FORCE MAIN - SEE SHEET C.3.4 \ I W o 0 o s� $ \ \s ( \ \\ \ \ \\ \\ Notify NC811 Three Full Working Days Before Digging \ ! \ Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW WET ELL 1 ( ( NEW 75.49 OF 30" DIP \\ ' RIM ELEV. 63.59' ( (� ( o ( GRAVITY SEWER Q 0.52/ INV. IN 42.00' (ice \ \ \ \ \ ( (NEW 82.10 OF 30" PVC _ 1 GRAVITY SEWER 0 0.097. \\ \ \ \ \ \ E � I ( ( \ Ex. 4" Water Main NEW MH -2 (WATERTIGHT \\ \ \\ \\ \\ \\ \ \ \ � � a 4 z LID W/ VENT) '/ �\ \\ -_ \ \ \\ \\ \\ \ \ �I RIM ELEV. 61.21 / � ` a" o s\ ,INV. IN 42.86' N 1 _ INV. OUT 42.66' / J %w A 0 0 D s STREAM CROSSING S1 'o \ N 1- - (PERENNIAL)\( ��\ ` - -- -_ - J \ \ CL \• \ IMPACT LENGTH- 16 F 5-/, \ \ \ o \ L 3 Ex_ Abandoned Well _ — m -NEW 224 LF OF SILT FENCE 1, ` \ \\ Ex. 4" Water Main I _ NEW MH -1 / v RIM ELEV. 63.88' INV. IN 42.59' INV. OUT 42.39 % y / BUFFER IMPACT B1 \ \ \ Ex. 4" Water Main 202 SQ.FT. .11 \ TOTAL ZONE 1 IMPACT= 2 \ / / TOTAL ZONE 2 IMPACT- 1,735 SQ.FT%. \ \ U 1 \ 1 Ex. Buffer w \ —� of -`m1 �o / / 1 \ \ \ \ J \\ 1 5&w� o\✓ \'\w� NEW 377.92 OF 30" PVC �/ / GRAVITY SEWER @ 0.097 \ \ \\ \ \ \\ - 1 11 NEW 225.92 OF 30" PVC 2 s / 1 - _ GRAVITY SEWER C 0.09/ SILT FENCE OUTLET \ ` Ex. Floodptoin \ \ \ -3 \ ) --- 1 L \ - - \ / `-`- BUFFER IMPACT B2 \\ \\ \ \ \\ BUFFER IMPACT B3 1 // TOTAL ZONE 1 IMPACT= 0 SQ.FT \ \ Cll TOTAL ZONE 1 IMPACT- 1,335 SQ.FT. Ex.Wingwa/l / 1 I / �\ TOTAL ZONE 2 IMPACT= 1,210 SQ.FT. \\ \ \ \\ \ TOTAL ZONE 2 IMPACT= 4,941 SQ.FT. NEW MH -5 - (WATERTIGHT LID I� i / s W/ VENT). NEW MH -3 (WATERTIGH ' T \ \ 7 e RIM ELEV. 63.12 ee LID W/ VENT). OUTSIDE DROP \ w 0 0 D 5 INV IN 50.29' �\ Ta' RIM ELEV. 60.01' \ \ \ \� NEW MH -4 INV. OUT 50.09'- -"~ j5 NEW 539 LF OF \ ti' 1yo INV. IN 49.20' \ \ \ W PERMANENT EASEMENT-- - -" - - ' L0 Ex. 10'xl0'Cu/vert \ \ / o SILT FENCE \ \ \ ° ` NEW 366.33 OF 30 PVC RIM ELEV. 62.02 NEW EACH SIDE OF ---- + / \ \ INV. OUT 43.20 24 Buried_ _INV. IN GRAVITY SEWER LINE). _ - � � � � 1 / h "GRAVITY SEWER 0.09/ 24" CMP ` INV OUT 49.73' 9353' N N. - \ \ CLEAR &GRUBBING \ - ��`- /r 4' 107 SY Ex . \ L _ \ . Washout � � � Ex. TOB ��-� �= - - ° --ss- ,\ \ �- ? ��� o - - o ° - -NEW 402.02 OF 30" PVC M (� \ \ I m,2. - - . o - �° v M ° o - - GRAVITY SEWER @ 0.09/Ld F- - m �- - _- — �_Ex. TOB --- s — - li+1JU - ---=C -..1 C/') I ek SILT FENCE OUTLET / _ -"/��P d - / C/L cr _ = W C / — -- b -- —ZONE 2— — _ � � � / i / . i- �- W \ ' - _ 6 -Guy \ \ \ \\\, / (� \ \ \ - LIMITED OF DISTURBANCE —5 - - - F- 1 O \; \',mrT \ 30 FT. WIDTH / - - - { 1\ \ i i_ J , _ZONE 1 NEW 1.109 LF OF -� Worn , ,t• _ W O O D S>c� ' J i , \- \ - - \ s _ SILT FENCE �' l� r t \ Post `, _ s I \ ` \ 4c' / SILT FENCE OUTLET - -1 i ✓��t z r. Ex. 16" Water Mai \ / \ - SILT FENCE OUTLET 55 NEW 10" FORCE MAIN \ `�� _ ��� � - .����� j -_! / '� ------ -�_ -- -_ � ✓/ /� ��` ��,c,,, - ---------- , I SEE SHEET C.3.3 1 \ ` Ex. Wetlands 1 \ Ex. Power 25 KV, — — — a� - _ = s —/ 3 3 Phase Distribution � � _ � 1 % \ 1 (� % / / i �_ i � � � � _ �/ � .. - � Oy- ZONE 2 \ ' \ Ex. Power 115 KV-.� z — — — — \ — —� - 1 \ \- / / \ i �� , a _ s ;' BUFFER IMPACT B4 / \ 1 Qi \ , \ a Transmission - - - - _ \ \ \ _ / / / i -� _ ° - = _ - _ - _ TOTAL ZONE 1 IMPACT- 0 SQ.FT. � — l �` 5- -TOTAL ZONE 2 IMPACT= 2,053 SQ.FT. - Ex. TOE NAD f -- \ \\ \ �\ �._ _ - `�Swale\ sL w o 0 D S, \ $3 2011) 1 \ \1 \ 1 \ - - - - _ \ -W 0 0 D S Ex. \\. \ \ \ \• \\� �,, , \�� \ NOTE' _ - — - - a / - %o - - NOTE THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD IF SELECTED, ADD ALTA MECHANICAL BAR SCREEN, INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 THE UNIT WILL BE CONSTRUCTED BETWEEN THE 50' 25' 0 50' 100' 150' AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES WET WELL AND MH -1. THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM SCALE: 1" = 50' OF THIS PROJECT IS 60.0'. MECHANICAL BAR SCREEN (ADD. ALT. 1) NEW 10" FORCE MAIN 7000 C'4 3: N W - NW + E I OO N N � rn O M M p N r-:0 82.10 LF 30" � o J 01 PVC Q 0.09'/. 357.92 LF 30" PVC Q 0.09/ ? > z N � - c0 F=— > >z w 4 \ W > O) N Q = q� U �o SO W o,Ct W _ 10 O c N7 W > �Lr) 0+00 a�� 0 11AwarnAV�p�� { w - _ - - Q , NEW PUMP STATION - - - - 1 SEE SHEET C.5.2 \ 1� v _ Worn — 40X3\';st� 1 NEW 10" FORCE MAIN - SEE SHEET C.3.4 \ I W o 0 o s� $ \ \s ( \ \\ \ \ \\ \\ Notify NC811 Three Full Working Days Before Digging \ ! \ Dial 811 or 1-800-632-4949, or visit www.nc8ll.org NEW WET ELL 1 ( ( NEW 75.49 OF 30" DIP \\ ' RIM ELEV. 63.59' ( (� ( o ( GRAVITY SEWER Q 0.52/ INV. IN 42.00' (ice \ \ \ \ \ ( (NEW 82.10 OF 30" PVC _ 1 GRAVITY SEWER 0 0.097. \\ \ \ \ \ \ E � I ( ( \ Ex. 4" Water Main NEW MH -2 (WATERTIGHT \\ \ \\ \\ \\ \\ \ \ \ � � a 4 z LID W/ VENT) '/ �\ \\ -_ \ \ \\ \\ \\ \ \ �I RIM ELEV. 61.21 / � ` a" o s\ ,INV. IN 42.86' N 1 _ INV. OUT 42.66' / J %w A 0 0 D s STREAM CROSSING S1 'o \ N 1- - (PERENNIAL)\( ��\ ` - -- -_ - J \ \ CL \• \ IMPACT LENGTH- 16 F 5-/, \ \ \ o \ L 3 Ex_ Abandoned Well _ — m -NEW 224 LF OF SILT FENCE 1, ` \ \\ Ex. 4" Water Main I _ NEW MH -1 / v RIM ELEV. 63.88' INV. IN 42.59' INV. OUT 42.39 % y / BUFFER IMPACT B1 \ \ \ Ex. 4" Water Main 202 SQ.FT. .11 \ TOTAL ZONE 1 IMPACT= 2 \ / / TOTAL ZONE 2 IMPACT- 1,735 SQ.FT%. \ \ U 1 \ 1 Ex. Buffer w \ —� of -`m1 �o / / 1 \ \ \ \ J \\ 1 5&w� o\✓ \'\w� NEW 377.92 OF 30" PVC �/ / GRAVITY SEWER @ 0.097 \ \ \\ \ \ \\ - 1 11 NEW 225.92 OF 30" PVC 2 s / 1 - _ GRAVITY SEWER C 0.09/ SILT FENCE OUTLET \ ` Ex. Floodptoin \ \ \ -3 \ ) --- 1 L \ - - \ / `-`- BUFFER IMPACT B2 \\ \\ \ \ \\ BUFFER IMPACT B3 1 // TOTAL ZONE 1 IMPACT= 0 SQ.FT \ \ Cll TOTAL ZONE 1 IMPACT- 1,335 SQ.FT. Ex.Wingwa/l / 1 I / �\ TOTAL ZONE 2 IMPACT= 1,210 SQ.FT. \\ \ \ \\ \ TOTAL ZONE 2 IMPACT= 4,941 SQ.FT. NEW MH -5 - (WATERTIGHT LID I� i / s W/ VENT). NEW MH -3 (WATERTIGH ' T \ \ 7 e RIM ELEV. 63.12 ee LID W/ VENT). OUTSIDE DROP \ w 0 0 D 5 INV IN 50.29' �\ Ta' RIM ELEV. 60.01' \ \ \ \� NEW MH -4 INV. OUT 50.09'- -"~ j5 NEW 539 LF OF \ ti' 1yo INV. IN 49.20' \ \ \ W PERMANENT EASEMENT-- - -" - - ' L0 Ex. 10'xl0'Cu/vert \ \ / o SILT FENCE \ \ \ ° ` NEW 366.33 OF 30 PVC RIM ELEV. 62.02 NEW EACH SIDE OF ---- + / \ \ INV. OUT 43.20 24 Buried_ _INV. IN GRAVITY SEWER LINE). _ - � � � � 1 / h "GRAVITY SEWER 0.09/ 24" CMP ` INV OUT 49.73' 9353' N N. - \ \ CLEAR &GRUBBING \ - ��`- /r 4' 107 SY Ex . \ L _ \ . Washout � � � Ex. TOB ��-� �= - - ° --ss- ,\ \ �- ? ��� o - - o ° - -NEW 402.02 OF 30" PVC M (� \ \ I m,2. - - . o - �° v M ° o - - GRAVITY SEWER @ 0.09/Ld F- - m �- - _- — �_Ex. TOB --- s — - li+1JU - ---=C -..1 C/') I ek SILT FENCE OUTLET / _ -"/��P d - / C/L cr _ = W C / — -- b -- —ZONE 2— — _ � � � / i / . i- �- W \ ' - _ 6 -Guy \ \ \ \\\, / (� \ \ \ - LIMITED OF DISTURBANCE —5 - - - F- 1 O \; \',mrT \ 30 FT. WIDTH / - - - { 1\ \ i i_ J , _ZONE 1 NEW 1.109 LF OF -� Worn , ,t• _ W O O D S>c� ' J i , \- \ - - \ s _ SILT FENCE �' l� r t \ Post `, _ s I \ ` \ 4c' / SILT FENCE OUTLET - -1 i ✓��t z r. Ex. 16" Water Mai \ / \ - SILT FENCE OUTLET 55 NEW 10" FORCE MAIN \ `�� _ ��� � - .����� j -_! / '� ------ -�_ -- -_ � ✓/ /� ��` ��,c,,, - ---------- , I SEE SHEET C.3.3 1 \ ` Ex. Wetlands 1 \ Ex. Power 25 KV, — — — a� - _ = s —/ 3 3 Phase Distribution � � _ � 1 % \ 1 (� % / / i �_ i � � � � _ �/ � .. - � Oy- ZONE 2 \ ' \ Ex. Power 115 KV-.� z — — — — \ — —� - 1 \ \- / / \ i �� , a _ s ;' BUFFER IMPACT B4 / \ 1 Qi \ , \ a Transmission - - - - _ \ \ \ _ / / / i -� _ ° - = _ - _ - _ TOTAL ZONE 1 IMPACT- 0 SQ.FT. � — l �` 5- -TOTAL ZONE 2 IMPACT= 2,053 SQ.FT. - Ex. TOE NAD f -- \ \\ \ �\ �._ _ - `�Swale\ sL w o 0 D S, \ $3 2011) 1 \ \1 \ 1 \ - - - - _ \ -W 0 0 D S Ex. \\. \ \ \ \• \\� �,, , \�� \ NOTE' _ - — - - a / - %o - - NOTE THIS PROJECT SCALES WITHIN ZONE "X" AS PER FLOOD IF SELECTED, ADD ALTA MECHANICAL BAR SCREEN, INSURANCE MAP 3720379900J, ALL DATED NOVEMBER 03, 2004 THE UNIT WILL BE CONSTRUCTED BETWEEN THE 50' 25' 0 50' 100' 150' AS ESTABLISHED BY FEMA. THIS REPORT IN NO WAY SUPERCEDES WET WELL AND MH -1. THE ABOVE MENTIONED FIRM. BASE FLOOD ELEVATION DOWNSTREAM SCALE: 1" = 50' OF THIS PROJECT IS 60.0'. MECHANICAL BAR SCREEN (ADD. ALT. 1) NEW 10" FORCE MAIN 7000 C'4 3: N W - NW + E I OO SEE SHEET C.3.4 rn O M M p N r-:0 82.10 LF 30" 40 � J 01 PVC Q 0.09'/. 357.92 LF 30" PVC Q 0.09/ ? > z N � - c0 F=— > >z z z z 225.92 LF 30" F- W > O) N U = ZN ONN QOO>_ >p WtQ�Y W SO W ? W _ 10 O c N7 W > 65 0+00 W 0 0 w 00 W =1 cZ �of Wwo o _ o'cro LOti w moo 3w O y 3 pO W ECc°zo — -- \LOW � ExGrade p a �Z �---_ \ 2 D E 2 t7 (n l '\ 55 \ 366.33 LF 30" PVC 0 0.097 402.02 LF 30" PVC @2 0.09/ 45 75.49 LF 30" DIP 0.52/ \_—.I 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 Z o �L�_ wV QaU LU C/3 O H %J Qz0 z LL LL 70 65 CD m O w It N N ao o � m z W Uj r. O O LU W a: rn III Ir CL W u CL o � U O OWC U as 9 im z 0 W m m O W O 0 W I OO _y O rn O M M p N r-:0 82.10 LF 30" 40 � N t0 a 6 0) LO `O PVC Q 0.09'/. 357.92 LF 30" PVC Q 0.09/ ? > z N � - j Z - > >z z z z 225.92 LF 30" NEW 20 LF OF 30" DIP @ z N U PVC 0 0.091 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 Z o �L�_ wV QaU LU C/3 O H %J Qz0 z LL LL 70 65 CD m O w It N N ao o � m z W Uj r. O O LU W a: rn III Ir CL W u CL o � U O OWC U as 9 im z 0 W m m O W O 0 W I OO _y O (0 ao `°N o N 40 � �� N N N � - > >z NEW 20 LF OF 30" DIP @ z N U z z z - 0.09% OF GRAVITY SEWER - ZN z ,- U In -� 35 zd c tV N LL 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 Z o �L�_ wV QaU LU C/3 O H %J Qz0 z LL LL 70 65 CD m O w It N N ao o � m z W Uj r. O O LU W a: rn III Ir CL W u CL o � U O OWC U as 9 im z 0 W m m O W O 0 W 1, •�F ESS S 041415 = FN S : �4i,, P 55 DESIGNED BY: wAL DRAWN BY: DRS CHECKED BY: 50 wAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 45 I SCALE: m HORZ.: V = 50' VERT: 1' = 6 SHEET ,5 1 C.4.1 z O IL m LU n M N U N O ZN m ,- U In -� zd c tV N LL LU C7 a = O h L o � U o w Q O O y 3 � N t - Wm O OJ O 1, •�F ESS S 041415 = FN S : �4i,, P 55 DESIGNED BY: wAL DRAWN BY: DRS CHECKED BY: 50 wAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 45 I SCALE: m HORZ.: V = 50' VERT: 1' = 6 SHEET ,5 1 C.4.1 QLOW O IL LU Z M O ,- w H o w Q O Z � t - W OJ O O M Q C7 Z Z U) Y 1, •�F ESS S 041415 = FN S : �4i,, P 55 DESIGNED BY: wAL DRAWN BY: DRS CHECKED BY: 50 wAL PROJECT NO.: 2488 - GX DATE: FEBRUARY 2018 45 I SCALE: m HORZ.: V = 50' VERT: 1' = 6 SHEET ,5 1 C.4.1