Loading...
HomeMy WebLinkAbout20090385 Ver 1_Application_20090408,r a STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. Steve Chapin NCDOT Coordinator Dear Sir: EUGENE A. CONTI, JR. SECRETARY &@ lr IJ A PR 2009 KE4R- TER UNDSgt sTDR nt'411:•4HI M 090385- Subject: Application for Section 404 Nationwide Permits 23, 33 and Section 401 Water Quality Certifications for the proposed replacement of Bridge No. 82 over Jacktown Creek on NC 226 in McDowell County, Federal Aid Project No. BRSTP-226(10); Division 13; TIP No. B-4191 $570.00 debit WBS 33538. 1.1 The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 82 over Jacktown Creek on NC 226. There will be 85 feet (0.02 acres) of temporary surface water impacts, 175 feet (0.04 acres) of permanent surface water impacts. Following construction of the project, NCDOT will mitigate for 175 feet of permanent stream impacts onsite at 1:1 ratio by restoring approximately 450 ft. of Jacktown Creek. The conceptual mitigation plan for the restoration is attached. NCDOT will apply for a separate permit for the onsite mitigation project and will include final mitigation design plans at that time. If for any reason the mitigation cannot be obtained onsite, NCDOT will request mitigation from the North Carolina Ecosystem Enhancement Program. Please see enclosed copies of the Pre-Construction Notification (PCN), permit drawings, design plans and Stormwater Management Plan for the above-referenced project. The Categorical Exclusion (CE) was completed in March 2006 and the Right-of-Way Consultation was completed in July 2008. Documents were distributed shortly thereafter. Additional copies are available upon request. This project calls for a letting date of September 15, 2009 and a review date of July 28, 2009. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 April 3, 2009 TELEPHONE: 919-431-2000 FAX: 919-431-2002 WEESITE: WWW.N000TORG LOCATION: 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 . A copy of this permit application will be posted on the NCDOT Website at: http://www.ncdot.org/doh/preconstruct/pe/. If you have any questions or need additional information, please call Jennifer Harrod at (919) 431-6672. S' rely, O"' Gregory . Thorpe, Ph.D. Environmental Management Director, PDEA w/attachment Mr. Brian Wrenn, NCDWQ (5 copies) Ms. Marla Chambers, NCWRC Ms. Marella Buncick, USFWS w/o attachment (see permit website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Mark Staley, Roadside Environmental Mr. Victor Barbour, P.E., Project Services Unit Mr. Greg Perfetti, P.E., Structure Design Mr. J.J. Swain, P.E., Division Engineer Mr. Roger Bryan, DEO Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USACE, Wilmington Mr. Vincent Rhea, PDEA O?aF WATFgOG I I ? ? Office Use Only Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 23 33 or General Permit (GP) number: tc. Has the NWP or GP number been verified by the Corps? ? Yes ®No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ®No For the record only for Corps Permit: ? Yes E] No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: Replacment of Bridge 82 over Jacktown Creek on NC 226 2b. County: McDowell 2c. Nearest municipality / town: Marion 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B-4191 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 431-6672 3g. Fax no.: (919) 431-2002 3h. Email address: jwharrod@ncdot.gov Page 1 of 11 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: V. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates in decimal degrees): ( .65 Longitude: - 81.95 Latitude: 35 (DD.DMDDD) (-DD.DDDDDD) 1 c. Property size: 950 ft L x 225 ft W = 213,750 sq. ft (213,750) sq. ft. / (43,650) sq. ft = 4.9 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Jacktown Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Bridge No. 82 will be replaced with a 90-foot long reinforced concrete box culvert. Area is heavily developed/disturbed. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 250 feet 3d. Explain the purpose of the proposed project: To replace a structurally deficient and/ or functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 21-foot bridge with a 90-foot, RCBC at new location just northeast of the existing location. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ®No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ®No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ®No 6b. If yes, explain. Page 3 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tem ora T ? Yes ? Corps Site 1 ? P ? T ? No ? DWQ ? Yes ? Corps Site 2 ? P ? T ? No ? DWQ ? Yes ? Corps Site 3 ? P ? T . ? No ? DWO ? Yes ? Corps Site 4 ? P ? T ? No ? DWQ ? Yes ? Corps Site 5 ? P ? T ? No ? DWQ ? Yes ? Corps Site 6 ? P ? T ? No ? DWQ 2g. Total wetland impacts X Permanent X Temporary 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact number - (PER) or jurisdiction stream length (linear Permanent (P) or intermittent (Corps - 404, 10 width feet) Temporary (T) (INT)? DWQ-non-404, (feet) other) Site 1 ®P ? T Culvert 2 @ 8' X 10' RCBC Creek Jacktown ® PER El INT ® Corps El DWQ 8' 175 Site 2 ? P ®T Temporary Pipe Jacktown Creek ® PER INT ® Corps ? DWQ 8 85 2 @ 66" CSP Site 3 ? P ? T ? PER ? INT ? Corps ? DWQ ? PER ? Corps Site 4 ? P ? T ? INT ? DWQ ? PER ? Corps Site 5 ? P ? T ? INT ? DWQ ? PER ? Corps Site 6 ? P ? T ? INT ?DWQ 3h. Total stream and tributary impacts 175 Perm 85 Temp 3i. Comments: Page 4 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number - waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) (if applicable) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 0. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres)': 5j. Size of pond watershed (acres): 51k. Method of construction: Page 5 of 1 l 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then ou MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 69. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? ?Yes 131 ?P?T ? No ?Yes B2 ?P?T ? No B3 ? P ? T ? Yes ? No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The current bridge will be replaced at new location just northeast of the existing location. During construction traffic will follow an on-site detour. There will be no direct discharge into Jacktown Creek. Low flow channel in RCBC and preformed scoure hole to reduce road runoff. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT Best Management Practices will be implemented during all phases of construction and demolition. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ? No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ® Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b . Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a . Approval letter from in-lieu fee program is attached. ? Yes 4b . Stream mitigation requested: linear feet 4c . If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d . Buffer mitigation requested (DWQ only): square feet 4e . Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g . Coastal (tidal) wetland mitigation requested: acres 4h . Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a . If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. NCDOT will restore approximately 175 feet of jurisdictional stream as onsite-mitigation at 1:1 ratio by restoring the downstream reach of Jacktown Cree. See attached Conceptual Stream Restoration Plan. Page 7 of 11 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 61b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8of11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? See attached % 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: See attached ? Certified Local Government. 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HOW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? lb. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ® Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2B.0200)? 21b . Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a . Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b . If you answered 'yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a . Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable Page 10 of I 1 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://www.fws.gov/nc-es/es/countyfr.htmi ; Field investigations within the project study area were conducted by NCDOT staff resulting in biological conclusions of No Effect (No Habitat Present) for all T&E species listed for McDowell County. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes ®No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b . What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a . Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b . If yes, explain how project meets FEMA requirements: Hydraulics coordination with FEMA 8c . What source(s) did you use to make the floodplain determination? FEMA Maps Dr. Gregory J. Thorpe, Ph D Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 ?i N O S i Gn2il .. Y }} r 4f? ` _IMARION if 221 J 40 >! 1 0 1 2 70 zJ 40 ten 1828 1 26 ' ;"-,/ NORTH CAROLINA DEPARTMENT OF TRANSPORTA770M .' PROJECT DEVELOPMENT & -?' EN ONMENTAL ANALYSIS BRANCH McDOWEU COUNTY TIP NO. B-4191 BRIDGE N0.81 ON NC 226 OVER JACKTOWN CREEK VICINITY MAP FIGURE I I Permit Drawing .. --f 0.25 0 0.25 0.5 MILES ,/1740 w` o PR F ;` n I Property Owners Parcel N Trustees of the McDowell County 3 Technical Institute Dawn J. Smith & Leo M. Smith: AND Phyllis J. Lynch & Linard P. 4 . Lynch 54 College Dr,. Marion NC 278752 Route 3, Box 68A, Ameliia, NC 23002 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS McDowell COUNTY WBS - 33538.1.1 (B-4191) SHEET 10/27/2008 pwmk Shed Drawing -f."--I m E m rn? z U o F" N (0 2 y RI l0 U F X= E m d W U - W N C ' C C U C N O Q m m n E? r n E w U wU a LL N ai N E 0 0 Y ' F- C C f N m 3 m ? o °o p E v o 0 U) a Q Q m D 1 f U c C m ? ` ? m = 1- U 3 W N D a N CL p m m y m Z N ?U3 " Lu 3 m ? o _ D ° '- R z ` x W 5 W N a ? c E FLLV- C N d D c c c m - m .. ELL S a a U U U ? ? m y x a N N p N m N ? E d F N N m N + ? O O O ? ? V b E + O co v P r F Q N 4 J F Uf J O O yz O Permit Drawing shmat 4 of f X19 ? I? J J Q U Z 1U U I? 1 ? I I I I „ 1.5 v \ 1 \ \I \ 1 IJ W LL 1z: O \\ J ooe- 11 o L` ? I-JS? # !S _i. I ? r H I I \ \ \ o? I I I I I ? I w J I I Q I I N i? N ,r? \ G_ li. OG to LL. CL Z op '- 00 F H W to !n W V W W ?- \ F I UI I I = I 0 s ? i y LL: O, N N W ?l J W V Z O J a 6 W = W CL N V zo O N d WC V J V? wl CL 1 N < 00 I Permit Drawing I Sheet of u Q) ?II H ? H Q i ? u J Q Q W A' W I W CL W W I I I ?CONTRACTD TIP PROJECT: B-4191 r ? O fFg. 0 O m O O ? Q i?? ? I -Z 0 411 22 i N N u • s z 0 ? Z I ?P L"f ? O? H b ?, RJ y 3O N O Vtj ? /J? 3p ° 0 V d •O ? 9 [ . If O k n+ u n n n n n x elf `?: p? o 0 000c14 m D 32 22 2° o "1 v v i? `" ?° x z O PO X c 0 Q Oy ?h1 (p.1 A ' h '? n Y S L o °n? i6? x ?a b !t b? p '\\ a ?1 a z :i5 <<H ?.I? y ~ Z 111yyy ti 2 m m ? o vi tj O F? ti .• ' z = C? c m n C?yn3 3 m L ssP ??. f1 m / n 0 X°w v O / / $?io cm i 9 9 9 ? // u ma G g Z y k f/ / a :)? ?Q°IC n W m ?1 ? v' m ? m?a / ,=m c?i tA, ? Nm?$n 1 a _ m O b k R "' m x ?\ m n, ?T1 C7 O mm ? ti ? ? Nab C ,,))))\ " ?• //?? coy ?Qm ~ ro CvCG ,p ? '? ? 2 S ?, r p ? C ? I ? 11[[?yywwa ? ?Q ? ? P--4 iHy ?.^? ? ?y \J a A _ AZ 1im ? n k - P ? S'c. ?0 t?ODC - A R -OET I PT Sto.19tJ6J2 8 y J- ;ljlt Y i ? mmTi m o ? ?, ? tiA6? `p ? ? it w=o ? ? b b I T C Y r S p O fNil fNJ ? •\ ^O p 2 ° gn ? mm y?8 pn m ) b O ?o y on? ? ? ?? r ? YSG) C S NOS cmg m 0 mm eEg nxo wn IF- a8 O j$G 4 N N Q` x? p Z P P aA 1 si ri10.• b'On •?A 149 , pp 2 = w z 98 m 'h ??' ?O m 3F I `o la 1- IN Iw I> IN la I1 Io 1 -0 f?ff O XII\bllbbX Ow N m a REVISIONS ? BMA \ \?? d jdi?p?.l5? ]NB] ?'R \ ? m \ ?\???Y LSB ?1pB p.1 \ BM ??2 dX?tl ? ?\r \ \ I fit l ? ? \ II I ll l \ ` _ ? 4 _ I m n . r ; I I I V.' ? t +o a g u ? -\ \I4" ,off \ ® `` \I?" :\ L3 ? ? 8 \ f c rXC s ?// ?0?1 Ig \ II\ 1 j'„ I Ir / I I I i? p^ ? ^?111I IIi .I e y _/? II III d /L I I II " I j 4 III II I° / I II I I' 1/ I ? I I I s I / 6I ?i ' ? rC I I II 1 i-?' I I Ir I I mt. I I ? ?g ?" it IF I ?ST I ? ¢ I i n I° ,? s A 15{00 ZoO zs ? i o ? tl 'IN uZ ? ?_ I I \JIrQJ Nm qg E I ma ??? \11 II j - / \ I R \ III o? ?\ II ms-70+p0 _ 20+00 _ _ _ _ _ Ixcuauav rna SR uiz dys o S M1 , [O?SIMC14i CBM N. L------ ----- Wis. - > I I c.nc.c w,. y =o SP y ? n o ?? ?3 5?n'IIIM poO e: _oln PIP . T E 3 p s a - Im 1 1, S_ ?? maza / 7 ? Yb g 8 SIN ; 75+00 0 m i 7g= I $ o / I Ao =m / nIN Z DS WD R?w / nln Nv 90 nN ?9 / Z !.I s[o DS f II ? $O-N cgo5i ? nrNO p=og, v ?I? ?/ I ? ? C ? 4/ G u I ` JM I ? I _ __ ? c iil ' I I CO N HO ? ' r.Vl 0 BOt00 " 9 Q am y 1 ?Z ?z N REVISIONS I t\9419L6yd_pa.mtt_pa64.dgn O. NO 0 IN I? I b14 , S{ pp?Ep pp B a 3 a?' lif ?? [$ 111 \\ \\\\ a/'?0"° 1 ' ° ???? 1 ?? 11Q # oat \ p '^ \ \\\\?g?Y \see??3 v_' ? a c = \? T 5 L ?g= \ , ?\ IIF \ O M 10,rte, b 1' "!? B 1 v, 9 0+ 0 uZ I ?` ? 4r \ 1'f S. k.. \ w./ ?. 11 II _ ?/? /o Rlg l l 1 W / ?? / o Igo \ Il?t L / ?` \ fl 50] / y1 1 11 I X qq 1 1 4 1 1 0 1 { O$ 4 It F. V Ni 1 N I" oO 15+00 m? V ??A^I'? o. ^e Z52S IBMn ? c l e u l e u l e" 14 V v?23v$om?$ yy Q ? m N + e u_ b ? n n z y Hm Va171 NV) Ya111 "ID 11 NVi NN 0O r f 14 Ico 1 ., 10 99Q ?? ` 'I ?I I 1° ? 8 I I ? I III to I ? II \ »? I 1 ?I 191 I I? III I I:? m ??? el II 1 41 I 1 ?\ I I I 8 70+00 " c€ z _ =1 n ° a oy w:? , 8 Y i ? N? obi 11I ri ?YP 1 N w' 4 " z_ P 'mO } i' 99? Ag G ye N? V 75+00 m 9 I m 3 ? sl I y REP 97? 'I I' o f ? N n O ? y T3C gds 2q Rs 1¢ AA B J ? ?o no n mri ao 20+00 alvevw r.rcm„ sa nn vi xx no _- I? I _ __ / v o roq tnr.sal rv.sx mrsr?ru. ? _ 'n'n DD wv ay , O '? v \? a I \ 80+0 " ?? ? °= s ?I I x ??14 ?oN x=Q n I U A I p 3 s m , . oO 5o;a?o ells I f j ?? € a t g=x / y ;gym o 9m .I I j °MA m : z m z II r CZ ?0 $ } I /' nom 9 .,t 7Jrgwlncy? j\B9191_rdy_tsh.dgn Fi; Dry t CONTRACT TIP PROJECT B-4191 0r Ir r ? 5` ? MINIM ? O MINI A O m o m o o m 'a s A A N (/) s p o a r D r y N ? ? p o c- D D z o v c? ~ N < O = < N O ,oo 11 + II II II II II II Z OC O n m O O O N b > ??? ? NO a a u N O 2 A h? n n x ?o b ? b n b Y R1 ? c? L y ?"I 0 0 0 Cpc ? L W ,r0 n y n m ''`.. 1111 m m 'b ? N b a ?' S o ,r?. • e ° a £b? i? m f . Z $ ^ e bA A O ` tog h ?b n$ e ? ,?., ?- m ~ ^ b?y o?'h? b 11?? T K14 ? b ? N C ? p $A 11?? n ? E Z A y -J N m ? C C ON 3 x , L y m .? VV10.• ? C y+• I?. 11 tz y 7 x n ? N O Z v a O Z N y Z Z O 1n H ? O = n Z ti N GG x 1 r C m z f1 m A O m C O Z y yO A , m = H m r N D m r N_ 0 j 2 O v y 0 a y m e? z ;a -e jrz t. 2 r°,ian aoc mmY N n 4 y nag x ? 0 1ie,3 >a ,PI: fig I 1 INN , li% ' ie (IY Q tl€ 1F6 t ? : F iBiRl d < n Z ! °1g ? ? ?? _ S 0 _ ',1FIs E 1 ' O Z RIO-, w`i R7 y ? b 'AN x b b a r h O a O N a x ^^°x `J N Q b 0 N. h C) 0 cb n o ti ? Q gk ? o Un ® ?s *`4 ® ? d? a W W .? ? .Y W W m D7 W J ? a ? m p p y A 9 ' J N N i .o N P N P E ? ? 0 0 m ? y f'n obi ? ti a? °T o m m N 0 ] c a a a ; m ti x. ° 0 a 0 c ?. m m x i' .°° E m m a° b O o o? 0 3 ?! N y O O 3 3 °. o m )I 3 O x N N m ? 5 T p ?a b m] ^ 0 0 H m m m a a m G 6 o I K3 o p II Li ° r m m .D o 3 F n Rf S" S" v x o' o n e 3c o a 3 0 o o]" C v° v° v° v° n v° v° ° m s o m a= T `1 3' 3' N ] o o N m m m m Z `Z m ] m < f 0 0 0' ° T o u o c 0 ] C i a a]? r m 3 m? m a a C o c m r 6 6 m O c] C 4S1 b o; a m T m o y 3 o m m^ m m ] m F O ° w m m c o o a c a o ] n .0 -o 0 x i I O i 'b b I ? i ? ? I i T m T S n 9 T S T r 3? o a' o to n o 0 0 0 » In a n a; ? a a a a n m? m 3 p P ? m ? F S N N C ?a O S 33 O O P m ya a ? ° C a G'1 C -- m m o ? c o o? n n N N T b c a= y m o o x? 4 e? m o o T n m a° m 3 , m" 3 n a T ly c ?• c A O' III ;;II I goo ? fIOD ? R ? ?0 S 0 0 0 m~_ T Y, In. 0 ". ? N. G 44?''l m m O m 9 y T a m a in>>>> i y Z m m m m 41 41 m m a 0 O 0 m 1I I m H N S S S 0 j n o o p m m a m i c m o m m m v 0 9 G L G ° y 0 O& S] S] Om a m.,D m m o m , 11 n n 0 n° a n °P o a m P x °Q m a c c m o c m m m n C i I I ? I I i ? i o}.ooo¢? I I 1 O ?y VI p VI T T S III S 9! 0' T S RI 9! 0 T T 9 O N 0 0 O m O D n ?! 1 ,1 i ma 1 1 m d n g 1 d d A A m O p S a ]V z ?o Io In ; »; c? O m m m?? n y m A y y O » O] O O '] a s 9 -.0 m a Om C O O? m o m'? r ° nm. C E r ]' c N m o 2 m ?. m E m m m 0 ' S S 3 ° m ] ° 3 3 m » j m D? } ?IC) I I ? ? f u mO m ? O O 0 9 k m a m E o 3 a S 0 I' I^ m S O ]O E ?Sf m n o 0 0 ? E m o = o ?? o f m m Z o m 0 m m r j o 0 3 a m r m m o_ C m m N N 0 G ? 9 x; m m? 1y?. 3 3 a 5 v m i O e m O ° n m m p m m o m Io ? a ? ? ?1 E E S m m 1 m m ] '? 0 m X ] 0 o = c a °_ L1 o_ S = 2 K ° c a C o a m m i join®o }o-. elOl J I , I I I '? m D? D C C C C C N p m D N vI O `? `Z `7 ? O C D m ° O 0 O a y ti iv ~ r r j yI a j ] j j , 0 0 0 D ° 6 J K ° 6 0 < ° d d m m O R x F j 34 O T a N ° O 0 6 N O d m ° d d n 4 O O £ 0 0 O n E ° ° ] N a _' S N T 1 p 4' cl m O O. m m O N T O N m n ; m L' T x S ] °- C Gl Gl m ° m ] m ° ° ° Gl ,°? „ c ° 0 m ° ° O Z O S a p J S r u°i r m m G d 1 e i a I _ r O O_ _ ? m O ] m m a n m 0 ' m n ° N p m T S m T m G N V a in C g e a o ? • e o ® I ® o ? I o ® e a r ??° 0 0 0 o D O ? O i m ? m ? ? o d 2 < O 6 a E m ] a m p 0 o N O A m' r r ? r o N C m i ' a ® o i 0 Z m z O Z r Z N 2 m 3 O r N li { h` co? a O Q ?o a a' w v e? o© a? > 0 f IU/ y/(0Utl oad.a\Pao?\B419t_Is_tc_0B051 q.dgn 797PN99 ? _ i ,iii O yip ? ? :I? •i? b O Z n ii (o b ?? ;` ; tiv?? y°i a a o ly y ? °i@ 1; ?f A z` a b P ( ?? ? r -i m; r ti m 3 m a m W N W a o m V b o D : 01. o a O mom oom ?z y z z 14 H O N v n y m m < m u' <: M y a mums m V 4 t`nn? C a iI tiNN Z ?0N0 ? I ti •A `Ol Z 9 .O Z A T ' ?o ? a0 V O r °' i II t mym- my°m- ?? ?n I O '? N ?iO ?O m N N amm f_ .v O b ?1 T N T m K r m m m m "/, ` y N m m a a W N W> m ? V? Vl I I? D D Z J J J J J Z w L y y ?l a a m m o m m m m m o uo J mA e a m m m p O W v O .O W m x •• W V V 'roy O 11 .O m.? N m m IlllyyN m man m W In m m m m m „I y w i N N • T N N N N N m ? m Uml (D/1 m m? N m m Z ti I I m N N m m ,(? \ I S J .O .D J In J N IV Z I ?. ?'mmnN ommnmmm N O ca '? I m rl V m m O • a t21 2 O - N m 2 Ul Z m a a m N ?I 11 C b mm mmJW N .? J N p J • 2' m?0? r r y ^' .p N ? rZ ?N ? ? m-?mmm y D D ?'AC "' Z Y y .t b y O ?+. ?jl? .Wim m?mu'ii tz ? ? ayyy` A wN z wwN m•- z ?(> b b I11 y mm .nmm m . I t2: Amy O i? " y O rG tow h'C ym 8 y Nqo oR?o ?v y O m 2> 2 `3 z 0 0 `. 8.? y j O 3 W b A O b A h tNn m o = N i ?' .n ? b m m fn O O W O ?h., {?{j??H z ?' U] :] 0 y mui mmnmium n m p b b b a y a y y m m ? m t? b 00 M O r 0 y b . ? ? O a A r ' m y x b Zm$ [n '2 O b to y A ?b°z ?sy O?C Z y O A n rn z -m ??2 > 0 O cC] '? r m o an o y 4 f? ? A n r r<.. ?y or ttz y y z AZ mo ° o x_ m .. Z z o ti b h K « ,nN mc?noo -a n n O O O [? b0 ?z , ozo?;mrzim°o ti A ? O n c _`n z^' i nz mm"'oyv C n m ,$ y b z a ° m v m a m> y `? Z b O A v a mvo n °?°m ar'm ? b0 ? ? m_ ?? m_ A Y m Z? N r?l A O A y Zr N AG?._.a iz v<i n A ? ?! c o 'an ?'"" z c "'m N A O C y n Z m? ? ?o mvay Nc??°po n b N A y y A ?m? oz c.. °m_m o< ? i 9? Nv? zvm?cczivaz? O '`?' b ? n K m y v n ti z N z : m m O 7 y m z my o ? o A ;] ? y vTO°'x ?? n m Z O z ' 1 tn?' r vim an ? tmn m i CL o y C y ? ; A=O `?`? N ?l ti ?vT m? ; Z v m Z ? O m n_ m? R I O o h I 6? 5 L 5 R 2 E ? a } } ? ? i } } P° E R ? o ? O J 9 H . ? i a ?' ? ? g - " y8 - 6? ? ? ° { Al a w $ o 8 ? 8 3 g 3$o a 'o ? g b°. f s a s s a'e g ; g o b S . . ? g§ ?,^ 3 bb tl i 5 3 L b a y i ?y ' ^ ? 444 1 app g ? I I I I I I I ?a I I I p ? I ' I I e ? a 5 3 G E _ C a Y C ? - a ' E g ? ? i L 3 b tl 8 8 g ? s 9 pp A A A c? O O O ? 4 D D D I I m m o _ V fJ H N V V U P _ y p y Q Q V d + + + a u N N ? ? £ I N N N C 6 0 6 i M r ,I o I II ((gy1p s m G II O I A Z m I I 3 f? IIII IIII( °L one I " O C m ? =gym p? m O y c O A A< A r T ?O 0 o z?= a c y ? A r y I I s T ° Z y 9 ~ p Z D D ° O ° A A Z ++ O Q Z ;20 y (1 N O O A y ? ' s O T N p iI Q 0 0 N z I2 m m n o r Z M Q O A + + A A Z N 9 9 n p y y m A 0 C N N JCCO 9 IZII n Z y y 4 0 p O n M C Z z 0 A w ; a ? + ~O I + r n I °- p w 0 O O M 71 O + s ?' V N I I 0 g O C 3 O ?M In D ? r a N a M V N O Z O P O O o N O I C " A 9 v N I? 0 ° N n py L pp? G s t 3 g a M ?>?? ': 19 ay s 1>111 ?a j P 19 Y W e 14 "Ct m a fag Ell M to $ z GI J a 4• 131 a a. G P 12 s ? g?G 328- p= z? ?6 Q x N m 0 m 3 > s s V V P + + O p O O O 0 y Q O V V V m ? + U O O 1 i 9 m ; Z -Q n A T V. = ° y ; D ~ A z o m c o + T_ N 9 Q O a D m O 9 ; y Z Z i 0 J 0 g l " i l III Q °p £ c C Q m q 4 m? Z O s p n ° n 3: y S S b i D > ° Z D € o _ N m C 5 o m ?r aZ A v z o m; 7• a > O n??A `z ro 0 N 0 r r I r f Ra`iFi[?P.F1 w REVISIONS p.?\Pro3\84191-rdy-Pah 4. d9n N N N L N IJ $\ N 0 w 0 a 0 n cn 0 P 0 u 0 P \ ? C O O? .. . no y@ q ? ? I S ._ `' 1 r N'O LY In V Q I?Z I ] 1 ? . NW O}y I `} . Q `?? i? a a z'. ?Z I? j b?0 o m ? t ? o L ? s ?o I? 100 0 IOD N ? 0 0 0 0 0 0 ? ?; I I I J. D I (y, r2 ? . mzA a -BL- PINC 10+26. 77 (SLO -L POC 9I+45.64 (21.23'RT) ? 006 - .qo qc sss a? !•s?N? i iw Sq ?1M3 p.i eM4 ?3?Na15\ T'a] \\?? ?? }5q .5f ls3 px.i xq qxr? \\2r e4°tl / \ ?a jr •a? I IF I I 8 rim, q1r? Rga I I I°- I la; 191 I m' II 95v I / ql ? t\ \\\\ll I CgMC x ° v ,.?,tg4FK4,^n ------ N ----VSt-- Cq4 x4 ?' 4? `-J ??T I } 9 ?i 4 a o r q ? . ntv? y 8 a 19.01 a.N ?S ; 70+0 Y b b A o b 8 o .? nD • +g O T @ 5 A [ b N g 8 4 2 a . Y ? 1y14y1 ? ° 5 ? om L. -BL- PINC 20*38.75 (BL2) ti °O -BY- PING B+43.01 (BY2) D 8- iT -L- POC 71,37.36 (25.V LT) rtAv.- r- ^rA4 0 ? Y yh?4 ss ° gnrv. 8S aPn O m -; y o; NEE LG 1lI + Z" y. r u aka 75+000 .°50 5 y y e`, 5.0° tT ? 4 ewOT fln TfHG 97 -L- IPOT 76+20.20 Up u m?rZin o?€ 4 4 Y g q tl N 4 q lwq ?? II C?m?yr p4, im? ?Le? tl111144444Q 8 y °g MR 80+0 Y ? I TX ? ' ? I €?U I _ ~ of / ;gym / ; 630 '6z a s= =r € 911 I I N °m c C; .z • I o Ia I s ° ?l I , i' N? 7 W ? ( i .? i •- i., ? i 0/29/2008 eal.atl.ayM.sc\B<191_Rdy_.p l_L_BE i.dg, I .? ? I. ?, I! I.. 1 w V Jacktown Creek Conceptual Stream Restoration Plan Replacement of Bridge No. 82 on NC 226 McDowell County TIP B-4191 Federal Aid Project No. BRSTP-226(10) WBS No. 33538.1.1 March 2009 The North Carolina Department of Transportation (NCDOT) will perform on-site mitigation for stream impacts associated with the replacement of Bridge Number 82 over Jacktown Creek on NC 226 in McDowell County. The project will replace a bridge with a reinforced concrete box culvert and permanently impact 175 linear feet and temporarily impact 85 linear feet of stream channel. NCDOT will restore approximately 450 linear feet of jurisdictional stream to use as onsite mitigation at 1:1 ratio for the impacts once construction has been completed. The mitigation will occur immediately downstream of Transportation Improvement Program (TIP) B-4191. Based on agency comments, any remaining mitigation credit will be considered onsite assets and will be available as mitigation for future projects in the service area. EXISTING CONDITIONS The project is located in McDowell County, approximately 0.2 miles south of I-40 on NC 226. The drainage area of the reach is 1.27 sq. miles and is comprised mainly of forested land with interspersed light residential and commercial. The reach flows through a fallow field on McDowell Technical Community College (MTCC). Roughly 0.25 mile downstream of the project, Jacktown Creek flows into Coperning Creek which is a 303d listed stream. A cross section was measured at a representative riffle section for Rosgen classification determination The width/depth ratio was found to be 12.6 (moderate to high) with an entrenchment ratio of 1.28 (entrenched) which would classify the stream as an F-type. The stream has high steep banks with little mature vegetation which leaves them susceptible to erosion. The stream slope for the entire reach is 0.007 ft/ft. PROPOSED CONDITIONS The creek currently flows under a bridge on US 226, but will be replaced with an 8'x 10' double box culvert. A rock sill will placed at one of the openings to restrict use to high flows only. The proposed stream mitigation will consist of restoring 450 linear feet of jurisdictional stream by improving channel dimensions, profile and to some extent, pattern. The proposed channel will be a C-type channel with a width/depth ratio of 12 or greater. The proposed bank full depth of approximately 1.2 feet is appropriate according to the V - , mountain regional curve data A floodplain will be excavated to increase the entrenchment ratio above 22 and a planted buffer will be established to allow storage of floodwaters and filtering nmoff. Pools will be excavated to provide more variability and habitat in the profile. The stream slope will remain at approximately 0.007 ft/ft. The stream pattern will be improved in meanders with low radius of curvature values to reduce the near bank stress and erosion susceptibility. The stream banks will be stabilized using coir fiber matting and planted in accordance to the reforestation plan. Structures, such as rock cross vanes will likely be utilized as needed to maintain the channel grade and establish pool habitats. NCDOT will be working with the Muddy Creek Restoration Partnership and NCSU Water Quality Group to incorporate stormwater wetlands into the site which are intended to capture and treat stormwater from the MTCC campus. The Natural Environment Unit shall be contacted to provide construction assistance, if necessary, to ensure that the stream mitigation area is constructed appropriately. The Natural Environment Unit is currently coordinating with MTCC to secure an easement to protect the mitigation site into perpetuity. During a meeting on 12/16/08, Brian Wilson, President of MTCC, gave NCDOT an initial approval for an easement and will be presenting a copy of an easement document to the MTCC Board in February 2009. The MTCC Grounds Committee will need to approve the easement as well. MONITORING NCDOT proposes to perform a Level 1 monitoring of the stream following completion of restoration. Monitoring shall be performed twice annually (summer and winter) for each of a five year period, provided at least two bankfull events have occured during this period. Monitoring activities shall consist of reference photos, plant survival determinations and visual inspection of stream stability. ? " t. STORMWATER MANAGEMENT PLAN Project: 33538.1.1 TIP No.: B-4191 County: McDowell 03/27/2009 Hydraulics Project Manager: Roger Weadon, P.E. (MA Engineering), Marshal Clawson, P.E. (NCDOT Hydraulics Unit) ROADWAY DESCRIPTION The project B-4191 consists of constructing a 2 @ 8x10 Reinforced Concrete Box Culvert, which is 90' long to replace the existing bridge #82 in McDowell County on NC-226 over Jacktown Creek. The total project length is 0.147 miles. The project creates impacts to Jacktown Creek, which is located in the Catawba River Basin. The project drainage systems consist of curb and gutter streets with an enclosed storm system as well as roadside ditches and cross pipes culverts. Jurisdiction Stream Jacktown Creek ENVIRONMENTAL DESCRIPTION The project is located within the Catawba River Basin in McDowell County. The stream is classified as type C. Jacktown Creek will be impacted by the proposed project, however impacts have been minimized by burying the primary 8'x10' RCBC barrel by 1 foot and raising the second barrel closer to the floodplain by installing a rock inlet sill. BEST MANAGEMENT PRACTICES AND MAJOR STRUCTURES The primary goal of Best Management Practices (BMPs) is to prevent degradation of the states surface waters by the location, construction and operation of the highway system The BMPs are activities, practices and procedures taken to prevent or reduce stormwater pollution- The BMP measures used on this project to reduce stormwater impacts are: • Bury primary flow barrel of the RCBC by 1' • Set second barrel of RCBC closer to the floodplain with a rock inlet sill. • Use preformed scour holes at storm drain outlets in flat areas. 1 O N Y ?Nr*? W .? W W W w w. iU _- 00, r W n? 1 r ? I I I I I • I ' I II L I I I . I I I I? IC-) I a ?0 / I 00 ? I Z N LLJ Q I I 0 3 I z O1= J? I I' on- I N I I "I1? ? I J V J ?? ii' I ? I oop? j tJ7 e ?1 Ln J I II -I 15„ I IIH N N !I W 0 -, Q N N I I ?J J 0? ?I I? I e ? o W I Lu '. Lui Q I I' 3 II I I II ? ce I I I I rn?a? LL. ` C?NV- ` az Roo; ? N r co W N r r 0 " g?WW U W W V 1 O 0 z w 0 W W N EO'OS+PZ to sa?sabzi =n: 0 N II r W I 4? N permh Drawing snee -LQ-.f f3 i/ II I ` / I? ?I? i 2 \70 I /J <wl ?/ I i d/ ul`L 1 I - Nj W?N N v / RC) a I (?fo y-__ m p I III???`777` ?O - N W ^\\ ' ~ \ I W W N J? ? I I I a ?\ ?I1 I/ tl qq I? I J _ I I I, X15" I j' r?','i t E0 ?05+tiL b ZP,9k =A w GlW 9ZA l 111 i :1. I W r I I V N I` `II V N to ? .J k Petrtld Diev? 1238 .=..__..__,J r 'Illy //?? I LLJ 1 U I \ r?° ? ? ? ;;v l lJ? OZ .-% r z 3 to o./Z) p u @) Y O \u N0? ?, J u--- W Ic..> o o f C<L -i cc Z I a i ?, O UU II Q Q r I ui U -I mil/ A m ?? d W I / :I II/ / I I / ?U ?l 41 It ?II 11' i - I' - 00 15 H Y, 1 vi I .1, I I Permit Drawing I,(I Il li',1 2 " i Sheet $_O