HomeMy WebLinkAbout20090401 Ver 1_401 Application_20090409THE April 9, 2009 WOOTE Mr. Thomas Brown COMPANY US Army corps of Engineers Raleigh Regulatory Field Office E N G! N E E R? N Ci 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 P L A N N I N G A R C H T E C T U R E Re: Pre-Construction Notification Application Town of Benson 2008 Annexation Water and Sewer Extensions Johnston County, North Carolina TWC No. 2293-BN Dear Mr. Brown: 0 0_ 0 4 0 1 DENR - WATT? UJALI VY ?.E UiNDS AND STORMWATER BRA.N0>' SPAID On behalf of the Town of Benson, please find enclosed for your review the following items regarding the above referenced project. • Pre-Construction Notification Application • Applicable construction drawings (reduced scale) • USGS map showing location of project • SCS Soils map showing location of project • Other appurtenant items to the Application (site coordinates, property owner approval) This project proposes to construct approximately 4,200 linear feet of water mains ranging in size from 6 to 8-inch diameter, approximately 14,500 linear feet of 8-inch gravity sewer, and approximately 650 linear feet of 2-inch force mains. The proposed water system will replace existing service through individual wells and provide a reliable source of quality drinking water to the area while the proposed wastewater collection system will ensure that the water is properly treated before being returned to the environment. To construct this project as proposed, it is necessary to impact zone 1 and zone 2 buffers in various locations as shown in the attached application package. No permanent impacts are proposed for this project and the preconstruction grade (contours) of streams will be reestablished after disturbance. Please recall our meeting in the field on April 6, 2008 to review the pond labeled as 01 on the USGS and Soils mapping. It was determined allowable to fill this pond with property owner agreement to only allow installation of the sewer main if this pond is filled. The impact has been included in the PCN documentation and the approval letter attached in the appendices. 1210 North Boyian A<<e !!e Rage qh N, 2"1, 03 142.3 I trust this information is sufficient for your review; however, if you should have any questions or require additional information, please do not hesitate to contact us. We will get you any information or clarification needed immediately. aY 9 19. 834.389 Mr. Thomas Brown April 9, 2009 Page 2 Sincerely, THE WOOTEN COMPANY Stephanie A. Bliss, E.I. Enclosures: As stated. cc: Mr. Keith Langdon. - Town Manager cc: Ms. Amy Chapman - Divison of Water Quality (w/ attachments) 1 1 1 1 1 1 1 1 II 1 1 1 PRE-CONSTRUCTION NOTIFICATION SUBMITTAL FOR Town of Benson 2008 Annexation Water and Sewer Extensions 2293-BN APRIL 2009 THE WOOTEN COMPANY F NGINEERING P I_ A N N I N G ARC H,TEC 7URE 120 North Boylan Avenue Raleigh NG 27603-1423 91?i 82?3.U?31 `ak ii':i.834.?589 r OR j L;,?,? 1 1 1 1 L t I 1 1 1 1 1 1 t 1 1 1 1 1 1 1 1 1 1 TABLE OF CONTENTS Title Pages Pre-Construction Notification Application ........................................................................ 1-10 APPENDICES Appendix A - Vicinity Maps & Site Plans ......................................................................... 1-5 Appendix B - Site Coordinates ..........................................................................................1-1 Appendix C - Soils Map & USGS Map of Project Area ................................................... 1-2 Appendix D- Property Owner Approval ............................................................................ 1-1 t 1 1 t 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0P-0401 of warF? O? o? Office Use Only: y Corps action ID no. M DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1. Type(s) of approval sought from the 4 Corps: ®Section 404 Permit El Section 10 Permit ?-- 1 b. Specify Nationwide Permit (NWP) number: NW 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ® 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ® Yes ? No ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu El Yes No fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ? Yes ® No below. 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Town of Benson 2008 Annexation: Water and Sewer Extensions 2b. County: Johnston County 2c. Nearest municipality / town: Benson 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if annGcahial• N/A N/A Town of Benson 3d. Street address: 303 E. Church Street 3e. City, state, zip: Benson, NC 27504 3f. Telephone no.: (919)-894-4953 3g. Fax no.: (919)-894-1283 3h. Email address: klangdon@townofbenson.com Page I of 10 PCN Form - Version 1.3 December 10, 2008 Version 1 1 1 t 1 t t 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: N/A 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: D. Lee Campbell, PE 5b. Business name (if applicable): The Wooten Company 5c. Street address: 120 North Boylan Avenue 5d. City, state, zip: Raleigh, NC 27603 5e. Telephone no.: (919)-828-0531 5f. Fax no.: (919)-834-3589 5g. Email address: Iampbell@thewootencompany.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version 1 1 B. Project Information and Prior P J roJect History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): 1 c. Property size: 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 11 1 t 1 N/A (Linear project in NCDOT R/W and Town of Benson Easements) Latitude: See Attached Longitude: - (DD.DDDDDD) (-DD.DDDDDD) N/A acres Hannah Creek C:NSW Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing residential and commercial establishments 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: To provide water and sewer service to the annexed area. 3e. Describe the overall project in detail, including the type of equipment to be used: The project will involve the installation of approximately 4,500 linear feet of waterline and approximately 14,500 linear feet of sewer mains. The equipment used will be track hoes and rubber tire back hoes. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ? Yes ® No ? Unknown Comments: 4b. If the Corpsmade the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): N/A Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ®No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b If yes, explain N/A Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version ' C Proposed Im acts i t . p nven ory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ® Buffers ® Open Waters ? Pond Construction 1 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 1 2a. 2b. 2c. Wetland impact 2d. 2e. 2f. Type of jurisdiction number - Type of impact Type of wetlan Permanent (P) or d Forested (Corps - 404, 10 Area of impact (if known) Temporary T - DWQ - non-404, other) (acres) W1 ? P ? T N/A ? Yes ? Corps ? No ? DWQ W2 ? P R T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? PEI T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ?DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (includin question for all stream sites impacted. g temporary impacts) proposed on the site, then comp lete this 3a. 3b. 3c. Stream impact Type of impact Stream name number - 3d. Perennial 3e. 3f. Type of jurisdiction Average 3g. Impact Permanent (Por (PER) or intermittent (Corps - 404, 10 stream length Temporary (T) (INT)? DWQ - non-404, width (linear other) (feet) feet) S1 ? P ®T Utility Crossing UT of Hannah F] PER ® Corps Creek ®INT ? pyyQ 18 20 S2 ? P ® T Utility Crossing UT of Hannah ® PER ® Corps Creek [:1 INT E3 DWQ 15 20 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps 3h. Total stream and tributary impacts ? INT ? DWQ 3i. Comments: 40 Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 1 ' 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ®P ? T 01 Fill Pond 0.12 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: N/A 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Wetland Impacts (acres) Stream Impacts (feet) Upland Proposed use or purpose number of pond (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A P2 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If es, below. If an impacts require mitigation, then you MUST fill out Section D of his fothen rm. individually list all buffer impacts 6a. ? Neuse F-1 Tar-Pamlico E] Other: Project is in which protected basin? El Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 1 Buffer impact 69• number - R Permanent (P) or eason for Stream name Buffer mitigation Zone 1 impact Zone 2 impact Tern ora T impact required? feet (square ) (square feet) Utilit 1 ? P ®T y Crossing UT of Hannah Creek ? Yes ® No 1200 800 Utilit E01 P ® T y Crossing UT of Hannah Creek Yes ® No 2400 1600 B3 ?P?T ?Yes ? No 6h. Total buffer impacts 3600 2400 61. Comments: Mitigation is not required according to 15A NCAC 02B .0233 (> 40 linear feet of riparian buffer disturbed and Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version crossing are perpendicular.) D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The water and sewer mains have been located to minimize impacts to streams. The utilities are located primarily in the rights- of-way and 5 feet from the edge of pavement. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The utilities are to be installed beneath the existing storm drain pipes that cross underneath the roadway thus minimizing the impact to the existing streams and all crossing will be perpendicular. I 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this E] Mitigation bank project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) =Typ?eN/A Quantity N/A ' 3c. Comments: N/A 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. El Yes 4b. Stream mitigation requested: N/A linear feet 4c. If using stream mitigation, stream temperature: El warm E3 cool ?cold 4d. Buffer mitigation requested (DWQ only): N/A square feet 4e. Riparian wetland mitigation requested: N/A acres 4f. Non-riparian wetland mitigation requested: N/A acres [4h. . Coastal (tidal) wetland mitigation requested: N/A acres Comments: N/A Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A 1 1 1 Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the 1 amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation ' Zo (square feet) (square feet) ne 1 N/A 3 (2 for Catawba) Zone 2 N/A 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A r r i r 1 ?1 1 1 r . Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version 1 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ? Yes No 1 b If th i . yes, en s a diffuse flow plan included? If no, explain why. Comments: N/A ? Yes ? No 2 Stor t M . mwa er anagement Plan 2a. What is the overall percent imperviousness of this project? >1 % 2b D thi . oes s project require a Stormwater Management Plan? ? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Percent Impervious is below 24% 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ' N/A 2e. Who will be responsible for the review of the Stormwater Management Plan? ? Certified Local Government ?DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Town of Benson 3b. Which of the following locally-implemented stormwater management programs ? Phase II ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been tt h ? Yes ? No a ac ed? 4. DWQ Stormwater Program Review ? Coastal counties I 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): E0 HQW ORW ? El Session Law 2006-246 4b. Has the ap roved St t ? Other: p ormwa er Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Y I 5b. Have all of the 401 Unit submittal requirements been met? es ? No ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version t F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? ®Yes ? No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ® No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No ' or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? ?Yes ®No ' 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A FCleaprly Disposal (DWQ Requirement) ' etail the ultimate tre atment methods and disposition (non-discharge or discharge) of wastewater generated from sed project, or available capacity of the subject facility. N/A t I Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat Requirement) (Corps 5a. Will this project occur in or near an area with federally protected species or habitat? ?Yes No I 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ®Yes ? No 5c. If yes, indicate the USFWS Field Office you have contacted. ® Raleigh ' ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Project is to be located in DOT right-of-way, 5 feet off the edge of pavement. Impacting federally protected species is highly unlikely and difficult to quantify since the habitats of the species in concern are not delineated. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Research was conducted using the USFWS and various other sources. No substantial evidence could be found to assume the unnamed tributaries of Hannah Creek could be considered Essential Fish Habitat. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in ?Yes No ' North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Johnston County, North Carolina, National Register of Historical Places, 2002 8. Flood Zone Designation (Corps Requirement) I 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FIRM ma s NC FI System p , oodplaln Mapping Information IKc:A. 1l,, ?. L4 v5c%,? Applicant/Agent's Printed Name t t Applicant/ ge ignature Date (Agent's signature is valid only if an horization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Appendix A Vicinity Maps & Site Plans a Z 0 a Cl) 0 z LLJ (J) Z ox w Z uj ZQ * z J z ~ w z W JN -1-CD 0 O J O w 3 z V) z zd Q A Oo J C ° o ?Y U 2 ;m W `) _ O H Q < - 2 3 w U LoR ° cno Y Z Z -max Z U Z o uj LL 0 Z O LL J Q W Q Q - n- oo Z N O 3w w ?i zm? z co 0 ?o m wwz 0 ? Q ? Z o =zc "? Z ?a- O O ?o w z Z z m a ?o Z O co Q V) ? O a Z 0 N Q uj I- Q ................................ m m m 68S£ '4£8'6I6 "I I£90'BZ8'616 £lbl-£09LZ 9N 48!a!e8 anuany uep8 43juN OZl 3 N n 19311 H 34 V 19 N INN V I d 19 N I N 33 N 19 N3 ANddW00 N3100M 3Hl SNOISIA3H ki. o d o to. 8 G 61 W'd g@ G «r : e e 1z e 1 ?7 br g3g °°J4 ears 2 dUMg Al J?; 131 Or 111 . r, cgs „g s > g? jg ^ r n • n e n d e g c 0 U0, N w Z o z q a W w w w Q Q F wZ _ m w wZ a W J 3 o f o r o Y w Q z 3 3o i.. 3 30 3 ~_ a J ° 0 0 W g; g $ g 0 p # W ri ttJ T o w- cn w® o d z x v W w ?? •? . J • z '! • I I O O Cl) o o LLJ z Y z lL W o ° ? o% Na?z°zo Q ?? Z z_ a mI m o? wv3o w 3a J w wr m tt- z - - Z w 3a tn30 ini Or- W f E"' N o v o o N ° in o ?gyovi ?pJOm z w Z E U wa®®s¦•••??JO _0o ?O I INC I I 1 ° r I ?pNe NYB OOK Cl CLE 1 I ? ? Cb?N £ L- -1 - - } i \11 ? \ \\ SRON W83NM / aN3031 SJNIMdda 30 X3aNl / dVW NOUVO01 SNOISN31X3 U3M3S (INV H31VM NOIIVX3NM/ M VNnom H1HON uNnO3 NOISNHOf NOSN39 30 NMOI Z*Z AAH ON 7-7 I / I ? eJ - --------=r--??, o I I ° 1 __ I I t?59 ? ? I I eJ > N m NI w a' m ? ZS S o ?i C , t C 18'35' ' O Q 0 i O 0 S o 00 O 0 O 0 0 Z6Z I I I , I ,I ? I ?? II I I I I I I I I _ o OAD 4i o f I °9OGEY ° \ \ ° \ ° ? i ? oa _. I I I ? A \ I ? III I ?o I I --1 A \ .? I I i? ---- ?° d 10 --------? r r ?I -------? 1-- m I ti ?-- I a I ------- 1------ I I L-2- \A, / - I 03 "? I ?_--- I ? II = o =_? I ? I E ? ?I I I ?I I m _ z - - -I \1 NC HWY AT- - ---------- ' II II I II II II 1?I° lo•ll ? _L - ?- W4,40-) I LL 00 ? NC HWY 50 I l II I I IIII I I I I I ? i -- \ I I I I I I I I II ?- I ?J I I I I I I \\ I I I i l I I I II r-- _L? L ?- 11 1°?i I I I I °I ° \\ ? I CL Q Z U ?I Z z X00 Ny= wWCR oWW J¢O ~ U ZZO <? oa ?° 8R s R ? as \ ? ??' I \\ '? o ? ?" o ' o f ° ? R \ 4 2 A ? R8 x1 a s s 8 8R ? QB / I \? o 8 8 84S a 8 8 0` 8 j ? td 6 tz / -- i : s si` ss 6 s ss s s is t; ; p Z Y > Y >Y7 Y) T > YT Y » ? ° ° ° s s hW Y>? > } ?? ? ? ' lt S[ 5t ? g 7c ? Ic e g ? ? ? o ? s ? t 1 y 1 Wy °? ? W g °ft W? ? 2 t e e - ti e e .6 6 ^ 4 ^ ^ n s ^ 3 Z 1HS u6p s;aagS\sIG9YS\OOdD\NB\£6ZZ-uosuG8\s;-1a(oJd\:1 r r sf:ol? ooh 7/d bOS09S3X - ssi/qs SNO1S1A3a NouonH1SNO0 H03 03SV3131A lON NUS30 IVNIJ 1 k' ? o ro= Z O C N ? / ? ? Z Q HN / / /? / C / I Tom 1 o I I .o `^ I oo I 1 I a °" m 1 I \ 1 \ 1 I \ \1 I ? I III 1 \ \ I _ I 13 I' I \` I ? I I \ \ I ? n?? 1 I I _ O tO N? I _ 1 I ee I z n? jm ' 1 1 ! a sm I ? 1 \ 1 I ?° o . I I I / 1 \ 1 \ I ? I y \ I i I' // 133 / 1 W i \ i v \ \? I 1 I it ? wi /\z 1 I ? W / \ k 1 ' ? 3;:P/ \ a N m .? ¢5 m aO?h m m ° 6858 V88 616 X21 IfSO'8Z8'616 RVI-608CZ ON 4810101 ODUMV WAS WON OZI 3X613311X0 N V 19 N INN V 1 d 19 N I H 33 N 19 N3 ANddW00 N3100M 3Hl z • u \ 4 m {} 3 \ 4 Y /?? 1 4 o U R\'k a e3 ot? O ?mN 3?0 bps ?S? ?S \ ' N / / ° V \ o° \ / Qom \ o X / / J \ gy=m \\ / / \ j / \ 4co \ i ` ? aM ao / `emu M m'? \ alo m / ? n O L0 111 d' ? M M N N 1 N N N N N N N N N N \ I J \ r n? 4 '6 Z - d 1 H II o 6- Z "e l 6 0 1 L• 0 l H Nil L £ Z 1 ,i ? J r I I S 0 *z 0 -vi 8 Q At \ J O ?, I I \ 4 6 Z - 1 L 8 L 1 1 1 11 ' INN I i S O TO S' Z II N 0 Y I I ? i I i i I U , .1 1 9• . f 1 4 •9 Z ! N I £ 0 l IR rv" S '9 Z - 1 0 A 1 1 I I I I I I I - C! T N n \ S O Z O 3 0 1 9 3, n - 1 16 *1 \ / O O JY \ nr _ 6 'l Z - d 1 H l 0 l H Z' 0• z Z II I N ' 3 ' N to O I/ ) Lo d • It P7 n N N N N N N N N N N N I I \ \ o I µl, w ° ' " 1 ml 04+tZ V1S 0158'£6+6 ViS OVOH 3A3000 83M3S k8ViINVS .8 N ?z _ ? o M SNOISN31X3 1i3M3S ONV 1131VM m m ? MI NOIlVX3NNV 9002 w VNI10dVO HJH0N A1Nf10O NOISNHOF 9 J w '1 5 ? y NOSN38 30 NMOl ? f 114S u6p'SlaayS\siaayS\GL7VO\N8\£6Zd-uosuag\s;06/o-id\:1 r rl ?I¦r rr r rr ?r r r r? r rr r? ?r rr rr ri?i °s Sir ; 6 oi" aldb°S09S3X ssuas SNOISIA38 NIDE56HISN00 803 03SV3138 ION NJISK IVNIJ USE VE8'616M IE90M616 £ZVl-£08CZ ON 43PIe8 anuaAV ue008 41i0N OZI 3N n19311" S N Y 19 N INN Y l d 19 N IV 33 N IS N3 ANddW00 N3100M 3Hl A 05+6£ YiS Ol DG4W YiS OVOH 3A3000 a3M3S ALIVIINVS.9 ?E SNOISN31X3 83M3S ONV 831VM m vl NOIlVX3NNV M w m °o VNIWHYO H1HON AiN100 N0ISNHOf a N NOSN38 30 NMOl A f\ n N N ce au ,,p u o? u^> `mob \ Ym OD \ O Ss s °Yb0 \\ Z NEV \ no ? x R y .0 \ / ooh O O \ / / o o In r m zd d?'y / 4y/y?? \ gaoN .0 0 vWC / \ 3W. Z? ° ewh O 0 Zd m I W o , oo! a ° r ? oiw O iQ WJ X O N N W rWW U I - x 4 3 ? ? / m h 1 / h 'ZN L' 4 00 o i _m o n~ Z p;N I I I b ?e W W O ° ' O r1 `F N i °oUO b 2 O I Y cab W rc / o on U } 0 h 3 \ ? °`xb a u O NO nc o o 11: e Z' If)R °,mN J y ) o? O M? p3mo x N d 3 e 2 0 °o o°u o3a _ Q? 3'jreR Jw o I ?! ^w? \ W ajA ? ? w j' \ 23 ON \ W / \ ° .0 lw 14 z N .° NO w In- \ oo vY d' i 2 Olt v? /- my /C, ° as w W ?O bbd ?•/ oN ?/ U m / / / u h ? ? /1 + p2 11h zcOP c r / h f? / h / 15 36 00 \ ZO Y 1 T I t I O 0 M ?o O n \ o ? J O O O n W J I ? o ° n o l p i - R 3V `D O4 a °m w m =o o N 3: 0 7 f?/ z o ^\ m \ ??? \ j yr u W o z?- 000 / o 0 0 lV / X T ?? + Z 0 0 ool x Nrn " i x rn' ` m om" \\ O ?' `1 ? w ? b ?o^opes z uri'Q i 2 +/ ° O ?° y i 0• Z Y Ls Y °o N F u J r b_ 6' Z- AID 'A I Tn wi= z0 + M - ?. Sf Z S \\\ Olb ?^ V ° Z \ f / a W ;° O rn 'Al w N .0 'y,j mx0p? W on a Ja a0 v? / ° aaaa J mY °O, WQOO 0 Nn apM2W ZW { ZY wvi O r..J f frYl0?W' Wx 11 0 \? a 0Ur J3VZ CO N o Doo ??W 0NW W 2 'IL N N pi ?b WyW ?rJ W% 17 d 2y W W F N0W D¢ >FNOm \ C)i a'M >- 3 q LO 0 In 0 LID O 0 0 In O N C4. C4 C4. C4... N C4, N N N \ Lo 0 -n to CD LID N N N N N N N N ?O n L9'SLZ L9' LL '0 o O n ?n ?O O m n O Ho n N J 2 a 6 1HS u6p slaayS\s;aagS\OOb'0\N8\F6JJ-uosuag\s;-la/odd\V1 VYd LS:80 fi 600JI616 7Id-t/0S09S3X ssggs SNOISIA38 N0110nliSN00 803 03SV3138 lON NJIS30 IVNl3 ME'6E8'616 xal IE50 8Z8 616 EZVI-£09CZ ON OWN anuantl URAIR 41l°N OZI 34n1 311 H] N V 15 N INN V l d 19 N I N 33 N 19 N3 ANVd W00 N3100M Ni A $ a :' Tj 3NIl a31VM .8 K19+0Z V1S Ol 00+04 'V1S 30V1d HBVd 83M3S kHVIINVS.9 g N SNOISN31X3 83M3S ONV 831VM m m g w l T NOIIVX3NNV 9001 w m A1Nnoo NOISNHOf VNnOUVO H1HON NOSN39 30 NMOl aid ..91?" l? I ' I ;x P 300 ' ' I aU h ?y?d aurd. N 1 U? mho °aurd ..01 I o} Ua oar q aId .. 11 I'd 01 4cc0 ? d ..01 hu my0 O Y mo i I _ Pw t5°R?PINo I I I I I 1 12., pina W I I 1? c,\ 1' 11 kryp I °EU I u? 1 IM 1 n q Po ?j15 : RCP, 1M O 1 Z O 1 20 // \\ 1 1 O N? O 1 1 1 om 1 / Ij 1 TPeA W N 3 4 Pine i O 1 .. P" I J 3 1 I I 1 i 1 I II I ? _ ,??p I 1 O (ON °UU W I 1 Z `tq I = I I I w mo o°?q ? I I 0 d? I n °9 i I r? I a° I =0 1 = z rn I ? ''? U w I I I I a`r owd 1 I as U« I I °n ? 000 ' Z 4" WW ^? I_ ?a4 1 JO ?N FVO I ' 2 ?2 l=ix ?_? I I I 2 Olt Padl I Z ?d 1 I1 Wr I I 30 W 30 1 0 W v> 1 ' 1 ° U I ?uq \j^ U 00 >, a z ?qi I I l ~F_Q a - O U ? N q° aryl 2 \ I C4C) I ? \ H p N \ 1 \ I J u b ail ..ZI ? mss/ 0' ? ? ? ° q J I \ v' c N I \ N q' ' b W qq0 I "?\ aeil ..9f i I Z 0 Eo J I / \ 1 (lu / ol^.?N I / `l I ? d N I / / ry? l ? I } Z I l amo a ; z .0 mo:w ?.otq i 3 I 1; Z ON Fy1/W? '° I 13 \ ZZ N Q W 2 Olt 4 ' m I W O _ ?f?I. I ` ? I O 4 ? ,. e ° O m1 O W SI EN h ti c I u? 0_ ?z ' i' -`loco a°w° n H o vl ;3 z d? =`1 H^ / 2 I `Fc o4 W') O nN ???W J NN QF- t Z N- I~ = Zjp 3y1 °°??r° J N? WMI oa f=/1 If a: o ? m 3 °;a m ~l W0 3 Z o l z „ 00 r- N N N NI N N NI N U) 0 Lo NI N W Q J Q- Y Q CL \ N r ?Y 2 LLI 1 1 1 1 ° 3 I t ?I rI 00 rl. r- co w LID Lo 1-t I ol Lo I I N N NI N N N N N N N I Z! 1HS u6pslaagS\slaagS\GGVO\N8\f6ZZ-uosuag\s;oalojd\.-1 Hd 90:01:f 6002/6/6 Ild HOS09S3X -- ssilgs Appendix B Site Coordinates 1 n 1 1 1 1 TahIP of Rtrpnm (?nnrrfinnfnc ta # Stream Name Latitude Longitude ff UT of Hannah Creek 35.3959 78.5524 UT of Hannah Creek 35.3962 78.5463 Appendix C Soil Map & USGS Map of the Project Area 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 VrA UCB p GeB VrA GeD JB? GoA MaA VrA Gr NoA z NkB GoA ?i GeU? Ge6 ?? ?. . u,,1 r GeB LEGEND GeB z -GeD VrA - GeB PROPOSED WATER LINE Bb: UcB " Vr6 ? VrA Uc6 a . } Ges PROPOSED FORCE MAIN A Ge6 No VrB GeD 'y No6 ?. r6Ma PROPOSED SEWER MAIN uec Vr6 u Bb Bb Ra A c6 GeD vrA UcP\ ?G X PERENNIAL STREAM Vr Wa$ ; ° ? ??\ ?GeD?s-1 ? Uc6 \. Nk6 VrB Bb -?„ INTERMITTENT STREAM No6 o uC, N 1jeE ( tie's VrA Vr6 e6 ya6 GeD VrA X OPEN WATER B b , 'JCC ?{?( vr6 m Nos Bb GeD WaB GeD Ucg 0 GeD y ?BbBb -GeD GeD _ MaB MaA 8 + VrB -- NkGeEi ' ?/ ?CoC VrA 6b JcB _ Uc8 mater MaB GeB BbGeD , VrA Ge8 m /? ueu ? Ma8 j / ur ` yr UcB NoB Bb? Uc6 GeD GeD Bb GeD ? eb/ GeB GNU ??Ra G r VrB yrA yr GeB B, /I? Uti;c V Vr6 Vr6 UcB ?? r . /? GeD Gr J: GeD J Ra i 1 1 VrA 6 GeD Uec } Ge ?UB VrA I GeD Uc8 D / \ ? ?c??/ a {( Gr aeD VrA Ra ?V.rA Vr6 ?? Gels Gc MaA 1309 Bb GeD ?1y?oeB J P Bb VrA / 8 a ? VrA UcB .?P ' VrB VrA c :1331 GeD BnA Uc8 co GeB -i GeB GeB y" W i Ra ,' Vr6 i GeD o VrA Gr Bb/ GeD I?GeD Geg Ra Nos V j? be y _ Ly Nos FuA , MaB oc d? y NuA FaA Fab NoB NoA \1, No6 27 . Coc UcB, f m? So Ra °? Ma8 \. VrB \ G NoA N06 FuA GoA FaB NuA NoB GeBGeD ?.d To ? b NuA ` v J Bb Nob 86 co ) j n // m FaA No6 Bbd ` G NuA Bbly GeD NaB NuA NoB was 1J FaB °4 MaB 4 (GA Nob NoA Ge To Benson ?y GGA NuA FuA , MaA B Bb GeB No6 1 RbA 50 coc. I Ca. NuA NoA GoA NoB . Wa8 °A ' NoA C', Ra GOA 301 Q°P Ud CoC ` Gr CoC ?. NuA gb Nob Nos NuA RbA 95 , e e FaA NoB GoA RbA GoA Ly ? (Joins sheet 13) I i ' 306 • ?` ? /. .?r'_?-..,.,_ ?..?*_ \ ???,I , LEGEND !{ \ - PROPOSED WATER LINE PROPOSED FORCE MAIN ?r-, •?,,' PROPOSED SEWER MAIN PERENNIAL STREAM INTERMITTENT STREAM o OPEN WATER Gold n r? If ' ' ti6 I V-4 Ail ce ti , J y 33 • •n 4 ?? j 1 t / • l.. 97 w n - /6ern , rz4 d 1 ?-- ? ?• . ;12191 ? . 2 ?- ?` IF'ENSO 71 ,a 5ff? 81 1 i? U 1 1 1 1 1 1 L7 Appendix D Property Owner Approval i ? -?- -_ -- -?•? ••. ivvrii vl UGIIOVII LILLIE WOOLARD ' 5113 FAISON RIDGE LN KNIGHTDALE NC 27545 TO WHOM IT MAY CONCERN, In consideration of the easement across the back of.my property that is Ic on 242 N, I will allow it if the water hole is filled in on the property so tE easement will follow the property line and not cut across the property. Lillie W Woolard APR-08-2009 10:40AM FAX:919 894 2366 ID:THE WOOTEN COMPANY 919-894-2366 it the p.2 PACE:002 R=96%