HomeMy WebLinkAboutIMP 2nd Quarter 2018 FINAL_20180406Water Resources
Environmental Quality
April 6, 2018
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
Subject: Revised Interim Monitoring Plans for 14 Duke Energy Facilities
2nd Quarter 2018
Dear Mr. Draovitch:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
The North Carolina Department of Environmental Quality (DEQ) is providing the attached revised
Interim Monitoring Plans (IMPs) for the respective coal ash facilities. Per our agreement, DEQ
will be providing Duke Energy with updated IMPs quarterly until the individual facility Corrective
Action Plans are approved, and Duke Energy will include and begin sampling any newly installed
groundwater assessment wells as part of the facility IMP which DEQ will formally include in the
subsequent IMPs.
The attached IMPs only contain references to groundwater monitoring locations. Sampling at
surface water locations that were identified as part of the May 1, 2017 communication from DEQ
to Duke Energy regarding revised IMPs at the facilities is expected to continue pending further
notice. For clarification, we have also provided the minimum expected groundwater sampling
analyte list.
The attached revised facility IMPs shall be conducted on a quarterly basis commencing the fourth
quarter of calendar year 2017 pursuant to 15A NCAC 02L .0110, until Corrective Action Plans
are approved for the individual facilities or as directed otherwise by DEQ. The quarterly sampling
events will be conducted in conjunction with planned compliance monitoring sampling events for
three quarters during the calendar year, supplemented with an additional sampling event conducted
at each facility in order to provide four rounds of monitoring data to evaluate seasonal fluctuations
during a year-long timeframe. If sampling an individual groundwater location is problematic,
please contact the appropriate Regional Office.
Since Duke Energy is in the process of submitting Comprehensive Site Assessments, the
requirement for an annual monitoring report submitted by April 30th for each respective coal
facility as set forth in the May 1, 2017 letter will be extended to a date in 2018 that will be later
defined.
•'-->'^Nothtng Compares7:,__
State of North Carolina I Environmental Quality I Division of Water Resources
Water Quality Regional Operations Section
1636 Mail Service Center I Raleigh, North Carolina 27699-1636
919-707-9129
In order to optimize the groundwater monitoring at each facility, DEQ will be removing the
groundwater monitoring condition from the NPDES permits as they are reissued. Duke Energy
shall continue to monitor the compliance wells separately under the individual NPDES permits
until the NPDES permits are reissued with no groundwater monitoring condition. At that time,
the compliance wells shall continue to be monitored per the attached revised IMPS under the
authority of 15A NCAC 02L .0110.
DEQ is open to consider further optimization of the IMPs following a qualitative and quantitative
review of site-specific data. A thorough analysis of spatial and temporal trends related to
contaminant distribution that include determination of background conditions and identification of
areas impacted by coal. ash residuals must be provided as a decision framework to support
improvements to long-term monitoring programs.
If you have any questions, please feel free to contact the appropriate Regional Office or Steve
Lanter (Central Office) at (919) 807-6444.
Sincerely,
S. ykierman, P.G.
Division of Water Resources
Attachments: Revised Interim Monitoring Plans for the 14 coal ash facilities
cc: WQROS Regional Offices
WQROS Central File Copy
Revised Allen Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
AB -10D
Sample for
Radionuclides
(X2
X
Regional Office Notes
_
AB -10S
AB -11D
AB -12D
AB -12S
AB -13D
X
AB -13S
X
AB-14BR
AB -14D
AB -1R
AB -2
AB -20D
X
X
Sample to be analyzed for total boron and sulfate
only.
AB -20S
AB -21 BRL
AB -21D
AB -21S
AB -21 SL
X
AB-22BRL
Need to discuss additional assessment potentially
needed at this location.
AB-22BR
AB -22D
AB -22S
AB-23BRU
Sample to be analyzed for total boron and sulfate
only.
AB -23S
Sample to be analyzed for total boron and sulfate
only.
AB-24BR
AB -24D
AB -24S
AB-24SL
AB-25BR
Sample to be analyzed for total boron and sulfate
only.
AB-25BRU
Sample to be analyzed for total boron and sulfate
only.
AB -25S
X
AB-25SL
X
AB -26D
AB -26S
AB-27BR
Allen Steam Station Page 1 of 5 March 29, 2018
Wells to be Sampled
AB -27D
AB -27S
Sample for
Radionuclides
(X)
Regional Office Notes
AB -28D
AB -28S
AB -29D
AB -29S
AB-29SL
AB -2D
AB -30D
AB -30S
AB -31S
AB -32D
AB -32S
AB -33D
X
AB -33S
X
AB -34D
AB -34S
AB-35BR
X
AB -35D
Sample to be analyzed for total boron and sulfate
only.
AB -35S
X
AB -36D
AB -36S
AB -37D
AB -37S
AB-38BR
AB -38D
AB -38S
AB -39D
AB -39S
AB-4BR
X
AB -4D
X
AB -4S
X
AB -5
AB -6A
X
AB -6R
X
AB -9D
X
AB -9S
X
BG-1DA
X
Note: BG -1D has been abandoned thus removed
from the IMP. BG -IDA was installed as
replacement well.
Allen Steam Station Page 2 of 5 March 29, 2018
Sample for
Wells to be Sampled Radionuclides
-(X)-
X)_BG-1S X
BG-IS
BG-2BRA-2 X
Regional Office Notes
Note: BG-2BR has been abandoned thus removed
from the IMP. BG-2BRA-2 was installed as
replacement well.
BG -2D
X
BG -2S
X
BG -3D
X
BG -3S
X
BG-4BR
X
BG -4D
X
BG -4S
X
GWA-14DA
Note: GWA-14D has been abandoned thus removed
from the IMP. GWA-14DA was installed as
replacement well.
Monitor pH closely.
GWA-14S
GWA-15D
GWA-15S
GWA-16D
GWA-16S
GWA-17D
X
GWA-17S
X
GWA-18D
GWA-18S
GWA-19D
Sample to be analyzed for total boron and sulfate
only.
GWA-19S
GWA-lBR
X
GWA-1D
X
GWA-1 S
X
GWA-21 BR
X
GWA-21DA
X
Note: GWA-21D has been abandoned thus removed
from the IMP. GWA-21DA was installed as
replacement well.
GWA-21 S
X
GWA-22D
GWA-22S
GWA-23D
Sample to be analyzed for total boron and sulfate
only.
GWA-23S
X
GWA-24BR
Allen Steam Station Page 3 of 5 March 29, 2018
Sample for
Wells to be Sampled Radionuclides
Regional Office Notes
A)
GWA-24D
Note: GWA-24S has been abandoned thus removed
GWA-24SA
from the IMP. GWA-24SA was installed as
replacement well.
GWA-26D
GWA-26S
GWA-2D
X
GWA-2S
X
Note: GWA-3BR has been abandoned thus removed
from the IMP. GWA-3BRA was installed as
replacement well.
GWA-3BRA
X
Replacement well appears to have water quality
issues (elevated pH). Need to discuss potential
replacement.
GWA-3D
X
GWA-3S
X
Note: GWA-4BR has been abandoned thus removed
GWA-4BRA
X
from the IMP. GWA-4BRA was installed as a
replacement well.
GWA-4D
X
GWA-4S
X
Note: GWA-5BR has been abandoned thus removed
from the IMP. GWA-5BRA was installed as
GWA-5BRA
X
replacement well.
Need to discuss additional assessment potentially
needed at this location.
GWA-5D
X
GWA-5S
X
Note: GWA-6BR has been abandoned thus removed
GWA-6BRA
X
from the IMP. GWA-6BRA was installed as
replacement well.
Note: GWA-6D has been abandoned thus removed
GWA-6DA
X
from the IMP. GWA-6DA was installed as
replacement well.
GWA-6S
X
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-8S
GWA-9D
X
GWA-9S
X
GWA-9BR
X
Allen Steam Station Page 4 of 5 March 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese Radium 228 Dissolved
Zinc
Solids
Allen Steam Station Page 5 of 5 March 29, 2018
Revised Asheville Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
(x
Regional Office Notes
ABMW-11BR
AMW-03B
X
AMW-1B
X
AMW-2A
AMW-2B
water level only
APZ-30
water level only
B-1
water level only
B -1-A
water level only
B-2
water level only
CB -1
X
CB -1 BR
water level only
CB-1BRL
water level only
CB -1D
X
water level only
CB-8BR
X
CB -8D
CB-9BR
X
CB-9SL
X
GW-lBR
GW -1D
GW -2
X
GW -3
X
GW -4
X
GW -5
X
MW -3D
X
MW-5BR
MW -5D
MW -8S
X
MW -10
X
MW -11
MW -11D
MW-13BR
MW -13D
MW-14BR
MW -15A
X
MW-15BR
water level only
MW -15D
X
MW -16A
X
Asheville Steam Electric Plant Page 1 of 3 March 29, 2018
MW-16BR
X
MW-17A
X
MW-18BR
X
MW-18BRL
X
MW-18D
X
MW-19BR
water level only
MW-20A
MW-21D
X
MW-22BR
X
MW-22D
X
MW-23BR
MW-23DL
MW-23DU
MW-24S
X
MW-6BR
X
MW-6D
X
MW-6S
X
MW-7BR
water level only
MW-8BR
water level only
MW-9BR
X
MW-9D
X
MW-9S
X
P-102
water level only
P-103
PZ-17D
X
PZ-17S
X
PZ-19
X
PZ-22
X
CB-2
CB-3R
X
CB-4
X
CB-4B
X
CB-5
CB-6
CB-7
CB-8
X
CB-9
X
GW-1
X
CCR-101BR
X
CCR-102D
X
CCR-102S
X
Asheville Steam Electric Plant Page 2 of 3 March 29, 2018
CCR-103BR
Boron
Copper
CCR -103D
Selenium
Thallium
CCR -104D
X
Hexavalent
CCR-105BR
Sodium
Total Organic
CCR -105D
X
Chromium
EXT -01
X
Carbon
EXT -02
AS-5BR
Potential pH issues; recommend redevelopment
AS-5BRL
Calcium
Potential pH issues; recommend redevelopment
MW-15BRL
X
Combined
MW-16BRL
X
MW -16D
Uranium
MW-17BRL
X
MW-20BRL
X
Total
MW-25BR
X
Lead
MW-25BRL
X
Suspended
MW -25S
MW-26BRL
X
Solids
MW -26S
Chromium
Magnesium
PZ-17BRL
X
Vanadium
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Asheville Steam Electric Plant Page 3 of 3 March 29, 2018
Belews Creek Steam Station Interim Monitorine Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
x)
Regional Office Notes
AB -1 BR
AB -1D
AB -1S
AB -2D
AB -2S
AB -3D
AB -3S
AB-4BR
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
AB-4BRD
AB -4D
AB -4S
AB-4SL
AB-4SAP
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
-
AB -5D
_
AB -5S
AB-5SL
AB -6D
AB -6S
AB-6SL
AB -7D
AB -7S
AB -8D
AB -8S
AB-8SL
AB-9BR
AB-913RD
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
AB -9D
AB -9S
BG -1D
BG -1S
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
BG-2BRA
BG -2D
X
BG -2S
X
Belews Creek Steam Station Page 1 of 4 March 29, 2018
BG -3D
BG -3S
GWA-1 ODA
GWA-10S
GWA-1113
GWA-11 S
GWA-12BR
GWA-12D
GWA-12S
GWA-16BR
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
GWA-16DA
GWA-16S
GWA-17D
GWA-17S
GWA-18D
GWA-18SA
GWA-19BR
GWA-19D
GWA-19SA
GWA-lBR
X
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
GWA-1D
X
GWA-1 S
X
GWA-20BR
GWA-20D
GWA-20SA
GWA-21D
GWA-21 S
GWA-22D
GWA-22S
GWA-23D
GWA-23S
GWA-24BR
GWA-24D
X
GWA-24S
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-25BR
X
GWA-26BR
X
GWA-26D
X
GWA-26S
X
Belews Creek Steam Station Page 2 of 4 March 29, 2018
GWA-27BR
GWA-27D
GWA-27S
GWA-2D
GWA-2S
GWA-30D
X
Measure all field parameters plus water level; if pH is still high,
do not sample for lab analyses
GWA-30S
X
GWA-31D
GWA-31 S
GWA-32D
GWA-32S
GWA-3D
GWA-3S
X
X
Measure water level if not dry; collect all filed parameters if
possible; if there is some water but not enough water for all
samples, please collect samples for boron, sulfate, chloride, TDS
only.
GWA-6D
GWA-6S
GWA-7D
X
GWA-7SA
X
GWA-8D
X
GWA-8S
X
GWA-9BR
GWA-9D
GWA-9S
MW-104BR
Measure all field parameters plus water level, if pH is still high,
do not sample for lab analyses
MW -104D
MW -1045
MW-200BR
X
MW -200D
X
MW -200S
X
MW -201 BR
MW -201D
MW-202BR
MW -202D
MW -202S
MW-203BR
MW -203D
MW -203S
MW -204D
MW -2045
Belews Creek Steam Station Page 3 of 4 March 29, 2018
MW -3 X
EX -OB -1
EX -OB -2
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Belews Creek Steam Station Page 4 of 4 March 29, 2018
Revised Buck Combined C► cle Station Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB -1D
AB -1 OBR
AB -1 OBRL
AB -10D
AB -10S
AB-2BR
X
Sample to be analyzed for total boron and sulfate
onlN .
AB -2D
X
AB -2S
X
AB-2SL
X
AB -3D
AB -3S
AB4BRL
Water quality continues to be an issue (elevated pH).
Need to discuss potential replacement.
AB-4BRU
AB -4S
AB-4SL
AB-5BRU
X
Volume has been insufficient to collect sample since
2015. Continue to monitor water level during each
sampling event and if volume is sufficient for
sampling then collect the sample accordingly.
AB -5S
X
AB-5SL
X
AB-6BRU
AB-7BRU
AB -7S
AB-8BRUA
Note: AB-8BRU has been abandoned thus removed
from the IMP. AB-8BRUA was installed as
re )lacement well.
AB -8S
AB-9BRA
X
Note: AB-9BR has been abandoned thus removed
from the IMP. AB-9BRA was installed as
replacement well.
Monitor pH closely.
AB-9BRUA
X
Note: AB-9BRU has been abandoned thus removed
from the IMP. AB-9BRUA was installed as
replacement well.
AB -9S
X
AS -1D
AS -IS
Buck Combined Cycle Station Page 1 of 4 Mach 29, 2018
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
AS -2D
AS -3D
AS -3S
BG-1BRA
N
Note: BG -IBR has been abandoned thus removed
from the IMP. BG -1 BRA was installed as
replacement well.
BG -1S
X
BG-lDA
X
Note: BG -1D has been abandoned thus removed from
the IMP. BG-lDA was installed as replacement well.
Water quality still an issue (appears to be grout
contaminated). Need to discuss potential
replacement.
BG -2D
X
BG -2S
X
BG-3BRU
X
BG -3S
X
GWA-1 OD
GWA-10S
GWA-11D
GWA-11 S
GWA-12BRU
X
GWA-12S
X
GWA-13D
GWA-13SR
GWA-14BR
X
GWA-14D
X
Sample to be analyzed for total boron and sulfate
only.
GWA-14S
X
GWA-15BR
X
GWA-15D
X
GWA-15S
X
GWA-16BR
X
GWA-16D
X
GWA-16S
X
GWA-17S
GWA-18DA
X
Note: GWA-1.81) has been abandoned thus removed
from the IMP. GWA-18DA was installed as
replacement well.
Need to discuss possible additional assessment in this
location sulfate/TDS j.
GWA-18S
X
Buck Combined Cycle Station Page 2 of 4 Mach 29, 2018
Wells to be
Sampled
Sample for
Radionuclides
Regional Office Notes
GWA-19D
X
GWA-19S
X
GWA-1D
X
GWA-1 S
X
GWA-20D
X
GWA-20S
X
GWA-22D
X
GWA-2BRA
X
Note: GWA-2BR has been abandoned thus removed
from the IMP. GWA-2BRA was installed as
replacement well.
GWA-2BRU
X
GWA-2S
X
GWA-3BR
X
GWA-3BRU
X
GWA-3 S
X
GWA-4D
X
GWA-4S
X
GWA-5BRU
X
GWA-5S
X
GWA-6BR
X
GWA-6BRL
X
GWA-6BRU
X
GWA-6S
X
Volume has been insufficient to collect sample since
2016. Continue to monitor water level during each
sampling event and if volume is sufficient for
samplingsamplj!!g then collect the sample accordingly.
GWA-7D
X
GWA-7S
X
GWA-8D
GWA-9BRA
X
Note: GWA-9BR has been abandoned thus removed
from the IMP. GWA-9BRA was installed as
replacement well.
GWA-9D
X
GWA-9S
X
MW -10D
MW-11BR
X
MW-11BRL
X
MW -11D
X
MW -11S
X
MW -12D
MW -12S
MW -13D
Buck Combined Cycle Station Page 3 of 4 Mach 29, 2018
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
_
MW -1D
Selenium
MW -1S
MW -3D
X
MW -3S
X
MW -4D
Alkalinity
MW -4S
Chromium
MW -5D
Sodium
MW -5S
MW-6BR
X
MW -6D
X
Calcium
MW -6S
X
Strontium
MW -7D
MW -7S
MW-8BRA
X
Note: MW-8BR has been abandoned thus removed
from the IMP. MW-8BRA was installed as
replacement well.
MW -8D
X
MW -8S
X
Chloride
MW -9D
X
Sulfate
MW -9S
X
Minimum Parameters to be AnalNrzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Hexavalent
Total Organic
Alkalinity
Cadmium
Chromium
Molybdenum
Sodium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Ma,(mesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Buck Combined Cycle Station Page 4 of 4 Mach 29, 2018
Revised Cape Fear Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be
Sampled
ABMW-1
Sample for
Radionuclides
Regional Office Notes
X
ABMW-1BR
X
ABMW-1 S
X
ABMW-2SL
ABMW-2SU
ABMW-3
X
_
ABMW-3BR
ABMW-3SR
X
ABMW-4
X
ABMW-4S
X
ABMW-5BR
ABMW-5S
BGMW-4
X
BGTMW-4
X
CMW-01
X
CMW-02
CMW-03
X
CMW-5R
CMW-06
X
CMW-07
X
CMW-08
X
CTMW-01
X
CTMW-02
CTMW-07
CTMW-08
X
MW -10
X
MW -1013R
X
MW-10BRL
MW -10D
MW -11
X
MW -12
X
MW-12BR
MW -13
MW-15BR
X
MW-15SL
I X
MW-15SU
X
MW-16BR
X
Cape Fear Steam Electric Plant Page 1 of 3 March 29, 2018
MW -16S
X
MW-17BR
MW-17SL
X
MW-17SU
X
MW -18S
X
MW -19S
MW-20BR
MW -20S
MW -21 BR
MW -21 SL
X
MW -21 SU
X
MW-22BR
MW -22S
MW-23BR
MW -23D
X
MW -23S
X
MW-24BR
X
MW -24S
X
MW-5BRR
MW-6BR
X
MW -9
X
MW-9BR
X
PZ -1
PZ -10
PZ -2
PZ -3D
PZ -3S
PZ -4
PZ -5
X
PZ -6
PZ -7
PZ -8
Cape Fear Steam Electric Plant Page 2 of 3 March 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercuty
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Chromium
Molybdenum
Sodium
Total Organic
Carbon
Total
Antimony Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium Chromium MaErnesium
y
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt Manganese
Radium 228
Dissolved
Zinc
Solids
Cape Fear Steam Electric Plant Page 3 of 3 March 29, 2018
Revised James E. Rogers Enerpry Complex Interim Monitorinp. Plan — Groundwater Only
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB-1BR0
Redevelop. Sample for boron only.
AB -1D
AB -IS
AB-2BRO
Redevelop. Sample for boron only.
AB -2D
AB -2S
AB-3BRUA
AB -3I
AB -3S
X
AB-3SLA
X
AB-4BR
AB -4D
AB -4S
X
AB-4SL
X
AB -513R
AB-5BRU
AB -5S
X
AB -613R
AB -6D
AB -6S
X
AS -1D
AS -1 SB
AS -213R
AS -2D
X
AS -2S
X
AS-3BRU
AS -4D
AS -4S
AS -513R
_
AS-5BRU
AS -5S
AS-6BRA
AS -6D
AS -6S
AS-7BRA
AS -7D
AS -7S
X
James E. Rogers Energy Complex Page 1 of 6 March 29, 2018
AS-8D
AS-8S
BG 1-BRA
BG-1D
X
BG-1S
X
BG-21)
Water level only
CCPMW-1D
X
CCPMW-1 S
X
CCPMW-2D
Water level only
CCPMW-2S
Water level only
CCPMW-3D
Water level only
CCPMW-3S
Water level only
CCPMW-4
Water level only
CCPMW-5
Water level only
CCPMW-6D
Water level only
CCPMW-6S
Water level only
CCPTW-1D
Water level only
CCPTW-1 S
Water level only
CCPTW-2
Water level only
CLMW-1
X
CLMW-2
CLMW-3D
X
CLMW-3S
X
CLMW-5D
CLMW-5S
CLMW-6
CLP-1
Water level only
CLP-2
Water level only
CLP-3
Water level only
CLP-4
Water level only
GWA-1 OD
GWA-lOS
GWA-11BRU
X
GWA-11 S
X
GWA-12BRU
GWA-12S
GWA-13BR
GWA-14BR
GWA-14D
GWA-14S
GWA-1BRU
James E. Rogers Energy Complex Page 2 of 6 March 29, 2018
GWA-20BR
X
GWA-20D
X
GWA-20S
X
GWA-21 BR
X
GWA-21 BRU
X
GWA-21 S
X
GWA-22BRU
GWA-22S
X
GWA-23D
GWA-24BR
GWA-24D
GWA-24S
GWA-25S
GWA-25D
Water level only
GWA-26S
GWA-26D
Water level only
GWA-27BR
X
GWA-27D-A
X
GWA-28BR
GWA-28BRU
GWA-28S
GWA-29BRA
GWA-29D
X
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-30BR
GWA-30BRU
Water level only
GWA-30S
GWA-31BR-A
GWA-31D
GWA-32D
GWA-32BR
Water level only
GWA-33BR
GWA-33D
GWA-33S
GWA-34S
GWA-35D
GWA-35S
GWA-36D
X
GWA-36S
X
James E. Rogers Energy Complex Page 3 of 6 March 29, 2018
GWA-37D
GWA-37S
GWA-38D
GWA-38S
GWA-39S
Water level only
GWA-3D
X
GWA-40S
Water level only
GWA-42S
Water level only
GWA-43D
GWA-43S
GWA-44BR
GWA-44D
GWA-44S
GWA-45D
Water level only
GWA-45 S
GWA-46D
GWA-47D
GWA-48BR
GWA-4BR
Water level only
GWA-4D
X
GWA-4S
X
GWA-51D
GWA-54D
GWA-54BRO
GWA-54S
GWA-56D
GWA-56S
GWA-5BRU
GWA-5S
GWA-6S
GWA-6D
Water level only
MW-10D
MW-10S
MW-11BRO
Redevelop. Sample for boron only.
MW-11DA
MW-11S
X
MW-20D
MW-20DR
MW-21 BR
MW-21D
MW-22BR
James E. Rogers Energy Complex Page 4 of 6 March 29, 2018
MW-22DR
MW -23D
MW-23DR
MW -23S
MW -24D
X
MW-24DR
X
MW-25DR
MW -2D -A
MW -30D
X
MW-30DA
X
MW -30S
X
MW-32BR
X
MW -32D
X
MW -32S
X
MW -34S
MW-34BRU
MW-36BRU
MW -36S
MW-38BR
X
MW -38D
X
MW -38S X
MW-40BRU
MW -40S
MW-42DA
MW -42S
MW -8D
MW -8S
X
U5 -1D
U54 S
U5-2BR
U5 -2D
X
U5 -2S -SL -A
X
U5-4BRA
U5 -4D
U5 -4S
U5-5BR
U5 -5D
X
U5 -6D
U5 -6S
U5-8BR
U5 -8D
James E. Rogers Energy Complex Page 5 of 6 March 29, 2018
U5 -8S
Boron
Copper
CCR12-S
Selenium
Thallium
CCR -12D
Cadmium
Hexavalent
CCR -13D
Sodium
Total Organic
CCR -15D
Chromium
CCR -IB -1S
Carbon
CCR -IB -1D
CCR -IB -3S
Total
CCR -IB -3D
Calcium
Iron
CCR -U5 -4S
Sample 1St
Quarter 2018 only
CCR -U5 -4D
Sample 1St
Quarter 2018 only
CCR -7S
Sample 1St
Quarter 2018 only
CCR -7D
Sample 1St
Quarter 2018 only
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
James E. Rogers Energy Complex Page 6 of 6 March 29, 2018
Dan River Combined Cycle Station Interim Monitorin Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides
X
Regional Office Notes
AB-30BR
AB -30D
AB -30S
BG -IDA
X
Measure water level if not dry; collect all filed
parameters if possible; if there is some water but not
enough water for all samples, please collect samples
for boron, sulfate, chloride, TDS oniti.
BG -10D
X
BG -10S
X
X
BG-10BR
BG -5D
BG -5S
GWA-10D
GWA-12D
GWA-12S
GWA-14D
GWA-14S
GWA-15D
GWA-16D
GWA-16S
GWA-17D
GWA-20D
GWA-20S
GWA-4D
GWA-4S
GWA-5BR
GWA-5BRD
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8BR
GWA-8D
GWA-8S
GWA-9D
X
GWA-9S
X
MW -11
X
Measure water level if not dry; collect all filed
arameters ifpossible; if there is some water but not
Dan River Combined Cycle Station Page 1 of 2 March 29, 2018
Minimum Parameters to be Analr zed
Aluminum
Boron
enough water for all samples, please collect samples
for boron, sulfate, chloride, TDS only.
MW -11D
X
Thallium
MW -12
X
Hexavalent
MW -12D
X
Total Organic
MW -21D
Cadmium
MW -21S
Sodium
MW-22BR
X
Chromium
MW -22D
X
Carbon
MW -22S
X
MW-23BR
Total
Antimony
MW -23D
Iron
Nickel
MW-317BR
Combined
MW-317BRL
Minimum Parameters to be Analr zed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Hexavalent
Total Organic
Alkalinity
Cadmium
Molybdenum
Sodium
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Maltnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Dan River Combined Cycle Station Page 2 of 2 March 29, 2018
Revised H. F. Lee EnergN, Complex Interim Monitoring Plan — Groundwater Onlr
Wells to be
Sampled
Sample for
Radionuclides
X
Regional Office Notes
ABMW-1
ABMW-1 S
X
AMW-11BC
AMW-11 S
X
AMW-12BC
AMW-12S
AMW-13BC
AMW-13S
AMW-14BC
AMW-14S
AMW-15BC
AMW-15S
AMW-16BC
AMW-17BC
AMW-17S
AMW-18S
X
AMW-6RBC
AMW-9BC
AMW-19S
AMW-19BC
AMW-20S
AMW-20BC
AMW-21 S
AMW-21BC
AMW-22S
AMW-22BC
AMW-23S
AMW-23BC
BGMW-10
BGMW-9
BW -1
CCR -100S
X
CMW-10
CMW-5
CMW-6R
CMW-7
CMW-8
H. F. Lee Energy Complex Pagel of 3 March 29, 2018
CTMW-1
CW-1
CW-2
CW-3
CW-4
DMW-1
DMW-2
DMW-3
IABMW-1
IABMW-1 S
X
IABMW-2S
IABMW-3
IABMW-3S
X
IMW-04BC
IMW-05BC
IMW-lBC
IMW-1 S
X
IMW-2BC
IMW-3BC
IMW-3S
X
IMW-4S
X
HMW-5S
X
LLMW-1
LLMW-1 S
LLMW-2
LLMW-2S
MW-1
MW-2
MW-3
X
SMW-3
SMW-4
SMW-5
H. F. Lee Energy Complex Page 2 of 3 March 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
H. F. Lee Energy Complex Page 3 of 3 March 29, 2018
Revised Marshall Steam Station Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
AB-l0BR
Sample for
Radionuclides
Regional Office Notes
AB -10D
AB -10S
AB -IDSL
AB -11D
AB -11S
AB-12BR
X
AB -12D
X
AB -12S
X
AB-12SL
X
AB -13D
AB -13S
AB -14D
AB -14S
AB-15BR
AB -15D
AB -15S
AB-15SL
AB -16D
AB -16S
AB -17D
AB -17S
AB -18D
AB -18S
AB-1BRL
X
Need to discuss additional assessment potentially
needed at this location.
AB -113R
X
AB -1D
X
AB -1S
X
AB -20D
AB -20S
AB -21D
AB -21S
AB -2D
X
AB -2S
X
AB -3D
AB -3S
Marshall Steam Station Page 1 of 5 March 29, 2018
Wells to be Sampled
Sample for
Radionuclides
]C
Regional Office Notes
AB -4D
AB -4S
AB-4SL
AB-5BR
X
AB -5D
X
AB -5S
X
AB-6BRL
AB-6BRA
Note: AB-6BR has been abandoned and thus
removed from the IMP. AB-6BRA was installed
as replacement well.
AB -6D
AB -6S
AB -7D
AB -7S
AB -8D
AB -8S
AB -913R
AB -9D
AB -9S
AL -113R
X
Monitor closely, boron concentrations are
trending upward.
AL -1D
X
AL -1S
X
AL -213R
AL-2BRL
AL-2BRLL
Need to discuss additional assessment potentially
needed at this location.
AL -2D
AL -2S
AL -313R
AL -3D
AL -3S
AL-4BRL
AL-4BR
AL -4D
BG-IBRA
X
Note: BG -IBR has been abandoned and thus
removed from the IMP. BG-1BRA was installed
as re lacement well.
BG -ID
X
BG -IS
X
BG-2BR
X
Marshall Steam Station Page 2 of 5 March 29, 2018
Wells to be Sampled
Sample for
Radionuclides
[fir
X
Regional Office Notes
BG -2S
BG-3BR
_
X
BG -3D
X
BG -3S
X
GWA-IBR
X
GWA-1D
X
GWA_-1 S
X
GWA-2DA
Note: GWA-21) has been abandoned and thus
removed from the IMP. GWA-2DA was
installed as replacement well.
GWA-2S
GWA-3D
GWA-3S
GWA-4D
GWA-4S
GWA-5D
GWA-5S
GWA-6D
X
GWA-6S
X
GWA-7D
GWA-7S
GWA-8D
GWA-8S
GWA-9BR
GWA-10D
GWA-10S
GWA-11BR
X
GWA-11D
X
GWA-11 S
X
GWA-12BR
X
GWA-12D
Sample to be analyzed for total boron and sulfate
only.
GWA-12S
X
GWA-13DA
Sample to be analyzed for total boron and sulfate
onl% .
GWA-13S
GWA-14D
GWA-14S
_
GWA-15S
X
MS -8
Marshall Steam Station Page 3 of 5 March 29, 2018
Wells to be Sampled
MS -10
MS -11
Sample for
Radionuclides Regional Office Notes
A)
X
X
X
MS -13
MW -1
MW -10D
MW -10S
MW -11D
MW -11S
MW -12D
MW -12S
MW -13D
MW -13S
MW-14BR
X
MW -14D
X
MW -14S
X
MW -2
MW -3
MW -4
X
MW -4D
X
MW -5
MW -6D
X
MW -6S
X
MW -7
Water level only
MW -7D
X
MW -7S
X
MW -8D
X
MW -8S
X
MW -9D
X
MW -9S
X
OB -1 (Dry Ash Basin)
OB -1 (Dry Ash Landfill)
Water level only
Marshall Steam Station Page 4 of 5 March 29, 2018
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226 Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228 Dissolved
Zinc
Solids
Marshall Steam Station Page 5 of 5 March 29, 2018
Revised Mai o Steam Electric Plant Interim Monitorin, Plan — Groundwater OWN
Sample for
Wells to be Sampled Radionuclides
X
Regional Office Notes
ABMW-1
X
ABMW-2
ABMW-2BR
ABMW-2BRL
ABMW-3
ABMW-3S
ABMW-4
X
ABMW-4BR
ABMW-4D
BG -1
X
BG -2
X
CW -1
CW-lD
CW -2
X
CW -2D
X
CW -3
CW -4
CW -5
CW -6
X
MW-10BR
X
MW-11BR
water level only
MW -12D
X
MW -12S
X
MW-13BR
MW-14BR
MW-15BR
water level only
MW-16BR
X
MW -16D
X
MW -16S
MW -18D
MW-18BR
MW -19D
MW-19BR
MW -2
MW -3
X
MW-3BR
MW -4
Mayo Steam Electric Plant Page 1 of 2 March 29, 2018
MW-5BR
MW-8BR
MW-9BR water level only
MW-9BRL
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Mayo Steam Electric Plant Page 2 of 2 March 29, 2018
Riverbend Steam Station Interim Monitoring Plan — Groundwater OWN
Wells to be
Sampled
Sample for
Radionuclides
Regional Office Notes
AB -11)
Measure all field parameters plus water level, if pH
still high, not sample for lab analyses.
AB -IS
AB -21)
AB -2S
AB -8D
AB -8S
BG-lDA
BG -1 S
BG-2BR
BG -2D
BG -2S
BG -3D
BG -3S
BG-4BR
X
BG -4D
X
BG -4S
X
BG-5BR
BG -5D
Field parameters plus water level, if pH still high, not
sample for lab analyses.
_
GWA-10BRU
GWA-10S
GWA-111)
GWA-11 S
GWA-12D
X
GWA-12S
X
GWA-13D
GWA-13S
GWA-14D
GWA-14S
GWA-15D
GWA-15S
X
GWA-1BRU
GWA-1 S
GWA-20BR
GWA-20DA
GWA-20S
GWA-21BR
Riverbend Steam Station Page 1 of 3 March 29, 2018
GWA-21D
GWA-21 S
GWA-22BR-A
X
GWA-22D
X
GWA-22S
X
GWA-23BR
Field parameters plus water level, if pH still high, not
sample for lab analyses.
GWA-23DA
GWA-23S
GWA-2BR
X
GWA-2BRU
X
GWA-2S
X
GWA-3BR
GWA-3D
GWA-3S-A
GWA-4BR
GWA-4D
X
GWA-4S
X
GWA-5D
GWA-5S
_
GWA-6D
X
GWA-6S
X
GWA-7BR
GWA-7D
GWA-7S
GWA-8D
X
GWA-8S
X
GWA-9BR
X
GWA-9D
X
GWA-9S
X
MW -10
X
MW-11DR
MW -11 SR
MW -13
MW -14
X
MW -15
-
MW-15BR
MW-15DA
MW -1D
MW -1 S
MW -2D
_
MW -2S -A
Riverbend Steam Station Page 2 of 3 March 29, 2018
MW -3D
Boron
Copper
MW -3S
Selenium
Thallium
MW -4D
Cadmium
Hexavalent
MW -4S
Sodium
Total Organic
MW -5D
Chromium
MW -5S
Carbon
MW -6D
MW -6S
Total
MW-7BRA
X
Iron
MW -7D
X
Combined
MW-7SR
X
MW -8D
Uranium
MW -8I
MW -8S
Total
MW -9
X
Lead
MW-9BRA
X
Suspended
MW-9DA
X
OB -1
Water level only
OB -2
Chromium
Water level only
Radium 226
Sulfide
Vanadium
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
Riverbend Steam Station Page 3 of 3 March 29, 2018
Revised Roxboro Steam Electric Plant Interim Monitoring Plan — Groundwater Only
Wells to be Sample for
Sampled Radionuclides
x
Regional Office Notes
ABMW-1
X
water level only
ABMW-lBR
X
ABMW-2
X
water level only
ABMW-2BR
X
ABMW-3
ABMW-3BR
ABMW-3BRL
ABMW-4
X
ABMW-4BR
X
ABMW-5
X
ABMW-5D
X
ABMW-6
ABMW-6BR
ABMW-7
water level only
ABMW-7BR
ABMW-7BRL
BG -1
X
BG-lBR
X
BG-1BRL
water level only
BG-1BRLR
X
BG-2BR
X
CW -1
CW -2
X
CW -2D
X
CW -3
CW -3D
CW -4
CW -5
X
GMW-10
GMW-11
GMW-6
X
GMW-7
GMW-8
GMW-9
MW-lBR
MW-2BR
MW-3BR
X
Roxboro Steam Electric Plant Page 1 of 3 March 29, 2018
MW-4BR
MW-4BRL
water level only
MW-5BR
X
MW-5D
X
MW-6BR
X
MW-6D
X
MW-7BR
MW-8BR
MW-9BR
X
MW-10BR
X
MW-11BR
X
MW-11D
X
MW-12BR
MW-13BR
X
MW-14BR
X
MW-15BR
X
MW-15D
X
MW-16BR
X
MW-17BR
X
MW-18BR
X
MW-18D
X
MW-19BRL
X
MW-2
X
MW-20BRL
MW-21BRL
water level only
MW-22BR
MW-22D
MW-23BR
water level only
MW-23BRR
_
MW-24BR
MW-25BR
MW-26BR
MW-27BR
MW-28BR
MW-29BR
MW-30BR
MW-31BR
MW-32BR
MW-33BR
GPMW-1 S
GPMW-1D
Roxboro Steam Electric Plant Page 2 of 3 March 29, 2018
GPMW-lBR
1 Boron
Copper
GPMW-2D
Selenium
Thallium
GPMW-2BR
Cadmium
Hexavalent
GPMW-3D
_
Total Organic
GPMW-3BR
Chromium
Minimum Parameters to be Analyzed
Aluminum
1 Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium Cobalt I' Manganese
Radium 228
Dissolved
Zinc
I
Solids
Roxboro Steam Electric Plant Page 3 of 3 March 29, 2018
Revised L.V. Sutton Enerey Complex Interim Monitoring Plan — Groundwater Only
Wells to be Sampled
Sample for
Radionuclides Regional Office Notes
x
X
X
AW -1C
AW -2C
AW -2D
AW -3C
AW -4C
AW -5C
AW -5D
AW -6R -D
AW -6R -E
AW -7R -D
AW -08C
AW -09C
AW -09D
MW -05C
X
MW-05CD
X
MW -05D
X
MW -05R -E
MW -7C
MW -8
X
MW -8E
X
MW -11
MW -12R
MW -16D
MW -19
MW -20
MW -20D
MW -21C
MW -22B
MW -22C
MW -23B
MW -23C
MW -23D
X
MW -23E
X
MW -24R -B
MW -24R -C
MW -27B
X
MW -27C
MW -28B
MW -28C
L.V. Sutton Energy Complex Page 1 of 2 March 29, 2018
MW -31R -C
X
MW -32C
X
MW -33C
X
MW -36C
X
MW -37B
X
MW -37C
X
MW-37CD
X
MW -37D
X
MW -37E
X
MW -38B
MW -38C
X
MW -38D
X
MW -39B
Calcium
MW -39C
X
MW -39D
X
MW -40B
MW -40C
MW -40D
Uranium
MW -41E
SMW-01 C
SMW-02C
Total
SMW-03C
Chloride
SMW-04C
Potassium
SMW-5C
Suspended
SMW-06C
SMW-06D
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Alkalinity
Cadmium
Hexavalent
Molybdenum
Sodium
Total Organic
Chromium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
_
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Magnesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
L.V. Sutton Energy Complex Page 2 of 2 March 29, 2018
'Revised W. H. Weatherspoon Power Plant Interim Monitorin_,, Plan — Groundwater On11
Wells to be
Sampled
Sample for Radionuclides
(g)
Regional Office Notes
AW -01D
AW -01I
AW -01S
AW -02D
AW -02S
AW -03D
AW -03I
AW -03S
BW -01
BW -02S
X
BW -03D
X
BW -03I
X
BW -03S
X
BW -4D
X
BW -4I
X
BW4S
X
CCR -101 -BG
CAMA
X
CW -01
CW -02
CW -03
X
MW -01
X
MW -02
X
MW -03
X
MW -04
X
MW -05
X
MW -06
X
MW -07
X
MW -33D
MW -33I
MW -33S
MW -41D
MW -41I
MW -52
X
MW -53D
MW -53I
MW -54D
MW -55D
X
W. H. Weatherspoon Power Plant Page 1 of 2 March 29, 2018
MW -55I 1 X
PW -1 (DEP 2) 1
Minimum Parameters to be Analyzed
Aluminum
Boron
Copper
Mercury
Selenium
Thallium
Hexavalent
Total Organic
Alkalinity
Cadmium
Chromium
Molybdenum
Sodium
Carbon
Total
Antimony
Calcium
Iron
Nickel
Strontium
Combined
Uranium
Total
Arsenic
Chloride
Lead
Potassium
Sulfate
Suspended
Solids
Barium
Chromium
Ma,,nesium
Radium 226
Sulfide
Vanadium
Total
Beryllium
Cobalt
Manganese
Radium 228
Dissolved
Zinc
Solids
W. H. Weatherspoon Power Plant Page 2 of 2 March 29, 2018