Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0032867_DMR NOV_20180406
DMR REVIEW RECORD Mooresville Regional Office Facility Name: Kings Mountain Travel Plaza Permit Number: NCO032867 Report Period: November 2017 Prior Assessments: 0 Enforcement Factor: 1_00 Waterbody Outfall # Outfall Description Waterbody Name Classification 001 Effluent to Dixon Branch Dixon Branch C Monthly Average Limit Violations Sample Location: Outfall 001 - Effluent Violation Unit of Limit Calculated %Over Date Parameter Frequency Measure Value Value Limit Action 11/30/2017 Nitrogen, Ammonia Total (as N) - Weekly mg/I 23 27.10 17.8 Proceed to NOV Concentration Daily Limit Violations Sample Location: Outfall 001 - Effluent Violation Unit of Limit Calculated %Over Date Parameter Frequency Measure Value Value Limit Action 11/29/2017 Nitrogen, Ammonia Total (as N) - Weekly mg/I 35 37.80 8.0 Proceed to NOV Concentration Violations/Staff Remarks: Remarks: A iw Page 1 of 4 DocuSigned by: Completed by: Ran57AX)FO1749S Date: Assistant Regional Supervisor Sign -off: Date: 4/6/2018 Regional Supervisor •-•��;� _ _ / (A��I•f� �/B Sign -off: Date: Page 2 of 4 Permit Number: NCO032867 Limit Violation Sample Location: Outfall 001 - Effluent Violation Report Date Period Parameter Prior 12 -Month Enforcement History Report Period: November 2017 Violation Nitrogen, Ammonia Total (as Monthly Average NOV-2018-LV-0219 Type NOD NOV CPA 10/31/2017 10-2017 Nitrogen, Ammonia Total (as Monthly Average NOV-2018-LV-0219 N) - Concentration Exceeded 8/4/2017 8-2017 Nitrogen, Ammonia Total (as Daily Maximum NOV-2018-LV-0218 N) - Concentration Exceeded 8/10/2017 8-2017 Nitrogen, Ammonia Total (as Daily Maximum NOV-2018-LV-0218 N) - Concentration Exceeded 8/23/2017 8-2017 Nitrogen, Ammonia Total (as Daily Maximum NOV-2018-LV-0218 N) - Concentration Exceeded 8/31/2017 8-2017 Nitrogen, Ammonia Total (as Monthly Average NOV-2018-LV-0218 N) - Concentration Exceeded Other Violation Sample Location: Violation Report Violation Date Period Parameter Type NOD NOV CPA 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 9/6/2017 Violation detected NOV-2017-PC-0602 during inspection 6/15/2017 4-2017 Permit conditions NOV-2017-PC-0361 violation Reporting Violation Page 3 of 4 Reporting Violation Sample Location: Violation Report Date Period Parameter Violation Type NOD NOV CPA 12/1/2017 10-2017 Late/Missing DMR NOV-2018-LR-0005 8/31/2017 7-2017 Late/Missing DMR NOV-2017-LR-0135 10/1/2017 8-2017 Late/Missing DMR NOV-2017-LR-0141 10/31/2017 9-2017 Late/Missing DMR NOV-2017-LR-0144 Page 4 of 4