Loading...
HomeMy WebLinkAbout20180482 Ver 1_PCN Form Submission_20180405Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 4/4/2018 3:21:02 PM (Start Event) Accept by Carpenter,Kristi 4/5/2018 4:59:17 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: April 9, 2018 5:00 PM 4/4/2018 3:21 PM �� � �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Iredell Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: 12.204911 WBS # 12.204911 (for �ICDOT use only) 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number: 03 - Maintenance NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: r Yes r No r Yes r No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank or in-lieu fee program f Yes �' No 1f. Is the project located in anyof NC's twentycoastal counties?* l' Yes C•' No 1h. Is the project located in a designated trout watershed?* f Yes C No Link to trout information: http://wvwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the PrimaryContact?* Trish Beam 1b. PrimaryContact Email:* pdbeam@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (980)522-4218 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Right of Way 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) Mark Stafford 2d. Address Street Address 1710 East Marion Street Address Line 2 PO box 47 a�y Shelby Fbstal / Zip Code 28151 2e. Telephone Number: (xxx)xxx-xxxx (980)552-4200 2f. Fax Number: (704)480-5401 (xxx)xxx-xxxx 2g. Email Address:* mstafford@ncdot.gov State / R ovince / F�gion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* I-77 Stream Stabilization 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town:* Mooresville 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Mooresville travel south on MNy 21 to I-77, then north onto the on ramp to I-77 North. Project is located just off ebt 33 on ramp to I-77 north. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address SYreet Address Address Line 2 a�y Fbstal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.556257 -80.857474 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Unnamed tributary to Catawba River 3b. Water Resources Classification of nearest receiving water:* WS-IV: Class B Surface Water Lookup 3c. What river basin(s) is your project located in?* Catawba River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* Existing failing concrete ditched channel. Land use is small forested area within a mix of commercial/residential area. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrem topo map.pdf Fle type rrust be pdF 141.27KB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent Soil_Map.pdf Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 200 950.09KB 4f. Explain the purpose of the proposed project:* The purpose of the purposed project is to stabilize the stream for the safety of the travelling public. 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* The North Carolina Department of Transportation (NCDOT) proposes to stabilize a failing concrete ditched stream along I-77 north bound lane at exit 33 in Iredell County. The concrete ditched stream has failed in multiple locations and is causing banks to become unstable. NCDOT proposes to remove the failed concrete ditch for approximately 129 feet and replace it with embedded riprap. There will be no new permanent impacts, however, approwmately 40 feet of temporary impacts will be needed for dewatering construction site. The temporary impacts will be to an unnamed tributary to the Catawba River (Lake Norman) which is classified as WS-IV; Class B waters by the Division of Water Resources. A temporary cofferdam pumping system will be used to divert the stream around the construction site as needed. Area affected by temporary cofferdam system will be graded and restored back to pre-project conditions. All Best Management Practice's will be utilized during the course of the project. 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent Drawings.pdf 62.52KB Fle type rrust be pdF 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* f• Yes C' No l" Unknawn Comme nts: Division 12 Environmental Office 5b. If the Corps made a jurisdictional determination, what type of determination was made?* l" Preliminary l" Approved �' Unknown f•' f�llA Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Division 12 Environmental Office Agency/Consultant Company: NC DOT Othe r: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d7. Jurisdictional determination upload aick the upload button or drag and drop files here to attach docurrent Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes r No �' Unknown 7. Future Project Plans 7a. Is this a phased project? * f Yes �' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands �J Streams-tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact sqfe� type * Type * Jurisdiction * width * length * g� Bypass pumping T Dewatering Ut to Catawba River Intermittent Both 3 40 1 N�p label (e.g. F3�ad Qossing F2rrranent (Fj or F2rennial (F$Z) or Average (linear feet) Z 1) Terrporary (lj intermittent (If� (feet) 0 *� All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 0 3i. Total temporary stream impacts: 40 3i. Total stream and tributary impacts: 40 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* NCDOT plans to embed riprap into stream to help dissipate energy. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Minimization of impacts by installing appropriate erosion control measures. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes �' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Failing concrete ditch replacement with embedded riprap. F. Stormwater Management and Diffuse Flow Plan (required by DWR) �** Recent changes to the stormwater rules have required updates to this section .`�� 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * l•' Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?'� C Yes l" No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comme nts: * The project is listed as a type and class of activity which qualifies as a Non-major action under the Minimum Criteria rules; therefore, a minimum criteria checklist as been completed for the stream stabilization project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (75A NCAC 2H .7300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (75A NCAC 2B .0200)?* f Yes l•' No 2b. Is this an after-the-fact permit application?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. The project is a Minimum Criteria Project with little anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No �' f�/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * f• Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* G' Yes C' No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* C' Yes G' No 5e. Is this a DOT project located within Division's 1-8?* f Yes C No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C Yes r No 5g. Does this project involve bridge maintenance or removal?* C' Yes C No C' Unknown Link to the NLEB SLOPES document: http://saw-reg.usace.arrny.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?'* C' Yes G No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? * NC Natural Heritage Program database and on-site surveys. Division 12 is located in the wtiite nose syndrome area; however, there are no known hibernacula or roosting trees in the Division 12 counties; therefore, a NLEB consultation form was completed (See attached). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * Per Natural Heritage database no salt marshes, oyster reefs, or sea-grass beds located in vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes �' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * Project occurs within previously disturbed NC DOT Right of Way. 7c. Historic or Prehistoric Information Upload C]ick the upload button or drag and drop files here to attach docurrent Fle rrust be F�F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* f Yes �' No 8c. What source(s) did you use to make the floodplain determination?* FEMA Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent Area to be reconstructed.pdf Area to be reconstructed2.pdf Area to be stabilized_retaining wall.pdf Condition of banks.pdf Cover Letter.pdf DS of area to be be reconstructed.pdf DS of area to be reconstructed.pdf DS of area to be stabilized_retaining wall.pdf Existing concrete debris.pdf Flood.pdf Insized channel.pdf 10B in stream.pdf JD Form.pdf Looking US at end of construction.pdf retaining wall.pdf StreamForm.pdf StreamlinedConsultationForm.pdf TE_memo.pdf Fle rrust be FDF or KNQ Signature �7 By checking the box and signing below, I certify that: 1.12MB 1012.47K6 973.81 KB 708.86KB 223.01 KB 883.89KB 964.25KB 1MB 1.13MB 495.65KB 1.09MB 820.03KB 56.13KB 794.91 KB 1.13MB 43.57KB 30.85KB 230.41 KB ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Jeffrey L Wyatt Signature �� � Initial Review Is this project a public transportation project?* (�) l•' Yes f No Change only 'rf needed. Has this project met the requirements for acceptance in to the review process? * C•' Yes C' No BIMS # Assigned * 20180482 Version#* 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Hood:eads\drhood Is a payment required for this project?* r No payment required f Fee received f Fee needed - send electronic notification