Loading...
HomeMy WebLinkAbout20180049 Ver 1_Approval Letter_20180405KI; Water Resources ENVIRONMENTAL QUALITY 1 April 5, 2018 City of Durham 101 City,Hall Place . Durham, NC 27701 ROY COOPER Governor MICHAEL S. REGAN Secretory LINDA CULPEPPER Interim Director D W R #'18-0049 Durham County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL'CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTIONRULES (15A NCAC 02B.023,3) WITH ADDITIONAL CONDITIONS City of D.urham7Eno River Outfall Phases I and II To Whom It May Concern: You have our approval for the impacts listed below for the purpose described in your application. dated January 9, 2018 and received by the Division of Water Resources (Division) on January 9, 2018 with additional information received on February 26, 2018 and March 26, 2018. These impacts are covered .by the attached Water Quality General Certification Number 4133 the conditions listed below. This certification is associated with the use of.Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Buffer Rules are met. No other impacts are " app`roved, including incidental impacts. [15A NCAC 0213.0506(b)(c) and 15A-NCAC 02B .0233(8)] Division of Water Resources, Raleigh Regional Office, Water Quality. Operations Section http://portal,ncdenr.org/web/wd/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919),791-4200 Location: 3800, Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 City of Durham -Eno River Outfall Phases I and II - DWR #1870049 401 AND BUFFER APPROVAL Page 2 of 6 Type of Impact, Amount Approved (units) Permanent Amount Approved (units) Temporary Wetland Site 1 WB: Excavation 0.0004 (acres) 0 (acres) Site 1 WB: Land Clearing 0 (acres) 0.008 (acres) Site 4 WA: Excavation 0.003 (acres) 0 (acres) Site 4 WA: Land Clearing 0 (acres) 0.006 (acres) . Site 10 WH: Land Clearing 0 (acres) 0.001 (acres) Site 10 WD: Land Clearing 0 (acres) 0.010 (acres) ,Site 11 WD: Excavation 0.001 (acres) 0 (acres) Site 11 WD: Land Clearing 0 (acres) 0.022 (acres) Site 13 WF: Excavation 0.025 (acres) 0 (acres) Site 13 WF: Land Clearing 0 (acres) 0.100 (acres) Site 13 WG: Excavation 0.003 (acres) 0 (acres) .Site 13WG: Land Clearing 0 (acres) 0.010 (acres) Stream Site 1: Fill 60 (linear feet) 0, (linear feet) Site 2: Fill 60 (linear feet) 0 (linear feet) Site 3: Fill 60 (linear feet) 0 (linear feet) Site 5 -ST: Fill 50 (linear feet) 0 (linear feet) Site 6: Excavation 0 (linear feet) 60 (linear feet) Site 8 -SL: Excavation 0 (linear feet) 60 (linear feet) Site 9 -SL: Excavation 0 (linear feet) 62 (linear feet) Site 10=5N: Excavation 0 (linear feet) 60 (linear feet) Site 10 -SH: Excavation 0 (linear feet) 60 (linear feet) Site 10 -SI: Excavation 0 (linear feet) 35 (linear feet) Site 11 -SL: Excavation 0 (linear feet) 42 (linear feet) Site 12 -SJ: Excavation 0 (linear feet) 50 (linear feet) Site 12 -SK: Excavation 0 (linear feet) 44 (linear feet) , Site 14 -SS: Excavation 0 (linear feet) 61 (linear feet) . Buffers -Zone 1 Site 1 -Sewer Line 0 (square feet) 3665.62 (square feet) Site 2 -Sewer Line 0. (square'feet) 3605.51 (square feet). Site 2 -Sewer Line 0 (square feet) 317.74 (square feet) Site 3 -Sewer Line 0 (square feet) 3693.69 (square feet) Site 3 -Sewer Line 120.92 (square feet) 1686.17 (square feet) Site 4 -Sewer Line 3875.74 (square feet) 20344.09 (square feet) Site 5 -Sewer Line 0 (square feet) T2922.82 (square feet) City of Durham -Eno River Outfall Phases I and II DWR #18-0049 401 AND BUFFER APPROVAL Page 3 of 6 Site 5 -Sewer Line 1016.62 (square feet) 4995.45,(square feet) Site 6 -Sewer Line 0 (square feet) - 3711.37 (square feet) Site 8 -Sewer Line 4068.72 (square feet) 3660.36 (square feet) Site 8 -Sewer Line 263.10 (square feet) 0 (square feet) Site 9 -Sewer Line 0 (square feet) 3753.26 (square feet) Site 9 -Sewer Line '0 (square feet) 3848.06 (square feet) Site 11 -Sewer Line 0 (square feet) 2860.99 (square feet) Site 12 -Sewer Line 0 (square feet) 5452.75 (square feet) Site 1j' -Sewer Line 0 (square feet) . 1420.91 (square feet)_ Site 14-Sewer,Line (square feet) 5759.25 (square feet) Site 15 -Sewer Line` 0 (square feet) 327.31 (square feet) Buffers -Zone 2 Site 1 -Sewer Line 8236.08 (square feet) 2454.26 (square feet) Site 2 -Sewer Line , 884.03 (square feet) 2419.97 (square feet) Site 3 -Sewer Line 12733.72 (square feet) 2605.26 (square feet) Site 4 -Sewer Line 36377.27 (square feet) 0 (square feet) Site 5 -Sewer Line 16981.01 (square feet) 1620.26(square feet) Site 6 -Sewer Line 0.(square feet) 2488.88 (square feet) Site 7 -Sewer Line 928.53 (square feet) 0 (square feet) Site 87 -Sewer Line 9654.15 (square feet) 2441.80 (square feet) Site 9 -Sewer Line 10835.58 (square feet) 2510.93 (square feet) Site 10 -Sewer Line 3562.20 (square feet) 0 (square feet) Site 11 -Sewer Line 1293.16 (square feet) 1558.17 (square feet) Site 12 -Sewer Line 4237.66 (square feet) 1017.17 (square feet) Site 13 -Sewer Line 2888.74 (square feet) 0 (square feet) Site 14 -Sewer Line 7273.42 (square feet) 0 (square feet) Site 15 -Sewer Line 1557.25 (square feet) 0 (square feet) 2.. Diffuse Flow All stormwater must be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re -concentrate before discharging into a stream. [15A NCAC 02H .0506(b)(5)] 3. The City of Durham shall submit to DWR final dewatering -plans with a detailed analysis or construction sequence of how work will be conducted in the dry. The plans should include details showing how turbidity curtains or other sediment barriers will be installed where the open-cut/excavation method will be utilized. This dewatering plan must,to be. approved by DWR before any impacts authorized in this certification occur. [15A NCAC 02H .507.(c)] 4. The City of Durham shall schedule and conduct a pre -construction meeting with the, construction contractors and DWR to review the conditions and requirements of the City of Durham -Eno River Outfall Phases I and II DWR #18-0049 401 AND BOFFER APPROVAL Page 4 of 6 respective certification for clarity and understanding before any impacts authorized in this certification occur.:Please.contact Stephanie Goss at 919-791-4256.to schedule the pre - construction meeting..[15A NCAC702H .0502(e) and .507(c)] 5. Compensatory Mitigation Using a Private, Mitigation. Bank 'Mitigation must be provided for the,proposed impacts as specified in.the table below. The Division has received a Statement of Availability letter from EBX to meet this mitigation - requirement.. The specific bank site to be debited -will be Cedar Grove, Hatley, or Ezell,'all located in HUC 03020201 and in the fallsIake watershed. Until the EBX receives and clears your payment, and proof of p;ayment has'been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this. Authorization Certificate authorizes payment to the EBX;to meet the following compensatory mitigation requirement [15A NCAC 02H ;.0506 (b)(6)1 6. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind -shall occur in wetlands, waters, or riparian areas beyond the footprint of the. impacts depicted in the,'Pre-Construction Notification. All construction activities, including the design, installation, operation,. and. maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501 and .0502] 7. Protective Fencing The outside buffer; wetland or water boundary and along the construction corridor:within these boundaries approved under this authorization shall be clearly marked with orange warning_ fencing (or.similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 8: This approval is for the purpose and design described 'in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may . be required to submit anew application package with, the appropriate fee. If,the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complyi,ng,with all conditions. [15A NCAC'02B .0507(d)(2)] Compensatory,Mitigation Bank Sponsor River & Sub -basin Number Required; Buffer 15,829.14 (square feet) EBX 03020201 and in the Falls Lake watershed 6. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind -shall occur in wetlands, waters, or riparian areas beyond the footprint of the. impacts depicted in the,'Pre-Construction Notification. All construction activities, including the design, installation, operation,. and. maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501 and .0502] 7. Protective Fencing The outside buffer; wetland or water boundary and along the construction corridor:within these boundaries approved under this authorization shall be clearly marked with orange warning_ fencing (or.similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)] 8: This approval is for the purpose and design described 'in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may . be required to submit anew application package with, the appropriate fee. If,the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complyi,ng,with all conditions. [15A NCAC'02B .0507(d)(2)] City of Durham -Eno River Outfall Phases I and II . DWR #18-0049 401 AND BUFFER APPROVAL Page 5 of 6 9. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification and Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.nc8ah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days.of receipt of this notice, a petition must be filed with the OAH. A petition is -considered filed when the original and one (1) copy,along with any, applicable OAH filing fee is received in the OAH during normal office'hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel . Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601- Please 7699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR — 401 & Buffer Permitting Branch 1617'Mail Service Center Raleigh, NC 2,7699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 City of Durham -Eno River Outfall Phases I and II DWR #18-0049 401 AND BUFFER APPROVAL Page 6 of 6 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse River Riparian Buffer Protection Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or stephanie.goss@ncdenr.gov if you have any questions or concerns. Si cerely, V Q' i'l �7G rn'u Danny Smith Supervisor, Water Quality Regional Operations Section Enclosure: GC 4133 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Drive, Ste. 105; Wake Forest, NC 27597 DWR RRO 401 file DWR 401 & Buffer Permitting Unit via Laserfiche Rajit Ramkumar via e-mail at rramkumar2sepiengineering.com