Loading...
HomeMy WebLinkAbout20000642 Ver 2_PCN Form Submission_20180404Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 4/2/2018 4:16:32 PM (Start Event) Accept by Carpenter,Kristi 4/4/2018 2:05:07 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: April 5, 2018 5:00 PM 4/2/2018 4:17 PM �� � �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Watauga Is this project a public transportation project?* C Yes l' No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: WBS # 11C.095123 (for f�i::DOT use only) 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 74 - Linear transportation 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: C' Yes �' No For the record onlyfor Corps Permit: C' Yes f' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program C Yes l" No Acceptance Letter Attachment Qick the upload button or drag and drop files here to attach docurrent Mitigation - SR 1300C - Division 11 - STR - WT 03 (cold).pdf RLE TYFE MJST BE FDF 1f. Is the project located in anyof NC's twentycoastal counties?'� f Yes r No 64.76KB 1h. Is the project located in a designated trout watershed?* C•' Yes C' No Link to trout information: http://wrwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact? * Heath Slaughter 1b. PrimaryContact Email:* hslaughter@ncdot.gov 1c. PrimaryContact Phone:�` (xxx)xxx-xxxx (336)903-9202 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address 801 Statesville Road Address Line 2 a�y North Wilkesboro Fbstal / Zip Code 28659 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (�oc)xxx-xxxx State / Rovince / f�gion NC Country USA 2g. Email Address:* hslaughter@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* SR 1300C, Rich Mountain Road 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/ town:* Zionville 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. See attached map. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address SYreet Address Address Line 2 a�y Wstal / Zip Code State / FYovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use bet�en 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 36.34079 -81.73575 ex:34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* UT to Cove Creek 3b. Water Resources Classification of nearest receiving water:* C Surface Water Lookup 3c. What river basin(s) is your project located in?* Watauga RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Gravel road in a rural area. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) aick the upload button or drag and drop files here to attach docurrent SR 1300C, Topo.pdf 145.29KB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 500 4f. Explain the purpose of the proposed project:* Secondary Road Improvement 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* See attached cover letter 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurrent SR1300C_dsn_Plans.pdf 285.18KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* G' Yes f' No C' Unknown Comme nts: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary C' Approved C' Unknown C� f�UA Corps AID Number: 6carrple: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Heath Slaughter NCDOT 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload aick the upload button or drag and drop files here to attach docurrent Fle type rrust be FL,F 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* f Yes f•' No C' Unknown 7. Future Project Plans 7a. Is this a phased project?'� f Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands fJ Streams-tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts ff there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * type'� S1 16+35 Road P Culvert Crossing F�rrranent(P�or N�p label (e.g. f�ad Qossing 1) Terrporary (� g2 16+35 Road P Bank Crossing �rrranent(Fjor Stabilization Nfip label (e.g. Fd�ad Qossing 1) Terrporary (� S3 16+35 Road T Dewatering Crossing F2rrranent(F'jor Nfip label (e.g. fmad Qossing 1) Terrporary (� UT to Cove Creek UTto Cove Creek UT to Cove Creek 3e. Stream Type'� Perennial F�rennial (�) or interrrittent (IfV� 3f. Type of 3g. Stream 3h. Impact sqfe� Jurisdiction* width* length* Both 4 30 1 Average (feet) (linear feet) 2 Perennial Both F2rennial (Fff2) or interrrittent (IIVT) Perennial Both F�rennial (Fff2) or interrrittent (IfVn *� All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 40 3i. Total temporary stream impacts: 40 3i. Total stream and tributary impacts: 80 3j. Comments: E. Impact Justification and Mitigation 4 10 Average (feet) (linear feet) 4 40 Average (feet) (linear feet) 0 4 0 1 6 0 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Avoiding wetlands and widening the road away from adjacent stream. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* All appropriate BMPs will be used during construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f• Yes �' No 2c. If yes, mitigation is required by (check all that apply): r DWR r7 Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank r% Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. fJ Yes 4b. Stream mitigation requested: (linear feet) 60 4c. If using stream mitigation, what is the stream temperature: cold 4d. Buffer mitigation requested (DWR only): (square feet) 4e. Riparian wetland mitigation requested: (acres) 4f. Non-riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) `"' Recent changes to the stormwater rules have required updates to this section ."` `w•���a�r•m��Fr 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? l' Yes �' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* l•' Yes f No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * G' Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* f Yes r No Comme nts: * MCC 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* C' Yes C•' No 2b. Is this an after-the-fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonablyanticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes f•' No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* l' Yes C No C' WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C Yes l" No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C' Yes r No 5d. Is another Federal agency involved?* C' Yes C No 5e. Is this a DOT project located within Division's 1-8?* f Yes C•' No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C•' Yes l' No �' Unknown Sg. Does this project involve bridge maintenance or removal?* C' Yes C No Link to the NLEB SLOPES document: http://saw-reg.usace.arrny.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?'* C' Yes C•' No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? * GIS, NHP and visual observation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? * f Yes �' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * Project was reviewed by HEU. 7c. Historic or Prehistoric Information Upload Qick the upload button or drag and drop files here to attach docurrent 17-12-0019 NoHistProps. pdf Watauga SR 1300C No Survey form.pdf Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C' Yes C•' No 8c. What source(s) did you use to make the floodplain determination?* above link Miscellaneous 3.43MB 1.53MB Miscellaneous attachments not previously requested. Qick the upload button or drag and drop files here to attach docurrent NHP - project_report_sr_1300c_gap_section.pdf 1.95MB SR 1300C, Letter.pdf 793.61K6 Fle rrust be FDF or IWQ Signature fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Heath Slaughter Signature �r`r!�f�i �l�rl�lrl� Initial Review Is this project a public transportation project?* (') G' Yes f No Change only if needed. Has this project met the requirements for acceptance in to the review process? * C Yes C' No BIMS # Assigned * 20000642 Version#* 2 Reviewing Office * Winston-Salem Regional Office - (336) 776-9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Is a payment required for this project?* f No payment required f• Fee received f Fee needed - send electronic notification