Loading...
HomeMy WebLinkAbout20140643 Ver 2_401 Application_20180318MOUNT HOLLY Connecting Community &Nature Sent by email to: alan.johnson@ncdenr.gov Original Not Sent Mr. Alan D. Johnson Senior Environmental Specialist State of North Carolina Department of Environmental Quality Water Resources of w(IPY 3 1/1--)1 PAID February 22, 2018 ��c 61 54, % Re: 401 Water Quality Certification and Catawba Riparian Buffer Authorization with Additional Conditions, Mount Holly Greenway Issued Permit on September 2, 2014 DWR#14-0643 Gaston County Dear Mr. Johnson: There are NO CHANGES to the attached application and supporting documentation which your Department relied on to issue the above referenced permit. Construction commenced on this project and over $250,000 has been expended by the City of Mount Holly for the bridge, clearing, earthwork, and soil erosion -sedimentation control measures — all before I stopped construction. The greenway bridge is physically onsite ready for installation. The reason for the work stoppage was to ensure the Wastewater Treatment Plant's (WWTP) structural embankment was not jeopardized by the greenway construction. Recently, the Mount Holly City Council voted to decommission our WWTP and connect to the Charlotte Water wastewater system in Mecklenburg County. Thus our WWTP will have a limited life of operation rather than be a permanent facility. We have completed additional field surveys and re-evaluated the greenway design along the WWTP. We are more confident that the greenway as designed will have little negative impact on the plant's structural embankment. My role has been to get this project under construction and completed without further delay. However, I was recently advised of the need to seek the re -issuance of the current 404 and 401 permits. I will be sending this same letter to Mr. David Brown. The information outlined in the attached permit application will not change. Also, the contact information remains unchanged. P.O. Box 406 Mount Holly, North Carolina 28120 We are meeting with our contractor tomorrow February 23, 2018 and will be working on a schedule to recommence work. It is our intent to reissue the Notice to Proceed and move quickly to install the bridge subject to your review of the permit application. Please accept this letter and attached application as our request for the re -issuance of the 401 and 404 permits. Thank you for your assistance in this matter and I look forward to hearing from you. If you should need additional information, please let me know and I will expedite a response. Best Regards, David E. Johnson, PE Utilities Director/ City Engineer The City of Mount Holly Office 704.951.0074 x102 Cell 704.458.1309 david.johnson@mtholly.us Attachment CC: Mr. David Brown david.w.brown@usace.army. miI Mr. Scott Allen, PE sallen@sepiengineering com Construction Services Manager North Carolina SEPI Engineering & Construction Mount Holly: Mr. Danny Jackson Mr. Miles Braswell Mr. Derek Dixon Mr. Greg Beal Mr. Mark Jusko P.O. Box 406 Mount Holly, North Carolina 28120 R9 AA WN -VA 4 W �''' tC R Norttl'Carulina Department of Environment and Natural Resources Pat McCrory Governor Mr. Danny Jackson City of Mount Holly P.O. Box 408 Mount holly, NC 28120 John E. Skvarla, III seclvh" September 2, 2014 DWR# 14-0643 Gaston County Subject: APPROVAL_ of 401 Water Quality Certification and Catawba Riparian Buffer Authorization with Additional Conditions, Mount Holly Greenway Dear Mr. Jackson: You have our approval, in accordance with the General Certification and those conditions listed below, for the purpose proposed in your application dated June 10, 2014 and additional information submitted on August 21,.2014, which was received by the Division of Water Resources (the Division) on June 23, 2014 and August 22, 2014, respectively. After reviewing your application, we have determined that this project is allow per the Catawba Buffer Rule (15A NCAC 0213.0243), and is covered by Water Quality General Certification Number 3890, which can be viewed on our web site at htto://P ortal.ncdenr.oratwehbMLMg wsJ401. The General Certification allows you to use Nationwide Permit Number 42 once it is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. . The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. In addition to the requirements of the certification, you must also comply with the following conditions: 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. Approved Impacts: Type of Impact Amount Approved Temporary Impact Amount Approved Permanent Impact Wetlands 0 0.020 acre Stream 0 38 linear ft. Bank Stabilization 0 63 linear ft. Buffer, Zone 1 43,211 scil ft. 23,000 sq. ft. -. Buffer, Zone 2 5,235 sq. ft. 580 sq. ft. 1617 Mail Service Genu, Ralafgh, Nath Carolina 27MI650 Phone: 919$07-i001 Ink rnet www.nodencgov An E1Wr Oppodoofty I Affirmft* Aeon Enpbsw- M W9IO put by reepded Mw R-10 3. This approval is only valid for the purpose and design that you described in your application. If you change_ your project, you mustnotify. us. in writing, and you may be required to send us a new application .for a new certification: If the property is sold, the new. owner must be given a .copy of the Certification and approval letter, and is thereby. responsible.for complying with all conditions.: 4. Trees located within the temporary impact area of the buffer which are removed for the construction of the greenway shall be replaced. At minimum, 2 -inch caliper, S feet in height native species trees shall. be utilized and shall be appropriately identified to prevent removal in the future. Should a tree fail to survive, it shall be replaced. 5. Culverts: plaosd in streamstwedands shall be installed "in the dry". Immediately upon completion of the installation, water flow shall be returned to its natural course. Existing stream dimensions (including the cross ssrction dimensions, pattern,. and longitutlinal.profrls) must be maintained (or restored via constructed benches) above and below locations of each culvert. If any of -the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. S. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This Includes intedor/extedor slopes of sediment basins. 7. Barelfill slopes in excess of 104et in height and within 30 feet of surface waters shall be matted. 8. Stormwater discharge structures at this site shall be constructed in 'a manner such that the potential receiving -streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 9. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application. All construction activities associated with this project shall meet, and/or exceed, those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards, statutes, or rules occur. 10. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is -unavoidable, -they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project. 11. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to the 401ANeWnds Unit of the Division. 12. Continuing Compliance. The applicant (Mount Holly, NC) shall conduct all activities in a manner so as not to contravene any state water quality standard (including -any requirements for . compliance with section 303(d) of the Clean Wafter Act) and any other appropriate regOirements of state and federal law. If the Division determines that such'standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being` violated, or that further conditions are necessary to assure compliance, the Division may' _ reevaluate and modify this certification to include conditions appropriate to assure compliance with.such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, the Division shag notify the applicant and the US Army -Corps of -Engi(ieers; provide jwt3lic notice in ao:ordanoe wftfi SK NCAC 2H.0503, 'and provide opportunity for pubec hearing in addbr+danoa with 15A NCAC 2H:0664. Any hew or rmAsed conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for. reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. This Certification can be contested as provided in Articles 3 and 4 of the General Statute 15M by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http./Avww.ncoah.com/0r by calling the OAH Cleric's Office at (919) 431 3000. Within sixty (60) calendar days of receipt of this notice, a. petition must be filed with the' OAH. A petition is considered filed when the original and one (1) copy along with -any applicable OAH filing fee is received in the OAH during normal office.hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at. (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: ffSWX V Vie US POW Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 ffWndW Ift deArve yWrWW (UPS, Fad&. etc) Office of Administrative Hearings 1711 Now Hope Church Rd. Raleigh, NC 27609-6285:. One (1) copy of the petition must also be served on DENR as follows: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Karen Higgins in the Central Office in Raleigh 919-807-6360. incerely, for Thomas A. Reeder Attachments cc, • Army Corps of Engineers, Asheville Karen Higgins, Wetiands.Unk Greg Antemann, CWS MRO, Land Quality r ;ources !AL QUALITY March 15, 2018 Certified Mail Return Receipt Requested Cert Mail # 70081300 00001124 5259 David Johnson PO Box 406 Mount Holly, NC 28120 Subject: Check Return Mount Holly Catawba River Dear Mr. Johnson, ROY COOPER rnvrrnor MICHAEL S. REGAN Seurelwr LINDA CULPEPPER Interim Oirrcmr DWR Project # 14-0643v2 Gaston County On March 14, 2018, the Division of Water Resources (DWR) received check #139367 from you for $750 for the above referenced project. This project requires a check in the amount of $240. As a requested, we are returning check #139367 to you and it is enclosed. Please remit a new check in the amount of $240, paid to the order of DWR. Thank you for your attention. If you have any questions, please contact Sheri Montalvo at (919) 807-6303 or me at (919) 807-6360. Sincerely, �I Karen A. Higgins, Supervisor Wetlands Branch 401 & Buffer Permitting Unit KAH/scs Enclosure: check #139367 cc: 401 & Buffer Permitting Unit - File Copy Filename: 140643v2MountHollyCatawbaRiver(Gaston)_Check Return State of North Carolina i Environmental Quality i Water Resources 1617 Mail Service Center i Raleigh, North Carolina 27699-1617 919 807 6300 AIAIAAI MT, o y WP o D 'ITY OF MOUNT HOLLY To: Purchasing/Administration From: Date: 2/26/2018 Department: Check Requisition Mark Name of Requestor Recreation PAYEE Name: NCDWR 4ddress: 1617 Mail Service Center Raleigh NC 27699 Phone: Fax: ECOMMENDED BY: APPROVED BYMAR 0 8 M16 EPARTME Z6�1✓ Date X AFRICA OTIS FINANCE OFFICER MOUNT Hoy yr _ Connecting Community &Xature February 22, 2018 Sent by email to: alan.johnson@ncdenr.gov Original Not Sent Mr. Alan D. Johnson Senior Environmental Specialist State of North Carolina Department of Environmental Quality Water Resources Re: 401 Water Quality Certification and Catawba Riparian Buffer Authorization with Additional Conditions, Mount Holly Greenway Issued Permit on September 2, 2014 DWR#14-0643 Gaston County Dear Mr. Johnson: There are NO CHANGES to the attached application and supporting documentation which your Department relied on to issue the above referenced permit. Construction commenced on this project and over $250,000 has been expended by the City of Mount Holly for the bridge, clearing, earthwork, and soil erosion -sedimentation control measures — all before I stopped construction. The greenway bridge is physically onsite ready for installation. The reason for the work stoppage was to ensure the Wastewater Treatment Plant's (WWTP) structural embankment was not jeopardized by the greenway construction. Recently, the Mount Holly City Council voted to decommission our WWTP and connect to the Charlotte Water wastewater system in Mecklenburg County. Thus our WWTP will have a limited life of operation rather than be a permanent facility. We have completed additional field surveys and re-evaluated the greenway design along the WWTP. We are more confident that the greenway as designed will have little negative impact on the plant's structural embankment. My role has been to get this project under construction and completed without further delay. However, I was recently advised of the need to seek the re -issuance of the current 404 and 401 permits. I will be sending this same letter to Mr. David Brown. The information outlined in the attached permit application will not change. Also, the contact information remains unchanged. P.O. Box 406 Mount Holly, North Carolina 28120 e � We are meeting with our contractor tomorrow February 23, 2018 and will be working on a schedule to recommence work. It is our intent to reissue the Notice to Proceed and move quickly to install the bridge subject to your review of the permit application. Please accept this letter and attached application as our request for the re -issuance of the 401 and 404 permits. Thank you for your assistance in this matter and I look forward to hearing from you. If you should need additional information, please let me know and I will expedite a response. Best Regards, David E. Johnson, PE Utilities Director / City Engineer The City of Mount Holly Office 704.951.0074 x102 Cell 704.458.1309 david.johnson@mtholly.us Attachment CC: Mr. David Brown david.w.brown@usace.army.mil Mr. Scott Allen, PE sallen@sepiengineering.com Construction Services Manager North Carolina SEPI Engineering & Construction Mount Holly: Mr. Danny Jackson Mr. Miles Braswell Mr. Derek Dixon Mr. Greg Beal Mr. Mark Jusko P.O. Box 406 Mount Holly, North Carolina 28120 R9 AMAWA Fun, North'Carolins Department of Environment and Natural Resources Pat McCrory Governor I Mr. Danny Jackson City of Mount Holly P.O. Box 406 Mount Holly, NC 28120 John E. Skvada, III Secretary September 2, 2014 DWR# 14-0643 Gaston County Subject: APPROVAL of 401 Water Quality Certfication and Catawba Riparian Buffer Authorization with Additional Conditions, Mount Holly Greenway Dear -Mr. Jackson: You have our approval, in accordance with the General Certification and those conditions hated below, for the purpose proposed in your applicattion dated June 10, 2014 and additional kiformation submitted on August 21,.2014, which was received by the Division of Water Resources (the Division) on June 23, 2014 and August 22, 2014, respectively. After reviewing your application, we have determined that this project Is allow per the Catawba Buffer Rule (15A NCAC 02B .0243), and is covered by Water Quality General Certification Number 3890, which can be viewed on ourweb site at htto; conal.ncdenr.oroNue4bot wohnrs/401. The General Certification allows you to use Nationwide Permit Number 42 once ft is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. In addition to the requirements of the owtification, you must altio comply with the following conditions: 1. The Mooresville Regional Office shall be notified in writing once oonstruction at the approved impact areas has commenced. 2. Approved Impacts: Type of Impact Amount Approved 'temporary Impact Amount Approved Permanent Impact Wetlands 0 0.020 acre Stream 0 38 linear ft. Bank Stabilization 0 63 linear ft. Buffer, Zane 1 43,211 scil ft. 23,000 sq. ft. -. Buffer, Zone 2 5,235 sq. ft. 580 sq. ft. 1617 Mall Salvia Center, Raleigh, North Cardlna 27699AW Phone: 919-807-63001 Internet: www.nodenr.gov An EqualoppoftoWl Mff4dW*AdM Employer-Mideln pet byreeycled papa R-10 3. This approval is only valid for the purpose and design that you described in your application. you change your project, you must, notify. us. In writing, and you may be required to send us a new application .fora new certification; If the property is sold, the new owner must be given a copy of the Ce"cation and approval letter, and is thereby.responslble for complying with all conditions.: 4. Trees located within the temporary impact area of the buffer which are removed for the construction of the greenway shall be replaced. At minimum, 24nch capper, 6 feet in height native species trees shall. be utilized and shall be appropriately identified to prevent removal in the future. Should a tree fad to survive, it shall be replaced.. 5. Culvedwolaoed in streams/wedands shall be installed "in the dry". immediately upon completion of the installation, water flow shall be returned to its natural course. Existing stream dimensims Onaluding the cross section dimensions, pattet'n,_and longitudknal.profile) mupt be maintained (or restored via constructed benches) above and belbw locations of each culvert. if any of -the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. 6. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss* and turbidity. This includes interior/exterior slopes of sediment basins. 7. Bare/fill slopes in excess of 10 -feet in height and within 30 -feet of surface waters shall be matted. B. Stormwater• discharge structures at this site shall be constructed in a manner such that the potential receiving -streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 9. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application. All oonstruction activities associated with this project shall meet, and/or exceed, those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control. Manual and shall be conducted so that no violations of state water quality standards, statutes, or rules occur. 10. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent predicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project. 11. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion' form to the 401ANetiands Unit of the Division. 12. Continuing Compliance. The applicant (Mount Holly, NC) shall conduct all activities in a manner so as not to contravene any state water quality standard (Including -any requirements for. compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If the Division determines that such'standarda or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may'- . reevaluate and modify this certification to include conditions appropriate to assure compliance wfih.such standards and requirements in acoordance with l5 A NCAC 2H.0507(d). Before codifying the certification; the DivIsion shall notify the applicant and the US Army.Corps of En itieei^s; provide p616116h6tica; in accordance with 15A= NCAC 2H.0503, and provioee' opportunity fbr public hearing in accordance with 15A NCAC 2H'.0604. Any new or revised conditions shall be provided to the applicant in writing, shat be provided to the United States Army Corps -of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the projecd. This Certification can be contested as provided In Articles.3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htb:/Ayww.ncoah.com/or by calling the OAH Clerk's Office at (919)'431-;3000. Within sixty (60) calendar days of receipt of this notice, a -petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with -any applicable OAH filing fee is received in the OAH during normal oftice.hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at. (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: ffa %ft via Us PORN Savk : Office of Adrrdniat VDM Hearings 6714 Mail Service Center Raleigh, NC 27599-6714 Iia aft via 5w*0 ryes. Feft oft) Office of Admirfotrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27809-6285: One (1) copy of the petition must also be served on DENR as folkwvs: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1501 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704863-1699 or Ms. Karen Higgins in the Central Office in Raleigh 919-807-5360. Aincerely, forThomas A. Reeder Attachments cc., • Army Corps of Engineers, Asheville Karen Higgins, Wetlands.Unit Greg Antemann, CWS MRO, Land Quality 13893 - NC DENR - DIV OF WATER QUALITY i j9J(b / CITY OF MOUNT HOLLY - MOUNT HOLLY, NC REFERENCE DATE DESCRIPTION AMOUNT DISCOUNT NET PAID -'----------------------------------------------------------------------------- 02262018 02/26/18 000011680 750.00 0.00 750.00 401 PERMIT FOR GREENWAY 41-00-8170-551 750.00 CHECK # DATE GROSS DISCOUNT CHECK AMOUNT ------------------------------------------------------------------------------- 139367 03/09/18 750.00 0.00 750.00