Loading...
HomeMy WebLinkAbout20141082 Ver 2_DCM Permit_20180329Permit Class MODIFICATION/MINOR STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 116-14 Issued to Wanchese Marina, LLC., 2000 Northgate Plaza Commerce Parkway Suffolk, VA 23435 Authorizing development in Dare County adj. to Mill Creek. at 4505 Mill Landing_ Road, NC 345, in Wanchese _,as requested in the permittee's letter dated 1/17/18, including the attached workplan drawing "Sheet C201" dated 10/13/17. This permit, issued on March 29.2018 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ✓c auoJcei w lines, linprisemnem or civil action; or may cause me permit to oe nun ana veto. 1) Unless specifically altered herein, this Minor Modification authorizes the travel lift, walkways and piers, and staging area, all as expressly and specifically set forth in the attached letter and workplan drawing. Any additional development activities may require an additional modification of this permit. 2) This permit authorizes no additional formalized boat slips. 3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Y j� Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Wanchese Marina LLC. Permit No. 116-14 Page 2 of 2 ADDITIONAL CONDITIONS 3) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 4) This Minor Modification shall be attached to the original Permit No. 116-14, which was issued on 1/5/15, and copies of both documents must be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The 395 linear foot bulkhead and maintenance dredging indicated as "proposed" on the workplan dated 10/13/17 were originally authorized under CAMA permit No. 116-14, issued on 1/5/15. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW - 2014 -02302. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2014-1082 V2. NOTE: A minor modification application processing fee of $100 was received by DCM for this project.