HomeMy WebLinkAboutSWA000022 Courtyards at Emerald Lake_Cover letter .pdfEnergy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
Epcon Lawyers Road LLC
Attn: Bob Kardos, VP of Operations
8600 Sam Furr Road, Suite 180
Huntersville, NC 28078
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. VINSON
Interim Director
Subject: Fast Track Authorization to Construct (ATC) Permit No. SWA 000022
Courtyards of Emerald Lake
Union County
Dear Mr. Kardos:
On March 13, 2018, the Central Office received a complete "Authorization to Construct" (ATC) Permit
Application Form for the subject project to be permitted under the State Stormwater Fast Track Process. Staff
have reviewed the application materials and have determined that the project, as proposed, complies with the
Stormwater Regulations set forth in Rule 15A NCAC 02H.1043. We are hereby forwarding Authorization to
Construct Permit No. SWA 000022 dated April 2, 2018, for the construction of the stormwater control
measures (SCMs) and built -upon area associated with the subject project.
This Authorization to Construct Permit replaces Permit No. SW3140902, which was originally issued for this
project. Permit No. SW3140902 has been rescinded effective 4/02/2018.
This Authorization to Construct Permit does not constitute an approval of the project at its completion.
Approval of this project at completion will be based on Division review and approval of the final permit
application completed by a North Carolina licensed professional. It shall be the Permittee's and the licensed
professional's responsibility to ensure that the as -built project meets the appropriate stormwater rules. Failure
to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through
§ 143-215.6C and/or referral of the licensed professional to the appropriate North Carolina licensing board.
This Authorization to Construct Permit shall be effective from the date of issuance until April 2, 2023, shall be
subject to the conditions and limitations as specified therein, and shall not supersede any other agency permit
that may be required.
This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this ATC
Permit and is herein incorporated by reference.
Please note that this Authorization to Construct Permit is not transferable except after notice to and approval
by the Division. The Division may require rescission and/or revocation and reissuance of this permit.
If you have any questions concerning this permit, please contact Richard Riddle in the Central Office at 919-
807-6375 or rick.riddle@ncdenr.gov.
Sincerely,
6',e ak aigwa Puy Z P,
zw-
William E. (Toby) Vinson, Jr., PE, CPESC, CPM, Interim Director
Division of Energy, Mineral and Land Resources
Enclosure(s): Attachment A — Fast Track Construction Commencement Form
Attachment B — Example Deed Restriction and Protective Covenants Language
cc: Laserfiche: SW Permits\SWA000022
Brian R Rossi, PE, EMH&T, Inc.
Mooresville Regional Office Stormwater File
State ofNorth Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612
919 707 9200 T