Loading...
HomeMy WebLinkAbout20170723 Ver 1_USACE Correspondence_20180330 Carpenter,Kristi From:Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> Sent:Friday, March 30, 2018 8:06 AM To:Briana D. Eddy; Ward, Garcy; Peed, Richard Cc:George Price; Bill P. Jordan Subject:\[External\] RE: \[Non-DoD Source\] **For Your Review** Bonner Bridge duct bank installation - new plans needed? CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Briana, If there are no additional wetland fills associated with this project then the Corps original scope stays the same. Our permit is focused on the fill for the access to the substation. No additional permitting is required. Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Briana D. Eddy \[mailto:EddyBD@booth-assoc.com\] Sent: Thursday, March 29, 2018 4:22 PM To: Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil>; garcy.ward@ncdenr.gov; Richard.Peed@ncdenr.gov Cc: George Price <GeorgeP@chec.coop>; Bill P. Jordan <JordanWP@booth-assoc.com> Subject: RE: \[Non-DoD Source\] **For Your Review** Bonner Bridge duct bank installation - new plans needed? Kyle, 1 There are no additional wetland impacts anticipated. I think DEQ will be more interested, I just wanted to keep you in the loop. Thanks! Briana -----Original Message----- From: Barnes, Kyle W CIV USARMY CESAW (US) \[mailto:Kyle.W.Barnes@usace.army.mil\] Sent: Thursday, March 29, 2018 4:06 PM To: Briana D. Eddy; garcy.ward@ncdenr.gov; Richard.Peed@ncdenr.gov Cc: George Price; Bill P. Jordan Subject: RE: \[Non-DoD Source\] **For Your Review** Bonner Bridge duct bank installation - new plans needed? Brianna, Will this require additional fill placed in wetlands to accomplish the project. Kyle Barnes Regulatory Project Manager US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Briana D. Eddy \[mailto:EddyBD@booth-assoc.com\] Sent: Wednesday, March 28, 2018 4:22 PM To: garcy.ward@ncdenr.gov; Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil>; Richard.Peed@ncdenr.gov Cc: George Price <GeorgeP@chec.coop>; Bill P. Jordan <JordanWP@booth-assoc.com> Subject: \[Non-DoD Source\] **For Your Review** Bonner Bridge duct bank installation - new plans needed? Gentlemen, Good afternoon. 2 I'm working with Bill Jordan and George Price, and they've asked me to reach out to you with a question regarding the additional use of temporary matting along NC12 for the Bonner Bridge ductbank installation. I'm happy to speak to you on the phone as well if you'd like. According to George Price, Steve Thompson at the NPS stated the NPS was ok with the use of mats along the west side of the existing silt fence for the installation of the duct bank. We can use up to 300' of mats that will have to move along with the progression of work. A construction fence and silt fence will need to be installed along the west side of the mats as they go. I've drafted up the matting and fences so you can see what I mean - see image below and attached plan. Would you like us to send you PDFs or plans incorporating this new language and detail in order to obtain your approval? Or does this email suffice? Thanks! Briana Eddy Manager of Environmental Services Booth & Associates, LLC 5811 Glenwood Avenue, Suite 109 Raleigh, NC 27612 (919) 851-8770 x188 Office eddybd@booth-assoc.com <mailto:eddybd@booth-assoc.com> <BlockedBlockedhttps://www.booth-assoc.com/> 3 4