From:Briana D. Eddy <EddyBD@booth-assoc.com>
Sent:Wednesday, March 28, 2018 4:22 PM
To:Ward, Garcy; Barnes, Kyle W SAW; Peed, Richard
Cc:George Price; Bill P. Jordan
Subject:\[External\] **For Your Review** Bonner Bridge duct
bank installation - new plans needed?
Attachments:BonnerBridge-ESCP2.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Send all
suspicious email as an attachment to Report Spam.
Gentlemen,
Good afternoon.
I’m working with Bill Jordan and George Price, and they’ve asked me to reach out to you
with a question regarding the additional use of temporary matting along NC12 for the
Bonner Bridge ductbank installation. I’m happy to speak to you on the phone as well if
you’d like.
According to George Price, Steve Thompson at the NPS stated the NPS was ok with the
use of mats along the west side of the existing silt fence for the installation of the duct
bank. We can use up to 300’ of mats that will have to move along with the progression
of work. A construction fence and silt fence will need to be installed along the west side
of the mats as they go. I’ve drafted up the matting and fences so you can see what I
mean – see image below and attached plan.
Would you like us to send you PDFs or plans incorporating this new language and detail
in order to obtain your approval? Or does this email suffice?
Thanks!
Briana Eddy
Manager of Environmental Services
Booth & Associates, LLC
5811 Glenwood Avenue, Suite 109
Raleigh, NC 27612
(919) 851-8770 x188 Office