HomeMy WebLinkAbout External U-5704 Start of Study LetterCarpenter,Kristi
From: Woldemariam, Hanna
<Hanna.Woldemariam@stantec.com>
Sent: Wednesday, March 28, 2018 4:06 PM
To: Weychert, Curtis R; Brittingham, Cathy; Steenhuis,
Joanne; ron.lucas@ncdot.gov; Wilson, Travis W.;
brad.e.shaver@usace.army.mil;
Militscher.chris@Epa.gov; gary�jordan@fws.gov;
mike.kozlosky@wilmingtonnc.gov;
ccoud riet@ n hcgov.com;
sterling.cheatham@wilmingtonnc.gov;
Somerville.amanetta@epa.gov; Lane, Stephen
Cc: Herndon, T. Mason; Howell, Trace R; Koch, Pau)
Subject: [External] U-5704: Start of Study Letter
Attachments: U-5704_SOS.pdf
Hello,
The North Carolina Department of Transportation (NCDOT) — Division 3 is beginning the
project development, planning, and engineering studies for State Transportation
Improvement Program (STIP) Project Number U-5704, mobility improvements at the
College Road and Oleander Drive intersection in Wilmington North Carolina. Attached
are the Start of Study letter and the scoping fact sheet, which includes a vicinity map
and an environmental features map. We respectfully request any comments you may
have on the subject project be sent to the address above, or via email to
trh_ca.wel.l_�(c�_n�dcrt.:.�ca.v by Friday May 4, 2018.
If you have any questions regarding the project please contact Paul Koch by email
pa_u.l.:_kca.c_h_�sta_ntec:�cr_rrr� or phone, (919) 865-7394. Thank you for your time and
assistance in this project.
I�i �,1 I` i I` i � 1(',l, r„ � 1 �,,,, I; � i � 1 I �„1 [ �,,,i
Environmental Scientist — Planner
Stantec
801 Jones Franklin Road Suite 300, Raleigh NC 27606-3394
Phone: (919) 851-7522
f�<�c�c�<�.Wr�l<�c;iri<�ri<�iri��si`<�c�lc;c.cr�iri
� „�,o.�o„o�,�.o�,�,.
The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except
with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.