Loading...
HomeMy WebLinkAbout20080329 Ver 1_Certification of Completion_20090406Certification of Completion DWQ Project No.: 0 8- 0 3 2 9 County: E ru N 5 W I SK k- Applicant: .$ c I u c ± Project Name: GNP() 15AQrra& COMa l SQ-U IIKc Q?512 v1?Qrtckce re?lc?_J Date of Issuance of Wetlaad Permit: A ig r t l ii, 2 o O g Certificate of Completion Upon completion of all work approved ,N thin the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to<the401 Oversight/Express Pertnitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, 'Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, ELard L- Ot 115,1r, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of" he construction such that the construction was, observed to be built within substantial. compliance and i nt of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supp ing material. , Signature: M? Dater - 3 O. a Agent's Certification 11 014 hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401, Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: N Date: ?.1 If this project was designed by a Certified Professional 11 , as a duly registered Professional 2 6: (i.e., Engineer, Landscape Architect, urveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full tithe) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care. and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, aad other supporting materials. Signature: -- MA Registration No, p) ik Date K1 ? 9?1 Progress Energy APR 0 2 2009 SERIAL: BSEP 09-0036 401 Wetlands Unit/Express Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 FR- @ F'-'-i 0 V, I R P APR e 2009 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH Subject: Certificate of Completion for Dredging of the Discharge Canal Settling Basin at the Brunswick Steam Electric Plant DWQ Project No. 08-0329 Dear Sir or Madam: Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., conducted maintenance dredging within the settling basin of the discharge canal for the Brunswick Steam Electric Plant, which is located in Southport, North Carolina. As required by the DWQ Project No. 08-0329, Progress Energy is submitting the attached Certificate of Completion. If you have any questions or need any further information, please contact Mr. Steve Cahoon of our Environmental Health & Safety Section at (919) 546-7457 or Mr. Marty McGowan at (910) 457-2538. Sincerely, vv ` Edward L. Wills, Jr. Plant General Manager Brunswick Steam Electric Plant Enclosure: Certificate of Completion Progress Energy Carolinas, Inc. Brunswick Nuclear Plant PO Box 10429 Southport, NC 28461