HomeMy WebLinkAbout20171303 Ver 1_USACE Permit_20180329 (12)U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2018-00489 County: Dare County U.S.G.S. Quad: Oregon Inlet
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Bobby Smith
Smith Oyster Company
Address: 222 Sunrise Crossing Drive
Kill Devil Hills, NC, 27948
Telephone Number:
Size (acres) 3.72 Nearest Town Wanchese
Nearest Waterway Roanoke Sound River Basin Albemarle -Chowan
USGS HUC 03010205 Coordinates Latitude: 35.788933
Longitude: -75.564994
Location description: The project area is located south of Walters Slough, southeast of Wanchese, northwest of Oregon Inlet, in
Roanoke Sound, Dare County North Carolina.
Description of projects area and activity: BL 1909860, WC 1909878. Development of a 3.72 acre shellfish aquaculture bottom
and water column lease.
Applicable Law: ❑ Section 404 (Clean Water Act, 33 USC 1344)
® Sections 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 48
SEE ATTACHED RGP or NWP GENERAL and REGIONAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated March 26, 2017. Any violation of the attached
conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class
I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified,
suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or
modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of
the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the
activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are
under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the
activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA),
prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Ronnie Smith at (910) 251-4829 or Ronnie.D.Smith(ausace.army.mil.
SMITH.RONNIE.DAL S-11-NNI DALE.138172-
Corps Regulatory Official: E.1281725242 Date: March 29, 2018
Expiration Date of Verification: March 18, 2022
Determination of Jurisdiction:
A. ❑ There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean
Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an
approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued . Action ID: SAW -
Basis For Determination: N/A. No jurisdiction determination was completed with this NWP.
E. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and
C above).
This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official:
Ronnie Smith
Date of JD: N/A
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
hqp:Hcop2smgpu.usace.army.mil/cm apex/f?p=136A:0.
Copy Furnished:
Mr. Michael Graven, North Carolina Division of Marine Fisheries;
Mr. Anthony Scarbraugh, North Carolina Department of Environmental Quality;
Ms. Karen Higgins, North Carolina Department of Environmental Quality
Action ID Number: SAW -2018-00489 County: Dare County
Permittee: Bobby Smith, Smith Oyster Company
Project Name: Smith Oyster Company, shellfish aquaculture lease, Roanoke Sound, BL 1909860,
Water Column 1909878
Date Verification Issued: March 29, 2018
Project Manager: Ronnie Smith
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Ronnie Smith
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date
DJ
a
/S�W—Pal
s4
5�
1-4
Lcjcx ,0,&j M
(5a lZr
-F4LT.
r-.
m�
35 4}�,ifo�
kJ Lii1-1
X X �
'�,5'q'l .1 y 3 N
-113- - 99 ")$7((,J
J i
'500
C }-! A �4
quo+ b �
-1,)3 to
FA WAS
0
75' 33. 059 CJ
L4 59,
f
pfjok.
N ' .
�(1W
I
pfj-cy?•-10 Aciza5
E � � Y�•e. t.v
G c= c "U=T 1A V eA
Ez
FlooA�,s
eats t=l`�'^S 4—Io��5
lb
�ro PcS"
S;M1 Ila cYSM` �n
V-e"sr
S 'l 6 G u i f: ter
Prv)roc,--
,-dh lt��Se—
sl L�
AaiA