Loading...
HomeMy WebLinkAbout20170841 Ver 1_Certification of Completion_20180320Water Resources ENVIRONMENTAL QUALITY DWR Project No: 2017-0841 Applicant: U.S. Army Corps of Engineers Project Name: ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director County: New Hanover Snow's Cut Bank Stabilization & Erosion Control Project 401 Water Quality Certification Issued Date: 14Aug2017 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1 Jennifer L. Owens hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans an pecifications, and er supporting materials. Signature: .1,�� �Date: \4 MQ(— a01s Agent's Certification I, n/a hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: n/a Date: n/a If this project was designed by a Certified Professional I, n/a as a duly registered Professional n/a (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: n/a Date: n/a Nothing Compares—, -,- State of North Carolina I Environmental Quality I Water Resources 512 N. Salisbury Street 1 1611 Mail Service Center I Raleigh. NC 27699-1611 919.707.9000 RECEI V CC MAR 2 0 2016 DENR-LAND QUALITY STORMWATER PERM'ffft