HomeMy WebLinkAbout20170841 Ver 1_Certification of Completion_20180320Water Resources
ENVIRONMENTAL QUALITY
DWR Project No: 2017-0841
Applicant: U.S. Army Corps of Engineers
Project Name:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
County: New Hanover
Snow's Cut Bank Stabilization & Erosion Control Project
401 Water Quality Certification Issued Date: 14Aug2017
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
1 Jennifer L. Owens hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans an pecifications, and er supporting materials.
Signature: .1,�� �Date: \4 MQ(— a01s
Agent's Certification
I, n/a hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
n/a Date: n/a
If this project was designed by a Certified Professional
I, n/a as a duly registered Professional n/a (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: n/a Date: n/a
Nothing Compares—, -,-
State of North Carolina I Environmental Quality I Water Resources
512 N. Salisbury Street 1 1611 Mail Service Center I Raleigh. NC 27699-1611
919.707.9000
RECEI V CC
MAR 2 0 2016
DENR-LAND QUALITY
STORMWATER PERM'ffft