Loading...
HomeMy WebLinkAbout20150610 Ver 3_Modifications_20180315Homewood, Sue From: Dishmon, Joyce Martin <Joyce.Dishmon@duke-energy.com> Sent: Thursday, March 15, 2018 6:21 PM To: Bailey, David E CIV USARMY CESAW (US); Homewood, Sue Cc: Cahoon, Steve Subject: [External] FW: Dan River coal ash narrative Attachments: Dan Rive r_Field_Data.pdf; Stormwater Diversion Project - Coal Ash Removal.pdf Importance: High CAUTION:not click links David and Sue, I am sending the letter and graphic concerning the ash removal from Wetland D at Dan River for the Stormwater Diversion for your review for approval. The project scope is the removal of ash from Wetland D discovered during clearing of the dredge pool. Thank you in advance for your review and consideration. Please let me know if you have questions or need additional information. Regards, Oqo,yce,,DaA/noa Sr. Environmental Specialist ESH CCP Permitting & Compliance Duke Energy Office: (336) 623-0238 Cell: (336) 394-5524 Joyce. dishmon@duke-energy. com f� ENERGY. .. �P. +�sP i�� I vs�' --_ _ yn. 'n,� '��• �. .se+.:��.F:}j{ r ham.., � �i�a�� '.?',� ^� �, i."•.. t .F.. i..: •. ,r^� /,. a �_ �'��`�#C __ _ ''} ,�yr. - yy f •? r - Ash Fill 1 �, � s,• ' � �a-�` .; :, , r /p ?r t ppii+ } AA MEMO Dredge Basin { '. AsALL h FiII 2 r' Secondary \' `� g Ash Basin 100 200 400 Feet • Temporary Stream Diversion Streams Figure 6a - Jurisdictional Waters Map ® Coal Ash Within Wetland (soil comprised mostly of coal ash) Wetlands Stormwater Diversion Project DR 131 Project Area Ponds and Associated Projects DUKE amen C DR 134 Project Area Dan River Station Boundary Dan River Steam Station ENERGY, foster Stormwater Diversion Project Area L' Existing Ash Basins Rockingham County, NC wheeler M 36 -Inch Pipe Closure Project 25 -Year, 24 Hour Runoff Inundation PROJECT NO: 7810-16-0761 FIGURE NO: 6a DUKE 410 S Wilmington St Raleigh NC 27601 �. ENERGY. Mar. 15, 2018 Mr. David E. Bailey Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RE: Stormwater Diversion Project Coal Ash Removal Duke Energy Dan River Steam Station Eden, Rockingham Co., NC Dear Mr. Bailey: Duke Energy is currently in the construction phase of the Dan River Steam Station Stormwater Diversion Project. Impacts to jurisdictional features are authorized by Individual 404 Permit USACE Action ID. No. SAW -2015-01381 issued by the US Army Corps of Engineers (USACE) and Individual Water Quality Certification No. WQC004126 issued by the N.C. Division of Water Resources (NCDWR). During a phase of project construction, coal ash was identified in portions of Wetland D upstream of the former dredge pond (see attached Figure). Coal ash has replaced the soil component within the central and southern portion of Wetland D. The coal ash occupies approximately 0.1 acre of the 0.16 -acre wetland and extends from the surface to approximately 12 inches below surface. Duke Energy proposes to remove the coal ash from within Wetland D utilizing heavy equipment and return the excavated area to the approximate original contours. Prior to excavation activities, the stream north of the coal ash area will be diverted outside of the excavation area outside of the wetland area utilizing a pump around (indicated by the red dot on the attached Figure). Duke Energy will backfill the excavated area with native soil fill material, re -contour to match existing wetland surface elevations, and then cover with a planting medium to support the re-establishment of wetland vegetation. This area will be planted with an appropriate wetland seed mix and covered with coir fiber erosion control matting. In order to reduce erosion issues, areas adjacent to Wetland D which are distributed by heavy equipment during ash removal will also be re-contoured, planted, and cover with coir fiber matting. The coir fiber matting used will be suitable for use on slopes of 1:1 or lower. Once the excavated area has been planted and covered with coir fiber matting, the temporary stream diversion will be removed. Upon receiving notice to proceed from the USACE, Duke Energy anticipates the ash removal activities and site seeding measures will be completed in ten working days. Duke Energy is requesting concurrence from the USACE to proceed with the proposed coal ash removal activities under USACE Action ID. No. SAW -2015-01381 and NCDWR Individual Water Quality Certification No. WQC004126. Please do not hesitate to contact me if you have any questions regarding the above responses to your request for additional information. Respectfully, Steve Cahoon Lead. Environmental Specialist EHS CCP Permitting & Compliance Enclosures Cc: Sue Homewood, NCDWR Joyce Dishmon Sr. Environmental Specialist EHS CCP Permitting & Compliance