HomeMy WebLinkAbout20090244 Ver 1_Staff Comments_2009040109-0244 Matheson Avenue & 30th Street Site AML comments April 1, 2009 Phase One of the proposed project - the road - is high density and therefore requires a stormwater management plan (SMP). Please provide a stormwater management plan that provides a minimum of 85% TSS removal from all stormwater generated by Phase One of this project. 2. For the remainder of the site, please provide a conceptual stormwater management plan for the project that includes the following: a. A depiction of the drainage areas on the site. b. An estimation of the percentage imperviousness associated with each of the drainage areas. c. A calculation of the water quality volume associated with each drainage area. d. A depiction of a proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume.