Loading...
HomeMy WebLinkAbout20180363 Ver 1_Approval Letter_20180327i� � Envrronmentul Quality ROY COOPER u,�� , �,:„� MICHAELS. REGAN �;�, ,������.�� I.INDA CULPEPPER i���.,��,�r n„�,��r,,,� March ?7, ?018 W'ake Counlv NCDW R I'roject No. ?01 A0363 Neuse Qossino Connector APPROV.4L of 101 �1'ATER QL'.4LITY CERTIFICATION and NF,USE BCFFER AUTHORIZ.4TION, N�ilh ADDITION.aL CONDITIONS Mr. Kris Morley-Nikfac Greenwa} Planner Cit} of Ralcigh 3�3 West Hareett Street Raleieh, NC ?7601 Dear Mc Kris Morley-Nikfar: You have our approval, in accordancr �vi[h Ihe conditions listed below, for tlie folloH�in, impacts for the purpose of constructin� tlie Neuse Crossim� ConnecWr in Wake Count�-: Strcam I Site Riprap in Pcrennial Strcam (linear fq se River 12 To[al ao i the Neusc Rircr 6asin Temporary Impac[ To Perennial li 34 a9 Total titream Impact for ProjecL• 89 Iinear feet. Neuse Ri arian Buffer Im acts Site Zone 1 Impact Zone i I3uffer Mitigation Zune 2 Impact !sa ffl Reauired (usine 3:1 ratiol IsU ft) 6i68 Totals � 6568 N�A N/A 0 * n'a = Tolal lor Sile is less than I'+ ncre and I�0 line� Total Buffer Impacl for Project: I0350 square tee[. 1731 Total Strcam Impact (linear ftl 6? 89 Zone 2 Buffer Mitiga[ion '.equired (usinQ I.5:1 rati� N+A 3782 I 0 of� impact, no miti,ation required The project shall be constructed in accordance with your application received March 19. �018. Atter reviewin, your applica[ion, we have decided that these impacts are covered by Genzral Water Qualily Cettitication Number d 13i. This certification corresponds to [he Nationwide Permil 14 issued by the Corps ol' Engineers. This approval is aiso valid for the Neuse Riparian Bufler Rules ( I?A NCAC ?6.0233). In addition, yuu shuuld acquire an}' other federal, sta�e or local permits befure you proceed with your projett includin, (but not limired to) Sediment and Erosion Control. Non-Discharge and Water Supply Wa�ershed reeulaiio�u. This approval will espire u�ith �he accompanying d0a pemiit. Sl;nc n(Nurth Carolina I CnnronmenWl I?imlit} IOI7M1leilServireCrnter Ralri@h_NnrthCuruhnu'_7h�)9-Ihl7 This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0233. For this approval to remain valid, you must adhere to the conditions listed in the General Certification and any additional conditions listed below. Conditions of Certification: 1. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water sha11 be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)] 2. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. [15A NCAC 02H .0506(b)(3)] 3. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. [15A NCAC 02H.0506(b)(2)] 4. For any streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction contours and revegetated with appropriate native species. [15A NCAC 02H.0506(b)(2)] 5. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless otherwise approved by this certification. [15A NCAC 2B.0233] 6. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular transportation corridor maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction. [15A NCAC 2B.0233] 7. Pursuant to 15A NCAC 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. 8. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] 9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 10. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 11. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 12. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 13. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [ISA NCAC 02H.0506(b)(3) and (c)(3)] 14. Heavy equipment shal] be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [ 15A NCAC 02H.0506(b)(3)] 15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] � 16. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] 17. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 18. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 19. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 20. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization, including all non-commercial borrow and waste sites associated with the project, shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 21. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances.that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 22. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 23. Upon completion of the project (including any impacts at associated borrow or waste sites), the permittee shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl] 24. Native riparian vegetation (i.e., trees and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [15A NCAC 02B.0233(10)] &[15A NCAC 02B.0506(b)(2)] 25. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. [15A NCAC 02H.0506(b)(3) and (c)(3) , 26. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3)]: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolrna Sedrment and Erosron Control P[annrng and Design Manua[. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Contro! Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoip projects, including conhacror-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolrna Surface Mrnrng Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 27. Sediment and erosion control measures shall not be placed in wetlands or surface waters, or within 5 feet of the top of bank, without prior approval from DWR. [15A NCAC 02H.0506(b)(3) and (cx3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Adminisuative Hearings within sixry (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during nortnal office hours. The Office of Administrative Hearings accepts filings Monday Uvough Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one ( I) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 4313000, Facsimile: (919) 431-3100 A copy of the petition mus[ also be served on DEQ as follows: Mc Sam M.Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act If you have any questions, please contact Rob Ridings at 919-707-8786. Sincerely, �f� Lin ulpepper, In rim Director Division of Water Resources Electronic copy only distribution: Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office David G. Cooper, Ecological Engineering, LLP File Copy Environmen Kil QUG7/liY NCDWR Project No.: .4pplicanh Project Name: Date of Issuance of �01 Water Qualih Certificafion: County: ROY COOPER i;urnvnn MICHAEL S. REGAN �, � � , i�,.� LINDA CULPEPPER Gnrrim l�u�.�r�or Cerfificate of Complefion Upon completion of aIl work approved within Ihe 401 Water Quality Certitication or applicable Butler Rules, and an}' subsequent moditications. Ihe applicant is required to retum ihis certificate to the 401 Transportation Permitting Unit. North Carolina Division of Water Resources. 1617 Mail Service Center, Raleigh, NC 27699-1617. �ihis fonn may be returned [o NCDWR by the applican[, the applicant"s authorized a�,ent. or Ihe pr�ject en!_ineer. It is not necessarv to send certificates from all ofthese. .-1 pplirm�Ps Certificnlinn I, . hereby state that, tu Ihe bes[ of m�� abilities, due care and diligence was used in the observation of the construction such that the construction w;�s observed to bc built within substantial compliance and inte�n of the 401 Water Qualit} Certitication and Bufler Rules. lhc approved plans and speci(ications. and other suppurting materials. Sienature: Date: .-lgenl's Cerfrficallon I, , hereby s[ate [hat, to the best of my abilities, duc care and diligence was used in the observation of [he construction such that Ihe construction was observed to be built w�ithin substantial compliance and intznt of [he �101 Water Quali[y Certification and Rufter Rules, thc approved plans and specitications, and other supporting materials. Sienature: Engineer's Cerlificntine Partial Final 1, , as a duly registered Professional F,neinecr in the S�ate ol North Carolina, having been authorizcd to observe (periodically, weekly, full time) [he cons[ructiun of the project for [he Permittee hereby state that, to the best of my abilities. due care and dili,ence was used in the observa[ion oFthe construction such that the consiruction was observed to be built within substamial compliance and imem of the d01 Wa[er Quality Certification and 6uffer Rules. the approved plans and specifications. and other supporting materials. Si�,naiure Date Registra[ion No. titate ol Nnnh Curolina I Fm irnnmcnml Quuhn I nl7 Mml Sen�in• Crnler I Rulcigh_ Nunh Coroluw'_7G�ri)-I<�I �