Loading...
HomeMy WebLinkAbout20061151 Ver 2_Staff Comments_20090401?y DWQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage Comment Sheet V Date: 2. Date: Date: ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue with conditions (Rev wer 1) Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doe PLEASE PRINT CLEARLY 06-1151 Town of Apex: Apex Peakway AML comments April 1, 2009 Per the requirements of GC 3704, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: hitp://h2o.enr. state.nc. us/ ncwetlandsidocuments,/SMPReq uirementsforApplicants otherthanNCDOT.pdf. Please include an SMP that removes a minimum of 85 percent TSS and 30 percent TN from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr.state. nc.us,'su/bmp_forins.htin. The currently proposed level spreaders do not meet the above pollutant removal requirement. Failure to provide an appropriate SMP in the next submittal will result in a return of application.