STORMWATER MANAGEMENT PLAN —
(Version 1.2; Released July 2012) FOR LINEAR ROADWAY PROJECTS
Project/TIP No.: BD-5112W County(ies): Cleveland Page 7 of 7
General Project Information
Project No.: BD-5112W Project Type: Bridge Replacement Date: 10/24/2014
NCDOT Contact: Steve Rackley Contractor / Designer: Michael Baker En ineerin , Inc.
Address: 1710 E. Marion St. Address: g000 Regency Parkway
Shelby, NC 28151 Suite 600
Car , NC 27518
Phone:704-480-9034 Phone:919-463-5488
Email: srackley@ncdot. ov Email: Todd.Buckner mbakerintl.com
City/Town: Town of Lawndale County(ies): Cleveland
River Basin s: Broad CAMA County? No
Primary Receiving Water: Man ness Creek NCDWQ Stream Index No.: 9-24
NCDWQ Surface Water Classification for Primary Receiving Water Primary: Water Supply IV WS-IV
Supplemental: None
Other Stream Classification: None
303(d) Impairments: None
Buffer Rules in Effect N/A
Project Description
Project Length (lin. Miles or feet): 0.115 MI Surrounding Land Use: Rural
Proposed Project Existing Site
Pro'ect Built-Upon Area (ac. 0.35 ac. 0.31 ac.
Typical Cross Section Description: Two-lane 24' asphalt roadway with 3' turf shoulders Two-lane 22' asphalt paved roadway with 5' turf shoulders.
Average Daily Traffic (veh/hr/day): Design/Future: 2100 Existing: 2100 2011
General Project Narrative: The existing bridge on Highway SR1005 over Mangness Creek in Cleveland County is proposed to be replaced with a single span (1@100'-0") 39" box beam bridge. The
existing approch sections of the roadway will be widened from approximately 22ft. To 30.8ft. The bridge crossing will be widened from 25.8 ft. to 33 ft. (out to out). The new
bridge will have no direct discharge of stormwater into the stream. Stormwater runoff will be directed to rip rap for energy dissipation prior to entering receiving waters.