Loading...
HomeMy WebLinkAbout20180453 Ver 1_17BP 12 R 53 WetlandpermitSummary_V2_20180328WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) Streambank Stabilization Left and Right side of 1 12+83-13+15 -L- stream 34 Existing End Bent 2 13+15 -L- Removal 0.003 TOTALS: 0.00 0.00 0.00 0.00 0.00 0.00 0.003 34 0 0 ATN Revised 3/31 /05