Loading...
HomeMy WebLinkAbout20180453 Ver 1_PCN Form Submission_20180328Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 3/27/2018 2:12:58 PM (Start Event) Accept by Carpenter,Kristi 3/28/2018 3:56:06 PM (DOT Initial Review) • The task was assigned to Carpenter,Kristi . The due date is: March 30, 2018 5:00 PM 3/27/2018 2:13 PM �� � �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Cleveland Is this project a public transportation project?* C Yes l' No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: WBS # 17BP.12.R.53 (for f�i::DOT use only) 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) Nationwide Permit (NWP) Number NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 03 - Maintenance 1c. Type(s) of approval sought from the DWR:* check all that apply � 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: * �' Yes �' No C•' Yes C' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program l' Yes r No 1f. Is the project located in anyof NC's twentycoastal counties?* f Yes �' No 1h. Is the project located in a designated trout watershed?* C' Yes C No Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Trish Beam 1b. PrimaryContact Email:* pdbeam@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (980)552-4218 1d. Who is applying for the permit? fJ Owner r P,pplicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address 1710 East Marion Street Address Line 2 aty Shelby Fbstal / Zip Code 28151 2e. Telephone Number: (xxx)xxx-xxxx (980)552-4200 2f. Fax Number: (704)480-5401 (xxx)xxx-xxxx 2g. Email Address:* mstafford@ncdot.gov State / Rovince / Region NC Cauntry USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Replacement of Bridge #190 on SR 1005 (Ballpark Road) 1b. Subdivision name: ('rf appropriate) 1c. Nearest municipality/ town:* Lawndale 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrepping system Rease provide directions. From Lawndale, take Main St (hwy 182) for one mile, turn right onto Ballpark Road and proceed —1.5 miles to bridge replacement site 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 a�y Fbstal / Zip Code State / Rovince / f�gion Courdry 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: * 35.399816 ex:34208504 3. Surface Waters Longitude:* -81.542884 -77.796371 3a. Name of the nearest body of water to proposed project:* Magness Creek 3b. Water Resources Classification of nearest receiving water:* WS-IV Surface Water Lookup 3c. What river basin(s) is your project located in?* Broad RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Ebsting bridge on paved secondary road. Land use in vicinity is designated cropland and pasture. 4b. Attach an 8 7/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent topo.pdf 178.89K6 Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent 20180327_11474611041 _210_So il_Ma p. pdf Fle type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 100 4f. Explain the purpose of the proposed project:* To replace a deteriorating bridge for the safety of the travelling public 224.26K6 4g. Describe the overall project in detail, including indirect imapacts and the type of equipment to be used:* NCDOT proposes to replace an existing timber deck bridge with a single 100 foot long 33-ft wide box beam bridge. Per Raleigh Hydraulics unit recommendation, the pre-ebsting abutments under the existing bridge will be left in place and cut down one foot above the 100 year storm event. The project will be constructed using typical heavy equipment (trackhoe, backhoe, crane, etc.) 4h. Please upload project drawings for the proposed project. C7ick the upload button or drag and drop files here to attach docurrent 17BP 12 R 53_PermitDrawings_v2.pdf 2.07M6 176P 12 R 53 WetlandpermitSummary_V2.pdf 34.9KB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes f' No C' Unknown Comme nts: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary C' Approved C' Unknown r f�UA Corps AID Number: 6carrple: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Jeff Wyatt NCDOT 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent Fle type rrust be FCF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* f Yes C No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* C' Yes C•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r% Streams-tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * type * S1 12+83-73+15 -L- P Bank N�p label (e.g. Finad Qossing 1) F�rrranent (Fj or Stabilization Terrporary (� Magness Creek 3e. Stream Type * Perennial F2rennial (�) or interrrittem (IfV� 3f. Type of 3g. Stream 3h. Impact sqfe� Jurisdiction* width* length* Both 78 34 6 Average (feet) (linear feet) 1 g2 13+15 -L- T Other Magness Creek Perennial Both fV�p label (e.g. fd�ad Qossing 1) F2rrranent (F) or F�rennial (Fff2) or Terrporary (� interrrittent (IfVT) *" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 34 3i. Total temporary stream impacts: 34 3i. Total stream and tributary impacts: 68 3j. Comments: Other - Ebsting End Bent Removal by pulling bents out with equipment. E. Impact Justification and Mitigation 1. Avoidance and Minimization 2 18 34 6 Average (feet) Qinear feet) 1 2 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* No direct discharge of stormwater into stream. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Minimal impact to stream wtien removing e�asting end bents. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? l" Yes l•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Timber bridge is being replaced with a box beam bridge. F. Stormwater Management and Diffuse Flow Plan (required by DWR) ��* Recent changes to the stormwater rules have required updates to this section ."� 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: The bridge is not located in an area with protected riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? � C Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* l•' Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* f Yes r No Comme nts: * The project is listed as a type and class of activity which qualifies as a non-major action under the Minimum Criteria rules; therefore, a minimum criteria checklist was completed for the bridge replacement project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (75A NCAC 2H .7300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* f Yes r No 2b. Is this an after-the-fact permit application?* f Yes f•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonablyanticipated future impacts) result in additional development, which could impact nearby downstream water qualit�/?* f Yes �' No 3b. If you answered "no," provide a short narrative description. This is a minimum criteria checklist project with little anticipated future impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes f No C' f�UA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * C•' Yes C' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C Yes l" No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* l•' Yes C' No What Federal Agency is involved? USACE 5e. Is this a DOT project located within Division's 1-8?* f Yes C No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?* C Yes r No 5g. Does this project involve bridge maintenance or removal?* C•' Yes f No !' Unknown 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. f• Yes C' No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf If you answered "Yes" to 5g(1), did you discover anysigns of bat use?* C•' Yes f No C' Unknown *** If yes, please show the location of the bridge on the permit drawings/project plans. 5h. Does this project involve the construction/installation of a wind turbine(s)?'* C' Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? * NC Natural Heritage database and on-site surveys. Division 12 is located in the white nose syndrome area; however, there are no known hibernacula or roosting trees in Division 12 counties. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * Per Natural Heritage database, there are no salt marshes, oyster reefs or seagrass beds in the vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * Cultural resources reviewand approval (tracking no. 15-10-0010) 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent 15-10-0010NoEligibleProps.pdf AR15-10-0010NoSitesPresent. pdf Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* G Yes �' No 8b. If yes, explain how project meets FEMArequirements: NCDOT hydraulic coordination 8c. What source(s) did you use to make the floodplain determination?* NCDOT hydraulics and floodplain mapping site (http://fris.nc.gov/fris/Index.asp�C? F IPS=097&ST=NC&user=General%20Public) Miscellaneous Miscellaneous attachments not previously requested. Qick the upload button or drag and drop files here to attach docurrent cover_letter.pdf bat_habitat_assessment. pdf hazardous_spill_basin_checklist.pdf floodmap.pdf TE.pdf smp.pdf signed_NLEB_form.pdf photo1.pdf photo2.pdf photo3.pdf photo4.pdf photo5.pdf Fle rrust be FDF or IWQ Signature 2.42M6 4.1 MB 226.16K6 66.18KB 4.46KB 167.33K6 47.81 KB 55.26KB 98.58KB 94.27KB 75.67KB 88.52KB 90.05KB 83.68KB fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Trish Beam Signature %tcct� �i'�rsrr Initial Review Is this project a public transportation project?* (') r Yes f No Change only if needed. Has this project met the requirements for acceptance in to the review process?* G Yes C' No BIMS # Assigned * 20180453 Version#* Reviewing Office * Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Hood:eads\drhood Is a payment required for this project?* f• No payment required C' Fee received C' Fee needed - send electronic notification