Loading...
HomeMy WebLinkAboutNC0024406_Notice of Consultation_20180327 Alexander, Laura From:scanner.942A.arch@ncdenr.gov Sent:Wednesday, March 28, 2018 3:48 PM To:Alexander, Laura Subject:Scanned page Attachments:SKM_C224e18032814472.pdf 1 �IC'06 Ali ENERGY LAND F, INFRASTRUCTURE March 23, 2016 Ms. Julie Ventaloro RECEIVED NC Division of Energy. Mineral, and Land Resources MAR 27 20 a Stormwater Permitting Program 1612 Mail Service Center DENR•LAND QUALITY Raleigh, NC 27699-1612 STORMNTER PERMITTING RE: AGENCY NOTIFICATION LETTER OF CONSULTATION PIEDMONT NATURAL GAS LINE 446, BELEWS CREEK PIPELINE GUILFORD, ROCKINGHAM, AND STOKES COUNTIES, NORTH CAROLINA Dear Ms. Ventaloro: Piedmont Natural Gas (Piedmont) is planning the Line 446 Gas Pipeline in response to a request from Duke Energy Corporation (Duke Energy) for Piedmont to provide a natural gas supply to their Belews Creek Steam Plant. In order to meet the request, Piedmont is expanding their system with approximately nine miles of 24-inch diameter transmission pressure gas pipeline that will be placed within a 60-foot wide permanent easement. This letter is to notify your agency and request comment since the proposed pipeline will cross a FERC-licensed lake, Belews Lake. Following is a brief description of the project including a location map along with a plan and profile drawing of the proposed lake crossing. The FERC Regulatory Agency consultation process requests review, comment and permit requirements from coordinating regulatory agencies within a 30-day period from the certified mail delivery date to the Agency. It is necessary to receive a documented response from all Agencies during the consultation process. The 30-day period for an estimated March 27, 2018 certified mail delivery date will be April 26, 2018. Please provide a response before this date. PROPOSED PROJECT DESCRIPTION The proposed pipeline will begin at a new tap of the existing Williams -Transco pipelines near the intersection of US 158 and US 220 in Stokesdale, Guilford County, North Carolina. From Guilford County, the pipeline will traverse Rockingham and Stokes Counties to the termination at the Belews Creek Steam Plant. The northern termini of the project will be at a metering and regulating station on the Steam Plantproperty. A USES map showing the full route, including access roads, is enclosed. The crossing of Belews Lake will be installed by horizontal directional drill (HDD). The estimated pipe length of the HDD will be 3,860 feet. As shown on the enclosed plan and profile drawing, during construction the drill rig will be placed in the temporary workspace on the east side of the lake. The drill exit will be on the west side of the lake. The HDD start and end points are both external to the FERC Project Boundary of Belews Lake. Temporary workspace for stringing the gas pipe prior to installation is also on the west side of the lake. The gas line will be installed approximately 25 feet below the bottom of the deepest part of the lake. 1420 Donelson Pike. Suite A-12, Nashville. Tennessee 37217 www.Eli-Ilc.com 615.383.6300 ENGINEERS • SURVEYORS 9 INFRASTRUCTURE • ENVIRONMENTAL Piedmont is acquiring a 60-foot wide permanent easement for the proposed gas line. This easement will be cleared of trees to maintain sight lines along the gas line right-of-way. This will require the removal of trees within the FERC Project Boundary (725.0 MSL elevation). COMMENT SUBMITTAL As discussed previously, please review this information and provide a response within 30 days (estimated April 26, 2018) containing comments and permit requirements for the proposed gas line crossing of Belews Lake. Responses may be sent by email to Suzanne.herron@eli-llc.com or by mail to my attention at 1420 Donelson Pike, Suite A-12, Nashville, TN 37217. Thank you for your consideration of this material. If you have any questions or need additional information, please contact me at (615) 383-6300 or at the email address above. Sincerely, ENERGY LAND & INFRASTRUCTURE, PLLC 36 kV✓. -- Suzanne rron, P.E., CPESC PE 04055 cc: Ms. Alicia DePalma, Piedmont Natural Gas, Environmental Siting and Licensing Support ENERGY LAND & INFRASTRUCTURE. LLC Nashville. TN%Cary. NC Arlington. VA www.rii-lic.com ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL ENERGY LAND & INFRASTRUCTURE March 23, 2016 Ms. Julie Ventaloro RECEIVED NC Division of Energy. Mineral, and Land Resources MAR 2 7 20m Stormwater Permitting Program 1612 Mail Service Center DENR-LAND QUALITY Raleigh, NC 27699-1612 STORMWATERPERMITTINO RE: AGENCY NOTIFICATION LETTER OF CONSULTATION PIEDMONT NATURAL GAS LINE 446, BELEWS CREEK PIPELINE GUILFORD, ROCKINGHAM, AND STOKES COUNTIES, NORTH CAROLINA Dear Ms. Ventaloro: Piedmont Natural Gas (Piedmont) is planning the Line 446 Gas Pipeline in response to a request from Duke Energy Corporation (Duke Energy) for Piedmont to provide a natural gas supply to their Belews Creek Steam Plant. In order to meet the request, Piedmont is expanding their system with approximately nine miles of 24-inch diameter transmission pressure gas pipeline that will be placed within a 60-foot wide permanent easement. This letter is to notify your agency and request comment since the proposed pipeline will cross a FERC-licensed lake, Belews Lake. Following is a brief description of the project including a location map along with a plan and profile drawing of the proposed lake crossing. The FERC Regulatory Agency consultation process requests review, comment and permit requirements from coordinating regulatory agencies within a 30-day period from the certified mail delivery date to the Agency. It is necessary to receive a documented response from all Agencies during the consultation process. The 30-day period for an estimated March 27, 2018 certified mail delivery date will be April 26, 2018. Please provide a response before this date. PROPOSED PROJECT DESCRIPTION The proposed pipeline will begin at a new tap of the existing Williams -Transco pipelines near the intersection of US 158 and US 220 in Stokesdale, Guilford County, North Carolina. From Guilford County, the pipeline will traverse Rockingham and Stokes Counties to the termination at the Belews Creek Steam Plant. The northern termini of the project will be at a metering and regulating station on the Steam Plantproperty. A USGS map showing the full route, including access roads, is enclosed. The crossing of Belews Lake will be installed by horizontal directional drill (HDD). The estimated pipe length of the HDD will be 3,860 feet. As shown on the enclosed plan and profile drawing, during construction the drill rig will be placed in the temporary workspace on the east side of the lake. The drill exit will be on the west side of the lake. The HDD start and end points are both external to the FERC Project Boundary of Belews Lake. Temporary workspace for stringing the gas pipe prior to installation is also on the west side of the lake. The gas line will be installed approximately 25 feet below the bottom of the deepest part of the lake. 1420 Donelson Pike, Suite A-12, Nashville. Tennessee 37217 www.eli-Ilc.com 615.383.6300 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL Piedmont is acquiring a 60-foot wide permanent easement for the proposed gas line. This easement will be cleared of trees to maintain sight lines along the gas line right-of-way. This will require the removal of trees within the FERC Project Boundary (725.0 MSL elevation). COMMENT SUBMITTAL As discussed previously, please review this information and provide a response within 30 days (estimated April 26, 2018) containing comments and permit requirements for the proposed gas line crossing of Belews Lake. Responses may be sent by email to Suzanne.herron@eli-Ilc.com or by mail to my attention at 1420 Donelson Pike, Suite A-12, Nashville, TN 37217. Thank you for your consideration of this material. If you have any questions or need additional information, please contact me at (615) 383-6300 or at the email address above. Sincerely, ENERGY LAND & INFRASTRUCTURE, PLLC Suzanne rron, P.E., CPESC PE 04055 cc: Ms. Alicia DePalma, Piedmont Natural Gas, Environmental Siting and Licensing Support ENERGY LAND & INFRASTRUCTURE LLC NashvillE. TN/Cary. NC/Arlington. VA www.eli-lic.com ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL