Loading...
HomeMy WebLinkAboutCedar Point Mitigation Site (2)i NC®ENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director September 11, 2008 Mr. Philip S. Harris, III, PE NC Department of "Transportation Project Development and Environmental Analysis Office of Natural Environment 1598 Mail Service Center Raleigh, NC 27699-1598 Re: Authorization to Discontinue Mitigation Monitoring Cedar Point Mitigation Site, Carteret County CAMA Permit No. 19-02 Dear Mr. Harris: re 1, "'4 rFp t ?. l ?? ?, William G. Ross Jr., Secretary ?? tH This correspondence is in response to your letter requesting the discontinuation of monitoring at the Cedar Point Mitigation Site in Carteret County, dated April 3, 2008. In our initial response of May 5, 2008, to your letter requesting the discontinuation of monitoring at the Cedar Point Mitigation Site, we requested that NCDOT provide the results of a post- restoration wetland delineation, an analysis of the amount of coastal wetlands restored relative to the initial wetland delineation in accordance with Condition No. 2 of CAMA Permit No. 19-02, and that NCDOT schedule an on-site meeting with the appropriate regulatory and resources agencies. On August 12, 2008, an interagency field review took place at the Cedar Point Mitigation Site. A pre-construction and post-restoration wetland delineation drawing was provided during the site review that appeared to accurately depict the Coastal Wetland restoration of the site. This document satisfied Condition No. 2 of CAMA Permit No. 19-02. Based on visual observations on August 12, 2008 and an evaluation of the success of the site, it appears that the site restoration has been successful. DCM concurs with the results of the wetland delineations that indicate that 0.38 acres of low marsh and 0.42 acres of high marsh have been restored. DCM authorizes the discontinuation of monitoring. This authorization does not eliminate the need to obtain written concurrence from the NC Division of Water Quality (DWQ), the NC Division of Marine Fisheries (DMF), and the NC Wildlife Resources Commission (WRC) as stipulated by Condition No. 27 of CAMA Permit No. 19-02 for the proposed use of the site as mitigation for wetland impacts of future projects. 400 Commerce Avenue, Morehead City, North Carolina 28557.3421 Phone; 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer- 50% Recycled \ 10% Post Consumer Paper Cedar Point Mitigation Site CAMA Permit No. 19-02 page 2 If you have any questions or concerns contact Steve Sollod at 919-733-2293, extension 230 or via e-mail at steve.sollod@ncmail.net. Sincerely, Douglas V. Huggett Major Permits and Consistency Unit Manager cc: Mr. Randy Giffin, NCDOT Mr. Stephen Lane, DCM Ms. Kathy Matthews, EPA Ms. Trish Murphy, DMF Ms. Leil.ani Paugh, NCDOT Mr. Ron Sechler, NW Mr. Steve Sollod, DCM Mr. David Wainwright, DWQ Mr. William Wescott, USACE Mr. Travis Wil;on, WRC