Loading...
HomeMy WebLinkAboutR-2417CDEPARTMENT OF THE ARMY WILMINGTON DISTRICT. CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON. NOR'T'H CAROLINA 28402-1890 u:11, To Arf l;mrlON OF, March 25, 2009 Reeulatory Division ryig4, Ol//? w?, 2 vo 7 ?o Subject Action ID No. 2002-20899, TIP No. R-2417C, U.S. 421/NC 87 from east of NC 42 to NC 87 near-SR 1138, Lee County, North Carolina. Gregory J. Thorpe, Ph.D. Environmental Marta-ement Director Project Development & Environmental Analysis 1595 Mail Service Center Ralei,,h, N.C. 27699-1598 Dear Dr. Thorpe: I am responding to your request dated November 4, 2008 and January 23, 2009 for modifications to the existing Department of the Army (DA) permit issued for the above referenced project on May 22, 2002. The referenced Section 404 permit authorized the impact to 3.22 acres ofjurisdictional wetlands and 4,732 linear feet of natural stream channel. Due to required highway fill slope changes as a result of erodible soils found within the project area the impacts associated with the project have increased to 3.96 acres of wetlands and 5,132 linear feet of stream channel. This change resulted in it 0.74 acre increase in wetland impacts and a 400 Linear feet increase in stream impacts. Utility line impacts have now been quantified for this section of the project with five utility line crossings totaling 0.01 acre of wetlands and 60 linear feet of steam impacts. The referenced Section 404 permit for R-2417 is scheduled to expire on December 31, 2009. Two sections still remain to be constructed and would require a four year extension of time to complete construction on these remaining sections. I have determined that the proposed project modifications described above are not contrary to the public interest and therefore, the DA permit is hereby modified. The proposed modifications are as follows: Special Condition b shall be modified to include: "The permittee shall mitigate for the additional 0.75 acres of unavoidable impacts to wetlands, and for the additional 259 linear feet of impact to important streams, associated with section R-2417C of the project. tMitigation shall be provided by the North Carolina Ecosystem Enhaitccitent Program (NCEEP) within the Cape Fear River Basin (Cataloging Unit 03030004). The EEP will provide 1.5 acres of riparian wetland credits and 518 linear feet of wart] water strew] credits, pursuant to Section A of Amendment Number 2 to the Meniorandum of Agreement (NIOA) signed 8 TJ'larch 2007."' -2- 2. Special Condition ff shall be modified to read: "The permittee shall schedule a preconstruction meeting between its representatives, the contractor's representatives, and the Corps of Engineers, Wilmington Regulatory Field Office, prim' to any work within jurisdictional waters and wetlands within Section R-2417C to ensure that there is a mutual understanding of all of the terms and conditions contained within this Department of the Army Permit. The permittee shall notify the Corps of Engineers Project Manager a minimum of thirty (30) days in advance of the scheduled meetings in order to provide that individual with ample opportunity to schedule and participate in the required meetings. One copy of,the final half-size construction drawings shall be furnished to the Corps of Engineers Project Manager prior to the pre-construction meeting." 3. The time limit for completing the work authorized ends on December 31, 2013. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 4. All work authorized by this permit modification must be preformed in strict compliance with the attached plans, which are a part of the permit. Please note that all unmodified terms and conditions of your original Department of the Army permit and all previous modifications shall remain in effect. Should you have any questions, please contact Mr. Richard Spencer, Wilmington Field Office. Regulatory Division, at telephone (910) 251-4172. Sincerely, Jefferson M. Colonel, EN Commanding EneloSUre Copies furnished (with enclosure): Mr. Tim Johnson, PE Division Engineer, Division 8 North Carolina Department of Transportation 11.0. Box 1067 Aberdeen, North Carolina 28315 Ryscavage -3- Mr. Travis W. Wilson NC Wildlife Resource Commission 1 142 1-85 Service Rd. Creeclmoor, North Carolina 27522 NIr. Brain Wrenn NCDENR-DWQ / Wetlands Section 1650 Mail Service Center Ralciuh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Raleiuh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 jMs. Kathy Matthews United States Environmental Protection Agency Region 4 Wetlands Section 109 T.W. Alexander Drive DUrham, North Carolina 27711 MAIL CODE: E143-04 Mr. Chris Militcher United States Environmental Protection Agency C/o Federal Highway Administration 310 New Bern Avenue Raleigh. North Carolina 27601 Mr. Art King Division Environmental Officer. Division 8 North Carolina Department of Transportation P.O. Box 1067 Aberdeen, North Carolina 28315 636914 h6hi. m d9rs* kit 14 h V N ti AI 11 JJ rt ???I id' IS,1 h %t KIM w re NC Ai STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS ?• UTAd.d AI,WFif ALn11 AIJWaf LEE COUNTY I0WONr US I2WC 87 (SANFORD BYPASS) FROM EAST OF NC $2 TO NC 87 W SR U38 TYPS OF FORK,, GRADING, PAVING, DRAL4A9 SIGNING, SIGNALS, STRUCTURES AND COLVSRTS. 1 lA MG = DIXIM v v uun mmm?n J3 dmvmo=nMJlR o xmm ?alma?mnauwm 4° r,, 1l ORAPRICSLALRS ORSIGYDdYR ??} EROX r&YO fio?bRpsd DD7SION OF INGIDPAYS A A I A a ADlRtlV = LU9I PFD un °w uyw,°edd ttnm ADTDDI • 34WfPD rm?mc?srm MYJ An DAP: a % LRSCIR R6WAAY 1P PmJec! R?PDO : . ® D•46% 16W1R '30M "PBM onc• 10 a FAY an, am A.MUNNhO am r • A %, =LAM LP PROJB6T F7A1C - L2d AW AX rm Pam IHOPi7U% P = H In 1 t Anus. LM an SG114 GL41CUffi O ? PRIA WAL AA10GL s®® f90.'D81Ymw '? ? BDlifl P.{ - Na d aae?u+.ur PLNS mev® Now mtiaal a mvlfl maa a %um ur?uA n Y ?? +.xngA 0 Z m m 0 ? ? ? ti ry ? ,_1 w _ _/ •?b ilJ z r . ID? zz atl" 8 0W? ? s nab y o u? 0 v Il " k •I 'I. • I 'i i c r? E.,...• • y I r, I I w 5 r? I I7 1 •+? I 1? ) I r,. ? .1 i •? ors-'"' -?• •11- •±y f f.. ? ? T ?L I.?..s 3?' ?I ' , Y I I -r : \ r\ ?r rl?' ,.. 'n s y G'r? _rn ? a-y 7.J'. rte, ? ? ?, -1\?a ? r _ ? ?l? ^?.?'•,T?' ?•? I ': r 'I r r??. ? , , ^ Ila -,n- - _ r"^mr `I c /l rte, :':at+?• rr r ., , .??r rm _ oile TF, -Z:. NCDOT kr-•„? t } ?.' ?, i I., ,!' I, J s? DIVISION OF HIGHWAYS LEE COUNTY :` I r 6 3 PROJECT: 34431(R'Y117C) US 121 / NC 87 \ .? ',Lai, , \ •, i ((' 'F` , SANFORD BYPASS FROM EAST ?-??,) ? t} ,? ? ,'? r •, ; ? ? ,? 1=?,,?? ?1I?j? ?rr? ,- OF NC 42 TO NC 81 NEAR SRI138 OF 31 3/16/08 N a IMPACT PERMIT DRAWINGS STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS LEE COUNTY LOCATION; US 42V,YC 89 (WORD BYPASS) FROM CAST PRmdOrrtlig OF NC 42 TO NC 87 M SR 1A S ?d 31 TYPE OF WORK GWAG, PAYING, DRAIN 9 SIMG, Slag STRUCTURES AD CULVERTS. r SRE S l i 9 Im um ro I SIZE T J O u4s SSE 4 I Ima Rw u a ?? ' ? SRE 16 ?? 31?\` @ ? SOE d 'j I StBE it I ?'? ?i SIiE 9 I ? SIiE 13 115 ?? d I I 0 4 el y ? ? Ede SlhB ?,y \ I \ SE 2 \ ; \ 9 S +20. SDE 1 in 14 a \\ SIR 15 SRE 12 \\ 11 I\ BddII fd@Y to o m 7 + 0 \ romo@ 4f-, 6 u4a SRE 10 \ LREV POT SM.594+2598IA 4 \ M W2 \ ? / DAM a® \ -LRRV-STA,6%4NW PROMR-24170\ P Ala 11?71f@ KII{I Am L OA 10 Iamm a al m f ===DRUM m m DO ma 0 TO um p Am 11 @ PPJILNLVARY PLAM1S d f@OGY @I®fIQ@.7tlFm"® Y4wLL II b1LM191161@®mrx @!dq@p A0? uwnenmmm GAlPIDCSCAIPS DDS DAN PAOJEGTIEYOPB hvs4R0RL H?INtlE?ffi xwolemis DENY OF IDGNWAYS Y E A ADI'7tw - 11X0 m IIII IIrt1114i b,LWI RE,llYI rv dDlIUS V = • A 17X0 HPVPDH MM WAY rP PROX? WX : acmlo mxr® fuv My- If % Y n 1 IA N D.0% MLMIJ iP PROJA7 RdA]C : to w AAY DIR?E19R'.,N[AWRDPR wiff wm amm IIW IRORQAYfdI) % r - 1 %' ANATA ID77 ^mce® PROPIII rota Lam m PROXT lax : is d "? O Y) I tl D Flgr w : 18D'i1B us Say CrARL47PdPR U PRWALAnu APAIlllt? s°m® FR?DdhRRtf i1 i%bD69,>Ii `rhQ? m5'3a5 podDN4 swa io a 31 i /i I I I X III 1 I I I X I 1 I _____1.. ___ I I I , +1 1 +? ??1 1 1 m n m + aez set . '"" pe bq A 'J nU f 7I lY' {RAP WAA ISO $ } pry . Y-POT SmSiltiS91LA /49i99,71y B&SSeAQ IXA el-Me i / ? U•dtlW l-IIDB 9-W f•50T P • 781 {86V-Adn 91HL1 ff•01 4 pg010 Po & az Mc xa em RI U[M IXY O Rol mw fen IM -=v UNN RLLY 410 F / B ? art C !A Rm RI ImM N r? oa A Ra ? , ? , P 1 .uM wuy { R r R AA41mu ?w .-.,/ OAR { SRE >b A•RP a*e.nl ? R!•UA ? 1 Mw 1 p.y / ` Im'kVlp l? SITE 15 Mau xR s j i ; . ? ` 1 Sao r ' ?? I O ? 11' ??UKY . ' { II' 1 1' ' I 11 ® KlYO M 1 I nlemr oxuw 4W. aws?,x? Po:sr? Pe7nlpm Feu 1 ' 0 01: MIZ o .3GT MIS Ulm 11 ime ; •79 xam • J•w / r 7A n, 11 03 ro: .ry} hlfmpBLl. WgfVYS ' RtlK I mN K91 ''I Kt m[M I I I O I ? N ; I liY I !i[9. Llh'B11M I I 1 7PSIy;y YIUIW! pe3 EG I? I I i ? ? _ I 1II M10Fm?1 ` II1. V11 M141 f W N \,1 mIKII ImW 0=1 MfM anl C _ M PWIm ?m QIN@1 .rW u• pa IWO c 1, I UT 1 i0 U B CR 8?! ?1 1 ,,/ m Srap1E Elw; ?' i ?a ;, ? I wa 1 1 rr S? ' ew?o ? t k r ` J'! oft Mau ? al?r9n N.S sonm 0.W SIZE 16 y u m< r ? I 0R'm Nll! `? i t , \ ' a?TMmN ?9?faS R. 1 RII[ vM CuOM no, go lw W I WM I 1 l . ti,' , r ?IIr70 WC orIrs ti ' „ , - fSlOl vrKE orta \. 00.9 ?xw WKno ' t , \ +mu wa a o , I f -?-- ? I ?? ??, shm2d 1 M. MY. Ft 9r EdG?99 N91SH?([ PofM NJllB B"•tSrl4! 0•QOIT,PWfI &•x6197 u•bw o•rR ?.? PemE 9x U•?07 I•A?1 9.H71 0 Shld d7? I A • A)01 A • E? A • PPELQIQ7 T?L4?3 51 ?1017n MIM AI•SEE F(M$ MCIW F n1.11 147Z r uw ulxa fihD PRO PIN I t me mil ?? 446 polszi +10 //ISVm m ? ?.r? 'I JR''. S `'v\n \ ? uPfi 8 ICI" ??° •1, J " ? o??v ? ? +w a° ncu?'00m1 auT°mm I L E n. P '4r ? IMy ` welual i /'?' 0 ?} VO I 1 ?. 1 SITE 13. II 0 j j'-- ? ? m _ 0 ? pip E? I IJ_n C PP "o 9?1 • { a?f F1 - ?'?? -37 ?Y?? Yom. i - ? ' ---•8-?c - _? __ wi t m r as r 'i y Jm• " SdRSifE In+wu r? I 5--t - -----'--''- --- j?? ?u9v9m?:r.91 EI 4 ??, ? 1\ 9 ?I• `y ISO WA SE (j - ? lfi fA 9 \ I n] \`\ ? n I I J1JvJ umv ® MMES ^15 M r. W c W P m vn uut / xU¢Ila ID or 0 1 / WO AtlG x? \ b?nn'Q `TVl i ?` ?4 -? LW'11 41° '2re I I II I il' rtlwu ?y?6?;, a v w ? ?dS"? JIf ?-d t ?a wo 9anl'6 i vm mown ours 1 W4 niG 44 m via SITE 5 9 I 11 IIII ,l E r A I / .C.d -.. dN '7 I I .II 1 14 \ uamt?e ? y'?y. 1 CR QI}? o? 'al sa 5 F RG SE 4 a y?gnn?p? I I µ I i ° I I'I r? H 1? r ~ m I? n z x a D m zy J a o + ? ,? , N // `Lb ? >?n?,oZ ¢ eti , ! p I- ? zyn? ? ,, oa m - „ o W X??rzx O V v O O V INSTALL IMPERVIOUS DIKE TO DIVERT HE STREAM DURING INSTALLATION OF THE 8" RVITY LINE p x b . ? ..? ?; , ,gyp \ BEGIN S G ?v 6 +0.0 C. i p O^/ p 11 OP: 33 3 y 340 14 1 4 ?x -N +I e 3 END SBG . +78.71 A -YRPC- +35.00 x 2GI ?9ry 1ND P0,48, PROPOSED 6 Z@919' BC 344.91 x0? 31 Zc F -YRP- +7 s. 135.16' RT IS ? 48, ,34 . x E? PROP. 8" GRAVITY SEWER LINE ^a S li \?x0 UTIUTY IMPACT SITE 2 LATERAL BASE DITCH CREEK AREA 343 SEE DETAIL 32 c UTILITY IMPACT SITE 1 PermR Drorg WEMND AREA Sheep. d-a SITE 1; FILL IN THE WETLAND AREA=150 S.FT=.006 AC ® DENOTES IMPACTS IN SURFACE WATER SITE 2; IMPACTS IN SURFACE AREA=88 S. FT=.002 AC F F DENOTES FILL IN WETLAND INSTALL IMPERVIOUS DIKE TO DIVERT THE STREAM DURING INSTALLATION OF THE 8" GARVITY SEWER LINE ,r uvvnu?q -- -_ .5Y - -- - / ii . REEAR f? GAP SET! g PROP, 291' OF 8" a PR ?s®. my. GRAVITY SEWER LINE / F 332/ ,i -TI- 3005 PINC 12+1549 / EUV=33835' / 30 ?• REEAR a CAP SET -Y POC Sta. 21+ 71.53 = N -YRPA- POT Sta. 16+73.69 -YRPB- POT Sta. 21+21.77 PROP. 113' OF 12" N- GRAVITY SEWER LINE p / ? I ,,? Fx+ PROP, 201' OF I x0 ,329 / GRAVITY SEWER I l /l-11- 3006 PING 14+10.40 I r TOP=746.12' Eav=33939 NV=779.62' MW 6 CAP SET I / she" of o SITE 3; UTILTIY IMPACTS= ,003 AC INSTALL IMPERVIOUS DIKE TO DIVERT THE STREAM DURING INSTALLATION OF THE 8" GRAVITY SEWER AND 12" WATER LINE L 4 viol 111115 I I / /i I UNIiE? ? CHURCHT4L pl 9 121 PG 621 ?\ lu 50/(& OR w NI o:I I PROP, 12" WATER LINE 11 i TOE `PROTECTION s SITE DETAIL 3 C4 r ! q 2GII??, CL '1'' RRRA3TN ? . FF=14ry (74 / F 116.OO LT FENCE I \--PROP. 8" SEWER LINE PermkDWng ? Sheet y of SITE 4: IMPACTS IN SURFACE AREA=299 S.FT=,007 AC INSTALL IMPERVIOUS DIKE TO DIVERT THE STREAM DURING INSTALLATION OF THE 8' GRA4ITY SEWER AND 12' WATER LINE ° a BL-334 PWC 47+01,53 = ' 1 ? P 3a??? 5' ? a RT -LRBV-- 628+72.83 ,12 a ? ?? ? ?t/p A, Ap ? , I I / ? 9° 6a N•56a,3 I RRACOi L3Z Qt ?? -rte > ? ? .. Iffy ? m Iln INV: 1B a 73 BEGIN SBG v +63.00 SEE DETAIL \ ATERAL v I - ? SEE DETAIL 25 c e1 ? z ?' °1 7 3s r1 X 3, 0 - F . 22 64' 1? EMBANKMENT E+s P0. PROTECTION / p0 . ?, c oo p p CL 'I' TAGS" ? TOE z{? F NV=363.2 00i ws i i Sty"2 `PROTECTION rl 00 00 SEE DETAIL 73/x• ^ n5 ?E. / Cly 9T?N HEADI ? / WALL RPD- / 94 . iXISiI!? pi W 9 2' i % . top=374 ? ihv , =356 ? F p -CL'I?'RR=3TN 1 PROP. 12 TER LINE yypppp , Z +45.93 I ! if •, 1 ? FF=14sy op=369 \ ? Mill a PROP° 8" SEWE R IINE + ,00 inv , =361 HOMFSTEAO INC. DENO TES IMPACTS IN SITE 5. IMPACTS IN SURFACE AREA=254 S° FT=,006 AC S/ SURF4E WATER Popp D*j